This is a design guide for Moving Infantry Target (MIT) emplacement installations developed by the U.S. Army Engineering and Support Center, Huntsville, as part of the Range and Training Land Program (RTLP). The document provides comprehensive technical specifications and design requirements for constructing MIT target positions used in military training ranges.

The guide specifies that MIT emplacements are available in two standard lengths (15m and 40m) plus an additional 2m space for electrical equipment, with the normal position at a 45-degree angle to the engagement point (variable from 30 to 90 degrees). Key civil/siting requirements include: above-grade or below-grade concrete emplacement construction with geotextile/gravel drainage layers and treated railroad tie front walls; a minimum front wall height of 660mm (26 inches) to protect electrical and targetry equipment; drainage slopes of 0-2% along the track length with a maximum of 5% to accommodate adverse weather; a minimum 2.3m (7.5ft) clear space from the emplacement wall for target travel; and protective earthen berms designed based on projectile type and soil compaction. Electrical requirements include Load Centers (LC), Target Power Receptacles (NEMA L14-20R at 120/240VAC single phase supplying 2kVA), Auxiliary Power Receptacles (NEMA L5-20R for 120V), GFCI Maintenance Receptacles, data enclosures rated NEMA 4, 4X, or 6P, grounding via 19mm copper-clad steel rods with #6 AWG bare copper conductors, and surge protective devices. Data connections utilize fiber optic cables with SC male connectors and Category 5E or better network cables with RJ45 connectors. Environmental operating limits are -34°C to 60°C with 5-95% relative humidity non-condensing. The document includes detailed civil and electrical elevation drawings, sections, and specifications for both above-grade (MIT-A) and below-grade (MIT-B) configurations.

View the file

Other files for this federal contract opportunity

Other files attached to Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep, newest first.
File Type Posted
Sol_140D0426R0084_Amd_0003.pdf PDF
Sol_140D0426R0084_Amd_0002.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part3_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part7_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part2_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part1_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part6_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part5_0001.pdf PDF
Sol_140D0426R0084_Amd_0001.pdf PDF
EXHIBIT_F_-_CCMU_JMMU_2001_Part4_0001.pdf PDF
Sol_140D0426R0084.pdf PDF
EXHIBIT_A_-_FTHOOD-JMMU-AERIAL.pdf PDF
EXHIBIT_J_-_Moving_Armor_Target_(MAT)_-_Aug2017.pdf PDF
EXHIBIT_L_-_JMMU_RANGE_SITE_SUMMARY_PCs_AND_CAMERA.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_A_-_Moving_Armored_Targets_(MATs).pdf PDF
EXHIBIT_T_-_Portable_Armored_Target_Protection.pdf PDF
EXHIBIT_FF_-_PKRA_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
EXHIBIT_GG_-_QTR_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
EXHIBIT_E___Cluster_MIT_V-Shape_Formation.pdf PDF
B08_SOL_Fort_Hood_JMMU_Range_Upgrades_SOW.pdf PDF
EXHIBIT_H_-_SIT_Cluster_November_2018.pdf PDF
EXHIBIT_N_-_Mandatory_Shutdown_times.pdf PDF
EXHIBIT_O___Summary_Target_Electrical_and_Communications.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_B_-_Clusters_and_Moving_Infantry_Targets_(MITs).pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_C_-_Startionary_Armored_Targets_(SATs).pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_D_-_Drainage_(ditches_culverts_and_sump_pumps).pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_E_-_Power_Centers.pdf PDF
EXHIBIT_U_-_Gate_Design.pdf PDF
EXHIBIT_AA___DMMU_MAT_System_locations_and_existing_conditions.pdf PDF
B08_SOL_140D0426R0084_JMMU_Range_Upgrades_Fort_Hood.pdf PDF
EXHIBIT_C_-_JMMU_MAT54_MAT56__MAT58___AT60_CROSS-SECTION.pdf PDF
EXHIBIT_D_-_Moving_Armor_Target_MAT_Locations.pdf PDF
EXHIBIT_I_-_Stationary_ArmorTarget_(SAT)_-_Aug2017.pdf PDF
EXHIBIT_M_-_Species_List_for_Range_Seed.pdf PDF
EXHIBIT_P_-_ELECTRICAL_AND_COMMUNICATIONS.pdf PDF
EXHIBIT_Q___TC25-8_Minimum_MAT_Specification_Requirements.pdf PDF
EXHIBIT_R_-_JMMU_Target_designation_ref__TAB_F_-_Fiber_Optics.pdf PDF
EXHIBIT_DD_-_BGRC_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
EXHIBIT_EE_-_CCRB_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
B03_WD_TX20260279.pdf PDF
EXHIBIT_B_-_JMMU_CLUSTER_LOCATIONS_FOR_MIT_LOCATIONS.pdf PDF
EXHIBIT_K_-_TXDOT_Concrete_Repair_Manual_crm.pdf PDF
EXHIBIT_S_-_Target_Protection_-_July_2017.pdf PDF
EXHIBIT_V_-_CCI-TII_Checklist_Instructions.pdf PDF
EXHIBIT_W_-_CCI-TII_Checklist.pdf PDF
EXHIBIT_X_-_Portable_HSAT_Specifications.pdf PDF
EXHIBIT_Y_-_Range_Limit_Marker_Design.pdf PDF
EXHIBIT_Z_-_JMMU_SACON_Trench_System_Repairs.pdf PDF
EXHIBIT_BB_-_Firing_Positions_Revision_6.pdf PDF
EXHIBIT_CC_-_EXISTING_CONDITIONS_PHOTOS.pdf PDF
Show all 50

Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RANGE AND TRAINING LAND PROGRAM – MANDATORY CENTER OF EXPERTISE

U.S. ARMY ENGINEERING AND SUPPORT CENTER, HUNTSVILLE

HUNTSVILLE, ALABAMA

256-895-1534

EMAIL RTLP

Moving Infantry Target

(MIT)

mailto:DLL-CEHNC-RTLP@usace.army.mil

BUILDING STRONG® 1

M o v in g I n fa n tr y T a rg e t– A u g u s t

R T L P

-M C

X R a n g e

D e s ig n G u id e

General

The Moving Infantry Target (MIT) emplacement is used for the installation of a MIT target.

There are two standard lengths, 15m and 40m; an additional 2m space is provided at one end for the installation of the electrical equipment. See the standard Civil and Electrical detail drawings for specific dimensions and details. The normal position for the MIT emplacement is at a 45-degree angle to the engagement point, though the angle can vary from 30 to 90 degrees. The block outs for the Load Center (LC) and Master Target Data Panel (MTDP) are located at the end of the emplacement closest to the engagement point.

Range designers should refer to the Inspection Checklists provided in the RDG to ensure that all required items are included in the design.

Civil/Siting

This section covers the Civil Engineering and Siting issues unique to this type of emplacement.

Refer to the separate range sections of the RDG for additional siting issues specific to a particular range. See the special sections below for additional information particular to a specific target type.

Emplacement

The standard MIT uses a concrete emplacement with a geotextile/gravel drainage layer, a treated railroad tie front wall protection, and a protective earthen berm. Either precast or cast-in-place concrete is acceptable. Differential settlement between precast sections is not allowed.

Installations may prefer to use other materials, which is acceptable as long as it is durable, provides protection, and is compatible with the electrical and target equipment. The compacted earth berm provides the protection for the coffin and installed equipment from all anticipated directions of fire. The concrete emplacement does not provide significant protection.

Mount all MIT emplacement permanent electrical and communication boxes on the front wall of the emplacement no less than 50 mm (2 in) below the top of the emplacement wall. This mounting height helps protect them from rounds that might skim over the top of the berm. The targetry provider installs the target mechanism on the floor of the concrete emplacement as far forward as practical to minimize its potential to be hit by a low round, yet still allow access to the electrical/data boxes.

Above-Grade Emplacement

Above-grade emplacements are the most common in range construction due to their ease of drainage, ease of obtaining line-of-sight, and small disturbance to the existing grade.

Below-Grade Emplacement

Below grade emplacements blend with the natural terrain and do not present the target position profile to the soldier/shooter. Unfortunately, below-grade emplacements present several design issues as follows:

Drainage :

BUILDING STRONG® 2

o v in g I n fa n tr y T a rg e t– A u g u s t

L P

-M C

X R a n g e

D e s ig n G u

Positive drainage is harder to achieve on a below grade emplacement. Floor drains are problematic in that they require a lower elevation nearby for a daylight drain and tend to clog. Drainage swales increase excavation requirements.

Unexploded Ordnance (UXO):

UXO disturbance potential increases with the depth of excavation. While an above-grade emplacement might only require disturbing the surface to 150mm (6in) below natural grade, below-grade emplacements often require excavation of 1m (3ft) or more. For medium and high-risk areas, normally a subsurface clearance to a depth of one foot below the construction footprint is required.

Line-of-Sight:

Line-of-sight between the firing position and the target emplacement may not be possible using the natural terrain.

Other debris:

Below-grade emplacements also tend to gather more sand, dirt, and windblown debris, which can cause maintenance problems.

The designer should discuss with the installation whether they desire above- or below-grade MIT emplacements, while ensuring that the installation understands the design issues and costs associated with either choice.

Drainage

Ensuring proper drainage is critical in the design and construction of target emplacements. Even though the electrical and target equipment is designed for outdoor installation, many of the issues with range targetry can be avoided with proper emplacement drainage. The ground should slope away from the emplacement whenever possible; add swales as necessary to ensure positive drainage. The floor of the emplacement must slope to the rear. Special care is required in the use of floor and trench drains, as they tend to clog easily and freeze in some climates. Ensure proper compaction under the emplacement to avoid differential settlement. Drainage is especially critical on newly constructed ranges before vegetation is fully established.

