12-Draft_PWS_App_L_(QF-4_to_QF-16_Trans_HMN)_AT.docx

DOCX document 38 KB Posted

Attached to
Aerial Targets Operations and Maintenance Services
Solicitation number
FA4890-14-R-0012
Issued by

About this file

12-Draft PWS App L (QF-4 to QF-16 Trans HMN) AT.docx

View the file

Other files

File Type Posted
FBO_RFP_Notice_for_Combined_Synopsis-Solicitation_FA4890-14-R-0012.pdf PDF
Govt_Responses_to_Industry_RFP_Ques_(FBO_3Nov14).pdf PDF
2-PPC-Site_Visit_Info_(FBO_24Oct14).pdf PDF
Govt_Responses_to_Industry_RFP_Ques_(FBO_24Oct14).pdf PDF
Govt_Responses_to_Industry_RFP_Ques_2Oct14.pdf PDF
1-Prelim_Site_Visit-Conf_Info_10Sep14.pdf PDF
Corrected-CDRL_A012_Incident_Report.pdf PDF
Govt_Req_for_Comments_4Aug14.pdf PDF
Draft_AT_14R0012_PWS_App_L_(QF-4_to_QF-16_Trans_HAFB)_1Jul14.docx DOCX document
Draft_AT_14R0012_PWS_App_C_(Pubs_Forms)_1Apr14.docx DOCX document
Draft_AT_14R0012_PWS_App_G_(QMS)_1Jul14.docx DOCX document
Draft_AT_14R0012_PWS_App_F_(Incentive-Awd_Fee_Plan)_31Jul14.docx DOCX document
Draft_AT_14R0012_PWS_App_I_(Illustrations)_1Apr14.docx DOCX document
Draft_AT_14R0012_PWS_App_K_(Workload_Data)_1Jul14.docx DOCX document
Draft_RFP_14R0012_1Aug14_1500.pdf PDF
Bidders_Library-FBO_31Jul14.pdf PDF
REV_Draft_PWS_App_G_(Quality_Mgmt_Sys)_AT_14R0012_1Jul14.pdf PDF
REVISED_Resp_to_Ques_to_Govt-Industry_Day_ _One-on-Ones_2Jul14.pdf PDF
Resp_to_Ques_to_Govt-Industry_Day_ _One-on-Ones_13Jun14_1530.pdf PDF
Req_for_OCI_Mitigation_Plan_11Jun14_(due_29Jul14).pdf PDF
Clarification_of_Vehicles_22May14-Industry_Day.pdf PDF
7-Rev_CM_Draft_AT_14R0012_CLIN_Structure_22May14.pdf PDF
AT_Industry_Day_Briefing_(posted_to_FBO_22May14).pdf PDF
Industry_Day_Attendees_Posted_to_FBO_21May14.pdf PDF
CBA_09C0004_Holloman_ _DS2_7May12-1May15.pdf PDF
CBA_09C0004_Tyndall_ _DS2_5Aug13-31Jul16.pdf PDF
Explanation_of_Posting_CBAs_to_FBO.pdf PDF
7-Draft_PWS_App_F_Incentive-Award_Fee_Plan.pdf PDF
Draft_14R0012_Sections_L M_Posted_to_FBO_16May14_(FINAL).pdf PDF
Draft_AT_14R0012_CLIN_Structure_15May14.pdf PDF
AT_II_Industry_Day_Invitation_21May14.pdf PDF
10-Draft_PWS_App_I_(Illustrations)_AT_14R0012_1Apr14.docx DOCX document
11-Draft_PWS_App_J_(Proposal_Inc)_AT_14R0012_1Feb14.docx DOCX document
8-Draft_PWS_App_G_(Quality_Mgmt_Sys)_AT_14R0012_1Apr14.docx DOCX document
7-Draft_App_D_FSAT_Bldg_9310.pdf PDF
8-Draft_App_D_Subscale_Bldg_256.pdf PDF
12-Draft_App_D_HMN_R14s_Spt_Equipment.pdf PDF
6-Draft_PWS_App_E_(GFF)_AT_14R0012_1Apr14.docx DOCX document
10-Draft_App_D_Subscale_Launch_Pad.pdf PDF
4-Draft_App_D_Subscale_R14.pdf PDF
3-Draft_App_D_RIS_R14s.pdf PDF
Draft_PWS_App_D_(GFE)_AT_14R0012_1Apr14.pdf PDF
11-Draft_App_D_Holloman_R14_105DM.pdf PDF
9-Draft_App_D_Hangar_5_TAS_2.pdf PDF
1-Draft_App_D_GFE_Annual_Inventory.xls XLS spreadsheet
6-Draft_App_D_Hangar_5_TAS.pdf PDF
Draft_PWS_App_H_(GFV)_AT_14R0012_1Apr14.docx DOCX document
5-Draft_App_D_Full_Scale_R14s.pdf PDF
2-Draft_App_D_ADPE.pdf PDF
13-Draft_App_D_DS2_TAS_Listing_Holloman.pdf PDF
Show 40 more

