Attachment 3 TC 25-8.pdf
PDF 32 MB Posted
- Attached to
- Range Managers Tool Kit Federal contract opportunity
- Solicitation number
- M67854-22-R-7905
- Issued by
- United States Marine Corps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 8_TEP Total Evaluated Price.xlsx | XLSX spreadsheet | |
| Amendment 1_M67854-22-R-7905 RMTK.docx | DOCX document | |
| Attachment 9 Staffing Planv2.xlsx | XLSX spreadsheet | |
| RFP M67854-22-R-7905-Questions.xlsx | XLSX spreadsheet | |
| Attachment 7 DD254 _RTAM_Solicatation 21 June 2022.pdf | ||
| Solicitation.docx | DOCX document | |
| Attachment 2 NAVSEA_OP-5_Rev7_OP_5.pdf | ||
| Attachment 8 Total Evaluated Price.xlsx | XLSX spreadsheet | |
| Attachment 1 MCO 3550.9A.pdf | ||
| Attachment 4 ARSP-2 VOLI EDB V1 E (2470).pdf | ||
| Attachment 4 continued ARSP-2 Vol II Edition A Version 1 Draft 4.pdf | ||
| Attachment 5 WDZ Tool Software Vol IV.pdf | ||
| Attachment 6 RMTK Mobile Assessment_9-29-17_Final.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TC 25-8
Training Ranges
DISTRIBUTION RESTRICTION: Distribution authorized to the DOD and DOD contractors only to protect technical or operational information from automatic dissemination under the International Exchange Program or by other means. This decision was made on 07 NOV 2007. Other requests for this document will be referred to: Commander, US Army Training Support Center (ATSC), ATTN: ATIC-LTR, Fort Eustis, VA 23604.
DESTRUCTION NOTICE: Destroy by any means that will prevent disclosure of contents or reconstruction of the document.
Headquarters Department of the Army
This publication is available at the Army Publishing Directorate site (http://www.apd.army.mil), and the Central Army Registry site (https://atiam.train.army.mil/catalog/dashboard)
To receive publishing updates, please subscribe at (http://www.apd.army.mil/AdminPubs/new_subscribe.asp)
TC 25-8 i
*TC 25-8
Training Circular Headquarters No. 25-8 Department of the rmy
Washington 201
Training Ranges
Contents Preface.............................................................................................................................................. xii Chapter 1 ....................................................................................................................................... 1-1 Introduction ..................................................................................................................................... 1-1
Army Ranges .......................................................................................................................... 1-2 Range Attributes ............................................................................................................... 1-2 Individual Ranges .............................................................................................................. 1-4 Crew Ranges ...................................................................................................................... 1-4 Collective Ranges .............................................................................................................. 1-5
Range Areas ........................................................................................................................... 1-6 Up-range Areas .................................................................................................................. 1-7 Range Operations and Control Area (ROCA) ................................................................... 1-8 Maneuver Area ................................................................................................................... 1-8 Downrange Area ................................................................................................................ 1-8 Target Area ........................................................................................................................ 1-9 Impact Area ...................................................................................................................... 1-10
Chapter 2 ....................................................................................................................................... 2-1 Ranges ............................................................................................................................................. 2-1
Naming Conventions .............................................................................................................. 2-1 Facility Category Codes (FCC) .............................................................................................. 2-2 Standardized Ranges .............................................................................................................. 2-4
Chapter 3 ....................................................................................................................................... 3-1 Range Modernization ...................................................................................................................... 3-1 Section I – Overview....................................................................................................................... 3-1 Section II – The Installation Range Modernization Planning and Development ............................ 3-2 Chapter 4 ....................................................................................................................................... 4-1 Sustainable Range Program Information Technology Applications and Range Support Systems . 4-1
Sustainable Range Program Web Portal ................................................................................. 4-1
DISTRIBUTION RESTRICTION: Distribution authorized to the DOD and DOD contractors only to protect technical or operational information from automatic dissemination under the International Exchange Program or by other means. This decision was made on 07 NOV 2007. Other requests for this document will be referred to: Commander, US Army Training Support Center (ATSC), ATTN: ATIC-LTR, Fort Eustis, VA 23604.
