EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_E_-_Power_Centers.pdf
PDF 65 KB Posted
- Attached to
- Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep Federal contract opportunity
- Solicitation number
- 140D0426R0084
About this file
This is a technical exhibit documenting JMMU (Joint Munitions Maintenance Unit) Target Designation power center infrastructure specifications from 2001 as-built drawings. The exhibit presents a comprehensive table of 17 power centers (PJ1A through PJ9A) that comprise the electrical power distribution system for the facility.
Each power center entry details the following specifications: the source drawing sheet reference, feed source equipment (pad-mounted air interrupter switches), location relative to Line of Authority (LOA), fiber connections serving each power center, fiber count entering and exiting the power center (ranging from 18 to 144 fibers entering and 12 to 198 exiting), sump conditions, RLM relay controller presence, and power and fiber directory availability. The table identifies 8 power centers located behind the LOA and 9 forward of the LOA. Critical infrastructure notes highlight specific issues including missing fiber or missing power components at several centers (PJ1B, PJ2A, PJ4B, PJ6B), flooding problems at PJ3B with active sump pump operations, and RLM relay installations at selected centers (PJ2B, PJ5A, PJ5B, PJ8B, PJ9B). Total documented end-to-end fiber testing requirements equal 2,088 segments, comprised of 876 tests from the Central Control Building to power center patch panels and 1,212 tests between power center patch panels and targets. Cross-section details, single-line electrical diagrams, and fiber routing diagrams are referenced in specific drawing sheets (E-21, E-52 through E-54, E-57 through E-58, and E-61 through E-63).
View the file
Other files for this federal contract opportunity
Show all 50
Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT R - JMMU Target Designation Ref:
TAB E - Power Centers
Power cent
2001 ASBUILT
DRAWING
SHEET FEED FROM location Fiber Feeds Power to:
Fibers Entering PC Fibers Exiting PC (excludes (JV) Sump?
RLM Relay Controller
POWER AND FIBER
DIRECTORIES at PC?
NOTES Power centers
PJ1A
E-11 (sheet 215 of 451)
Pad Mounted Air Interrupter Switch PM- 2 Behind LOA C20, 412, 414
48 54 NO NO YES
PJ1A
PJ1B
E-16 (Sheet 220 of 451)
Pad Mounted Air Interrupter Switch PM- 2 Behind LOA (JV-5), 432, 420/C62
18 12 NO NO MISSING BOTH
PJ1B
PJ2A
E-17 (sheet 221 of 451) PJ3A/SE-J1 Behind LOA C14, C12, 418, 416, 426, 428, 430 84 114 NO NO MISSING FIBER PJ2A
PJ2B
E-17 (sheet 221 of 451) PJ1B Behind LOA C18, 448, 446, C16 72 96 NO YES YES power feeds RLM PJ2B
PJ3A
E-17 (sheet 221 of 451) PJ3A/SE-J1 Behind LOA 436, C22, 424, 422, 438, MAT52 48 72 NO NO YES PJ3A
PJ3B
E23 (sheet 227 of 451) PJ2B Behind LOA (JV-25), 460, 462, 454, 452, 458 96 96 YES NO YES Pit has flooding problem. Sump pump is working PJ3B
PJ4A
E-17 (sheet 221 of 451) PJ3A/SE-J1 Behind LOA (JV-23), 444, C24, 440, 438, 442 60 66 NO NO YES PJ4A
PJ4B
E23 (sheet 227 of 451) PJ3B Forward of LOA (JV-43), 464, 472, MAT54, C32, 478 60 66 NO NO MISSING POWER PJ4B
PJ5A
E-18 (sheet 222 of 451) PJ4A Behind LOA 450, 470, C30, 466, 456, C34 84 108 YES NO YES PJ5A
PJ5B
E23 (sheet 227 of 451) PJ4B Forward of LOA 480, 490, C40, 486 48 60 YES NO YES PJ5B
PJ6A
E-18 (sheet 222 of 451) PJ5A Forward of LOA C26, C28, 474, 482, C38, C36, 468, 476 144 198 NO NO YES PJ6A
PJ6B
E24 (sheet 228 of 451) PJ5B Forward of LOA (JV-50, JV-69), 506, 492 84 84 NO YES MISSING POWER RLM JL-2 relay PJ6B
PJ7A
E24 (sheet 228 of 451) PJ6A Forward of LOA (JV-52), 504, 498, 494, 488 72 72 NO NO YES PJ7A
PJ7B
E25 (sheet 229 of 451) PJ6B Forward of LOA (JV-66), 514, 512, 510, 508 60 24 YES NO YES PJ7B
PJ8A
E-19 (sheet 223 of 451) PJ7A Forward of LOA MV60, 498, 502, (JV-65) 48 42 NO NO YES PJ8A
PJ8B
E-20 (sheet 224 of 451) PJ9A Forward of LOA (JV-64), 528, 530, 524, 526, 520 30 30 NO YES YES RLM CL-3 relay PJ8B
PJ9A
E-20 (sheet 224 of 451) PJ8A Forward of LOA 516, 522, 518, PJ8B 30 18 NO NO YES PJ9A
NOTE: SEE 2001 ASBUILT DRAWING CD-5 1086 1212
FOR SINGLE LINE DIAGRAM FOR ELECTRICAL POWER DISTRIBUTION SEE SHEETS E-52 (sheet 255 of 451) thru E-54 (sheet 257 of 451) FOR SINGLE LINE DIAGRAMS SEE E-57 (sheet 260 of 451) & E-58 (sheet 261 of 451) ALL PCS FEED "TVSS" FOR "transient voltage surge suppressor" FOR TRENCH CROSS-SECTION SEE E-21 (sheet 225 of 451) For Single line diagram for fiber see E-61 (264 of 451), E-62 (265 of 451) & E-63 (266 of 451)
876 End to End fiber testing from Central Control Building to PC patch panel.
1212 End to End fiber testing from PC patch panel to PC patch panel and targets Total 2088 End to End fiber testing.
8 of 17 behind LOA 9 of 17 forward of LOA
File details come from the government source that posted it. Updated .