Target Clearance

No obstruction may be present which interferes with travel of the target along the entire length either in the up or down position. Provide a minimum of 2.3m (7.5ft) clear space from the face of the emplacement wall along the entire length of the MIT.

MIT Slope

The MIT targetry is required to be able to travel on a maximum grade of 10 percent. In general practice, design the emplacement with 0-2% slope along the length of the track. Use a maximum slope of 5 percent to allow for use in adverse weather.

Vertical or horizontal curves are not allowed.

BUILDING STRONG® 3

o v in g I n fa n tr y T a rg e t– A u g u s t

L P

-M C

X R a n g e

D e s ig n G u

Wall Height

The front wall and berm must be high enough to protect the targetry equipment while still allowing the target to be visible from the firing position. The standard (minimum) front wall height is 660mm (26in). The height has been coordinated within the program as the minimum that hides both the electrical equipment and the targetry based on a relatively flat angle of fire from the shooter to the target, generally +/- 2 degrees.

Angle of Fire

The angle of fire (AOF) from the gun barrel to the target is a critical parameter on a range that affects the functionality in a number of ways. Certain range and weapon types have a limit on the allowable angle of fire, e.g. a Known Distance range limits the AOF to +/- 2 degrees. Refer to the installation trainers, applicable training manuals, and the RDG section for specific range types for additional information and guidance. In addition, the amount of the target that is visible to shooters can affect the ability to qualify, e.g. it is harder to qualify on a MRF when only half of the target is visible. Finally, rounds can hit and damage targetry and electrical equipment on higher angles of fire.

The standard MIT emplacement with a 26-inch front wall and a 2-percent slope on the berm provides adequate protection for AOF of +/- two degrees. Greater angles require special design consideration. Higher negative angles may require increasing the front wall height, adjusting the slope of the berm to match the AOF, or some other method. Theoretically, the minimum wall height hides the electrical equipment, including the target arms and clamps, up to a -8o AOF. In situations with a positive AOF, greater than 2 degrees, the berm itself begins to hide the target.

Adjustments to the berm slope may be necessary. Note that the direction of fire (angle to the firing line) affects the allowable angle of fire as well.

On ranges where target engagement is from multiple points, the designer must coordinate closely with the installation and the targetry provider to determine the correct front wall height. The emplacement protection is also critical for aviation gunnery.

Berm Criteria

The Target Protection Design Curves in the RDG provide the recommended thickness for emplacement protective berms. The berm must protect the emplacement from all anticipated directions of fire. The berm should be thickest in the expected direction of fire. Use thinner berms to protect the emplacement from occasional directions of fire and ricochets.

Determine the berm thicknesses based on projectile type, soil compaction, and the in-place soil density. However, the designer must also coordinate with the range trainer or user to determine the appropriate berm thickness for each target, since individual target siting may dictate added target protection. For example, when SIT emplacements is in front of or behind a MAT or SAT, the emplacements will need to be designed to withstand the largest weapon system that will engage that group of targets. At a minimum, berm widths will be at least 4 feet to facilitate ease of maintenance.

Historical experience shows that, under normal usage, well-compacted berms, designed with the recommended widths require maintenance on 6-month cycles. Heavily used ranges and individual targets often require increased berm thicknesses.

BUILDING STRONG® 4

o v in g I n fa n tr y T a rg e t– A u g u s t

L P

-M C

X R a n g e

D e s ig n G u

Weather Considerations

In regions with large quantities of blowing sand or snow, consider providing elevated target mechanism platforms and emplacement covers. The elevated target mechanism platform allows for shoveling out snow and sand, while the emplacement cover keeps the accumulation of blown or fallen material to a minimum. Consider access for snow removal equipment as well.

Electrical/Communications

This section discusses electrical/communication considerations unique to this specific emplacement type. Downrange power, communication, transformers, trenching requirements, etc., are discussed in the Downrange Distribution Section of this document.

Target Emplacement Wall Configuration

Refer to Emplacement Elevation Drawings for a typical target emplacement wall configuration.

The electrical equipment required in each MIT emplacement are the 1) Load Center (LC), 2)

Target Power Receptacle (TPR), 3) Auxiliary Power Receptacle, 4) GFCI Maintenance

Receptacle (MR), 5) and the data enclosure, along with the associated wiring and conduits which are not detailed in this document. The load center contains the secondary branch circuits and provides feed-through capability to the load center in the next adjoining target emplacement. All boxes and receptacles on the front wall of the emplacement should be mounted no higher than two inches from the top of the emplacement wall; this protects the boxes and receptacles from low rounds that might skim the top of the emplacement wall. A detailed drawing of the electrical equipment requirements for MIT emplacements is provided in the Appendix of this design guide.

REPRESENTATIVE MIT ELEVATION DRAWING (NOT TO SCALE)

Routing

All conduits and/or cables should enter and exit from the side or rear of the emplacement. This cable routing helps to minimize damage to the cables from range operations and maintenance crews performing berm repair.

BUILDING STRONG® 5

o v in g I n fa n tr y T a rg e t– A u g u s t

L P

-M C

X R a n g e

D e s ig n G u

Grounding

Grounding is required for safety at each downrange emplacement or equipment location. A

19mm (3/4in) by 3,050mm (10ft) copper-clad steel ground rod will be driven to a depth of

305mm (1ft) below finished grade at each emplacement or equipment location. The MTDP/TDP and load center equipment will be connected to the emplacement’s single ground rod with a #6

AWG bare copper conductor and exothermically welded connections. All data cable armor or shields must be bonded to the ground bar in the TDP. The design will leave an 1829mm (10ft) coil of #6 AWG bare copper that will be used to ground the target mechanism.

Surge Suppression

Provide surge protective devices (SPD) in the load center of all target emplacements. The surge suppression for the data communication cables will be provided by the target vendor during the installation of targets.

Conduit and Cable Fittings

All penetrations into the MTDP or TDP must be made with fittings approved for use with a

NEMA 4, 4X or 6P enclosure. Non-compliance with this requirement will result in equipment failure. Sheet ED-01 in the Range Design Guide illustrates the preferred sealing method. Foam filled conduits are not acceptable. The MIT load center only requires a NEMA

3R rated enclosure. Provide fittings approved for use with a NEMA 3R enclosure for connection to the load center.

Target Outlets

TPRs and APRs must be equipped with a waterproof enclosure approved for use with the power plug inserted and unattended, according to NEC 406.8(B) (2). The standard TPR configuration is shown in the Table below:

MIT EMPLACEMENT TARGET INTERFACE SPECIFICS

TARGET POWER

RECEPTACLE

AUXILIARY

POWER

RECEPTACLE

FIBER OPTIC

CABLE

CONNECTORS

CATEGORY 5E OR

BETTER CABLE

CONNECTORS

NEMA L14-20R NEMA L5-20R Type “SC” MALE, RJ45

BUILDING STRONG® 6

o v in g I n fa n tr y T a rg e t– A u g u s t

L P

-M C

X R a n g e

D e s ig n G u

TARGET POWER RECEPTACLE (TPR) – AUXILIARY POWER RECEPTACLE (APR)

EMPLACEMENT

TYPE

POWER

FEED TYPE

PEAK STATIC

LOAD

DESIGN

LOAD

MIT

120/240VAC

Single Phase

2kVA While moving.

50VA

2kVA

MIT EMPLACEMENT TARGET POWER TABLE

Standard Target Interface

All targets operate at 240 V. Power is supplied to the target through a 120/240V cord and plug connection. The target emplacement shall be provided with a standard 120/240V receptacle that is supplied power through a circuit breaker that is located inside the target emplacement. An auxiliary 120 V outlet is provided in the target emplacement for additional devices or training aids that may be added to the target mechanism. Thermal blankets are the most common devices that are added to the target mechanisms that utilize this power outlet. The specific components used to supply power to the target mechanisms installed inside each target emplacement is fully defined in the remaining sections.

Target and training device communication is accomplished by equipment installed inside the data enclosure located in each target emplacement. All networking equipment will be provided with the target mechanism when the target mechanism is purchased. The target mechanisms are normally purchased with Other Appropriations-Army (OPA) funded target installation contracts.

BUILDING STRONG® 7

o v in g I n fa n tr y T a rg e t– A u g u s t

L P

-M C

X R a n g e

D e s ig n G u

The range data infrastructure should be installed with data cables to the target emplacement and these cables should be properly terminated inside the target emplacement data enclosures. These data enclosures are referred to as either a Target Data Panel (TDP) or a Master Target Data Panel

(MTDP), and they are fully defined in other sections of this document. The target mechanism installer will interface with the data cables inside these enclosures during the installation of the targets. The schematic below provides an overview of the wiring responsibilities inside the data enclosures.

MTDP DATA WIRING SCHEMATIC

The Master Target Data Panel (MTDP), or the Target Data Panel (TDP) must be rated NEMA 4, 4X, or 6P depending on environmental conditions (refer to Conduit and Cable Fittings section below for connections). The MTDP/TDP contains the electronics for local target operation, including data cable splicing and terminations. Data cabling shall enter and exit the data panels through approved cable seal fittings (refer to Conduit and Cable Fittings below). All fiber optic cabling will be terminated with SC type connectors, and the network cables will be terminated with CAT 5e or better rated RJ45 connectors. The MTDP and TDP provides space for Other

Appropriations-Army (OPA) funded equipment which may include the fiber optic jumpers, switch/media converter, target data outlet, and network cables. The OPA equipment is installed by others and not the MILCON contractor. The designer must ensure the dimensions of the data panel are consistent with those dimensions stated on the detail plans for the MTDP and TDP equipment. A 120v AC power outlet is provided in the TDP for “Use by Others”. The TDP and the GFCI maintenance receptacle may utilize the same power circuit, but the TDP equipment must be wired ahead of the maintenance to ensure no nuisance tripping occurs. Reference the

Electrical and Civil Details in the directory of the Range Design Guide for more information pertaining to the MTDP, TDP and their mounting requirements.

BUILDING STRONG® 8

o v in g I n fa n tr y T a rg e t– A u g u s t

L P

-M C

X R a n g e

D e s ig n G u

Target Data Connection

All automated targets are connected to the data cable infrastructure through copper patch cables provided by the target vendor. The interface point between the facility infrastructure and the target installation occurs through the faceplate in the weatherproof outlet box installed immediately adjacent to the MTDP or TDP enclosure. The target vendor will penetrate the face plate on the outlet box and install a weatherproof coupling mechanism that mates with the patch cord provided with their targets.

TARGET DATA CONNECTION

Environmental Limits

The temperature and humidity limits for electronic equipment are as follows:

Outdoor:

Non-operating and operating temperature: -34°C (-30°F) to 60°C (140°F).

Humidity: 5% to 95% RH (non-condensing).

BUILDING STRONG® 9

o v in g I n fa n tr y T a rg e t– A u g u s t

L P

-M C

X R a n g e

D e s ig n G u

REPRESENTATIVE MIT PHOTOS

%PRODUCTION DATA 1%

SHEET ID

®of Engineers

US Army Corps

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

P R

O J E

C T N

U M

B E

R

H U

N T S

V

IL

L E

A L A

B A

M A

E N

G

IN

E E

R

IN

G

S

U P P

O R

T

C

E N

T E

R

U S

A R

M Y

C

O R P

O F

E

N G

IN

E E

R S

A U

G U

S T

R A

N G

E A

N D T

R A

IN

IN

G L

A N

D P

R O

G R

A M

S T

A N

D A

R D D

E S

IG

N M

A N

U A

L

9.

8.

7.

6.

5.

4.

3.

2.

1.

SCALE: 1" = 1'

SCALE: 1" = 10'

10 0 10 20

42012

1 0 1 2

GRAPHIC SCALES:

ELECTRICAL BLOCKOUT DETAIL

SURFACE / FILL SLOPE EMPLACEMENT

SECTION

SECTION

SECTION

FOR NUMBERING SCHEME.

LABEL EACH EMPLACEMENT. COORDINATE WITH RANGE CONTROL

OF THE TARGET.

HORIZONTAL CONTROL POINT (F) IS LOCATED ON THE POWER SIDE

THE EMPLACEMENT NEAREST TO THE ENGAGEMENT POINT.

HERE. THE ELECTRICAL BLOCK OUTS ARE LOCATED AT THE END OF

THE EMPLACEMENT MAY BE MIRRORED FROM WHAT IS SHOWN

INDICATED FOR INSTANCE 1372mm [4'-6"].

ALL DIMENSIONS ARE METRIC [ENGLISH] UNLESS OTHER WISE

WITH CONCRETE ANCHORS.

MAXIMUM OF 914mm (3') ON CENTER. ATTACH ANGLE TO CONCRETE

"x4") STEEL ANGLES SPACED A 2 1102mm x 12.7mm x 102mm (4"x4"x

PLACE TREATED TIMBERS AGAINST CONCRETE WALL ON L102mm x

VISIBILITY.

SURROUNDINGS, GROUND COVER SHALL NOT REDUCE TARGET

REVEGITATED OR RESURFACED CONSISTENT WITH THE NATURAL

AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE

ALL REINFORCING STEEL SHALL BE PER ASTM A615, GRADE 60.

CUT FLUSH. PRECAST SECTIONS SHALL BE KEYED.

CAST-IN-PLACE. PRECAST STRUCTURES WILL HAVE LIFTING EYES

CONCRETE; CONCRETE STRUCTURES SHALL BE PRECAST OR

EMPLACEMENTS SHALL BE CONSTRUCTED OF REINFORCED

OF 28 MPa (4000PSI) IN 28 DAYS.

CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH

GENERAL NOTES:

SCALE: 1/2" = 1'

SCALE: 1/2" = 1'

A

C

SCALE: 1" = 1'

152mm [6"]

HORIZONTAL AND

VERTICAL CONTROL

POINT 457mm

[1'-6"] [2'-2"]

660mm 457mm

[1'-6"] 152mm

[6"] TYP.

SCALE: 1" = 1'

TOE OF BERM

DIRECTION

OF FIRE

ELECTRICAL BLOCKOUTS

SEE DETAIL AT RIGHT

HORIZONTAL AND

VERTICAL CONTROL

POINT (F)

(TYP.)

3:1 V A

R

IE

S

NOTE 4)

(SEE DESIGNER

(T Y

P

:1

S L

O P

E

TREATED TIMBERS (TYP.)

[8" x 6" x 8'-0"]

203mm x 152mm x 2438mm

SLOPE

(TYP.)3:1

** 18m [59'-0"]

* 43m [141'-0"]

VARIES

NOTE 4)

(SEE DESIGNER

** FOR USE WITH 15 METER MIT

* FOR USE WITH 40 METER MIT

SCALE: 1" = 10'

B

A C

POINT (E)

VERTICAL CONTROL

HORIZONTAL AND

BASED ON FRONT WALL HEIGHT

VARIES 1372mm [4'-6"]

VARIES (SEE DESIGNER NOTE 4)

152mm [6"]

[3'-0"]

914mm

VERTICAL CONTROL

HORIZONTAL AND

POINT (F) (SEE GENERAL NOTE 5)

203mm x 152mm x 2438mm

[8" x 6" x 8'-0"]

TREATED TIMBERS

2% SLOPE

25mm [1"]

2% SLOPEVARIES

NOTE 2)

(SEE DESIGNER

DIRECTION

OF FIRE

ANGLE OF FIRE

EXISTING GRADE

COMPACTED FILL

MATERIAL

152mm [6"]

152mm [6"]

152mm [6"]

2% SLOPE

GRADE TO DRAIN

FILTER FABRIC

COMPACED SUBGRADE

(ENTIRE FOOTPRINT OF EMPLACEMENT)

MATERIAL

GRANULAR DRAINAGE

152mm [6"] #13 REBAR @ 300mm O.C.E.W.

[#4's @ 12" O.C.E.W.] (CENTERED IN

WALL AND SLAB TYPICAL) ALL LAPS

TO BE A MINIMUM OF 305mm [12"]

DIRECTION

OF FIRE

203mm x 152mm x 2438mm

[8" x 6" x 8'-0"]

TREATED TIMBERS

[6"]

152mm 1372mm [4'-6"]

(SEE GENERAL

NOTE 5)

[8" x 6"]

203mm x 152mm

TREATED TIMBERS

2% SLOPE

COMPACTED FILL

MATERIAL

(SEE GENERAL NOTE 5)

152mm [6"]

152mm [6"]

152mm [6"]

152mm [6"]

B

SCALE: 1/2" = 1'

(ENTIRE FOOTPRINT OF EMPLACEMENT)

COMPACTED SUBGRADE

FILTER FABRIC

MATERIAL

GRANULAR DRAINAGE

152mm [6"]

2% SLOPE

COMPACTED SUBGRADE

(ENTIRE FOOTPRINT OF EMPLACEMENT)

MATERIAL

GRANULAR DRAINAGE

VARIES

152mm [6"]

305mm

[12"]

CONTROL POINT (E)

HORIZONTAL AND VERTICAL

152mm [6"]

2% SLOPE

COMPACTED FILL

#13 REBAR @ 300mm O.C.E.W.

[#4's @ 12" O.C.E.W.] (CENTERED IN

WALL AND SLAB TYPICAL) ALL LAPS

TO BE A MINIMUM OF 305mm [12"]

152mm [6"]

152mm [6"]

MIT-A

M O

V

IN

G I

N F

A N

T R

Y

T A

R G

E T

A B

O V

E G

R A

D E

ABOVE GRADE MOVING INFANTRY TARGET EMPLACEMENT

MIT-A MIT-A

MIT-A MIT-A

MIT-A MIT-A

MIT-A MIT-A

MIT-A MIT-A

MIT-A MIT-A

MATCH BERM

WALL HEIGHT VARIES TO

FIRE

EQUIPMENT (HOME END) AT THE END CLOSEST TO THE DIRECTION OF

MIRROR THE MIT EMPLACEMENTS AS REQUIRED TO KEEP ELECTRICAL

MOVEMENT/LAYDOWN.

2290MM (7’-6”) CLEAR SPACE BEHIND THE FRONT WALL FOR TARGET

THE MIT TARGET RAIL/LIFTER/SILHOUETTE REQUIRES A MINIMUM OF

CURVES.

A MAXIMUM OF 5 PERCENT. DO NOT USE HORIZONTAL OR VERTICAL

TARGET TRAVEL. LIMIT SLOPES TO 3 PERCENT WHERE POSSIBLE WITH

MIT EMPLACEMENTS ARE TYPICALLY FLAT ALONG THE DIRECTION OF

SITE-SPECIFIC GEOTECHNICAL REPORT.