DESTRUCTION NOTICE: Destroy by any means that will prevent disclosure of contents or reconstruction of the document.
*This publication supersedes TC 25-8, dated 10 May 2010
Contents ii TC 25-8
Range Facility Management Support System (RFMSS) ........................................................ 4-2 Army Range and Training Land Program Requirements Model (ARRM) ............................ 4-5 Range Managers Toolkit (RMTK) ......................................................................................... 4-8 ITAM Workplan ................................................................................................................... 4-10 Range Modernization & Facilities Configuration Control Board (RCCB) .......................... 4-10 Range Operations Professional Development (ROPD) ........................................................ 4-13 Range Complex Master Planning Tool (RCMPT) ............................................................... 4-16 MILCON Project Dashboard ................................................................................................ 4-17
Chapter 5 ....................................................................................................................................... 5-1 Range Operations ............................................................................................................................ 5-1 Section I Range Operations Organization ....................................................................................... 5-1
Directorate of Plans, Training, Mobilization, and Security (DPTMS) ................................... 5-1 Section II – Range Division/Training Support Division/Range Branch ......................................... 5-3
Range Manager ....................................................................................................................... 5-5 Support System Use ........................................................................................................... 5-5 Professional Development ................................................................................................. 5-5
Operations Officer .................................................................................................................. 5-6 Support System Use ........................................................................................................... 5-7 Professional Development ................................................................................................. 5-7
Range Safety Office ............................................................................................................... 5-7 Range Safety Officer ..............................................................................................................5-8
Support System Use ........................................................................................................... 5-9 Professional Development ................................................................................................. 5-9
Firing Desk ............................................................................................................................. 5-9 Support System Use ......................................................................................................... 5-10 Professional Development ............................................................................................... 5-10
Range and Training Area Scheduling ................................................................................... 5-10 Support System Use ......................................................................................................... 5-11 Professional Development ............................................................................................... 5-11
Range Maintenance .............................................................................................................. 5-11 Support System Use ......................................................................................................... 5-12 Professional Development ............................................................................................... 5-12
Range Technicians ............................................................................................................... 5-12 Support System Use ......................................................................................................... 5-12 Professional Development ............................................................................................... 5-13
Appendix A Range Selection .............................................................................................. A-1 Appendix B Range Operations and Control Area (ROCA) Facilities ........................... B-1 Appendix C Instrumentation, Devices, and Accessories ................................................. C-1 Appendix D Target Mechanisms and Emplacements ..................................................... D-1 Appendix E Targets, Panels, and Markers ....................................................................... E-1 Appendix F Small Arms Facilities ..................................................................................... F-1 Appendix G Crew-served Facilities ...................................................................................G-1 Appendix H Collective Facilities........................................................................................H-1 Appendix I Urban Operations Facilities ............................................................................ I-1 Appendix J Enablers ...........................................................................................................J-1 Appendix K Austere Environment ....................................................................................K-1
Glossary .................................................................................................................................. Glossary-1 References ........................................................................................................................... References-1
TC 25-8 iii
