About this file

This document is a technical design guide section from the RTLP-MCX Range Design Guide addressing target protection requirements for military training ranges, specifically detailing berm (earthen barrier) design specifications.

The guide establishes minimum berm thickness requirements to protect target emplacements from weapon fire across various caliber systems, including 105-mm and 120-mm projectiles, 25-mm cartridges, .50-caliber rounds, and 5.56-mm and 7.62-mm ball projectiles. Berm thickness is determined by three primary variables: projectile type, soil compaction level (80%, 90%, 95%, or 100% per ASTM D1557 Method D), and in-place soil density. The document specifies that berms must provide full-thickness protection within a direction of fire range of ±20 degrees from perpendicular, with adequate protection extending to ±30 degrees or greater; standard berm extensions equal one-quarter of the berm thickness. A minimum berm thickness of 4 feet is required to facilitate maintenance operations. The document includes ten technical graphs—five in English units (feet and PCF) and five in metric units (meters and grams per cubic centimeter)—that provide design curves for each weapon caliber category, allowing designers to cross-reference soil density against required berm thickness based on compaction specifications. Maintenance cycles for well-compacted berms typically occur at 6-month intervals or longer under normal usage, with small arms qualification ranges and main gun targets experiencing the greatest wear.

View the file

Other files for this federal contract opportunity

Other files attached to Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep, newest first.
File Type Posted
Sol_140D0426R0084_Amd_0002.pdf PDF
SQA_Q_A_JMMU_Ft__Hood_0002.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part2_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part1_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part6_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part5_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part3_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part7_0001.pdf PDF
Sol_140D0426R0084_Amd_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part4_0001.pdf PDF
EXHIBIT_E___Cluster_MIT_V-Shape_Formation.pdf PDF
B08_SOL_Fort_Hood_JMMU_Range_Upgrades_SOW.pdf PDF
EXHIBIT_H_-_SIT_Cluster_November_2018.pdf PDF
EXHIBIT_N_-_Mandatory_Shutdown_times.pdf PDF
EXHIBIT_O___Summary_Target_Electrical_and_Communications.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_B_-_Clusters_and_Moving_Infantry_Targets_(MITs).pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_C_-_Startionary_Armored_Targets_(SATs).pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_D_-_Drainage_(ditches_culverts_and_sump_pumps).pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_E_-_Power_Centers.pdf PDF
EXHIBIT_U_-_Gate_Design.pdf PDF
EXHIBIT_AA___DMMU_MAT_System_locations_and_existing_conditions.pdf PDF
Sol_140D0426R0084.pdf PDF
EXHIBIT_A_-_FTHOOD-JMMU-AERIAL.pdf PDF
EXHIBIT_G_-_Moving_InfantryTarget_(MIT)_-_Aug2017.pdf PDF
EXHIBIT_J_-_Moving_Armor_Target_(MAT)_-_Aug2017.pdf PDF
EXHIBIT_L_-_JMMU_RANGE_SITE_SUMMARY_PCs_AND_CAMERA.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_A_-_Moving_Armored_Targets_(MATs).pdf PDF
EXHIBIT_T_-_Portable_Armored_Target_Protection.pdf PDF
EXHIBIT_FF_-_PKRA_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
EXHIBIT_GG_-_QTR_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
B03_WD_TX20260279.pdf PDF
EXHIBIT_B_-_JMMU_CLUSTER_LOCATIONS_FOR_MIT_LOCATIONS.pdf PDF
EXHIBIT_K_-_TXDOT_Concrete_Repair_Manual_crm.pdf PDF
EXHIBIT_V_-_CCI-TII_Checklist_Instructions.pdf PDF
EXHIBIT_W_-_CCI-TII_Checklist.pdf PDF
EXHIBIT_X_-_Portable_HSAT_Specifications.pdf PDF
EXHIBIT_Y_-_Range_Limit_Marker_Design.pdf PDF
EXHIBIT_Z_-_JMMU_SACON_Trench_System_Repairs.pdf PDF
EXHIBIT_BB_-_Firing_Positions_Revision_6.pdf PDF
EXHIBIT_CC_-_EXISTING_CONDITIONS_PHOTOS.pdf PDF
B08_SOL_140D0426R0084_JMMU_Range_Upgrades_Fort_Hood.pdf PDF
EXHIBIT_C_-_JMMU_MAT54_MAT56__MAT58___AT60_CROSS-SECTION.pdf PDF
EXHIBIT_D_-_Moving_Armor_Target_MAT_Locations.pdf PDF
EXHIBIT_I_-_Stationary_ArmorTarget_(SAT)_-_Aug2017.pdf PDF
EXHIBIT_M_-_Species_List_for_Range_Seed.pdf PDF
EXHIBIT_P_-_ELECTRICAL_AND_COMMUNICATIONS.pdf PDF
EXHIBIT_Q___TC25-8_Minimum_MAT_Specification_Requirements.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_F_-_Fiber_Optics.pdf PDF
EXHIBIT_DD_-_BGRC_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
EXHIBIT_EE_-_CCRB_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
Show all 50

Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING STRONG® 1

Ta rg et P ro te ct io n– Ju ly

R

TL

P- M

CX

R an ge

D es ig n

G ui de

Purpose This section provides the required berm dimensions required to protect target emplacements. The berm, not the wall, provides the protection for the target equipment. The section covers the berm thicknesses required for varied soil types for different weapons. The berm must protect the emplacement from all anticipated directions of fire, but is thickest in the expected direction of fire. Use thinner berms to protect the emplacement from occasional directions of fire and ricochets. The standard berm extensions are ¼ of the berm thickness; see figure below. Refer to the individual target emplacement sections in the RDG for additional information including wall heights, angle of fire, and direction of fire requirements/limitations.

Target Berms The Target Protection Design Curves at the end of this section provide the recommended minimum berm thicknesses required to protect the target emplacements from weapon firing during training. The curve thicknesses provide protection from many bullet impacts; the amount of soil needed to stop a single round is significantly less. The calculated thickness provides protection from repeated firing between maintenance cycles. The time between maintenance cycles varies depending on many things including soil types, compaction rates, weapons used, and training volume; heavily used targets usually require more maintenance.

Determine the berm thicknesses based on projectile type, soil compaction, and the in-place soil density. In addition, the designer must coordinate with the range trainer or user to determine the appropriate berm thickness for each target, since individual target siting may dictate added target protection. For example, when SIT emplacements are in front of or behind a MAT or SAT, the berm will need to withstand the largest weapon system that will engage that group of targets.

The standard curves allow some flexibility on the required thickness depending on the range type and other factors. The designer/installation must balance the cost of thicker berms against the amount of maintenance required and the risk of damage based on the weapons used and the target usage. The worst case for wear on target berms is often on small arms qualification ranges, MRF/ARF/AFF and the most used main gun targets. Historical experience shows that, under normal usage, well-compacted berms, designed with the recommended widths require maintenance cycles of 6-months or more on these type of ranges. Ranges without fixed firing positions like infantry battle courses and ranges with lower usage can use with thinner berms.

Target Protection

Target Protection Curves

BUILDING STRONG® 2

rg et P ro te ct io n– Ju ly

R

TL

P- M

CX

R an ge

D es ig n

G

Direction of Fire The direction of fire (DOF) is the horizontal angle from perpendicular to the target. The standard berm provides full thickness protection for DOF of +/- 20 degrees and adequate protection to +/- 30 degrees or more. Due to SDZ and range safety considerations, it is uncommon to engage targets regularly at larger DOF; coordinate with the RTLP MCX in those cases. The standard berm will protect the electronics and mechanism from errant rounds and ricochets to much higher DOF, up 90 degrees.

Minimum Use a berm thickness of at least 4 feet to facilitate ease of maintenance.

Target Protection Design Curves The following tables provide curves for various caliber weapons: 105 and 120 mm, 25mm, .50cal, and 7.62 and 5.56 mm. Use the appropriate curve the largest weapon that will engage the particular target. Note that the 7.62 and 5.56 table covers both standard ball and Enhanced Performance Rounds (EPR) rounds.

BUILDING STRONG® 3

rg et P ro te ct io n– Ju ly

R

TL

P- M

CX

R an ge

D es ig n

G

BUILDING STRONG® 4

rg et P ro te ct io n– Ju ly

R

TL

P- M

CX

R an ge

D es ig n

G

BUILDING STRONG® 5

rg et P ro te ct io n– Ju ly

R

TL

P- M

CX

R an ge

D es ig n

G

BUILDING STRONG® 6

rg et P ro te ct io n– Ju ly

R

TL

P- M

CX

R an ge

D es ig n

G

BUILDING STRONG® 7

rg et P ro te ct io n– Ju ly

R

TL

P- M

CX

R an ge

D es ig n

G

BUILDING STRONG® 8

rg et P ro te ct io n– Ju ly

R

TL

P- M

CX

R an ge

D es ig n

G

BUILDING STRONG® 9

rg et P ro te ct io n– Ju ly

R

TL

P- M

CX

R an ge

D es ig n

G

BUILDING STRONG® 10

rg et P ro te ct io n– Ju ly

R

TL

P- M

CX

R an ge

D es ig n

G

Purpose
Target Berms
Direction of Fire
Minimum
Target Protection Design Curves