TE-3_DD_Form_1354_Checklist.xls

DoD Form XLS spreadsheet 64 KB Posted

Attached to
Major Exterior Paint Project
Solicitation number
FA303018Q0017
Issued by

About this file

DD Form 1354 Checklist

View the file

Other versions and copies of DD Form 1354

File Revision Posted Attached to
P-1555U WCSR DD1354 27FEB2026.pdf Feb 27, 2026 P1555U Wallace Creek Service Road
DD Form 1354 - AUG 2022.pdf Aug 2022 Demo Mini mute sites
Attachment 16-DD Form 1354 - AUG 2022.pdf Aug 2022 Well 4 PFAS/PFOA Upgrade
DD Form 1354 - AUG 2022.pdf Aug 2022 B1130 ROOF REPLACEMENT
DD Form 1354 - AUG 2022.pdf Aug 2022 New Poinsett Tower Installation
DD Form 1354 - AUG 2022.pdf Aug 2022 B1921 Repair Power
017800_Attch2_DD1354 Checklist.docx Revision not stated WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
017800_Attch1_DD1354.pdf Revision not stated WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Attachment 04 - DD Form 1354.pdf Revision not stated Bldg 1947 Repair Drop Arms
Attachment E - DD1354 Form.pdf Revision not stated New Fort Bliss Paving IDIQ Contract
Attachment E - DD1354 Form.pdf Revision not stated New Fort Bliss Paving IDIQ Contract
017800_Attch1_DD1354.pdf Revision not stated Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
017800_Attch2_DD1354 Checklist.docx Revision not stated Tinker AFB MAC BOA - WWYK240176 - Replace Industrial Waste Lift Stations 6N & 6S, B62501
Attachment H - BLANK SAMPLE DD Form 1354 Transfer and Acceptance of DoD Real Property.pdf Revision not stated Robins AFB Paving Multi-Award IDIQ
DD Form 1354.pdf Revision not stated Repair Oil Water Separators - Stratton ANGB
CDRL A014 DD Form 1354 (Draft and Final).pdf Revision not stated AMARG Large Component Bead Blast Booth
SOW App 005 DD Form 1354.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
Attachment 0001_SOW Attachment 1.1 - DD1354.pdf Revision not stated SOLICITATION - National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
6 - Attachment 0001 - DRAFT SOW Attachment 1.1 - DD1354.pdf Revision not stated DRAFT SOLICITATION - National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
DD1354 Equipment Warranty.xlsx Revision not stated B1921 Repair Power
Show all 20

