CDRL_A003_DID_DI-MGMT-80004A_Management_Plan.pdf

PDF 219 KB Posted

Attached to
Aerial Targets Federal contract opportunity
Solicitation number
FA4890-14-R-0012
Issued by
Department of the Air Force Air Combat Command

About this file

Aerial Targets PWS App B CDRL A003 DID DI-MGMT-80004A

View the file

Other files for this federal contract opportunity

Other files attached to Aerial Targets, newest first.
File Type Posted
Amendment_0001.pdf PDF
Final_RFP_Ques__Govt_Resp_(FBO_30Dec14).pdf PDF
Final_RFP_Ques_ _Govt_Resp_(FBO_17Dec14).docx DOCX document
Final_RFP_Ques_ _Govt_Resp_(FBO_1Dec14).docx DOCX document
Aerial_Targets_PWS_REV_App_A_(Definitions)_26Nov14_(Final).doc DOC document
AT_PPC_Brief_20Nov14_(as_briefed _FBO_24Nov14).pdf PDF
CBA_Aerial_Tgts_Tyndall_ _DS2_5Aug13-31Jul16.pdf PDF
Govt_Responses_to_Industry_RFP_Ques__2_(FBO_17Nov14).pdf PDF
Govt_Responses_to_Industry_RFP_Ques_(FBO_17Nov14).pdf PDF
Aerial_Targets_PWS_App_G_(Quality_Managment_System)_02_Sept_14_(Final)_Updated_14Nov14.pdf PDF
CDRL_A010_DD1423_GFE_Inventory.pdf PDF
CDRL_A002_DD1423_Cost_Performance_Report.pdf PDF
CDRL_A007_DD1423_Property_Control_Plan.pdf PDF
CDRL_A008_DID_DI-IPSC-81427A_Software_Development_Plan_(SDP).pdf PDF
CDRL_A014_DID_DI-IPSC-81488_Computer_Software_Product.pdf PDF
CDRL_A005_DID_DI-ENVR-81378_Environ_Operation_ _Maint_(O M)_Plan.pdf PDF
CDRL_A007_DID_DI-MISC-81420_Property_Control_Report.pdf PDF
CDRL_A014_DD1423_RIS_SW_Code_Doc.pdf PDF
CDRL_A006_DD1423_Safety_ _Health_Program.pdf PDF
CDRL_A005_DD1423_Environmental_Protection_Program.pdf PDF
CDRL_A011_TAB_Spill_Report_Form.doc DOC document
CDRL_A013_DID_DI-DRPR-80151A_Comm-Computer_Systems_Install_Records_(CSIRs).pdf PDF
CDRL_A011_DID_DI-SAFT-80494A_Pollution_Incident_Report.pdf PDF
CDRL_A010_DID_DI-ILSS-81251_Equip_Inventory_Records_(EIRs).pdf PDF
CDRL_A017_DID_DI-IPSC-81442A_Software_Version_Descrip_(SVD).pdf PDF
CDRL_A002_DID_DI-MGMT-80227_Contractor's_Progress-Status-Mgmt_Report.pdf PDF
CDRL_A009_DID_DI-MISC-80393A_Master_Document_List_(MDL).pdf PDF
CDRL_A001_DID_DI-ADMN-80447A_Contract_Summary_Report.pdf PDF
CDRL_A019_DD1423_SW_Test_Report.pdf PDF
CDRL_A016_DD1423_Technical_Reports.pdf PDF
CDRL_A019_DID_DI-IPSC-81440A_Software_Test_Report_(STR).pdf PDF
CDRL_A017_DD1423_Version_Desc_Report.pdf PDF
CDRL_A015_DID_DI-MGMT-81607_Acq_Support_Documentation.pdf PDF
CDRL_A016_DID_DI-MISC-80508B_Technical_Report-Study_Services.pdf PDF
CDRL_A001-02_TAB_SSAT_O M.docx DOCX document
CDRL_A006_DID_DI-ENVR-81375_Environ_Health_and_Safety_Plan_(HSP).pdf PDF
CDRL_A018_DID_DI-IPSC-81439A_Software_Test_Descrip_(STD).pdf PDF
CDRL_A011_DD1423_Spill_Report.pdf PDF
CDRL_A001-03_TAB_RIS_O M.doc DOC document
CDRL_A020_DID_DI-MCCR-80902_Software_Develop_Summary_Report.pdf PDF
CDRL_A018_DD1423_SW_Test_Desc.pdf PDF
Aerial_Targets_PWS_App_L_(QF-4_to_QF-16_Transition_HAFB)_02_Sept_14_(Final).pdf PDF
Aerial_Targets_PWS_App_J_(Proposal_Inc)_02_Sept_14_(Final).pdf PDF
Aerial_Targets_PWS_App_G_(Quality_Mgmt_System)_02_Sept_14_(Final).pdf PDF
Aerial_Targets_PWS_App_F_(Incentive-Awd_Fee_Plan)_2_Sept_14_(Final).pdf PDF
Aerial_Targets_PWS_App_E_(GFF)_02_Sept_14_(Final).pdf PDF
Aerial_Targets_PWS_App_D_(GFE)_02_Sept_14_(Final).docx DOCX document
Aerial_Targets_PWS_App_C_(Pubs_ _Forms)_02_Sept_14_(Final).docx DOCX document
Aerial_Targets_PWS_App_A_(Definitions)_02_Sept_14_(Final).pdf PDF
Aerial_Targets_RFP_FA4890-14-R-0012_12Nov14_(FINAL).pdf PDF
Show all 50

Aerial Targets has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Management Plan

Number: DI-MGMT-80004A Approval Date: 30 OCT 2006 AMSC Number: 7621 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship: The management plan describes the contractor’s organization, assignment of functions, duties, and responsibilities, management procedures and policies, and reporting requirements for the conduct of contractually-imposed tasks, projects, or programs.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID may be applied in any contract or program phase where the contract management is under the direction and control of the contractor.

