B.08.02.07.10 MPMG SOW Section 011010_Att 10_TC 25-8.pdf

PDF 32 MB Posted

Attached to
Range Improvements, Slunj, Croatia
Solicitation number
W912GB21R0018
Issued by

About this file

This document describes a federal contract solicitation for range improvements at Slunj, Croatia. The U.S. Army Corps of Engineers Europe District (CENAU) is seeking a design-build contractor to complete three projects at the Eugen Kvaternik Training Area including converting an existing tank range to a multipurpose machine gun range, converting a structure to a live fire shoot house, and clearing a site for a rapid runway repair concrete pad. The solicitation number is W912GB21R0018 and interested vendors must pre-register for a virtual pre-proposal conference by the response deadline in Section 00 21 16 to receive connection details. The agency is the Department of the Army European Command.

View the file

Other files

File Type Posted
B.08.03 Amendment 0003 W912GB21R0018.pdf PDF
B.08.02.07 MPMG SOW Section 011010 - Amended 2021.06.17.pdf PDF
B.08.02.09.02 LFSH SOW Section 011010_Att2_Concept Drawings - Amended 2021.06.17.pdf PDF
B.08.02.07 MPMG SOW Section 011010 - Amended 2021.06.17.pdf PDF
B.08.02.09 LFSH SOW Section 011010 - Amended 2021.06.17.pdf PDF
B.08.03 Amendment 0002 RFP W912GB21R0018.pdf PDF
B.07.01 2021.06.11 - W912GB21R0018 PPC Slides.pdf PDF
B.08.03 Amendment 0001 RFP W912GB21R0018.pdf PDF
B.07.01 7ATC Range Improvements, Slunj, Croatia Site, Visit Roster - 2021.06.08.pdf PDF
B.08.02.07.09 MPMG SOW Section 011010_Att 9_MPMG Narrative Description Mar2017.pdf PDF
B.08.02.09.03 LFSH SOW Section 011010_Att3_Structural Calculations.pdf PDF
B.08.02.07.03 MPMG SOW Section 011010_Att 3_Structural Calculations.pdf PDF
B.08.02.09.06 LFSH SOW Section 011010_Att6_UFC 04 179 02_Small Arms Range.pdf PDF
B.08.02.07.04 MPMG SOW Section 011010_Att 4_MPMG Description.pdf PDF
B.08.02.09.04 LFSH SOW Section 011010_Att4_10 48 60_Ballistic Specifications.pdf PDF
B.08.02.07.02 MPMG SOW Section 011010_Att 2_Concept Site Plan.pdf PDF
B.08.02.09.07 LFSH SOW Section 011010_Att7_Shoothouse Standard Design Guide.pdf PDF
B.08.02.07.08 MPMG SOW Section 011010_Att 8_MAT Detail.pdf PDF
B.08.02.07.01 MPMG SOW Section 011010_Att 1_Location Map.pdf PDF
B.08.02.04 Attachment 4_BLA Template.docx DOCX document
B.08.02.09.01 LFSH SOW Section 011010_Att1_Location Map.pdf PDF
B.08.02.09.02 LFSH SOW Section 011010_Att2_Conceptual Drawings.pdf PDF
B.08.02.07 MPMG SOW Section 011010.pdf PDF
B.08.02.06 Specifications Binder Slunj Rg Imprv 2021.05.04.pdf PDF
B.08.02.08.02 RRR SOW Section 011010_Att2_Conceptual Plan.pdf PDF
B.08.02.10 RFP Attch Site Visit Registration Form v2.xlsx XLSX spreadsheet
B.08.02.09 LFSH SOW Section 011010_011010.pdf PDF
B.08.02.01 Attachment 1_Past Performance Info Sheet.pdf PDF
B.08.02.09.05 LFSH SOW Section 011010_Att5_05 12 00_Metals.pdf PDF
B.08.02.03 Attachment 3_Letter of Commitment Sample.docx DOCX document
B.08.02.07.07 MPMG SOW Section 011010_Att 7_SAT Detail.pdf PDF
B.08.02.07.05 MPMG SOW Section 011010_Att 5_Firing Position.pdf PDF
B.08.02.08 RRR SOW Section 011010.pdf PDF
B.08.02.02 Attachment 2_PPQ.pdf PDF
B.08.02.07.06 MPMG SOW Section 011010_Att 6_SIT.pdf PDF
B.08.02 RFP W912GB21R0018 Range Improvements, Slunj, Croatia.pdf PDF
B.08.02.08.01 RRR SOW Section 011010_Att1_Location Map.pdf PDF
B.08.02.05 Attachment 5_BLG Template.docx DOCX document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TC 25-8