Who attaches DD Form 1354

State Files
Michigan 3

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1354 Checklist

DD Form 1354 Checklist
Description/Title:Project #:
BOD Date:
Total Project Cost$ - 0
1. General Building Data.
Category CodesNomenclatureTotal CostTotal SF
$ - 0
$ - 0
$ - 0
Exterior Dimensions:Square Footage
Main Bldg:
Wings:
Offsets:
No. of Stories:
Dimensions of Covered Walkways/Corridors:
Type of Construction:
Foundation:
Floors:
Exterior Walls:
Roof:
Utilities:
Water (Type and size of pipe):Pre Cast Grease Trap 1,000gal
Gas (Type and size of pipe):
Electric (Phase, voltage, wire):
Other Utility (Type, capacity, etc.):
2. Installed Systems & Plants.
Fire Protection.
CategoryNomenclatureUnitQuantityCost
880-211Closed Head Auto SprinklersSFIHD$ - 0
880-212Open Head Deluge SystemSFIHD$ - 0
880-216Pre-action Sprinkler SystemSF/HD$ - 0
880-217AFFF PA Sprinkler SystemSF/HD$ - 0
880-218Hi-expansion Foam, SystemEA$ - 0
880-221Auto Fire Protection SystemSF/EA$ - 0
880-222Manual Fire Alarm SystemEA$ - 0
880-231CO2 Fire SystemEA$ - 0
880-232Foam Fire SystemEA$ - 0
880-233Other Fire SystemEA$ - 0
880-234Halon 1301 Fire SystemEA$ - 0
880-235Dry Chemical SystemEA$ - 0
880-236Foam SystemEA$ - 0
Total Fire Protection Cost$ - 0
Security.
CategoryNomenclatureUnitQuantityCost
872-841Security Alarm SystemEA$ - 0
Installed Plants.
CategoryNomenclatureUnitQuantityCost
890-124A/C From Central PlantSF$ - 0
890-126A/C Window UnitsSF/TN$ - 0
890-125A/C Plant < 5 TonsSF/TN$ - 0
890-121A/C Plant 5 to 25 TonsTN$ - 0
826-122A/C Plant 25 - 100 TonsTN$ - 0
826-123A/C Plant Over 100 TonsTN$ - 0
821-115Heating PlantMB$ - 0
811-147Emergency Power GeneratorKW$ - 0
124-XXXFuel Tank for Htg/GeneratorGA$ - 0
Total Installed Plants Cost$ - 0
3. Related Facilities.
CategoryNomenclatureUnitQuantityCost
116-XXXPads (Type:SY$ - 0
411-XXXLarge Storage TanksBL$ - 0
Contents:
812-223
*(60060)Pri Elec Distr - OverheadLF$ - 0
*TransformersKVA$ - 0
*Power PolesLF/EA$ - 0
812-224
*(60065)See Elec Distr - OverheadLF$ - 0
812-225
*(60070)Pri Elec Distr - UndergroundLF$ - 0
*TransformersKVA$ - 0
*Power PolesLF/EA$ - 0
812-226
*(60075)See Elec Distr - UndergroundLF$ - 0
812-926
*(60170)Exterior Area Lighting
(Street/Parking Lights)EA$ - 0
824-464
*(60130)Gas MainsLF$ - 0
831-169Sewage Septic TankKG$ - 0
832-255
*(60040)Industrial Waste MainsLF$ - 0
832-266
*(60050)Sanitary Sewer MainsLF$ - 0
841-161Water Supply MainsLF$ - 0
842-245
*(60005)Water Distr MainsLF$ - 0
843-315
*(60015)Fire HydrantsEA$ - 0
851-143
*(50195)Curbs & GuttersLF$ - 0
851-145
*(50230)DrivewaySY$ - 0
851-147
*(50205/50210)Road
(50205 is asphalt and 50210 is concrete)SY/LF$ - 0
CategoryNomenclatureUnitQuantityCost
852-262
*(50240)Vehicle ParkingSY$ - 0
852-289
*(50300)SidewalkSY$ - 0
871-183
*(50190)Storm DrainsLF$ - 0
872-247
*(50040)Security FenceLF$ - 0
872-248
*(50030)Interior FenceLF$ - 0
890-144Compressed Air Distr (x-line)LF$ - 0
890-158Load/Unload Platform (x-line)SF$ - 0
890-187Utility Vault (x-line)SF$ - 0
890-272EMCS Field Equipment (x-line)EA$ - 0
890-273EMCS Data Links (x-line)LF$ - 0
135-583Telephone DuctLF$ - 0
135-586Telephone PoleLF/EA$ - 0
Total Related Facilities Cost$ - 0
(Note: " * " denotes Facility Number)
Demolition Cost Related to Project1 JB$ - 0
Construction Deficiencies (attach blank sheet for continuations)
Project Remarks (attach blank sheet for continuations)
4. Additions to Existing Facilities. Use checklists 1 - 3 above. Include any plants, systems, real

property installed equipment, or related facilities added, removed, or replaced.

5. Alterations or Renovations to Existing Facilities. Use checklists 1 - 3 above. Include plants, systems, real property installed equipment, or related facilities added, removed, or replaced. If demolition of existing facilities was a part of the project, include the specifics and costs related to the demolition.

6. Remarks. Where needed, add any explanatory remarks or descriptions, which more fully describe items.

7. When is a DD Form 1354 Required?
* Initial construction of a new facility
* Addition to an existing facility
* Demolition of an existing facility (and all its associated related real property)
* Removal of, or upgrade to, an installed system
* In general, if the project was funded in part or in whole with minor construction (EEIC 529) or

MCP funds, a DD Form 1354 is required in order to transfer the completed construction to real property records.

Do not input data in this cell. It will pre-fill once cost data is entered below.

Do not input data in this cell. It totals Fire Protection RPIE cost automatically.

Do not input data in this cell. It totals Installed Plants RPIE cost automatically.

Do not input data in this cell. It totals Related Facilities cost automatically.

File details come from the government source that posted it.