Figures Figure 1-1 – Range Areas ................................................................................................................... 1-2 Figure 1-2 – Up-range Areas .............................................................................................................. 1-1 Figure 1-3 – Downrange Areas ........................................................................................................... 1-2 Figure 1-4 – Impact Area .................................................................................................................... 1-1 Figure 2-1 – Facility Category Code Example, 5 Digit ...................................................................... 2-2 Figure 4-1 – ARRM User to ARRM Data Interface ........................................................................... 4-6 Figure 4-2 – ARRM Data Input Process ............................................................................................. 4-7 Figure 4-3 - ARRM............................................................................................................................. 4-8 Figure 4-4 – RCCB Process Model ................................................................................................... 4-12 Figure 4-5 – ROPD Blueprint ........................................................................................................... 4-13 Figure 4-6 – ALMS ROPD Homepage ............................................................................................. 4-15 Figure 5-1 – DPTMS Example Organizational Structure ................................................................... 5-2 Figure 5-2 – DPTMS and Range Branch Example Structure ............................................................. 5-3 Figure 5-3 – Organization to RFMSS Relationships ........................................................................ 5-11 Figure B-1 - Small ROCA Layout ..................................................................................................... B-3 Figure B-2 - Mounted ROCA Layout ................................................................................................ B-3 Figure B-3 - Instrumented ROCA (IROCA) Layout ......................................................................... B-4 Figure B-4 - Urban ROCA Layout .................................................................................................... B-5 Figure B-5 - Initial Entry Training ROCA (IEROCA) Layout .......................................................... B-6 Figure B-6 - Control Tower, Small Arms Ranges ............................................................................. B-7 Figure B-7 - Control Tower, Non-Instrumented Ranges ................................................................... B-8 Figure B-8 - Control Tower, Instrumented Ranges ........................................................................... B-8 Figure B-9 - AAR Small .................................................................................................................... B-9 Figure B-10 - AAR Large ................................................................................................................ B-10 Figure B-11 - CACTF ROC/ AAR .................................................................................................. B-11 Figure B-12 - Operations and Storage, Standard ............................................................................. B-12 Figure B-13 - Operations and Storage, Large .................................................................................. B-12 Figure B-14 - Classroom Building ................................................................................................... B-13 Figure B-15 - Aerated Vault Latrine................................................................................................ B-13 Figure B-16 - Water Latrine............................................................................................................. B-14 Figure B-17 - Bleacher Enclosure .................................................................................................... B-14 Figure B-18 - Covered Mess ............................................................................................................ B-15 Figure B-19 - Ammunition Breakdown Building ............................................................................ B-15 Figure B-20 - Ammunition Loading Dock ...................................................................................... B-16 Figure B-21 - Vehicle Instrumentation Dock .................................................................................. B-17 Figure B-22 - Battery Building ........................................................................................................ B-18 Figure B-23 - Unit Staging Area...................................................................................................... B-18 Figure B-24 - Bivouac Area ............................................................................................................. B-19 Figure C-1 - Range Control Station ................................................................................................... C-1 Figure C-2 - TRACR Suite ................................................................................................................ C-2 Figure C-3 - Tower Evaluation Workstation ..................................................................................... C-2 Figure C-4 - AAR Workstation .......................................................................................................... C-2 Figure C-5 - Crew Module Unit with Recorder (CMUR) .................................................................. C-3 Figure C-6 - Bustle Module Unit Enhanced (BMUE) ....................................................................... C-4 Figure C-7 - 8 Channel Video Encoder (POE) .................................................................................. C-4 Figure C-8 - Vehicle Accessory Case ................................................................................................ C-5 Figure C-9 - Location of Hit and Miss (LOMAH), Student Station .................................................. C-5 Figure C-10 - Shot Sensor with Shot Sensor Interface ...................................................................... C-5 iv TC 25-8
