This document is a technical exhibit detailing fiber optics infrastructure and JMMU (Joint Munitions Maintenance Unit) target designations as of a 2001 as-built drawing. It serves as a reference table for power centers and fiber optic distribution throughout a facility located behind and forward of a LOA (Line of Aim) central control building.
The exhibit documents 19 primary power centers (PJ1A through PJ9A, with corresponding B designations) plus ancillary facilities (FC-5, FC-6, FC-7, JM Tower, and Gen Inst Bldg), detailing their reference drawing locations and the targets they feed. Each power center entry specifies the fiber count entering the center, number of targets fed, and the quantity of Sensor Interface Terminals (SITs), Sensor Array Terminals (SATs), future SATs, and Monitored Vehicles (MVs) supported. The aggregate infrastructure includes 912 total fiber strands with 181 SITs fed, 117 SATs fed, and 59 MVs fed across the system. Key summary metrics include 1,080 total fiber strand count from the central control building, 1,202 fiber strands between power centers and targets, and 2,286 end-to-end fiber tests. The document references multiple cross-section drawings (sheets 225-266 of 451) for trench details, target emplacement patch panels, and downstream fiber optics configuration. Eleven locations (JV-5, JV-13, JV-23, JV-25, JV-43, JV-50, JV-52, JV-64, JV-65, JV-66, JV-69) contain power and data infrastructure installed in 2001 for future SATs with 7.8 meters of slack, though their fiber counts are excluded from the primary totals.
View the file
Other files for this federal contract opportunity
Show all 50
Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT R - JMMU Target Designation Ref:
TAB F - Fiber Optics
Power centers
2001 ASBUILT DRAWING
SHEET
FEED FROM (see E-61 thr E-
63) FEEDS TO (see E-61 thr E-63) fiber count entering # targets/PC fed SITs Fed SATs Fed future SATs not included in fiber count MVs Fed
Strands Fed to
PC/ECM
targets Fed (G thru J) Checksum fiber count leaving total (L x 6) per Fiber PC Query.
Checksum Power centers
Diagram posted at patch panel? Y/N
NOTES
PJ1A E-36 (Sheet 240 of 451) Behind LOA central control building C20, 412, 414 48 9 7 2 0 0 0 9 54 54 54 PJ1A YES Behind LOA PJ1B E-41 (Sheet 244 of 451) Behind LOA central control building 432, 420/C62, (JV-5) 24 6 4 2 JV-5 0 0 6 36 36 42 PJ1B NO Behind LOA Missing Fiber diagram PJ2A E-42 (Sheet 245 of 451) Behind LOA central control building C14, C12, 418, 416, 426/C64, 428, 430 84 23 18 5 0 0 0 23 138 138 138 PJ2A NO Behind LOA Missing Fiber diagram PJ2B E-42 (Sheet 245 of 451) Behind LOA central control building C18, 448, 446, C16, (JV-13) 72 16 14 2 JV-13 0 12 16 96 96 96 PJ2B YES Behind LOA PJ3A E-42 (Sheet 245 of 451) Behind LOA central control building 436, C22, 424, 422, 438, EJM-1 48 12 7 4 0 1 0 12 72 72 72 PJ3A YES Behind LOA PJ3B E-47 (Sheet 250 of 451) Behind LOA central control building 460, 462, 454, 452, 458, (JV-25) 36 5 0 5 JV-25 0 0 5 30 30 30 PJ3B YES Behind LOA
PJ4A E-42 (Sheet 245 of 451) Behind LOA central control building (JV-23), 444, C24, 440/C66, 438, 422 60 15 11 4 JV-23 0 18 15 90 90 102 PJ4A
YES
Behind LOA the DATA box ground makes it hard to open.
need to verify how many strands running to heavy 6 x 7? Appears 36 strands going to SAT440
PJ4B E-47 (Sheet 250 of 451) Forward of LOA central control building 462, 472, MAT54, C32, 478, (JV-43) 60 11 7 3 JV-43 1 36 11 66 66 66 PJ4B YES Forward of LOA PJ5A E-43 (Sheet 245 of 451) Behind LOA central control building 450, 470, C30, 466, 456, C34 84 18 14 4 0 0 0 18 108 108 108 PJ5A YES Behind LOA PJ5B E-47 (Sheet 250 of 451) Forward of LOA central control building 480, C40, 486, 490 48 10 7 3 0 0 0 10 60 60 60 PJ5B YES Forward of LOA
PJ6A E-43 (Sheet 245 of 451) Forward of LOA central control building
C28, C36, 468, 476, MAT56, 484, C38, 474,
C26, 482 144 34 28 5 0 1 0 34 204 204 204 PJ6A YES Forward of LOA
PJ6B E-48 (Sheet 251 of 451) Forward of LOA central control building (JV-69), 492, 506, (JV-50) 24 2 0 2 JV-69, JV-50 0 0 2 12 12 12 PJ6B YES Forward of LOA PJ7A E-48 (Sheet 251 of 451) Forward of LOA central control building (JV-52), 496, 488, MAT58, 494, 504 36 5 0 4 JV-52 1 0 5 30 30 30 PJ7A YES Forward of LOA PJ7B E-49 (Sheet 252 of 451) Forward of LOA central control building (JV-66), 514, 512, 510, 508 30 4 0 4 JV-66 0 48 4 24 24 24 PJ7B YES Forward of LOA PJ8A E-44 (Sheet 246 of 451) Forward of LOA central control building (JV-65), 502, MAT60, 498 18 3 0 2 JV-65 1 0 3 18 18 18 PJ8A YES Forward of LOA PJ8B E-45 (Sheet 247 of 451) Forward of LOA central control building (JV-64), 528, 526, 520, 524, 530 30 5 0 5 JV-64 0 0 5 30 30 30 PJ8B YES Forward of LOA PJ9A E-45 (Sheet 247 of 451) Forward of LOA central control building 518, 516, 522 18 3 0 3 0 0 36 3 18 18 18 PJ9A YES Forward of LOA
EJM-1 E-43 (Sheet 245 of 451) Forward of LOA PJ3A MAT52 0 0 0 0 0 0 0 0 0 EJM-1 Not required Forward of LOA FC-5 E-35 (Sheet 239 of 451) Behind LOA central control building 6 0 0 0 0 FC-5 Behind LOA FC-6 E-36 (Sheet 240 of 451) Behind LOA central control building 6 0 0 0 0 FC-6 Behind LOA FC-7 E-43 (Sheet 245 of 451) Behind LOA central control building 6 0 0 0 0 FC-7 Behind LOA JM Tower E-35 (Sheet 239 of 451) Behind LOA central control building 18 0 0 0 0 JM Tower Behind LOA Gen Inst Bldg. E-35 (Sheet 239 of 451) Behind LOA central control building 12 0 0 0 0 Gen Inst Bldg. Behind LOA
SITs Fed SATs Fed MVs Fed 181 117 59 5
912 1086 1104
E-1 sheet 206 of 451
NOTE:
1. SEE 2001 ASBUILT DRAWING E-63, (sheet 266 of 451)
2. SEE E-61 (sheet 264 of 451)& E-62 (sheet 265 of 451) for FO downstream of PCs.
3. each target receives 6 fiber count typical.
A. 630 fiber count total to SITs B. 366 fiber count total to SATs
c. 30 fiber count total to MVs
4. see E-46 (Sheet 249 of 451) for Target Emplacement Patch Panel Detail.
5. Total of 1080 Fiber Strand Count from Central Control Building or other PCs.
6. Total of 1202 Fiber Strand Count between PCs and targets/other PCs.
7. Total of 2286 End to End fiber tests.
8. power and data ran in 2001 for future SATs with 7.8 meters of slack. JV-5, JV-13, JV-23, JV-25, JV-43, JV-50, JV-52, JV-64, JV-65, JV-66, JV-69 (11 locations total) FIBER COUNT NOT INCLUDED IN THE ABOVE NUMBERS. SEE LEGEND ON E-58 (Sheet 261 of 451) & E-62 (Sheet 265 of 451)
9. FOR TRENCH CROSS-SECTION SEE E-21 (Sheet 225 of 451)
10. See E-26 (Sheet 230 of 451) for Camera Towers
End to End strand count (1998) target counts