EXHIBIT_Q___TC25-8_Minimum_MAT_Specification_Requirements.pdf
Army Training Circular PDF 291 KB Posted
- Solicitation number
- 140D0426R0084
About this file
This document is an exhibit containing minimum specification requirements for a MAT (Maintenance and Troubleshooting) system designated TC25-8.
The specification table outlines detailed technical requirements across multiple capability areas. Key MAT capacity requirements include a minimum load lift of 300 lbs, with time to lower and raise capabilities of 12 seconds each. The target weight is 400 lbs, with a minimum acceptable capacity of 90% of the target weight. Presentation requirements specify RF frequency ranges of 138-160 MHz (low) and 400-4220 MHz (high), along with bandwidth specifications of ≤ 12.5 kHz. Wire communications must support maximum distance of 8 km and maximum distance target of 8 km (RCS - Target). Cycles per hour cycles without regenerating power supply should meet 8,100 per 24 hours, with a mean time between failures standard of 2000 cycles. Power supply requirements mandate a 12V/24V AC, single-phase system with a 3.8 VAC and 100/240 VAC static design load specification. The document also references targeted liner standards of 350 with full barrel exposure of 50 wph, and includes movement speed specifications with a 0-200 km/h range and acceleration records within 10 km and 14-18 km/h distance parameters. Mean time between failures and system charging requirements are also specified.
View the file
Other versions and copies of TC 25-8
| File | Revision | Posted | Attached to |
|---|---|---|---|
| TC 25-8 Ranges 2004.pdf | 2004 | Construct Hand Grenade Range | |
| EXHIBIT_O___TC25-8_Minimum_MAT_Specification_Requirements.pdf | Revision not stated | Sources Sought for DMMU - Fort Hood | |
| EXHIBIT_Q___TC25-8_Minimum_MAT_Specification_Requirements.pdf Same revision and size as this file | Revision not stated | Sources Sought notice - JMMU Range at Fort Hood, TX | |
| TC 25-8 MPTR.pdf | Revision not stated | Project 120342 Multipurpose Training Range Design | |
| Attachment 3 TC 25-8.pdf | Revision not stated | Range Managers Tool Kit | |
| TC 25-8.pdf | Revision not stated | Range Managers Toolkit | |
| B.08.02.07.10 MPMG SOW Section 011010_Att 10_TC 25-8.pdf | Revision not stated | Range Improvements, Slunj, Croatia | |
| tc_25-8.pdf | Revision not stated | FULL SIZE GREEN TARGETS |
Who attaches TC 25-8
| State | Files |
|---|---|
| Florida | 1 |
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT Q – TC25-8 Minimum MAT Specification Requirements
File details come from the government source that posted it. Updated .