Latest 50 of 110 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT AERIAL TARGETS PWS

Solicitation No. FA4890-14-R-0012

APPENDIX L – QF-4 to QF-16 TRANSITION

1.0 FULLSCALE AERIAL TARGETS (FSAT) QF-4 TO QF-16 TRANSITION AT HOLLOMAN AFB (HAFB) NM AND TYNDALL AFB (TAFB) FL. Starting the first quarter FY16 (TAFB) and first quarter FY17 (HAFB), the FSAT operations will be exclusively QF-16 Aircraft. The transition will be a phased and iterative process at both locations as described below. The following paragraphs describe the levels of support required by the contractor to support PWS requirements and the required support during the transition period. It’s time-lined in terms of performance periods and fiscal years.

1.1 FY16. The contractor shall:

1.1.1 HAFB

1.1.1.1 Receive and induct remaining QF-4Es from the Tyndall AFB (TAFB) fleet starting approximately the first quarter.

1.1.1.2 Maintain and support ground operation exclusively for the QF-4 IAW PWS Section A, Paragraph 3.0 and 4.0 for the first and second quarter (approx.) of FY16.

1.1.1.3 Heritage Flight. The Contractor shall be prepared to support AF Heritage Flight operations of the QF-4 FSAT. This effort is expected to be, but not limited to, one (1) on-station events and five (5) off-station events per year at HAFB. Prior to each air show season (which commences at the conclusion of the Heritage Conference in mid-March), identify support personnel at HAFB who will support the Heritage show schedule. For continuity, the individuals identified shall be the only personnel authorized to support Heritage events for a given air show season. For each Heritage event or other special events as specified by the Government, support personnel shall wear Heritage team uniforms.

1.1.1.4 Accept delivery of QF-16 aircraft at a rate of 1 per month starting approximately third quarter.

1.1.1.5 Perform acceptance inspections and SAFE flights IAW PWS Section A, Paragraph 3.0.

1.1.1.6 Manage the QF-16 and QF-4 fleet inventory and scheduled/unscheduled maintenance IAW PWS Section A, Paragraph 3.0.

1.1.1.7 Sustain a sufficient combination QF-4 and QF-16 manned flyers to support the flying operations and pilot qualifications IAW Section A, Paragraph 4.4.

1.1.2 TAFB

1.1.2.1 Maintain and support ground operation exclusively for the QF-16 IAW PWS Section A, Paragraph 3.0 and 4.0 for the entire FY.

1.1.3 QF-4 DEACTIVATION, DEMILITARIZATION, AND DISPOSAL (3D) PLAN. Support field disposal DEMIL of remaining QF-4 aircraft (expected 20 aircraft) IAW the 3D Plan. The support shall include but not limited to:

· Preparation of aircraft for Demil.

· Safe aircraft for maintenance.

· Remove and purge fuel and fluids. Disposal of these liquids shall be IAW Federal, State and Local regulations.

· Remove egress items, CAD/PAD and other explosive devices,

· Remove save list items. Disposition removed items and material appropriately.

· Perform any unique tasks as requested by the SPO and approved by the PM (if applicable and within scope).

· Disposition engines per engine management office instruction.

· Sign off applicable blocks in the Demil checklist.

· Notify and coordinate with applicable on-base organizations for hazardous material turn-in accomplished in Phase 2 and obtain any necessary containers to facilitate turn-in.

· Ensure availability of tools to support Phase 2 activities. Notify the SPO upon completion of Phase 1.

· Provide technical data and equipment to DEMIL team

· Provide technical subject matter expertise to DEMIL team

· Tow equipment and aircraft as required for DEMIL activity

1.2 FY17 – FY21. The contractor shall maintain and ground operate QF-16s exclusively at both TAFB and HAFB IAW PWS Section A, Paragraph 3.0 and 4.0. The contractor shall support DEMIL IAW Paragraph 1.1.3 at both locations until the fleet is properly disposed and removed from the inventory.

L-1 1 Apr 14