Requirements:

1. Reference documents. None.

2. Format. The plan shall be in a format that the contractor devises and conforms to the following:

a. Identification. The plan shall be identified with the preparing office or contractors title, the identifying numbers or designation of the Contract/Procurement Request, the identify and/or nomenclature of the system/component/program/project, the security classification and the Government activity issuing the controlling contract.

b. Descriptive material. As may be needed to clarify or explain matters in the text, the plan may include descriptive material, sketches, drawings, photographs, tables, forms, graphs, worksheets, charts, etc.

c. Page size. The plan may be typewritten or printed on standard size paper, e.g., 8 ½ x 11 inches or metric A4. The pages shall be sequentially numbered and security bound together. As necessary, graphic material may be one-way fold-outs. All attachments shall be identified and referenced in the text. Each section and paragraph shall be numbered.

d. Table of contents and index. Plans of more than 30 pages in length shall contain a

Source: http://www.assistdocs.com -- Downloaded: 2008-03-18T16:48Z Check the source to verify that this is the current version before use.

h. delivery procedures

DI-MGMT-80004A

table of contents. Plans more than 120 pages in length shall also include an Index.

e. Legibility. The document shall be legible and reproducible.

3.1 General. The Management Plan shall consist of the organizational structure, the assignment of functions, duties, and responsibilities, the procedures and policies and the reporting requirements that are established for the initiation, monitoring, control, completion, test and verification, and reporting of contractual tasks, projects, and programs.

3.2 Specific contents. The Management Plan shall cover the organizational structure, program management methodology, personnel, security, and the reports as described herein. Other subjects to be included are as follows:

a. design control

b. reliability

c. configuration control

d. standardization

e. quality assurance

f. provisioning

g. control of Government property

i. tests

j. certifications

k. packaging

l. shipping

m. other

3.3 Organizational structure. The plan shall present an organizational chart and supporting narrative portraying the contractor’s business (corporate) structure. It shall describe the functional relationships and responsibilities among the organizational elements that will participate in the accomplishment of the contractual commitments.

DI-MGMT-80004A

3.4 Program management. The plan shall present an organizational chart and supporting narrative describing the management office the contractor establishes to manage the contractual commitments. The plan shall define the direct lines of control, responsibilities, functional relationships, and authority between the management office and the contractor’s other organizational elements. The plan shall also describe all interfaces between the contractor and the Government and between the contractor and other contractors which are necessary and pertinent to the accomplishment of contractual tasks, projects and programs.

3.5 Methodology.

a. The plan include a narrative description of the technical approach or methods the contractor will employ to accomplish contractual tasks, projects, and programs, including, as applicable, development, tests, manufacture, construction, formulation, installation, logistics support, training, maintenance documentation, and configuration controls.

b. The plan shall include a milestone chart graphically depicting the schedule of events associated with accomplishing each contractual commitment.

3.6 Personnel.

a. The plan shall list the personnel staffing of the contractor’s management office that directs the contractual tasks, projects, and programs and assist in completing the contract. The listing shall include the education, training, skills, experience, and security clearance that personnel require to fill each such position and shall state the identity, background, and work experience of the personnel assigned to fill these positions.

b. The plan shall also describe the staffing required for proper accomplishment of each contractual task by skill type, skill level, number of personnel, and security clearance. When submitted as part of a proposal, the plan shall state how many such personnel are currently available and how many new hires are required to staff fully to accomplish each task as scheduled.

3.7 Security.

a. Provide a Standard Practice Procedure (SPP) which fully describes the security program, safeguards emergency procedures to be established to the protection of Government-furnished and contractor-developed classified materials prepared In conjunction with the project. The SPP shall be prepared in accordance with guidelines contained in the Industrial Security Manual, Purchase Description, and such additional requirements as may be stipulated by the cognizant security compliance organization. The SPP shall require approval by the Government.

DI-MGMT-80004A

b. Develop a comprehensive security accreditation plan to demonstrate how the computer security requirements stipulated in the PD, as applicable, have been accounted for in the system design, and how satisfaction of each requirement will be explicitly demonstrated in the test program. This plan shall also identify any specific support equipment or software to be provided for demonstration of design compliance and/or system compliance with the planned security requirements. The plan shall require approval by the Government prior to implementation.

c. Reports. The plan shall describe the management methods the contractor will employ to ensure meeting all preparations, format, and submittal requirements established by the CDRL (DD Form 1423) for data to be delivered to the Government.

4. END OF DI-MGMT-80004A

DATA ITEM DESCRIPTION
Requirements:

File details come from the government source that posted it. Updated .