TE-3_DD_Form_1354_Checklist.xls

XLS spreadsheet 64 KB Posted

Attached to
Major Exterior Paint Project Federal contract opportunity
Solicitation number
FA303018Q0017
Issued by
Department of the Air Force Air Education and Training Command

About this file

DD Form 1354 Checklist

View the file

Other files for this federal contract opportunity

Other files attached to Major Exterior Paint Project, newest first.
File Type Posted
FA303018Q0017_Questions_and_Answers_2.pdf PDF
FA303018Q0017-0002.pdf PDF
FA303018Q0017_Amendment_1.pdf PDF
FA3030-18-Q-0017_RFI-JULY_MAJOR_EXTERIOR_PAINT.pdf PDF
Major_Exterior_Painting_SOW_Jul2018.pdf PDF
BAL_Request.docx DOCX document
AF_FORM_66.xls XLS spreadsheet
TE-2_Contractor_Usage_Guide_2017.pdf PDF
Exterior_Paint_Project_Photos.pdf PDF
FA303018Q0017_Solicitation_Major_Exterior_Paint.pdf PDF
Major_Exterior_Paint_Project_SOW_Feb2018.pdf PDF
DBA_Wage_Determination.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1354 Checklist

DD Form 1354 Checklist
Description/Title:Project #:
BOD Date:
Total Project Cost$ - 0
1. General Building Data.
Category CodesNomenclatureTotal CostTotal SF
$ - 0
$ - 0
$ - 0
Exterior Dimensions:Square Footage
Main Bldg:
Wings:
Offsets:
No. of Stories:
Dimensions of Covered Walkways/Corridors:
Type of Construction:
Foundation:
Floors:
Exterior Walls:
Roof:
Utilities:
Water (Type and size of pipe):Pre Cast Grease Trap 1,000gal
Gas (Type and size of pipe):
Electric (Phase, voltage, wire):
Other Utility (Type, capacity, etc.):
2. Installed Systems & Plants.
Fire Protection.
CategoryNomenclatureUnitQuantityCost
880-211Closed Head Auto SprinklersSFIHD$ - 0
880-212Open Head Deluge SystemSFIHD$ - 0
880-216Pre-action Sprinkler SystemSF/HD$ - 0
880-217AFFF PA Sprinkler SystemSF/HD$ - 0
880-218Hi-expansion Foam, SystemEA$ - 0
880-221Auto Fire Protection SystemSF/EA$ - 0
880-222Manual Fire Alarm SystemEA$ - 0
880-231CO2 Fire SystemEA$ - 0
880-232Foam Fire SystemEA$ - 0
880-233Other Fire SystemEA$ - 0
880-234Halon 1301 Fire SystemEA$ - 0
880-235Dry Chemical SystemEA$ - 0
880-236Foam SystemEA$ - 0
Total Fire Protection Cost$ - 0
Security.
CategoryNomenclatureUnitQuantityCost
872-841Security Alarm SystemEA$ - 0
Installed Plants.
CategoryNomenclatureUnitQuantityCost
890-124A/C From Central PlantSF$ - 0
890-126A/C Window UnitsSF/TN$ - 0
890-125A/C Plant < 5 TonsSF/TN$ - 0
890-121A/C Plant 5 to 25 TonsTN$ - 0
826-122A/C Plant 25 - 100 TonsTN$ - 0
826-123A/C Plant Over 100 TonsTN$ - 0
821-115Heating PlantMB$ - 0
811-147Emergency Power GeneratorKW$ - 0
124-XXXFuel Tank for Htg/GeneratorGA$ - 0
Total Installed Plants Cost$ - 0
3. Related Facilities.
CategoryNomenclatureUnitQuantityCost
116-XXXPads (Type:SY$ - 0
411-XXXLarge Storage TanksBL$ - 0
Contents:
812-223
*(60060)Pri Elec Distr - OverheadLF$ - 0
*TransformersKVA$ - 0
*Power PolesLF/EA$ - 0
812-224
*(60065)See Elec Distr - OverheadLF$ - 0
812-225
*(60070)Pri Elec Distr - UndergroundLF$ - 0
*TransformersKVA$ - 0
*Power PolesLF/EA$ - 0
812-226
*(60075)See Elec Distr - UndergroundLF$ - 0
812-926
*(60170)Exterior Area Lighting
(Street/Parking Lights)EA$ - 0
824-464
*(60130)Gas MainsLF$ - 0
831-169Sewage Septic TankKG$ - 0
832-255
*(60040)Industrial Waste MainsLF$ - 0
832-266
*(60050)Sanitary Sewer MainsLF$ - 0
841-161Water Supply MainsLF$ - 0
842-245
*(60005)Water Distr MainsLF$ - 0
843-315
*(60015)Fire HydrantsEA$ - 0
851-143
*(50195)Curbs & GuttersLF$ - 0
851-145
*(50230)DrivewaySY$ - 0
851-147
*(50205/50210)Road
(50205 is asphalt and 50210 is concrete)SY/LF$ - 0
CategoryNomenclatureUnitQuantityCost
852-262
*(50240)Vehicle ParkingSY$ - 0
852-289
*(50300)SidewalkSY$ - 0
871-183
*(50190)Storm DrainsLF$ - 0
872-247
*(50040)Security FenceLF$ - 0
872-248
*(50030)Interior FenceLF$ - 0
890-144Compressed Air Distr (x-line)LF$ - 0
890-158Load/Unload Platform (x-line)SF$ - 0
890-187Utility Vault (x-line)SF$ - 0
890-272EMCS Field Equipment (x-line)EA$ - 0
890-273EMCS Data Links (x-line)LF$ - 0
135-583Telephone DuctLF$ - 0
135-586Telephone PoleLF/EA$ - 0
Total Related Facilities Cost$ - 0
(Note: " * " denotes Facility Number)
Demolition Cost Related to Project1 JB$ - 0
Construction Deficiencies (attach blank sheet for continuations)
Project Remarks (attach blank sheet for continuations)
4. Additions to Existing Facilities. Use checklists 1 - 3 above. Include any plants, systems, real

property installed equipment, or related facilities added, removed, or replaced.

5. Alterations or Renovations to Existing Facilities. Use checklists 1 - 3 above. Include plants, systems, real property installed equipment, or related facilities added, removed, or replaced. If demolition of existing facilities was a part of the project, include the specifics and costs related to the demolition.

6. Remarks. Where needed, add any explanatory remarks or descriptions, which more fully describe items.

7. When is a DD Form 1354 Required?
* Initial construction of a new facility
* Addition to an existing facility
* Demolition of an existing facility (and all its associated related real property)
* Removal of, or upgrade to, an installed system
* In general, if the project was funded in part or in whole with minor construction (EEIC 529) or

MCP funds, a DD Form 1354 is required in order to transfer the completed construction to real property records.

Do not input data in this cell. It will pre-fill once cost data is entered below.

Do not input data in this cell. It totals Fire Protection RPIE cost automatically.

Do not input data in this cell. It totals Installed Plants RPIE cost automatically.

Do not input data in this cell. It totals Related Facilities cost automatically.