FA3030-18-Q-0017_RFI-JULY_MAJOR_EXTERIOR_PAINT.pdf
PDF 44 KB Posted
- Attached to
- Major Exterior Paint Project
- Solicitation number
- FA303018Q0017
About this file
Questions and Answers from the Site Visit on 10 July 2018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA303018Q0017-0002.pdf | ||
| FA303018Q0017_Questions_and_Answers_2.pdf | ||
| Major_Exterior_Painting_SOW_Jul2018.pdf | ||
| FA303018Q0017_Amendment_1.pdf | ||
| TE-2_Contractor_Usage_Guide_2017.pdf | ||
| Major_Exterior_Paint_Project_SOW_Feb2018.pdf | ||
| DBA_Wage_Determination.pdf | ||
| BAL_Request.docx | DOCX document | |
| TE-3_DD_Form_1354_Checklist.xls | XLS spreadsheet | |
| Exterior_Paint_Project_Photos.pdf | ||
| AF_FORM_66.xls | XLS spreadsheet | |
| FA303018Q0017_Solicitation_Major_Exterior_Paint.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Paint products listed on page 6 in the Statement of Work are Interior paints, are these products to be used on exterior surfaces? See revised Statement of Work dated July 2018.
2. Several of the buildings are located close to each other, may one Superintendent supervise multiple works sites or is a separate Superintendent required for each site? One Superintendent is fine.
3. Part 1.1.1 states “ make all necessary preparations and repairs to noted building exterior stucco walls”. Several of the buildings have rotten wood trim, door frames, and loose soffits; is the replacement of the damaged wood to be included in the scope of work? Any damaged wood noticed can be repaired by our team of carpenters. Please take note any areas needing repaired at beginning of project and let base contracting officer know so that it can be repaired ASAP.
4. Please verify all building exteriors are stucco and not EFIS. They are both Stucco and EIFS, depending on the building.
5. The Scope states “ pressure wash ; some of the buildings are a combination of brick and stucco, are the areas to be pressure washed just the painted areas or all of the walls? Pressure wash entire building unless noted different.
6. Some of the buildings have metal covering over the wood fascia boards matching the metal roof, does the metal covers over the fascia board get painted? Para 1.1 states any wood trim, not metal.
7. The Base Service Center bldg... is listed as 136 on the photograph, should this be # 137? This building has AC duct insulation coming loose from the duct at the wall, verify repair of the insulation is not included in the scope of Work. Yes it is B‐137 and repair is not included in the scope of work.
8. Does the water from pressure washing have to be recovered or just any paint chips removed during washing? The water does not have to be recovered per 17CES environmental, just clean up the paint chips after wash and/or before the project area is left.
9. Is any of the existing paint on the buildings Lead based? No.
10. Is the wood and metal on bleachers to be painted? Bleachers are to be painted, as stated on description pictures.
11. Are there 2‐two building ‐ 136's? No, one is 136 and the other is 137.
12. Is there no bid bond our payment protection due for this job? No, we are not requiring bonds for this project.
13. Can quotes be submitted electronically? Yes. Electronic is preferred.