Training Ranges

DISTRIBUTION RESTRICTION: Distribution authorized to the DOD and DOD contractors only to protect technical or operational information from automatic dissemination under the International Exchange Program or by other means. This decision was made on 07 NOV 2007. Other requests for this document will be referred to: Commander, US Army Training Support Center (ATSC), ATTN: ATIC-LTR, Fort Eustis, VA 23604.

DESTRUCTION NOTICE: Destroy by any means that will prevent disclosure of contents or reconstruction of the document.

Headquarters Department of the Army

This publication is available at the Army Publishing Directorate site (http://www.apd.army.mil), and the Central Army Registry site (https://atiam.train.army.mil/catalog/dashboard)

To receive publishing updates, please subscribe at (http://www.apd.army.mil/AdminPubs/new_subscribe.asp)

TC 25-8 i

*TC 25-8

Training Circular Headquarters No. 25-8 Department of the rmy

Washington 201

Training Ranges

Contents Preface.............................................................................................................................................. xii Chapter 1 ....................................................................................................................................... 1-1 Introduction ..................................................................................................................................... 1-1

Army Ranges .......................................................................................................................... 1-2 Range Attributes ............................................................................................................... 1-2 Individual Ranges .............................................................................................................. 1-4 Crew Ranges ...................................................................................................................... 1-4 Collective Ranges .............................................................................................................. 1-5

Range Areas ........................................................................................................................... 1-6 Up-range Areas .................................................................................................................. 1-7 Range Operations and Control Area (ROCA) ................................................................... 1-8 Maneuver Area ................................................................................................................... 1-8 Downrange Area ................................................................................................................ 1-8 Target Area ........................................................................................................................ 1-9 Impact Area ...................................................................................................................... 1-10

Chapter 2 ....................................................................................................................................... 2-1 Ranges ............................................................................................................................................. 2-1

Naming Conventions .............................................................................................................. 2-1 Facility Category Codes (FCC) .............................................................................................. 2-2 Standardized Ranges .............................................................................................................. 2-4

Chapter 3 ....................................................................................................................................... 3-1 Range Modernization ...................................................................................................................... 3-1 Section I – Overview....................................................................................................................... 3-1 Section II – The Installation Range Modernization Planning and Development ............................ 3-2 Chapter 4 ....................................................................................................................................... 4-1 Sustainable Range Program Information Technology Applications and Range Support Systems . 4-1

Sustainable Range Program Web Portal ................................................................................. 4-1

DISTRIBUTION RESTRICTION: Distribution authorized to the DOD and DOD contractors only to protect technical or operational information from automatic dissemination under the International Exchange Program or by other means. This decision was made on 07 NOV 2007. Other requests for this document will be referred to: Commander, US Army Training Support Center (ATSC), ATTN: ATIC-LTR, Fort Eustis, VA 23604.

DESTRUCTION NOTICE: Destroy by any means that will prevent disclosure of contents or reconstruction of the document.

*This publication supersedes TC 25-8, dated 10 May 2010

Contents ii TC 25-8

Range Facility Management Support System (RFMSS) ........................................................ 4-2 Army Range and Training Land Program Requirements Model (ARRM) ............................ 4-5 Range Managers Toolkit (RMTK) ......................................................................................... 4-8 ITAM Workplan ................................................................................................................... 4-10 Range Modernization & Facilities Configuration Control Board (RCCB) .......................... 4-10 Range Operations Professional Development (ROPD) ........................................................ 4-13 Range Complex Master Planning Tool (RCMPT) ............................................................... 4-16 MILCON Project Dashboard ................................................................................................ 4-17

Chapter 5 ....................................................................................................................................... 5-1 Range Operations ............................................................................................................................ 5-1 Section I Range Operations Organization ....................................................................................... 5-1

Directorate of Plans, Training, Mobilization, and Security (DPTMS) ................................... 5-1 Section II – Range Division/Training Support Division/Range Branch ......................................... 5-3

Range Manager ....................................................................................................................... 5-5 Support System Use ........................................................................................................... 5-5 Professional Development ................................................................................................. 5-5

Operations Officer .................................................................................................................. 5-6 Support System Use ........................................................................................................... 5-7 Professional Development ................................................................................................. 5-7

Range Safety Office ............................................................................................................... 5-7 Range Safety Officer ..............................................................................................................5-8

Support System Use ........................................................................................................... 5-9 Professional Development ................................................................................................. 5-9

Firing Desk ............................................................................................................................. 5-9 Support System Use ......................................................................................................... 5-10 Professional Development ............................................................................................... 5-10

Range and Training Area Scheduling ................................................................................... 5-10 Support System Use ......................................................................................................... 5-11 Professional Development ............................................................................................... 5-11

Range Maintenance .............................................................................................................. 5-11 Support System Use ......................................................................................................... 5-12 Professional Development ............................................................................................... 5-12

Range Technicians ............................................................................................................... 5-12 Support System Use ......................................................................................................... 5-12 Professional Development ............................................................................................... 5-13

Appendix A Range Selection .............................................................................................. A-1 Appendix B Range Operations and Control Area (ROCA) Facilities ........................... B-1 Appendix C Instrumentation, Devices, and Accessories ................................................. C-1 Appendix D Target Mechanisms and Emplacements ..................................................... D-1 Appendix E Targets, Panels, and Markers ....................................................................... E-1 Appendix F Small Arms Facilities ..................................................................................... F-1 Appendix G Crew-served Facilities ...................................................................................G-1 Appendix H Collective Facilities........................................................................................H-1 Appendix I Urban Operations Facilities ............................................................................ I-1 Appendix J Enablers ...........................................................................................................J-1 Appendix K Austere Environment ....................................................................................K-1

Glossary .................................................................................................................................. Glossary-1 References ........................................................................................................................... References-1

TC 25-8 iii

Figures Figure 1-1 – Range Areas ................................................................................................................... 1-2 Figure 1-2 – Up-range Areas .............................................................................................................. 1-1 Figure 1-3 – Downrange Areas ........................................................................................................... 1-2 Figure 1-4 – Impact Area .................................................................................................................... 1-1 Figure 2-1 – Facility Category Code Example, 5 Digit ...................................................................... 2-2 Figure 4-1 – ARRM User to ARRM Data Interface ........................................................................... 4-6 Figure 4-2 – ARRM Data Input Process ............................................................................................. 4-7 Figure 4-3 - ARRM............................................................................................................................. 4-8 Figure 4-4 – RCCB Process Model ................................................................................................... 4-12 Figure 4-5 – ROPD Blueprint ........................................................................................................... 4-13 Figure 4-6 – ALMS ROPD Homepage ............................................................................................. 4-15 Figure 5-1 – DPTMS Example Organizational Structure ................................................................... 5-2 Figure 5-2 – DPTMS and Range Branch Example Structure ............................................................. 5-3 Figure 5-3 – Organization to RFMSS Relationships ........................................................................ 5-11 Figure B-1 - Small ROCA Layout ..................................................................................................... B-3 Figure B-2 - Mounted ROCA Layout ................................................................................................ B-3 Figure B-3 - Instrumented ROCA (IROCA) Layout ......................................................................... B-4 Figure B-4 - Urban ROCA Layout .................................................................................................... B-5 Figure B-5 - Initial Entry Training ROCA (IEROCA) Layout .......................................................... B-6 Figure B-6 - Control Tower, Small Arms Ranges ............................................................................. B-7 Figure B-7 - Control Tower, Non-Instrumented Ranges ................................................................... B-8 Figure B-8 - Control Tower, Instrumented Ranges ........................................................................... B-8 Figure B-9 - AAR Small .................................................................................................................... B-9 Figure B-10 - AAR Large ................................................................................................................ B-10 Figure B-11 - CACTF ROC/ AAR .................................................................................................. B-11 Figure B-12 - Operations and Storage, Standard ............................................................................. B-12 Figure B-13 - Operations and Storage, Large .................................................................................. B-12 Figure B-14 - Classroom Building ................................................................................................... B-13 Figure B-15 - Aerated Vault Latrine................................................................................................ B-13 Figure B-16 - Water Latrine............................................................................................................. B-14 Figure B-17 - Bleacher Enclosure .................................................................................................... B-14 Figure B-18 - Covered Mess ............................................................................................................ B-15 Figure B-19 - Ammunition Breakdown Building ............................................................................ B-15 Figure B-20 - Ammunition Loading Dock ...................................................................................... B-16 Figure B-21 - Vehicle Instrumentation Dock .................................................................................. B-17 Figure B-22 - Battery Building ........................................................................................................ B-18 Figure B-23 - Unit Staging Area...................................................................................................... B-18 Figure B-24 - Bivouac Area ............................................................................................................. B-19 Figure C-1 - Range Control Station ................................................................................................... C-1 Figure C-2 - TRACR Suite ................................................................................................................ C-2 Figure C-3 - Tower Evaluation Workstation ..................................................................................... C-2 Figure C-4 - AAR Workstation .......................................................................................................... C-2 Figure C-5 - Crew Module Unit with Recorder (CMUR) .................................................................. C-3 Figure C-6 - Bustle Module Unit Enhanced (BMUE) ....................................................................... C-4 Figure C-7 - 8 Channel Video Encoder (POE) .................................................................................. C-4 Figure C-8 - Vehicle Accessory Case ................................................................................................ C-5 Figure C-9 - Location of Hit and Miss (LOMAH), Student Station .................................................. C-5 Figure C-10 - Shot Sensor with Shot Sensor Interface ...................................................................... C-5 iv TC 25-8

Figure C-11 - Location of Hit and Miss (LOMAH) Bar/ Target Lifter .............................................. C-5 Figure D-1 - Stationary Infantry Target (SIT)................................................................................... D-3 Figure D-2 - Double Target Arm (DTA) ........................................................................................... D-3 Figure D-3 - Moving Infantry Target (MIT) ..................................................................................... D-5 Figure D-4 - Stationary Armor Target (SAT) ................................................................................... D-6 Figure D-5 - Moving Armor Target (MAT) ...................................................................................... D-7 Figure D-6 - Entry Control Point Moving Target ............................................................................... D-9 Figure D-7 - SIT emplacement......................................................................................................... D-12 Figure D-8 - Widened SIT emplacement ......................................................................................... D-13 Figure D-9 - MIT emplacement ....................................................................................................... D-14 Figure D-10 - SAT emplacement ..................................................................................................... D-15 Figure D-11 - MAT emplacement .................................................................................................... D-16 Figure D-12 - Individual Fighting Position ...................................................................................... D-17 Figure D-13 - Individual Foxhole ..................................................................................................... D-17 Figure D-14 - Individual and Crew Machine Gun Position ............................................................. D-18 Figure D-15 - Defensive Battle Position- Two Tier ......................................................................... D-18 Figure D-16 - Reverse Slope Defensive Battle Position .................................................................. D-19 Figure D-17 - Hasty Defensive Battle Position ................................................................................ D-19 Figure D-18 - Infantry Cluster - 7 each SITs, (7:0) .......................................................................... D-20 Figure D-19 - Infantry Cluster - 6 each SITs, 1 each MIT (6:1) ..................................................... D-20 Figure E-1 - Type A1 Series Targets .................................................................................................. E-5 Figure E-2 - Type A2 Series Targets.................................................................................................. E-6 Figure E-3 - Type A4 Series Targets.................................................................................................. E-7 Figure E-4 - B Type Targets, B1 through B3-R................................................................................. E-9 Figure E-5 - B Type Targets, B4 through B5-R ............................................................................... E-10 Figure E-6 - B Type Targets, B6 through B8-R ............................................................................... E-11 Figure E-7 - B Type Targets, B9 through B12 ................................................................................. E-12 Figure E-8 - B Type Targets, B13 through B14 ............................................................................... E-13 Figure E-9 - C Type Targets, C1 through C5 ................................................................................... E-14 Figure E-10 - D Type Targets, D1 through D2 ................................................................................ E-15 Figure E-11 - E Type Targets, E1 through E3 .................................................................................. E-16 Figure E-12 - F Type Targets, F1 through F3 .................................................................................. E-17 Figure E-13 - G Type Targets, G1 through G2 ................................................................................ E-18 Figure E-14 - I Type Targets, I1 ....................................................................................................... E-19 Figure E-15 - J Type Targets, J1 through J2 .................................................................................... E-19 Figure E-16 - K Type Targets, K1 through K3 ................................................................................ E-20 Figure E-17 - Thermal Blanket, Road Wheel, Support Roller, Radar Dish, Standard Square ......... E-22 Figure E-18 - Thermal Blanket, Track and Engine Compartment ................................................... E-23 Figure E-19 - Thermal Blanket, Hull ............................................................................................... E-23 Figure E-20 - Thermal Blanket, Turret ............................................................................................. E-24 Figure E-21 - Thermal Blanket, Silhouette ...................................................................................... E-24 Figure E-22 - Thermal Identification Panels .................................................................................... E-26 Figure E-23 - Fabric Target Reference Point ................................................................................... E-27 Figure E-24 - H,M, and L Type Panel Naming Convention Definitions ......................................... E-28 Figure E-25 - Core Panel Set ............................................................................................................ E-29 Figure E-26 - H1T, Frontal ............................................................................................................... E-31 Figure E-27 - H1T, Frontal Material List ......................................................................................... E-32 Figure E-28 - H1T, Frontal VCID .................................................................................................... E-33 Figure E-29 - H1T, Flank ................................................................................................................. E-34 Figure E-30 - H1T, Flank Material List ........................................................................................... E-35 Figure E-31 - H1T, Flank VCID ...................................................................................................... E-36

TC 25-8 v

Figure E-32 - H1T, Defilade ............................................................................................................ E-37 Figure E-33 - H1T, Defilade Material List ....................................................................................... E-38 Figure E-34 - H1T, Turret ................................................................................................................ E-39 Figure E-35 - H1T, Turret Material List .......................................................................................... E-40 Figure E-36 - H1T, 3-Dimensional .................................................................................................. E-41 Figure E-37 - H1F, Friendly Frontal VCID ...................................................................................... E-42 Figure E-38 - H2T, Frontal ............................................................................................................... E-43 Figure E-39 - H2T, Frontal Material List ......................................................................................... E-44 Figure E-40 - H2T, Flank ................................................................................................................. E-45 Figure E-41 - M2T, Flank Material List ........................................................................................... E-46 Figure E-42 - H3T-BKR, Frontal ..................................................................................................... E-47 Figure E-43 - H3T-BKR, Frontal Material List ............................................................................... E-48 Figure E-44 - M1T-Frontal ............................................................................................................... E-50 Figure E-45 - M1T, Frontal Material List ........................................................................................ E-51 Figure E-46 - M1T, Frontal VCID ................................................................................................... E-52 Figure E-47 - M1T, Flank ................................................................................................................ E-53 Figure E-48 - M1T, Flank Material List ........................................................................................... E-54 Figure E-49 - M1T, Flank VCID...................................................................................................... E-55 Figure E-50 - M1T, 3-Dimensional .................................................................................................. E-56 Figure E-51 - M2T, Frontal .............................................................................................................. E-57 Figure E-52 - M2T, Frontal Material List ........................................................................................ E-58 Figure E-53 - M2T, Flank ................................................................................................................ E-59 Figure E-54 - M2T, Flank Material List ........................................................................................... E-60 Figure E-55 - M3T, Frontal .............................................................................................................. E-61 Figure E-56 - M3T, Frontal Material List ........................................................................................ E-62 Figure E-57 - M3T, Flank ................................................................................................................ E-63 Figure E-58 - M3T, Flank Material List ........................................................................................... E-64 Figure E-59 - M4T, Frontal .............................................................................................................. E-65 Figure E-60 - M4T, Frontal Material List ........................................................................................ E-66 Figure E-61 - M4T, Flank ................................................................................................................ E-67 Figure E-62 - M4T, Flank Material List ........................................................................................... E-68 Figure E-63 - M4T, 3-Dimensional .................................................................................................. E-69 Figure E-64 - L1T, Frontal ............................................................................................................... E-71 Figure E-65 - L1T, Frontal Material List ......................................................................................... E-72 Figure E-66 - L1T, Flank ................................................................................................................. E-73 Figure E-67 - L1T, Flank Material List ............................................................................................ E-74 Figure E-68 - L2T, Frontal ............................................................................................................... E-75 Figure E-69 - L2T, Frontal Material List ......................................................................................... E-76 Figure E-70 - L2T, Frontal VCID .................................................................................................... E-77 Figure E-71 - L2T, Flank ................................................................................................................. E-78 Figure E-72 - L2T, Flank Material List ............................................................................................ E-79 Figure E-73 - L2T, Flank, VCID...................................................................................................... E-80 Figure E-74 - L2T, 3-Dimensional ................................................................................................... E-81 Figure E-75 - L2F, Frontal ............................................................................................................... E-82 Figure E-76 - L2F, Frontal Material List .......................................................................................... E-83 Figure E-77 - L2F, Frontal VCID..................................................................................................... E-84 Figure E-78 - L2F, Flank .................................................................................................................. E-85 Figure E-79 - L2F, Flank Material List ............................................................................................ E-86 Figure E-80 - L2F, Flank VCID ....................................................................................................... E-87 Figure E-81 - L2F, 3-Dimensional ................................................................................................... E-88 Figure E-82 - L3T, Frontal ............................................................................................................... E-89 vi TC 25-8

Figure E-83 - L3T, Frontal Material List .......................................................................................... E-90 Figure E-84 - L3T, Flank .................................................................................................................. E-91 Figure E-85 - L3T, Flank Material List ............................................................................................ E-92 Figure E-86 - L3T, 3-Dimensional ................................................................................................... E-93 Figure E-87 - L4T, Frontal ................................................................................................................ E-94 Figure E-88 - L4T, Frontal Material List .......................................................................................... E-95 Figure E-89 - L4T, Flank .................................................................................................................. E-96 Figure E-90 - L4T, Flank Material List ............................................................................................ E-97 Figure E-91 - L5T, Frontal ................................................................................................................ E-98 Figure E-92 - L5T, Frontal Material List ......................................................................................... E-99 Figure E-93 - L5T, Flank ................................................................................................................ E-100 Figure E-94 - L5T, Flank Material List .......................................................................................... E-101 Figure E-95 – SP-1, Material List ................................................................................................... E-103 Figure E-96 – SP-2, Material List ................................................................................................... E-104 Figure E-97 – SP-3, Material List ................................................................................................... E-105 Figure E-98 – ST-1, Material List ................................................................................................... E-106 Figure E-99 – ST-5, Material List ................................................................................................... E-107 Figure E-100 – ST-6, Material List ................................................................................................. E-108 Figure E-101 – RM-1, Material List ............................................................................................... E-109 Figure E-102 – RM-2, Material List ............................................................................................... E-109 Figure E-103 – RM-3, Material List ............................................................................................... E-110 Figure E-104 – FT-1, (versions A, B, and C) ................................................................................ E-111 Figure E-105 – FT-2 ....................................................................................................................... E-112 Figure E-106 – FT-3 ....................................................................................................................... E-112 Figure E-107 – FT-4 ....................................................................................................................... E-113 Figure F-1 – CPQC, Targetry, Instrumentation, and Structures ......................................................... F-2 Figure F-1.1- CPQC, Range Operations Control Area ....................................................................... F-2 Figure F-1.2 – CPQC, Range Sketch .................................................................................................. F-3 Figure F-1.3 – Standard Military Police Barricade Design ................................................................. F-4 Figure F-2 – AFF, Targetry and Instrumentation, and Structure ........................................................ F-5 Figure F-2.1 – AFF, Range Operations Control Area ......................................................................... F-5 Figure F-2.2- AFF, Range Sketch ....................................................................................................... F-6 Figure F-3 – ARF, Targetry and Instrumentation, and Structure ........................................................ F-7 Figure F-3.1 – ARF, Range Operations Control Area ........................................................................ F-7 Figure F-3.2- ARF, Range Sketch ...................................................................................................... F-8 Figure F-4 – SFF, Targetry and Instrumentation, and Structure ......................................................... F-9 Figure F-4.1 – SFF, Range Operations Control Area ......................................................................... F-9 Figure F-4.2- SFF, Range Sketch ..................................................................................................... F-10 Figure F-5 – Zero, Targetry and Instrumentation, and Structure ...................................................... F-11 Figure F-5.1 – Zero, Range Operations Control Area ...................................................................... F-11 Figure F-5.2- Zero, Range Sketch ..................................................................................................... F-12 Figure F-6 – FMR, Targetry and Instrumentation, and Structure ..................................................... F-13 Figure F-6.1 – FMR, Range Operations Control Area ...................................................................... F-13 Figure F-6.2 - FMR, Range Sketch ................................................................................................... F-14 Figure F-7 - GLR, Targetry and Instrumentation, and Structure ...................................................... F-15 Figure F-7.1 - GLR, Range Operations Control Area ....................................................................... F-15 Figure F-7.2 - GLR, Range Sketch ................................................................................................... F-16 Figure F-8 – HGFR, Targetry and Instrumentation, and Structure ................................................... F-17 Figure F-8.1 – HGFR, Range Operations Control Area ................................................................... F-17 Figure F-8.2- HGFR, Range Sketch .................................................................................................. F-18 Figure F-9 – HGQC, Targetry and Instrumentation, and Structure .................................................. F-19

TC 25-8 vii

Figure F-9.1 – HGQC, Range Operations Control Area .................................................................. F-19 Figure F-9.2- HGQC, Range Sketch ................................................................................................ F-20 Figure F-10 – HSR, Targetry and Instrumentation, and Structure ................................................... F-21 Figure F-10.1 – HSR, Range Operations Control Area .................................................................... F-21 Figure F-10.2- HSR, Range Sketch .................................................................................................. F-22 Figure F-11 – IC, Targetry and Instrumentation, and Structure ....................................................... F-23 Figure F-11.1- IC, Range Operations Control Area ......................................................................... F-23 Figure F-11.2- IC, Range Sketch ...................................................................................................... F-24 Figure F-12 – KD, Targetry and Instrumentation, and Structure ..................................................... F-25 Figure F-12.1- KD, Range Operations Control Area ....................................................................... F-25 Figure F-12.2 - KD, Range Sketch ................................................................................................... F-26 Figure F-13 – DEMO-L, Targetry and Instrumentation, and Structure ........................................... F-27 Figure F-13.1- DEMO-L, Range Operations Control Area .............................................................. F-27 Figure F-13.2- DEMO-L, Range Sketch .......................................................................................... F-28 Figure F-14 – MRF, Targetry and Instrumentation, and Structure ................................................... F-29 Figure F-14.1- MRF, Range Operations Control Area ..................................................................... F-29 Figure F-14.2- MRF, Range Sketch ................................................................................................. F-30 Figure G-1 – MPMG, Targetry and Instrumentation, and Structure .................................................. G-2 Figure G-1.1 – MPMG, Range Operations Control Area ................................................................... G-2 Figure G-1.2 – MPMG, SIT Emplacement ....................................................................................... G-3 Figure G-1.3 – MPMG, Range Sketch .............................................................................................. G-4 Figure G-1.4 – MPMG, Center Lanes ................................................................................................ G-5 Figure G-1.5 – MPMG, Wing Lanes .................................................................................................. G-6 Figure G-2 – QTR, Targetry and Instrumentation, and Structure ...................................................... G-7 Figure G-2.1 – QTR, Range Operations Control Area ....................................................................... G-8 Figure G-2.2 – QTR, SIT Formations ............................................................................................... G-9 Figure G-2.3 – QTR, Range Sketch ................................................................................................. G-10 Figure G-2.4 – QTR, Center Lanes .................................................................................................. G-11 Figure G-2.5 – QTR, Wing Lanes .................................................................................................... G-12 Figure G-2.6 – QTR, Basic Rifle Center Lanes ............................................................................... G-13 Figure G-2.7 – QTR, Pistol Center Lanes ........................................................................................ G-14 Figure G-3 – LAWR, Targetry and Instrumentation, and Structure ................................................. G-15 Figure G-3.1 - LAWR, Range Operations Control Area .................................................................. G-15 Figure G-3.2 - LAWR, Range Sketch .............................................................................................. G-16 Figure H-1 – AGR, Targetry and Instrumentation, and Structure ...................................................... H-3 Figure H-1.1 – AGR, Range Operations Control Area ...................................................................... H-4 Figure H-1.2 – AGR, Range Sketch ................................................................................................... H-5 Figure H-1.3 – AGR, Zone A ............................................................................................................. H-6 Figure H-1.4 – AGR, Zone B ............................................................................................................. H-7 Figure H-1.5 – AGR, Zone C ............................................................................................................. H-8 Figure H-1.6 – AGR, 5 Building Urban Cluster ................................................................................ H-9 Figure H-1.7 – AGR, A-GI Village .................................................................................................. H-10 Figure H-2 – ADFR, Targetry and Instrumentation, and Structure .................................................. H-11 Figure H-2.1 – ADFR, Range Operations Control Area .................................................................. H-11 Figure H-2.2 – ADFR, Range Sketch ............................................................................................... H-12 Figure H-3 – ATLF, Targetry and Instrumentation, and Structure .................................................. H-13 Figure H-3.1 – ATLF, Range Operations Control Area ................................................................... H-13 Figure H-3.2 – ATLF, Range Sketch ............................................................................................... H-14 Figure H-4 – IPBC, Targetry and Instrumentation, and Structure ................................................... H-15 Figure H-4.1 – IPBC, Range Operations Control Area .................................................................... H-15 Figure H-4.2 – IPBC, Range Sketch ................................................................................................ H-16 viii TC 25-8

Figure H-4.3 – IPBC, Objective A ................................................................................................... H-17 Figure H-4.4 – IPBC, Objective B ................................................................................................... H-17 Figure H-4.5 – IPBC, Objective C ................................................................................................... H-18 Figure H-4.6 – IPBC, Objective D ................................................................................................... H-18 Figure H-4.7 – IPBC, Objective E ................................................................................................... H-19 Figure H-4.8 – IPBC, Objective F ................................................................................................... H-19 Figure H-5 – ISBC, Targetry and Instrumentation, and Structure ................................................... H-20 Figure H-5.1 – ISBC, Range Operations Control Area ................................................................... H-20 Figure H-5.2 – ISBC, Range Sketch ................................................................................................ H-21 Figure H-5.3 – ISBC, Objective A ................................................................................................... H-22 Figure H-5.4 – ISBC, Objective B ................................................................................................... H-22 Figure H-5.5 – ISBC, Objective C ................................................................................................... H-23 Figure H-5.6 – ISBC, Objective D ................................................................................................... H-23 Figure H-5.7 – ISBC, Objective E ................................................................................................... H-24 Figure H-6 – BAX, Targetry and Instrumentation, and Structure ................................................... H-25 Figure H-6.1 – BAX, Range Operations Control Area .................................................................... H-26 Figure H-6.2 – BAX, Range Sketch ................................................................................................ H-27 Figure H-6.3 – BAX, Zone A .......................................................................................................... H-28 Figure H-6.4 – BAX, Zone B ........................................................................................................... H-29 Figure H-6.5 – BAX, 5 and 7 Building Urban Cluster .................................................................... H-30 Figure H-7 – CLF, Targetry and Instrumentation, and Structure .................................................... H-31 Figure H-7.1 – CLF, Range Operations Control Area ..................................................................... H-31 Figure H-7.2 – CLF, Range Sketch .................................................................................................. H-32 Figure H-7.3 – CLF, Entry Control Point ........................................................................................ H-33 Figure H-8 – DAGIR, Targetry and Instrumentation, and Structure ............................................... H-35 Figure H-8.1 – DAGIR, Range Operations Control Area ................................................................ H-36 Figure H-8.2 – DAGIR, Range Sketch ............................................................................................ H-37 Figure H-8.3 – DAGIR, Section 1 ................................................................................................... H-38 Figure H-8.4 – DAGIR, Section 2 ................................................................................................... H-39 Figure H-8.5 – DAGIR, Section 3 ................................................................................................... H-40 Figure H-8.6 – DAGIR, 7 Building Urban Cluster and A-GI Village ............................................. H-41 Figure H-9 – FAIR, Targetry and Instrumentation, and Structure ................................................... H-42 Figure H-9.1 – FAIR, Range Operations Control Area ................................................................... H-42 Figure H-9.2 – FAIR, Range Sketch ................................................................................................ H-43 Figure H-10 – MPRC/DMPRC, Targetry and Instrumentation, and Structure ................................ H-44 Figure H-10.1 – MPRC/DMPRC, Range Operations Control Area ................................................ H-45 Figure H-10.2 – MPRC/DMPRC, Range Sketch ............................................................................. H-46 Figure H-10.3 – MPRC/DMPRC, Zone A ....................................................................................... H-47 Figure H-10.4 – MPRC/DMPRC, Zone B ..........................

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .