TE-3_DD_Form_1354_Checklist.xls
XLS spreadsheet 64 KB Posted
- Attached to
- Major Exterior Paint Project Federal contract opportunity
- Solicitation number
- FA303018Q0017
About this file
DD Form 1354 Checklist
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA303018Q0017_Questions_and_Answers_2.pdf | ||
| FA303018Q0017-0002.pdf | ||
| FA303018Q0017_Amendment_1.pdf | ||
| FA3030-18-Q-0017_RFI-JULY_MAJOR_EXTERIOR_PAINT.pdf | ||
| Major_Exterior_Painting_SOW_Jul2018.pdf | ||
| BAL_Request.docx | DOCX document | |
| AF_FORM_66.xls | XLS spreadsheet | |
| TE-2_Contractor_Usage_Guide_2017.pdf | ||
| Exterior_Paint_Project_Photos.pdf | ||
| FA303018Q0017_Solicitation_Major_Exterior_Paint.pdf | ||
| Major_Exterior_Paint_Project_SOW_Feb2018.pdf | ||
| DBA_Wage_Determination.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1354 Checklist
| DD Form 1354 Checklist | |||||
| Description/Title: | Project #: | ||||
| BOD Date: | |||||
| Total Project Cost | $ - 0 | ||||
| 1. General Building Data. | |||||
| Category Codes | Nomenclature | Total Cost | Total SF | ||
| $ - 0 | |||||
| $ - 0 | |||||
| $ - 0 | |||||
| Exterior Dimensions: | Square Footage | ||||
| Main Bldg: | |||||
| Wings: | |||||
| Offsets: | |||||
| No. of Stories: | |||||
| Dimensions of Covered Walkways/Corridors: | |||||
| Type of Construction: | |||||
| Foundation: | |||||
| Floors: | |||||
| Exterior Walls: | |||||
| Roof: | |||||
| Utilities: | |||||
| Water (Type and size of pipe): | Pre Cast Grease Trap 1,000gal | ||||
| Gas (Type and size of pipe): | |||||
| Electric (Phase, voltage, wire): | |||||
| Other Utility (Type, capacity, etc.): | |||||
| 2. Installed Systems & Plants. | |||||
| Fire Protection. | |||||
| Category | Nomenclature | Unit | Quantity | Cost | |
| 880-211 | Closed Head Auto Sprinklers | SFIHD | $ - 0 | ||
| 880-212 | Open Head Deluge System | SFIHD | $ - 0 | ||
| 880-216 | Pre-action Sprinkler System | SF/HD | $ - 0 | ||
| 880-217 | AFFF PA Sprinkler System | SF/HD | $ - 0 | ||
| 880-218 | Hi-expansion Foam, System | EA | $ - 0 | ||
| 880-221 | Auto Fire Protection System | SF/EA | $ - 0 | ||
| 880-222 | Manual Fire Alarm System | EA | $ - 0 | ||
| 880-231 | CO2 Fire System | EA | $ - 0 | ||
| 880-232 | Foam Fire System | EA | $ - 0 | ||
| 880-233 | Other Fire System | EA | $ - 0 | ||
| 880-234 | Halon 1301 Fire System | EA | $ - 0 | ||
| 880-235 | Dry Chemical System | EA | $ - 0 | ||
| 880-236 | Foam System | EA | $ - 0 | ||
| Total Fire Protection Cost | $ - 0 | ||||
| Security. | |||||
| Category | Nomenclature | Unit | Quantity | Cost | |
| 872-841 | Security Alarm System | EA | $ - 0 | ||
| Installed Plants. | |||||
| Category | Nomenclature | Unit | Quantity | Cost | |
| 890-124 | A/C From Central Plant | SF | $ - 0 | ||
| 890-126 | A/C Window Units | SF/TN | $ - 0 | ||
| 890-125 | A/C Plant < 5 Tons | SF/TN | $ - 0 | ||
| 890-121 | A/C Plant 5 to 25 Tons | TN | $ - 0 | ||
| 826-122 | A/C Plant 25 - 100 Tons | TN | $ - 0 | ||
| 826-123 | A/C Plant Over 100 Tons | TN | $ - 0 | ||
| 821-115 | Heating Plant | MB | $ - 0 | ||
| 811-147 | Emergency Power Generator | KW | $ - 0 | ||
| 124-XXX | Fuel Tank for Htg/Generator | GA | $ - 0 | ||
| Total Installed Plants Cost | $ - 0 | ||||
| 3. Related Facilities. | |||||
| Category | Nomenclature | Unit | Quantity | Cost | |
| 116-XXX | Pads (Type: | SY | $ - 0 | ||
| 411-XXX | Large Storage Tanks | BL | $ - 0 | ||
| Contents: | |||||
| 812-223 | |||||
| *(60060) | Pri Elec Distr - Overhead | LF | $ - 0 | ||
| *Transformers | KVA | $ - 0 | |||
| *Power Poles | LF/EA | $ - 0 | |||
| 812-224 | |||||
| *(60065) | See Elec Distr - Overhead | LF | $ - 0 | ||
| 812-225 | |||||
| *(60070) | Pri Elec Distr - Underground | LF | $ - 0 | ||
| *Transformers | KVA | $ - 0 | |||
| *Power Poles | LF/EA | $ - 0 | |||
| 812-226 | |||||
| *(60075) | See Elec Distr - Underground | LF | $ - 0 | ||
| 812-926 | |||||
| *(60170) | Exterior Area Lighting | ||||
| (Street/Parking Lights) | EA | $ - 0 | |||
| 824-464 | |||||
| *(60130) | Gas Mains | LF | $ - 0 | ||
| 831-169 | Sewage Septic Tank | KG | $ - 0 | ||
| 832-255 | |||||
| *(60040) | Industrial Waste Mains | LF | $ - 0 | ||
| 832-266 | |||||
| *(60050) | Sanitary Sewer Mains | LF | $ - 0 | ||
| 841-161 | Water Supply Mains | LF | $ - 0 | ||
| 842-245 | |||||
| *(60005) | Water Distr Mains | LF | $ - 0 | ||
| 843-315 | |||||
| *(60015) | Fire Hydrants | EA | $ - 0 | ||
| 851-143 | |||||
| *(50195) | Curbs & Gutters | LF | $ - 0 | ||
| 851-145 | |||||
| *(50230) | Driveway | SY | $ - 0 | ||
| 851-147 | |||||
| *(50205/50210) | Road | ||||
| (50205 is asphalt and 50210 is concrete) | SY/LF | $ - 0 | |||
| Category | Nomenclature | Unit | Quantity | Cost | |
| 852-262 | |||||
| *(50240) | Vehicle Parking | SY | $ - 0 | ||
| 852-289 | |||||
| *(50300) | Sidewalk | SY | $ - 0 | ||
| 871-183 | |||||
| *(50190) | Storm Drains | LF | $ - 0 | ||
| 872-247 | |||||
| *(50040) | Security Fence | LF | $ - 0 | ||
| 872-248 | |||||
| *(50030) | Interior Fence | LF | $ - 0 | ||
| 890-144 | Compressed Air Distr (x-line) | LF | $ - 0 | ||
| 890-158 | Load/Unload Platform (x-line) | SF | $ - 0 | ||
| 890-187 | Utility Vault (x-line) | SF | $ - 0 | ||
| 890-272 | EMCS Field Equipment (x-line) | EA | $ - 0 | ||
| 890-273 | EMCS Data Links (x-line) | LF | $ - 0 | ||
| 135-583 | Telephone Duct | LF | $ - 0 | ||
| 135-586 | Telephone Pole | LF/EA | $ - 0 | ||
| Total Related Facilities Cost | $ - 0 | ||||
| (Note: " * " denotes Facility Number) | |||||
| Demolition Cost Related to Project | 1 JB | $ - 0 | |||
| Construction Deficiencies (attach blank sheet for continuations) | |||||
| Project Remarks (attach blank sheet for continuations) | |||||
| 4. Additions to Existing Facilities. Use checklists 1 - 3 above. Include any plants, systems, real |
property installed equipment, or related facilities added, removed, or replaced.
5. Alterations or Renovations to Existing Facilities. Use checklists 1 - 3 above. Include plants, systems, real property installed equipment, or related facilities added, removed, or replaced. If demolition of existing facilities was a part of the project, include the specifics and costs related to the demolition.
6. Remarks. Where needed, add any explanatory remarks or descriptions, which more fully describe items.
| 7. When is a DD Form 1354 Required? |
| * Initial construction of a new facility |
| * Addition to an existing facility |
| * Demolition of an existing facility (and all its associated related real property) |
| * Removal of, or upgrade to, an installed system |
| * In general, if the project was funded in part or in whole with minor construction (EEIC 529) or |
MCP funds, a DD Form 1354 is required in order to transfer the completed construction to real property records.
Do not input data in this cell. It will pre-fill once cost data is entered below.
Do not input data in this cell. It totals Fire Protection RPIE cost automatically.
Do not input data in this cell. It totals Installed Plants RPIE cost automatically.
Do not input data in this cell. It totals Related Facilities cost automatically.
File details come from the government source that posted it.