AF Form 3000.xls

Air Force Form XLS spreadsheet 37 KB Posted

Attached to
Longhaul Upgrade Services
Solicitation number
FA4486-12-R-0010
Issued by

About this file

provided is attachment 3 AF Form 3000 for solicitation FA4486-12-R-0012.

View the file

Other versions and copies of AF Form 3000

File Revision Posted Attached to
Attachment D AF Form 3000.pdf Revision not stated Robins AFB Paving Multi-Award IDIQ
SOW App 001 AF IMT 3000 Submittal.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
G_23 05 93-1 TAB Shops - AF FORM 3000 Submittal_JV.pdf Revision not stated ASOG Complex EMCS Camp Murray, WA
AF IMT 3000 - Material Approval Submittal.pdf Revision not stated Repair Airfield Pavement Spalling
12 AF Form 3000.pdf Revision not stated Construct T-1A Static Display
AF IMT 3000 Material Approval Submittal.pdf Revision not stated Repair Storm Drain Bldg 1788
Appendix C - AF Form 3000.pdf Revision not stated Static Display Aerospace Vehicles Restoration
Attachment 15 - AF Form 3000.pdf Revision not stated Construct Honor Guard Facility, Tyndall AFB, FL
Appendix H - AF Form 3000.pdf Revision not stated Construct AFTP Fence, Louisiana Avenue Bridge
Attachment 2_AF IMT 3000_2003091_VI_ Submittal.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 2.10 - AF Form 3000 Material Submittals Template.pdf Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 6 - AF Form 3000.pdf Revision not stated Camp Sparta Access Road
Q- AF IMT 3000_Material Approval Submittal.pdf Revision not stated Repair South Deer Fence
J. AF IMT 3000 Material Approval Submittal.pdf Revision not stated Repair_Replace Liner, Wastewater Lagoon One
Attachment 1j Mini-MACC SOW AF IMT 3000 Submittal.pdf Revision not stated JBER Mini-MACC
Attachment 9 AF Form 3000.pdf Revision not stated B729 Parking Lot Improvements, Tyndall AFB, FL
AF Form 3000.pdf Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
15. AF Form 3000 Material Approval Submittal (2 pages) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Attachment 10. AF Form 3000.pdf Revision not stated Repair Beacon Beach Road, Tyndall AFB, FL
Attachment 7 AF Form 3000.pdf Revision not stated Ammo Phase III
Show all 20

Who attaches AF Form 3000

Other files

File Type Posted
Amendment 01.pdf PDF
31Z3-822-2 .pdf PDF
MIL-STD-188-124B.pdf PDF
31R4-2GRN31-2.pdf PDF
31R4-2GRN29-6WC-1.pdf PDF
31R2-2GRT-102-WA-1.pdf PDF
31R2-2GRT-104.pdf PDF
31R4-2FRN45-2-33FI-1.pdf PDF
31R4-2GRN31-3.pdf PDF
31R4-2GRN30-2-1.pdf PDF
31R4-2GRN30-6WC-1.pdf PDF
31R4-2GRN30-3.pdf PDF
31R2-2GRR-116WC-1.pdf PDF
31R4-2FRN45-6WC-1.pdf PDF
31R4-2GRN29-4.pdf PDF
31R2-2GRR-112BA_CHG18.pdf PDF
31R4-2FRN45-2-33SD-1.pdf PDF
31R4-2GRN29-2 CHG 1.pdf PDF
31R4-2FRN45-2-33GE-1.pdf PDF
31R2-2GRR-114B_CHG7.pdf PDF
31R4-2GRN30-4 CHG 3.pdf PDF
31R4-2FRN45-2-33JG-1.pdf PDF
31R4-2GRN29-3 CHG 1.pdf PDF
31R4-2FRN45-4-33PL-1 CHG 4.pdf PDF
TO 31R4-2GRN31-4.pdf PDF
31R4-2GRN31-6WC-1.pdf PDF
31R4-2FRN-41 CHANGE 6.pdf PDF
31R4-2FRN45-2-33GS-1.pdf PDF
31R2-2GRT-106WC-1.pdf PDF
FA4486 12 R 012 GATR NAVAID RFP.pdf PDF
Lajes Field SON GATR Longhaul Upgrade 17 may 12.pdf PDF
Lajes Field MHDS for Longhaul Project.pdf PDF
PP Questionnaire.pdf PDF
Blanket Waiver ATCALS Shelter Fiber Equipment Installation.pdf PDF
Subcontractor Consent Form.pdf PDF
Synopsis - Longhaul upgrade.doc DOC document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

MATERIAL APPROVAL SUBMITTAL (attachment 3)FORM APPROVED
(See Instructions on Reverse)OMB NO. 9000-0062
Expires Apr.30 1993
Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters. Services. Directorate for information Operations and Reports. 1215 Jefferson Davis Highway, Suite 1204, Arlinton VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form either of these addresses. Send your completed form to: SAF/AQCO, Pentagon, Washington DC 20330-1000.
TO: ( Contracting Officer)FROM: (Contactor)DATE
CONTRACT NUMBERSUBMISSION NUMBERSUBMITTAL
NEWRESUBMITTAL
PREVIOUS SUBMITTAL NUMBERPROJECT NUMBER
TO BE COMPLETED BY CONTRACTORFOR GOVERNMENT USE ONLY
ITEMSPECIFICATION SECTION /DESCRIPTION OF MATERIALAPPROVEDDISAP-PROVEDSEE REVERSEINITIAL
NO.PARA NO./DRAWING NO.(Include Type, Model Number, Catalog, Mfg.,etc.)
BY COMPANLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT
THE MATERIAL COMPLIES WITH ALL SPEICIFICATIONS OF SUBJECT CONTRACT.
DATETYPE OR PRINT NAME AND TITLESIGNATURE
FOR GOVERNMENT USE ONLY
TO: (Base Civil Engineering Officer)
For Evaluation and Action
DATETYPE OR PRINT NAME AND GRADESIGNATURE
TO: (AF Contracting Office)
RECOMMENDAPPROVALDISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE
DATETYPE OR PRINT NAME AND GRADESIGNATURE
TO: (CONTRACTOR)
DISAPPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE.
REQUEST RESUBMITTAL ON DISAPPROVED ITENS WITHIN _______________ DAYS OF DATE SHOWN BELOW.
DATETYPE OR PRINT NAME AND GRADESIGNATURE
AF FORM 3000, 19910901 (EF-V2)PREVIOUS EDITION IS OBSOLETE

&RAtch 7

APPROVED

COMMENTS
(Number to correspond with applicable Item Number on reverse)
INSTRUCTIONS TO CONTRACTORS
1. The term "material " is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2. Tlhis form is to be used by contractors for submitting Shop Drawing, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to prepared in 4 copies,signed, and provide to the contracting officer with appropriate attachments.
3. Item(s) to be approved will be clearly tabbed or identified. Data pertainin to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.
4. Request submittal shal be numbered consecutively, by contract. In the space entitled "Submission No". This number, in addition to the contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A Single submission should be used for all work of a section of the specifications, but in NO instace should the submission include work for more than one (1) contract. Submittals requiring priority handliing will be submitted by seprate submittal using the form and so marked across the face of the form.
5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.
AF FORM 3000, 199109011 (EF-V2) (REVERSE)

Sheet3

File details come from the government source that posted it. Updated .