THE 3:1 BERM SLOPES SHOWN ARE TYPICAL; ADJUST BASED ON A

TARGET, INCLUDING BELOW GRADE EMPLACEMENTS

THE DESIGN MUST INCLUDE POSITIVE DRAINAGE AWAY FROM THE

REQUIREMENTS.

RDG FOR THE REQUIRED BERM THICKNESS AND BERM EXTENSION

REFER TO THE TARGET EMPLACEMENT PROTECTION SECTION OF THE

CONDITIONS

EXTENDING THE FULL HEIGHT OF WALL DESIGNED BASED ON LOCAL

ADEQUATELY CONNECTED TREATED TIMBERS WITH FILTER FABRIC

WOOD RETAINING WALLS MUST BE CONSTRUCTED OUT OF

GREATER ANGLES OF FIRE.

FIRE. COORDINATE WITH THE INSTALLATION AND THE RTLP-MCX FOR

INCLUDING THE TARGET ARMS UP TO AN 8 DEGREE DOWN ANGLE OF

AN ANGLE OF FIRE OF +/- 2 DEGREES AND HIDES THE TARGET LIFTER

PROTECTION FOR THE TARGETRY AND ELECTRICAL EQUIPMENT FOR

THE MINIMUM FRONT WALL HEIGHT OF 660MM (26”) PROVIDES FULL

FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

REFER TO THE MOVING INFANTRY TARGETS WRITE-UP IN THE RDG

DESIGNER NOTES

9.

8.

7.

6.

5.

4.

3.

2.

1.

%PRODUCTION DATA 1%

SHEET ID

®of Engineers

US Army Corps

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

P R

O J E

C T N

U M

B E

R

H U

N T S

V

IL

L E

A L A

B A

M A

E N

G

IN

E E

R

IN

G

U P P

O R

T

C

E N

T E

R

U S

A R

M Y

C

O R P

O F

E

N G

IN

E E

R S

A U

G U

S T

R A

N G

E A

N D T

R A

IN

IN

G L

A N

D P

R O

G R

A M

S T

A N

D A

R D D

E S

IG

N M

A N

U A

L

SCALE: 1" = 1'

SCALE: 1" = 10'

10 0 10 20

42012

1 0 1 2

GRAPHIC SCALES:

SCALE: 1/2" = 1'

ASCENDING SLOPE OR BELOW GRADE EMPLACEMENT

ELECTRICAL BLOCKOUT DETAIL

SECTION

SCALE: 1"= 2'MIT-BMIT-B

A

AS REQUIRED TO DRAIN.

DRAINAGE LAYER. SLOPE

PERFORATED DRAINAGE PIPE IN

DRAIN TO DAYLIGHT

WALL AND SLAB TYPICAL) ALL LAPS

[#4's @ 12" O.C.E.W.] (CENTERED IN

#13 REBAR @ 300mm O.C.E.W.

TO BE A MINIMUM OF 305mm [12"]STRAINER (TYPICAL)

152mm [6"] (MIN)

(ENTIRE FOOTPRINT OF EMPLACEMENT)

COMPACTED SUBGRADE

MATERIAL

GRANULAR DRAINAGE

(SEE DESIGNER NOTE 3)

FILTER FABRIC

EXISTING GRADE

ANGLE OF FIRE

OF FIRE

DIRECTION

NOTE 4)

(SEE DESIGNER

VARIES

(SEE GENERAL NOTE 5)

203mm x 152mm x 2438mm

[8" x 6" x 8'-0"]

TREATED TIMBERS

2% SLOPE

COMPACTED FILL

152mm [6"]

152mm [6"]

NOTE 2)

(SEE DESIGNER

VARIES

2% SLOPE

25mm [1"]

POINT (F)

VERTICAL CONTROL

HORIZONTAL AND

1372mm [4'-6"]

2286mm [7'-6"]

[6"] 152mm914mm [3'-0"]

VERTICAL CONTROL

HORIZONTAL AND

POINT (F)

DIRECTION

OF FIRE

(T Y

P

:1

3:1

(TYP.)

ELECTRICAL BLOCKOUTS

SEE DETAIL AT RIGHT

NOTE 4)

DESIGNER

VARIES (SEE

V A

R

IE

S

NOTE 4)

(SEE DESIGNER

S L

O P

E

TREATED TIMBERS (TYP.)

[8" x 6" x 8'-0"]

203mm x 152mm x 2438mm

TOE OF BERM

DRAIN TO DAYLIGHT

VERTICAL CONTROL

HORIZONTAL AND

POINT (E)

HORIZONTAL AND

VERTICAL CONTROL

TOP OF CUT

STRAINER (TYPICAL)

PERFORATED DRAINAGE PIPE IN

DRAINAGE LAYER

MIT-B MIT-B

A* FOR USE WITH 40 METER MIT

** FOR USE WITH 15 METER MIT

* 44m [144'-4 1/2"]

** 19m [62'-4"]

:1

DIVERSION SWALE

SLOPE

152mm [6"]

POINT

[1'-6"]

457mm

[2'-2"]

660mm

[1'-6"]

457mm

152mm

[6"] TYP.

SCALE: 1" = 1'

SCALE: 1" = 10'

2% SLOPE

9.

8.

7.

6.

5.

4.

3.

2.

1.

FOR NUMBERING SCHEME.

LABEL EACH EMPLACEMENT. COORDINATE WITH RANGE CONTROL

OF THE TARGET.

HORIZONTAL CONTROL POINT (F) IS LOCATED ON THE POWER SIDE

THE EMPLACEMENT NEAREST TO THE ENGAGEMENT POINT.

HERE. THE ELECTRICAL BLOCK OUTS ARE LOCATED AT THE END OF

THE EMPLACEMENT MAY BE MIRRORED FROM WHAT IS SHOWN

INDICATED FOR INSTANCE 1372mm [4'-6"].

ALL DIMENSIONS ARE METRIC [ENGLISH] UNLESS OTHER WISE

WITH CONCRETE ANCHORS.

MAXIMUM OF 914mm (3') ON CENTER. ATTACH ANGLE TO CONCRETE

"x4") STEEL ANGLES SPACED A 2 1102mm x 12.7mm x 102mm (4"x4"x

PLACE TREATED TIMBERS AGAINST CONCRETE WALL ON L102mm x

VISIBILITY.

SURROUNDINGS, GROUND COVER SHALL NOT REDUCE TARGET

REVEGITATED OR RESURFACED CONSISTENT WITH THE NATURAL

AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE

ALL REINFORCING STEEL SHALL BE PER ASTM A615, GRADE 60.

CUT FLUSH. PRECAST SECTIONS SHALL BE KEYED.

CAST-IN-PLACE. PRECAST STRUCTURES WILL HAVE LIFTING EYES

CONCRETE; CONCRETE STRUCTURES SHALL BE PRECAST OR

EMPLACEMENTS SHALL BE CONSTRUCTED OF REINFORCED

OF 28 MPa (4000PSI) IN 28 DAYS.

CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH

GENERAL NOTES:

FIRE

EQUIPMENT (HOME END) AT THE END CLOSEST TO THE DIRECTION OF

MIRROR THE MIT EMPLACEMENTS AS REQUIRED TO KEEP ELECTRICAL

MOVEMENT/LAYDOWN.

2290MM (7’-6”) CLEAR SPACE BEHIND THE FRONT WALL FOR TARGET

THE MIT TARGET RAIL/LIFTER/SILHOUETTE REQUIRES A MINIMUM OF

CURVES.

A MAXIMUM OF 5 PERCENT. DO NOT USE HORIZONTAL OR VERTICAL

TARGET TRAVEL. LIMIT SLOPES TO 3 PERCENT WHERE POSSIBLE WITH

MIT EMPLACEMENTS ARE TYPICALLY FLAT ALONG THE DIRECTION OF

SITE-SPECIFIC GEOTECHNICAL REPORT.

THE 3:1 BERM SLOPES SHOWN ARE TYPICAL; ADJUST BASED ON A

TARGET, INCLUDING BELOW GRADE EMPLACEMENTS

THE DESIGN MUST INCLUDE POSITIVE DRAINAGE AWAY FROM THE

REQUIREMENTS.

RDG FOR THE REQUIRED BERM THICKNESS AND BERM EXTENSION

REFER TO THE TARGET EMPLACEMENT PROTECTION SECTION OF THE

CONDITIONS

EXTENDING THE FULL HEIGHT OF WALL DESIGNED BASED ON LOCAL

ADEQUATELY CONNECTED TREATED TIMBERS WITH FILTER FABRIC

WOOD RETAINING WALLS MUST BE CONSTRUCTED OUT OF

GREATER ANGLES OF FIRE.

FIRE. COORDINATE WITH THE INSTALLATION AND THE RTLP-MCX FOR

INCLUDING THE TARGET ARMS UP TO AN 8 DEGREE DOWN ANGLE OF

AN ANGLE OF FIRE OF +/- 2 DEGREES AND HIDES THE TARGET LIFTER

PROTECTION FOR THE TARGETRY AND ELECTRICAL EQUIPMENT FOR

THE MINIMUM FRONT WALL HEIGHT OF 660MM (26”) PROVIDES FULL

FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

REFER TO THE MOVING INFANTRY TARGETS WRITE-UP IN THE RDG

DESIGNER NOTES

9.

8.

7.

6.

5.

4.

3.

2.

1.

M O

V

IN

G I

N F

A N

T R

Y

T A

R G

E T

B E

L O

W G

R A

D E

MIT-BBELOW GRADE MOVING INFANTRY TARGET EMPLACEMENT

File details come from the government source that posted it. Updated .