Figure C-11 - Location of Hit and Miss (LOMAH) Bar/ Target Lifter .............................................. C-5 Figure D-1 - Stationary Infantry Target (SIT)................................................................................... D-3 Figure D-2 - Double Target Arm (DTA) ........................................................................................... D-3 Figure D-3 - Moving Infantry Target (MIT) ..................................................................................... D-5 Figure D-4 - Stationary Armor Target (SAT) ................................................................................... D-6 Figure D-5 - Moving Armor Target (MAT) ...................................................................................... D-7 Figure D-6 - Entry Control Point Moving Target ............................................................................... D-9 Figure D-7 - SIT emplacement......................................................................................................... D-12 Figure D-8 - Widened SIT emplacement ......................................................................................... D-13 Figure D-9 - MIT emplacement ....................................................................................................... D-14 Figure D-10 - SAT emplacement ..................................................................................................... D-15 Figure D-11 - MAT emplacement .................................................................................................... D-16 Figure D-12 - Individual Fighting Position ...................................................................................... D-17 Figure D-13 - Individual Foxhole ..................................................................................................... D-17 Figure D-14 - Individual and Crew Machine Gun Position ............................................................. D-18 Figure D-15 - Defensive Battle Position- Two Tier ......................................................................... D-18 Figure D-16 - Reverse Slope Defensive Battle Position .................................................................. D-19 Figure D-17 - Hasty Defensive Battle Position ................................................................................ D-19 Figure D-18 - Infantry Cluster - 7 each SITs, (7:0) .......................................................................... D-20 Figure D-19 - Infantry Cluster - 6 each SITs, 1 each MIT (6:1) ..................................................... D-20 Figure E-1 - Type A1 Series Targets .................................................................................................. E-5 Figure E-2 - Type A2 Series Targets.................................................................................................. E-6 Figure E-3 - Type A4 Series Targets.................................................................................................. E-7 Figure E-4 - B Type Targets, B1 through B3-R................................................................................. E-9 Figure E-5 - B Type Targets, B4 through B5-R ............................................................................... E-10 Figure E-6 - B Type Targets, B6 through B8-R ............................................................................... E-11 Figure E-7 - B Type Targets, B9 through B12 ................................................................................. E-12 Figure E-8 - B Type Targets, B13 through B14 ............................................................................... E-13 Figure E-9 - C Type Targets, C1 through C5 ................................................................................... E-14 Figure E-10 - D Type Targets, D1 through D2 ................................................................................ E-15 Figure E-11 - E Type Targets, E1 through E3 .................................................................................. E-16 Figure E-12 - F Type Targets, F1 through F3 .................................................................................. E-17 Figure E-13 - G Type Targets, G1 through G2 ................................................................................ E-18 Figure E-14 - I Type Targets, I1 ....................................................................................................... E-19 Figure E-15 - J Type Targets, J1 through J2 .................................................................................... E-19 Figure E-16 - K Type Targets, K1 through K3 ................................................................................ E-20 Figure E-17 - Thermal Blanket, Road Wheel, Support Roller, Radar Dish, Standard Square ......... E-22 Figure E-18 - Thermal Blanket, Track and Engine Compartment ................................................... E-23 Figure E-19 - Thermal Blanket, Hull ............................................................................................... E-23 Figure E-20 - Thermal Blanket, Turret ............................................................................................. E-24 Figure E-21 - Thermal Blanket, Silhouette ...................................................................................... E-24 Figure E-22 - Thermal Identification Panels .................................................................................... E-26 Figure E-23 - Fabric Target Reference Point ................................................................................... E-27 Figure E-24 - H,M, and L Type Panel Naming Convention Definitions ......................................... E-28 Figure E-25 - Core Panel Set ............................................................................................................ E-29 Figure E-26 - H1T, Frontal ............................................................................................................... E-31 Figure E-27 - H1T, Frontal Material List ......................................................................................... E-32 Figure E-28 - H1T, Frontal VCID .................................................................................................... E-33 Figure E-29 - H1T, Flank ................................................................................................................. E-34 Figure E-30 - H1T, Flank Material List ........................................................................................... E-35 Figure E-31 - H1T, Flank VCID ...................................................................................................... E-36
TC 25-8 v
Figure E-32 - H1T, Defilade ............................................................................................................ E-37 Figure E-33 - H1T, Defilade Material List ....................................................................................... E-38 Figure E-34 - H1T, Turret ................................................................................................................ E-39 Figure E-35 - H1T, Turret Material List .......................................................................................... E-40 Figure E-36 - H1T, 3-Dimensional .................................................................................................. E-41 Figure E-37 - H1F, Friendly Frontal VCID ...................................................................................... E-42 Figure E-38 - H2T, Frontal ............................................................................................................... E-43 Figure E-39 - H2T, Frontal Material List ......................................................................................... E-44 Figure E-40 - H2T, Flank ................................................................................................................. E-45 Figure E-41 - M2T, Flank Material List ........................................................................................... E-46 Figure E-42 - H3T-BKR, Frontal ..................................................................................................... E-47 Figure E-43 - H3T-BKR, Frontal Material List ............................................................................... E-48 Figure E-44 - M1T-Frontal ............................................................................................................... E-50 Figure E-45 - M1T, Frontal Material List ........................................................................................ E-51 Figure E-46 - M1T, Frontal VCID ................................................................................................... E-52 Figure E-47 - M1T, Flank ................................................................................................................ E-53 Figure E-48 - M1T, Flank Material List ........................................................................................... E-54 Figure E-49 - M1T, Flank VCID...................................................................................................... E-55 Figure E-50 - M1T, 3-Dimensional .................................................................................................. E-56 Figure E-51 - M2T, Frontal .............................................................................................................. E-57 Figure E-52 - M2T, Frontal Material List ........................................................................................ E-58 Figure E-53 - M2T, Flank ................................................................................................................ E-59 Figure E-54 - M2T, Flank Material List ........................................................................................... E-60 Figure E-55 - M3T, Frontal .............................................................................................................. E-61 Figure E-56 - M3T, Frontal Material List ........................................................................................ E-62 Figure E-57 - M3T, Flank ................................................................................................................ E-63 Figure E-58 - M3T, Flank Material List ........................................................................................... E-64 Figure E-59 - M4T, Frontal .............................................................................................................. E-65 Figure E-60 - M4T, Frontal Material List ........................................................................................ E-66 Figure E-61 - M4T, Flank ................................................................................................................ E-67 Figure E-62 - M4T, Flank Material List ........................................................................................... E-68 Figure E-63 - M4T, 3-Dimensional .................................................................................................. E-69 Figure E-64 - L1T, Frontal ............................................................................................................... E-71 Figure E-65 - L1T, Frontal Material List ......................................................................................... E-72 Figure E-66 - L1T, Flank ................................................................................................................. E-73 Figure E-67 - L1T, Flank Material List ............................................................................................ E-74 Figure E-68 - L2T, Frontal ............................................................................................................... E-75 Figure E-69 - L2T, Frontal Material List ......................................................................................... E-76 Figure E-70 - L2T, Frontal VCID .................................................................................................... E-77 Figure E-71 - L2T, Flank ................................................................................................................. E-78 Figure E-72 - L2T, Flank Material List ............................................................................................ E-79 Figure E-73 - L2T, Flank, VCID...................................................................................................... E-80 Figure E-74 - L2T, 3-Dimensional ................................................................................................... E-81 Figure E-75 - L2F, Frontal ............................................................................................................... E-82 Figure E-76 - L2F, Frontal Material List .......................................................................................... E-83 Figure E-77 - L2F, Frontal VCID..................................................................................................... E-84 Figure E-78 - L2F, Flank .................................................................................................................. E-85 Figure E-79 - L2F, Flank Material List ............................................................................................ E-86 Figure E-80 - L2F, Flank VCID ....................................................................................................... E-87 Figure E-81 - L2F, 3-Dimensional ................................................................................................... E-88 Figure E-82 - L3T, Frontal ............................................................................................................... E-89 vi TC 25-8
Figure E-83 - L3T, Frontal Material List .......................................................................................... E-90 Figure E-84 - L3T, Flank .................................................................................................................. E-91 Figure E-85 - L3T, Flank Material List ............................................................................................ E-92 Figure E-86 - L3T, 3-Dimensional ................................................................................................... E-93 Figure E-87 - L4T, Frontal ................................................................................................................ E-94 Figure E-88 - L4T, Frontal Material List .......................................................................................... E-95 Figure E-89 - L4T, Flank .................................................................................................................. E-96 Figure E-90 - L4T, Flank Material List ............................................................................................ E-97 Figure E-91 - L5T, Frontal ................................................................................................................ E-98 Figure E-92 - L5T, Frontal Material List ......................................................................................... E-99 Figure E-93 - L5T, Flank ................................................................................................................ E-100 Figure E-94 - L5T, Flank Material List .......................................................................................... E-101 Figure E-95 – SP-1, Material List ................................................................................................... E-103 Figure E-96 – SP-2, Material List ................................................................................................... E-104 Figure E-97 – SP-3, Material List ................................................................................................... E-105 Figure E-98 – ST-1, Material List ................................................................................................... E-106 Figure E-99 – ST-5, Material List ................................................................................................... E-107 Figure E-100 – ST-6, Material List ................................................................................................. E-108 Figure E-101 – RM-1, Material List ............................................................................................... E-109 Figure E-102 – RM-2, Material List ............................................................................................... E-109 Figure E-103 – RM-3, Material List ............................................................................................... E-110 Figure E-104 – FT-1, (versions A, B, and C) ................................................................................ E-111 Figure E-105 – FT-2 ....................................................................................................................... E-112 Figure E-106 – FT-3 ....................................................................................................................... E-112 Figure E-107 – FT-4 ....................................................................................................................... E-113 Figure F-1 – CPQC, Targetry, Instrumentation, and Structures ......................................................... F-2 Figure F-1.1- CPQC, Range Operations Control Area ....................................................................... F-2 Figure F-1.2 – CPQC, Range Sketch .................................................................................................. F-3 Figure F-1.3 – Standard Military Police Barricade Design ................................................................. F-4 Figure F-2 – AFF, Targetry and Instrumentation, and Structure ........................................................ F-5 Figure F-2.1 – AFF, Range Operations Control Area ......................................................................... F-5 Figure F-2.2- AFF, Range Sketch ....................................................................................................... F-6 Figure F-3 – ARF, Targetry and Instrumentation, and Structure ........................................................ F-7 Figure F-3.1 – ARF, Range Operations Control Area ........................................................................ F-7 Figure F-3.2- ARF, Range Sketch ...................................................................................................... F-8 Figure F-4 – SFF, Targetry and Instrumentation, and Structure ......................................................... F-9 Figure F-4.1 – SFF, Range Operations Control Area ......................................................................... F-9 Figure F-4.2- SFF, Range Sketch ..................................................................................................... F-10 Figure F-5 – Zero, Targetry and Instrumentation, and Structure ...................................................... F-11 Figure F-5.1 – Zero, Range Operations Control Area ...................................................................... F-11 Figure F-5.2- Zero, Range Sketch ..................................................................................................... F-12 Figure F-6 – FMR, Targetry and Instrumentation, and Structure ..................................................... F-13 Figure F-6.1 – FMR, Range Operations Control Area ...................................................................... F-13 Figure F-6.2 - FMR, Range Sketch ................................................................................................... F-14 Figure F-7 - GLR, Targetry and Instrumentation, and Structure ...................................................... F-15 Figure F-7.1 - GLR, Range Operations Control Area ....................................................................... F-15 Figure F-7.2 - GLR, Range Sketch ................................................................................................... F-16 Figure F-8 – HGFR, Targetry and Instrumentation, and Structure ................................................... F-17 Figure F-8.1 – HGFR, Range Operations Control Area ................................................................... F-17 Figure F-8.2- HGFR, Range Sketch .................................................................................................. F-18 Figure F-9 – HGQC, Targetry and Instrumentation, and Structure .................................................. F-19
TC 25-8 vii
Figure F-9.1 – HGQC, Range Operations Control Area .................................................................. F-19 Figure F-9.2- HGQC, Range Sketch ................................................................................................ F-20 Figure F-10 – HSR, Targetry and Instrumentation, and Structure ................................................... F-21 Figure F-10.1 – HSR, Range Operations Control Area .................................................................... F-21 Figure F-10.2- HSR, Range Sketch .................................................................................................. F-22 Figure F-11 – IC, Targetry and Instrumentation, and Structure ....................................................... F-23 Figure F-11.1- IC, Range Operations Control Area ......................................................................... F-23 Figure F-11.2- IC, Range Sketch ...................................................................................................... F-24 Figure F-12 – KD, Targetry and Instrumentation, and Structure ..................................................... F-25 Figure F-12.1- KD, Range Operations Control Area ....................................................................... F-25 Figure F-12.2 - KD, Range Sketch ................................................................................................... F-26 Figure F-13 – DEMO-L, Targetry and Instrumentation, and Structure ........................................... F-27 Figure F-13.1- DEMO-L, Range Operations Control Area .............................................................. F-27 Figure F-13.2- DEMO-L, Range Sketch .......................................................................................... F-28 Figure F-14 – MRF, Targetry and Instrumentation, and Structure ................................................... F-29 Figure F-14.1- MRF, Range Operations Control Area ..................................................................... F-29 Figure F-14.2- MRF, Range Sketch ................................................................................................. F-30 Figure G-1 – MPMG, Targetry and Instrumentation, and Structure .................................................. G-2 Figure G-1.1 – MPMG, Range Operations Control Area ................................................................... G-2 Figure G-1.2 – MPMG, SIT Emplacement ....................................................................................... G-3 Figure G-1.3 – MPMG, Range Sketch .............................................................................................. G-4 Figure G-1.4 – MPMG, Center Lanes ................................................................................................ G-5 Figure G-1.5 – MPMG, Wing Lanes .................................................................................................. G-6 Figure G-2 – QTR, Targetry and Instrumentation, and Structure ...................................................... G-7 Figure G-2.1 – QTR, Range Operations Control Area ....................................................................... G-8 Figure G-2.2 – QTR, SIT Formations ............................................................................................... G-9 Figure G-2.3 – QTR, Range Sketch ................................................................................................. G-10 Figure G-2.4 – QTR, Center Lanes .................................................................................................. G-11 Figure G-2.5 – QTR, Wing Lanes .................................................................................................... G-12 Figure G-2.6 – QTR, Basic Rifle Center Lanes ............................................................................... G-13 Figure G-2.7 – QTR, Pistol Center Lanes ........................................................................................ G-14 Figure G-3 – LAWR, Targetry and Instrumentation, and Structure ................................................. G-15 Figure G-3.1 - LAWR, Range Operations Control Area .................................................................. G-15 Figure G-3.2 - LAWR, Range Sketch .............................................................................................. G-16 Figure H-1 – AGR, Targetry and Instrumentation, and Structure ...................................................... H-3 Figure H-1.1 – AGR, Range Operations Control Area ...................................................................... H-4 Figure H-1.2 – AGR, Range Sketch ................................................................................................... H-5 Figure H-1.3 – AGR, Zone A ............................................................................................................. H-6 Figure H-1.4 – AGR, Zone B ............................................................................................................. H-7 Figure H-1.5 – AGR, Zone C ............................................................................................................. H-8 Figure H-1.6 – AGR, 5 Building Urban Cluster ................................................................................ H-9 Figure H-1.7 – AGR, A-GI Village .................................................................................................. H-10 Figure H-2 – ADFR, Targetry and Instrumentation, and Structure .................................................. H-11 Figure H-2.1 – ADFR, Range Operations Control Area .................................................................. H-11 Figure H-2.2 – ADFR, Range Sketch ............................................................................................... H-12 Figure H-3 – ATLF, Targetry and Instrumentation, and Structure .................................................. H-13 Figure H-3.1 – ATLF, Range Operations Control Area ................................................................... H-13 Figure H-3.2 – ATLF, Range Sketch ............................................................................................... H-14 Figure H-4 – IPBC, Targetry and Instrumentation, and Structure ................................................... H-15 Figure H-4.1 – IPBC, Range Operations Control Area .................................................................... H-15 Figure H-4.2 – IPBC, Range Sketch ................................................................................................ H-16 viii TC 25-8
Figure H-4.3 – IPBC, Objective A ................................................................................................... H-17 Figure H-4.4 – IPBC, Objective B ................................................................................................... H-17 Figure H-4.5 – IPBC, Objective C ................................................................................................... H-18 Figure H-4.6 – IPBC, Objective D ................................................................................................... H-18 Figure H-4.7 – IPBC, Objective E ................................................................................................... H-19 Figure H-4.8 – IPBC, Objective F ................................................................................................... H-19 Figure H-5 – ISBC, Targetry and Instrumentation, and Structure ................................................... H-20 Figure H-5.1 – ISBC, Range Operations Control Area ................................................................... H-20 Figure H-5.2 – ISBC, Range Sketch ................................................................................................ H-21 Figure H-5.3 – ISBC, Objective A ................................................................................................... H-22 Figure H-5.4 – ISBC, Objective B ................................................................................................... H-22 Figure H-5.5 – ISBC, Objective C ................................................................................................... H-23 Figure H-5.6 – ISBC, Objective D ................................................................................................... H-23 Figure H-5.7 – ISBC, Objective E ................................................................................................... H-24 Figure H-6 – BAX, Targetry and Instrumentation, and Structure ................................................... H-25 Figure H-6.1 – BAX, Range Operations Control Area .................................................................... H-26 Figure H-6.2 – BAX, Range Sketch ................................................................................................ H-27 Figure H-6.3 – BAX, Zone A .......................................................................................................... H-28 Figure H-6.4 – BAX, Zone B ........................................................................................................... H-29 Figure H-6.5 – BAX, 5 and 7 Building Urban Cluster .................................................................... H-30 Figure H-7 – CLF, Targetry and Instrumentation, and Structure .................................................... H-31 Figure H-7.1 – CLF, Range Operations Control Area ..................................................................... H-31 Figure H-7.2 – CLF, Range Sketch .................................................................................................. H-32 Figure H-7.3 – CLF, Entry Control Point ........................................................................................ H-33 Figure H-8 – DAGIR, Targetry and Instrumentation, and Structure ............................................... H-35 Figure H-8.1 – DAGIR, Range Operations Control Area ................................................................ H-36 Figure H-8.2 – DAGIR, Range Sketch ............................................................................................ H-37 Figure H-8.3 – DAGIR, Section 1 ................................................................................................... H-38 Figure H-8.4 – DAGIR, Section 2 ................................................................................................... H-39 Figure H-8.5 – DAGIR, Section 3 ................................................................................................... H-40 Figure H-8.6 – DAGIR, 7 Building Urban Cluster and A-GI Village ............................................. H-41 Figure H-9 – FAIR, Targetry and Instrumentation, and Structure ................................................... H-42 Figure H-9.1 – FAIR, Range Operations Control Area ................................................................... H-42 Figure H-9.2 – FAIR, Range Sketch ................................................................................................ H-43 Figure H-10 – MPRC/DMPRC, Targetry and Instrumentation, and Structure ................................ H-44 Figure H-10.1 – MPRC/DMPRC, Range Operations Control Area ................................................ H-45 Figure H-10.2 – MPRC/DMPRC, Range Sketch ............................................................................. H-46 Figure H-10.3 – MPRC/DMPRC, Zone A ....................................................................................... H-47 Figure H-10.4 – MPRC/DMPRC, Zone B ..........................
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .