EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_E_-_Power_Centers.pdf

PDF 65 KB Posted

Attached to
Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep Federal contract opportunity
Solicitation number
140D0426R0084
Issued by
Department of the Interior Departmental Offices Interior Business Center

About this file

This is a technical exhibit documenting JMMU (Joint Munitions Maintenance Unit) Target Designation power center infrastructure specifications from 2001 as-built drawings. The exhibit presents a comprehensive table of 17 power centers (PJ1A through PJ9A) that comprise the electrical power distribution system for the facility.

Each power center entry details the following specifications: the source drawing sheet reference, feed source equipment (pad-mounted air interrupter switches), location relative to Line of Authority (LOA), fiber connections serving each power center, fiber count entering and exiting the power center (ranging from 18 to 144 fibers entering and 12 to 198 exiting), sump conditions, RLM relay controller presence, and power and fiber directory availability. The table identifies 8 power centers located behind the LOA and 9 forward of the LOA. Critical infrastructure notes highlight specific issues including missing fiber or missing power components at several centers (PJ1B, PJ2A, PJ4B, PJ6B), flooding problems at PJ3B with active sump pump operations, and RLM relay installations at selected centers (PJ2B, PJ5A, PJ5B, PJ8B, PJ9B). Total documented end-to-end fiber testing requirements equal 2,088 segments, comprised of 876 tests from the Central Control Building to power center patch panels and 1,212 tests between power center patch panels and targets. Cross-section details, single-line electrical diagrams, and fiber routing diagrams are referenced in specific drawing sheets (E-21, E-52 through E-54, E-57 through E-58, and E-61 through E-63).

View the file

Other files for this federal contract opportunity

Other files attached to Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep, newest first.
File Type Posted
Sol_140D0426R0084_Amd_0003.pdf PDF
Sol_140D0426R0084_Amd_0002.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part2_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part1_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part6_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part5_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part3_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part7_0001.pdf PDF
Sol_140D0426R0084_Amd_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part4_0001.pdf PDF
EXHIBIT_E___Cluster_MIT_V-Shape_Formation.pdf PDF
B08_SOL_Fort_Hood_JMMU_Range_Upgrades_SOW.pdf PDF
EXHIBIT_H_-_SIT_Cluster_November_2018.pdf PDF
EXHIBIT_N_-_Mandatory_Shutdown_times.pdf PDF
EXHIBIT_O___Summary_Target_Electrical_and_Communications.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_B_-_Clusters_and_Moving_Infantry_Targets_(MITs).pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_C_-_Startionary_Armored_Targets_(SATs).pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_D_-_Drainage_(ditches_culverts_and_sump_pumps).pdf PDF
EXHIBIT_U_-_Gate_Design.pdf PDF
EXHIBIT_AA___DMMU_MAT_System_locations_and_existing_conditions.pdf PDF
Sol_140D0426R0084.pdf PDF
EXHIBIT_A_-_FTHOOD-JMMU-AERIAL.pdf PDF
EXHIBIT_G_-_Moving_InfantryTarget_(MIT)_-_Aug2017.pdf PDF
EXHIBIT_J_-_Moving_Armor_Target_(MAT)_-_Aug2017.pdf PDF
EXHIBIT_L_-_JMMU_RANGE_SITE_SUMMARY_PCs_AND_CAMERA.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_A_-_Moving_Armored_Targets_(MATs).pdf PDF
EXHIBIT_T_-_Portable_Armored_Target_Protection.pdf PDF
EXHIBIT_FF_-_PKRA_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
EXHIBIT_GG_-_QTR_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
B08_SOL_140D0426R0084_JMMU_Range_Upgrades_Fort_Hood.pdf PDF
EXHIBIT_C_-_JMMU_MAT54_MAT56__MAT58___AT60_CROSS-SECTION.pdf PDF
EXHIBIT_D_-_Moving_Armor_Target_MAT_Locations.pdf PDF
EXHIBIT_I_-_Stationary_ArmorTarget_(SAT)_-_Aug2017.pdf PDF
EXHIBIT_M_-_Species_List_for_Range_Seed.pdf PDF
EXHIBIT_P_-_ELECTRICAL_AND_COMMUNICATIONS.pdf PDF
EXHIBIT_Q___TC25-8_Minimum_MAT_Specification_Requirements.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_F_-_Fiber_Optics.pdf PDF
EXHIBIT_DD_-_BGRC_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
EXHIBIT_EE_-_CCRB_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
B03_WD_TX20260279.pdf PDF
EXHIBIT_B_-_JMMU_CLUSTER_LOCATIONS_FOR_MIT_LOCATIONS.pdf PDF
EXHIBIT_K_-_TXDOT_Concrete_Repair_Manual_crm.pdf PDF
EXHIBIT_S_-_Target_Protection_-_July_2017.pdf PDF
EXHIBIT_V_-_CCI-TII_Checklist_Instructions.pdf PDF
EXHIBIT_W_-_CCI-TII_Checklist.pdf PDF
EXHIBIT_X_-_Portable_HSAT_Specifications.pdf PDF
EXHIBIT_Y_-_Range_Limit_Marker_Design.pdf PDF
EXHIBIT_Z_-_JMMU_SACON_Trench_System_Repairs.pdf PDF
EXHIBIT_BB_-_Firing_Positions_Revision_6.pdf PDF
EXHIBIT_CC_-_EXISTING_CONDITIONS_PHOTOS.pdf PDF
Show all 50

Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT R - JMMU Target Designation Ref:

TAB E - Power Centers

Power cent

2001 ASBUILT

DRAWING

SHEET FEED FROM location Fiber Feeds Power to:

Fibers Entering PC Fibers Exiting PC (excludes (JV) Sump?

RLM Relay Controller

POWER AND FIBER

DIRECTORIES at PC?

NOTES Power centers

PJ1A

E-11 (sheet 215 of 451)

Pad Mounted Air Interrupter Switch PM- 2 Behind LOA C20, 412, 414

48 54 NO NO YES

PJ1A

PJ1B

E-16 (Sheet 220 of 451)

Pad Mounted Air Interrupter Switch PM- 2 Behind LOA (JV-5), 432, 420/C62

18 12 NO NO MISSING BOTH

PJ1B

PJ2A

E-17 (sheet 221 of 451) PJ3A/SE-J1 Behind LOA C14, C12, 418, 416, 426, 428, 430 84 114 NO NO MISSING FIBER PJ2A

PJ2B

E-17 (sheet 221 of 451) PJ1B Behind LOA C18, 448, 446, C16 72 96 NO YES YES power feeds RLM PJ2B

PJ3A

E-17 (sheet 221 of 451) PJ3A/SE-J1 Behind LOA 436, C22, 424, 422, 438, MAT52 48 72 NO NO YES PJ3A

PJ3B

E23 (sheet 227 of 451) PJ2B Behind LOA (JV-25), 460, 462, 454, 452, 458 96 96 YES NO YES Pit has flooding problem. Sump pump is working PJ3B

PJ4A

E-17 (sheet 221 of 451) PJ3A/SE-J1 Behind LOA (JV-23), 444, C24, 440, 438, 442 60 66 NO NO YES PJ4A

PJ4B

E23 (sheet 227 of 451) PJ3B Forward of LOA (JV-43), 464, 472, MAT54, C32, 478 60 66 NO NO MISSING POWER PJ4B

PJ5A

E-18 (sheet 222 of 451) PJ4A Behind LOA 450, 470, C30, 466, 456, C34 84 108 YES NO YES PJ5A

PJ5B

E23 (sheet 227 of 451) PJ4B Forward of LOA 480, 490, C40, 486 48 60 YES NO YES PJ5B

PJ6A

E-18 (sheet 222 of 451) PJ5A Forward of LOA C26, C28, 474, 482, C38, C36, 468, 476 144 198 NO NO YES PJ6A

PJ6B

E24 (sheet 228 of 451) PJ5B Forward of LOA (JV-50, JV-69), 506, 492 84 84 NO YES MISSING POWER RLM JL-2 relay PJ6B

PJ7A

E24 (sheet 228 of 451) PJ6A Forward of LOA (JV-52), 504, 498, 494, 488 72 72 NO NO YES PJ7A

PJ7B

E25 (sheet 229 of 451) PJ6B Forward of LOA (JV-66), 514, 512, 510, 508 60 24 YES NO YES PJ7B

PJ8A

E-19 (sheet 223 of 451) PJ7A Forward of LOA MV60, 498, 502, (JV-65) 48 42 NO NO YES PJ8A

PJ8B

E-20 (sheet 224 of 451) PJ9A Forward of LOA (JV-64), 528, 530, 524, 526, 520 30 30 NO YES YES RLM CL-3 relay PJ8B

PJ9A

E-20 (sheet 224 of 451) PJ8A Forward of LOA 516, 522, 518, PJ8B 30 18 NO NO YES PJ9A

NOTE: SEE 2001 ASBUILT DRAWING CD-5 1086 1212

FOR SINGLE LINE DIAGRAM FOR ELECTRICAL POWER DISTRIBUTION SEE SHEETS E-52 (sheet 255 of 451) thru E-54 (sheet 257 of 451) FOR SINGLE LINE DIAGRAMS SEE E-57 (sheet 260 of 451) & E-58 (sheet 261 of 451) ALL PCS FEED "TVSS" FOR "transient voltage surge suppressor" FOR TRENCH CROSS-SECTION SEE E-21 (sheet 225 of 451) For Single line diagram for fiber see E-61 (264 of 451), E-62 (265 of 451) & E-63 (266 of 451)

876 End to End fiber testing from Central Control Building to PC patch panel.

1212 End to End fiber testing from PC patch panel to PC patch panel and targets Total 2088 End to End fiber testing.

8 of 17 behind LOA 9 of 17 forward of LOA