This is a Request for Proposal (RFP) for construction services at Fort Hood, Texas Jack Mountain Multi-Use (JMMU) Range. The solicitation number is 140D0426R0084, issued by the Interior Business Center, Acquisition Services Directorate (D21) on June 29, 2026, with proposals due by July 30, 2026 at 12:00 noon EDT. The procurement is structured as a small business set-aside with a Firm Fixed Price contract type. The government estimates construction magnitude between $10,000,000 and $15,000,000. Performance bonds and payment bonds equal to 100 percent of the contract price are required, with a liquidated damages rate of $5,572.00 per calendar day for delays. Proposals must include three volumes: Volume I (Administrative, 5 pages), Volume II (Design and Construction Plan, 50 pages), and Volume III (Price with unlimited spreadsheet pages). The contractor shall begin performance upon notice to proceed, with actual physical work on-site scheduled from November 30, 2026 through April 30, 2027 (152 calendar days behind Limit of Advance), plus optional 60-calendar day periods forward of LOA from February 12, 2027 through April 12, 2027.
The project requires upgrades, repairs, and modernizations to range infrastructure including repair of Moving Armored Targets (MATs), Stationary Infantry Targets (SITs), and Stationary Armor Targets (SATs), along with optional tasks for additional improvements such as FASIT BOI equipment, sump pump systems, range limit markers, SACON trench system repairs, and procurement of Portable Armored Target Systems. Evaluation will be based on Past Performance (most important), Technical Approach & Capabilities (second most important), and Price (least important when combined with non-price factors). The contracting officer is David Boyd (David_Boyd@ibc.doi.gov, 703-964-4853). Proposals must comply with Buy American requirements for construction materials under trade agreements, include an offer guarantee of 20 percent of bid price or $3 million (whichever is less), and acknowledge receipt of any solicitation amendments. Questions may be submitted no later than August 10, 2026 at 12:00 noon EDT, and proposals shall be submitted electronically to david_boyd@ibc.doi.gov by September 1, 2026.
View the file
Other files for this federal contract opportunity
Show all 50
Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140D0426R0084
Interior Business Center, AQD Division 2/ Branch 1 381 Elden St Suite 2000A Herndon VA 20170
D21
David Boyd 7039644853
06/29/2026
07/30/2026
0 0
The Fort Hood, Texas Jack Mountain Multi-Use (JMMU) Range requires upgrades, repairs, and modernizations to update the current infrastructure.
This procurement is being solicited as a small business set aside.
a. The resulting contract shall be structured as Firm Fixed Price.
b. See Statement of Work (SOW) and associated supporting documents for details of the construction requirements in Section J-List of Documents, Exhibits, and Other Attachments.
c. Magnitude of Construction: In accordance with FAR 36.204 and DFARS 236.204, Disclosure of Magnitude of construction estimated by the Government for the subject requirement is within in the following dollar ranges: Between $10,000,000 and $15,000,000.
1 38
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
Interior Business Center, AQD Division 2/ Branch 1 381 Elden St Suite 2000A Herndon VA 20170
D21
David Boyd
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
00010 1 EABASE TASKS: Task 1: Preconstruction Activities
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00011 1 EABASE TASKS: Task 2: Repair and Modification of four (4) Moving Armored Targets (MAT) emplacements MAT54, MAT56, MAT58 and MAT60.
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00012 1 EABASE TASKS: Task 3: Repair and Modification of one (1) MAT emplacement MAT52.
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00013 1 EABASE TASKS: Task 4: Repair and Modernization of one hundred (117) Stationary Infantry Target
(SIT) at eighteen
(18) Clusters.
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00014 1 EABASE TASKS: Task 5: Repair and Modernization of fifty-six (56) Stationary Armor Target (SAT) emplacements.
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00015 1 EABASE TASKS: Task 6: Repair and Modernization of three (3) Stationary Armor Target
(SAT)/Stationary Infantry Target (SIT) combination Cluster.
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00110 1 EAOPTIONAL TASK #1: At Four (4) MATs, replace
Continued...
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C) timbers with concrete panels for MAT Mover
Safe-Haven 3 concrete panels per MAT, with one top timber.
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00210 1 EAOPTIONAL TASK #2: At Four (4) MATs, replace every 5 set of timbers with concrete panels at each MATs Total 30 Concrete panels with one top timber at each MAT.
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00310 1 EAOPTIONAL TASK #3: At Four (4) MATs, replace every timber section with concrete panels at each MATs Total 152 Concrete panels with one top timber at each MAT.
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00410 1 EAOPTIONAL TASK #4: Furnish and install Two (2)
FASIT BOI MAT Target Equipment
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00510 1 EAOPTIONAL TASK #5: Install Four (4) Sump Pumps systems.
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
00610 1 EAOPTIONAL TASK #6: Replace three (3) Range Limit
Markers (RLMs) North of MAT52, at SAT531 and
SAT528
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00710 1 EAOPTIONAL TASK #7: Repair One (1) SACON Trench
System Command Bunker and Machine-gun Bunker
(SACON and Roof Structure Repairs).
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00810 1 EAOPTIONAL TASK #8: Replace timbers with Mafia
Block/BIN Block at Fifty-Eight (58) SATs.
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
00910 1 EAOPTIONAL TASK #9: Grade thirty-one (31) drainage ditches and clear nine (9) culverts.
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
01010 1 EAOPTIONAL TASK #10: Install Four (4) gates.
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
01110 1 EAOPTIONAL TASK #11: Procurement ten (10)
Portable Armored Target System for Live-Fire
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
Training.
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
01210 1 EAOPTIONAL TASK #12: Install thirteen (13) Moving
Infantry Target (MIT) emplacements.
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
01310 1 EAOPTIONAL TASK #13: Replace sixteen (16) Small
Arms Range Firing Positions.
(Option Line Item)
Anticipated Exercise Date
Product/Service Code: Z2PZ
Product/Service Description: REPAIR OR
ALTERATION
OF OTHER NON-BUILDING FACILITIES
Section D - Packaging and Marking
All required submittals shall be delivered to the Contracting Officer’s Representative (COR) listed in Section G [or whatever section you name the COR in] herein. All required submittals shall contain the following markings, if applicable:
1. Name and address of the contractor
2. Contract Number
3. Description of item submitted
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government
0110 Destination Government Destination Government 0210 Destination Government Destination Government 0310 Destination Government Destination Government 0410 Destination Government Destination Government 0510 Destination Government Destination Government 0610 Destination Government Destination Government 0710 Destination Government Destination Government
0810 Destination Government Destination Government 0910 Destination Government Destination Government 1010 Destination Government Destination Government 1110 Destination Government Destination Government 1210 Destination Government Destination Government
FAR CLAUSES
FAR 52.246-12 Inspection of Construction (Aug 1996)
FAR 52.246-13 Inspection – Dismantling, Demolition, or Removal of Improvements (Aug 1996)
Section F - Deliveries or Performance
CLIN
00010 TASK 1, actual physical work on site:
00011 TASK 2, actual physical work on site:
Behind LOA 11/30/2026 thru 4/30/2027, 152 calendar days.
Forward of LOA 2/12/2027 thru 4/12/2027, 60 calendar days
00012 TASK 3, actual physical work on site:
11/30/2026 thru 4/30/2027, 152 calendar days.
00013 TASK 4, actual physical work on site:
Forward of LOA 2/12/2027 thru 4/12/2027, 60 calendar days.
00014 TASK 5, actual physical work on site:
Forward of LOA 2/12/2027 thru 4/12/2027, 60 calendar days.
00015 TASK 6, actual physical work on site:
11/30/2026 thru 4/30/2027, 152 calendar days.
00110 Option TASK 1, actual physical work on site:
00210 Option TASK 2, actual physical work on site:
00310 Option TASK 3, actual physical work on site:
00410 Option TASK 4, 180 calendar days after award.
00510 Option TASK 5, actual physical work on site:
00610 Option TASK 6, actual physical work on site:
00710 Option TASK 7, actual physical work on site:
00810 Option TASK 8, actual physical work on site:
00910 Option TASK 9, actual physical work on site:
01010 Option TASK 10, actual physical work on site:
01110 Option TASK 11, deliverables by 1 November 2026.
01210 Option TASK 12, actual physical work on site:
Forward of LOA 2/12/2027 thru 4/12/2027, 60 calendar days.
01310 Option TASK 13, actual physical work on site:
1/4/2027 thru 2/5/2027, 33 calendar days.
FAR CLAUSES
FAR 52.211-13 Time Extensions (Sep 2000)
FAR 52.236-15 Schedules for Construction Contracts (Apr 1984)
Section G - Contract Administration Data
CLAUSES INCORPORATED BY REFERENCE
Invoicing/Payment for Firm-Fixed-Price Task
Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (FEB
2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions – Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov
Under this contract, the following documents are required to be submitted as an attachment to the
IPP
invoice:
Invoices must include, as a minimum, the following information:
1. Contractor Name, Address, Contact Information
2. Contract Number/Task Order Number
3. Purpose of the Invoice
4. CLIN/Item number of deliverable
5. Description of deliverable
6. Quantity and Firm Fixed Price of deliverable
7. Date deliverable was provided to the government for inspection
8. Period of Performance/Milestones
The contractor is responsible for ensuring invoices submitted are accurate and complete.
Additional supporting documentation MAY BE REQUESTED at the discretion of the COR or
CO.
PAYMENT:
1. Payments under this order will be due thirty (30) calendar days after the date of actual receipt of proper invoice in the office designated to receive the original invoice or final acceptance of the goods or services, whichever is later.
2. The date of the check issued in payment or the date of payment by wire transfer through the Treasury Financial Communications System shall be considered to be the day payment is made.
FINAL INVOICE:
https://www.ipp.gov/
Within sixty calendar days of product acceptance and/or completion of services:
1. The contractor shall submit a final invoice, designated as such by a clear statement of “FINAL INVOICE” on the face of the invoice document.
2. The contractor shall provide a certificate of completion which certifies all goods and service have been provided as required by this purchase order/contract.
The sixty calendar day submission timeframe shall not be extended without written authorization from the Contracting Officer. In the event the items above are not submitted within the authorized timeframe, the Contracting Officer will make final cost determinations in order to make final payment and close out the contract unilaterally.
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
DEPARTMENT OF INTERIOR ACQUISITION REGULATION (DIAR) CLAUSES IBR:
1452.204-70 Release of Claims – Department of the Interior (July 1996) mailto:IPPCustomerSupport@fiscal.treasury.gov
Section I - Contract Clauses
CLAUSES INCORPORATED BY FULL TEXT
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/ (End of clause)
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Defense Federal Acquisition Regulation Supplement (48
CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions JUN 2020
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020 52.203-7 Anti-Kickback Procedures JUN 2020
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or MAY 2014
Improper Activity
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal JUN 2020
Transaction
52.203-13 Contractor Code of Business Ethics and Conduct NOV 2021
52.203-17 Contractor Employee Whistleblower Rights NOV 2023
52.203-19 Prohibition on Requiring Certain Internal Confidentiality JAN 2017
Agreements or Statements 52.204-9 Personal Identity Verification of Contractor Personnel MAR 2026
52.204-10 Reporting Executive Compensation and First-Tier MAR 2026
Subcontract Awards
52.204-13 System for Award Management Maintenance MAR 2026
52.204-19 Incorporation by Reference of Representations and MAR 2026
Certifications.
52.209-6 Protecting the Government’s Interest When Subcontracting MAY 2026 with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded
52.209-9 Updates of Publicly Available Information Regarding MAY 2026
Responsibility Matters
52.209-10 Prohibition on Contracting With Inverted Domestic MAY 2026
Corporations
52.210-1 Market Research JUL 2025
52.215-2 Audit and Records—Negotiation JUL 2025
52.215-8 Order of Precedence—Uniform Contract Format OCT 1997
52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 http://www.acquisition.gov/
52.219-8 Utilization of Small Business Concerns JAN 2026
52.219-6 Notice of Total Small Business Set-Aside JAN 2026
52.219-16 Liquidated Damages-Subcontracting Plan JAN 2026 52.219-28 Post-Award Small Business Program Representation JAN 2026
52.222-3 52.222-4
52.222-6 52.222-7 52.222-8 52.222-9 52.222.10 52.222-11 52.222-12 52.222.13
52.222-14 52.222-15 52.222-20
Convict Labor MAY 2026 Contract Work Hours and Safety Standards – Overtime MAY 2026 Compensation Construction Wage Rate Requirements MAY 2026 Withholding of Funds MAY 2026 Payrolls and Basic Records MAY 2026 Apprentices and Trainees MAY 2026 Compliance with Copeland Act Requirements MAY 2026 Subcontracts (Labor Standards) MAY 2026 Contract Termination – Debarment MAY 2014 Compliance with Construction Wage Rate Requirements and MAY 2014 Related Regulations Disputes Concerning Labor Standards MAY 2026 Certification of Eligibility MAY 2014 Contracts for Materials, Supplies, Articles, and Equipment MAY 2026
52.222-35 Equal Opportunity for Veterans MAY 2026
52.222-36 Equal Opportunity for Workers with Disabilities MAY 2026 52.222-37 Employment Reports on Veterans MAY 2026
52.222-40 Notification of Employee Rights Under the National Labor MAY 2026
Relations Act 52.222-50 Combating Trafficking in Persons MAY 2026
52.222-54 Employment Eligibility Verification MAY 2026
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026
MAY 2026
52.222-62 52.222-90
Paid Sick Leave Under Executive Order 13706 Addressing DEI Discrimination by Federal Contractors
MAY 2026
MAY 2026
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2026 52.226-7 Drug Free Workplace MAR 2026
52.226-8
52.227-4 52.228-2
Encouraging Contractor Policies to Ban Text Messaging While Driving Patent Indemnity – Construction Contracts Additional Bond Security
MAR 2026
DEC 2007
OCT 1997
52.228-5 52.228-11 52.228-12 52.228-14 52.228-15
Insurance - Work On A Government Installation Individual Surety – Pledge of Assets Prospective Subcontractor Requests for Bonds Irrevocable Letter of Credit Performance and Payment Bonds - Construction
JAN 1997
FEB 2021
DEC 2022
NOV 2014
JUN 2020
52.229-3 52.232-5
Federal, State And Local Taxes Payments Under Fixed-Price Construction Contracts
OCT 2025
MAY 2014
52.232-17 Interest MAY 2014
52.232-18 Availability Of Funds APR 1984
52.232-23 Assignment Of Claims MAY 2014
52.232-26 Prompt Payment for Fixed-Price Architect-Engineer JAN 2017
52.232-27
Contracts Prompt Payment for Construction Contracts
JAN 2017
52.232-33 Payment by Electronic Funds Transfer--System for Award OCT 2018
Management 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013
52.232-40 Providing Accelerated Payments to Small Business MAR 2023
Subcontractors 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996
52.233-4 52.236-2
Applicable Law for Breach of Contract Claim Differing Site Conditions
OCT 2004
APR 1984
52.236-3 52.236-5 52.236-6
52.236-7 52.236-8 52.236-9
52.236-10 52.236-11 52.236.12 52.236-13 52.236-14 52.236-21 52.237-1
Site Investigation and Conditions Affecting the Work Material and Workmanship Superintendence by the Contractor
Permits and Responsibilities
Other Contracts Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements Operations and Storage Areas Use and Possession Prior to Completion
Cleaning Up Accident Prevention
Availability and Use of Utility Services Specifications and Drawings for Construction Site Visit
APR 1984
APR 1984
APR 1984
APR 1984
APR 1984
APR 1984
APR 1984
APR 1984
APR 1984
52.237-2 Protection Of Government Buildings, Equipment, And APR 1984
Vegetation 52.242-13 52.242-14 52.242.17 52.243-4
52.246-21 52.248-3
Bankruptcy Suspension of Work Government Delay Of Work Changes
Warranty of Construction Value Engineering - Construction
JUL 1995
APR 1984
JUN 2007
MAR 1994
OCT 2025
52.249-2
52.249-3
52.249-10
Termination for Convenience of the Government (Fixed Price) Default (Fixed-Price Construction) Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements)
Default (Fixed-Price Construction)
APR 2012
APR 2012
52.253-1
Computer Generated Forms
MAY 2026
252.203-7000 Requirements Relating to Compensation of Former DoD SEP 2011
Officials 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- JAN 2023
Contract-Related Felonies 252.203-7003 Agency Office of the Inspector General AUG 2019 252.203-7004 Display of Hotline Posters JAN 2023
252.204-7012 Safeguarding Covered Defense Information and Cyber MAY 2024
Incident Reporting 252.205-7000 Provision Of Information To Cooperative Agreement Holders JUN 2023
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By MAY 2019
The Government of a Country that is a State Sponsor of
Terrorism 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements JAN 2023
252.232-7010 252.236-7000 252.236-7001
Levies on Contract Payments Modification Proposals – Price Breakdown Contract Drawings and Specifications
DEC 2006
DEC 1991
AUG 2000
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7002 Requests for Equitable Adjustment DEC 2022 252.244-7000 Subcontracts for Commercial Products or Commercial
Services
NOV 2023
1452.201-70 Authorities and Delegations SEP 2011 1425.203-70 Restrictions and Endorsements JUL 1996
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $5,572.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.219-14 LIMITATIONS ON SUBCONTRACTING (JAN 2026)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System
(NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are—
(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-
5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are—
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and https://www.acquisition.gov/far/19.000#FAR_19_000 https://www.acquisition.gov/far/19.000#FAR_19_000 https://www.acquisition.gov/far/subpart-19.8#FAR_Subpart_19_8 https://www.acquisition.gov/far/subpart-19.13#FAR_Subpart_19_13 https://www.acquisition.gov/far/subpart-19.14#FAR_Subpart_19_14 https://www.acquisition.gov/far/subpart-19.15#FAR_Subpart_19_15 https://www.acquisition.gov/far/8.405-5#FAR_8_405_5 https://www.acquisition.gov/far/8.405-5#FAR_8_405_5 https://www.acquisition.gov/far/16.505#FAR_16_505 https://www.acquisition.gov/far/19.504#FAR_19_504 https://www.acquisition.gov/far/subpart-19.8#FAR_Subpart_19_8 https://www.acquisition.gov/far/subpart-19.13#FAR_Subpart_19_13 https://www.acquisition.gov/far/subpart-19.14#FAR_Subpart_19_14 https://www.acquisition.gov/far/subpart-19.15#FAR_Subpart_19_15 https://www.acquisition.gov/far/8.405-5#FAR_8_405_5 https://www.acquisition.gov/far/16.505#FAR_16_505 https://www.acquisition.gov/far/subpart-19.8#FAR_Subpart_19_8 https://www.acquisition.gov/far/subpart-19.13#FAR_Subpart_19_13 https://www.acquisition.gov/far/subpart-19.14#FAR_Subpart_19_14 https://www.acquisition.gov/far/subpart-19.15#FAR_Subpart_19_15 https://www.acquisition.gov/far/19.504#FAR_19_504
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System
(NAICS) code for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause—
[Contracting Officer check as appropriate.]
□ By the end of the base term of the contract and then by the end of each subsequent option period; or
□ By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
52.225-11 BUY AMERICAN--CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS
(NOV 2023)
(a) Definitions. As used in this clause--
Caribbean Basin country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4)such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Designated country means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);
(2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or
(4) A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material. Least developed country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
“Free Trade Agreement country construction material” means a construction material that—
(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.
“Least developed country construction material” means a construction material that—
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
United States means the 50 States, the District of Columbia, and outlying areas. WTO GPA country construction material means a construction material that--
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
(b) Construction materials.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). In addition, the Contracting Officer has determined that the WTO GPA and Free Trade Agreements (FTAs) apply to this acquisition. Therefore, the Buy American restrictions are waived for designated country construction materials.
(2) The Contractor shall use only domestic or designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.
(3) The requirement in paragraph (b)(2) of this clause does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
NONE
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the restrictions of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the
Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is theunreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) \1\
Item 1:
Foreign construction material Domestic construction material Item 2:
Foreign construction material Domestic construction material
\1\ Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include other applicable supporting information.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 million, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
CONSTRUCTION-WAGE DETERMINATION
(i) Reference FAR 52.222-6 Davis Bacon Act General Decision Number WD # TX20260279, State:
Texas, Construction Type: Building, County(ies): Coryell & Lampasas in Texas, applies to this solicitation and/or purchase order and/or contract. Wage Determination may be downloaded from the following websites: https://sam.gov/wage-determination/TX20250279/2
PERFORMANCE AND PAYMENT BONDS (POST AWARD SUBMISSION) – Performance and Payment bonds must equal 100 percent of the original contract price and if that contract price increases, an additional amount equal to 100 percent of the increase, per FAR 28.102-2.
LIQUIDATED DAMAGES – As per the base contract, liquidated damages will be imposed at the task order level. Per FAR Clause 52.211-12, Liquidated Damages- Construction, if the contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $5,572.00 for each calendar day of delay until the work is completed or accepted by the Government.
https://sam.gov/wage-determination/TX20250279/2
Section J – List of Attachments
Enclosures/ Attachments
1. Ft. Hood SOW
2. SOW EXHIBITS
3. Davis-Bacon Act WD # TX20250230
Section K - Representations, Certifications and Other Statements of Offerors
FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): www.acquisition.gov
DIAR 1452.233-2 – SERVICE OF PROTEST DEPARTMENT OF THE INTERIOR
(JUL 1996) (DEVIATION)
(a) Protests, as defined in section 31.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
David Boyd, Contracting Officer Acquisition Services Directorate Email: David_Boyd@ibc.doi.gov
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the Department of the Interior Assistant Solicitor, Acquisitions and Intellectual Property, 1849 C Street, NW, Room 6511, Washington, D.C. 20240.
(End of Provision) mailto:David_Boyd@ibc.doi.gov
Section L - Instructions, Conditions and Notices to Bidders
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/
PROVISIONS INCORPORATED BY REFERENCE
52.204-7 52.209-7
System for Award Management Information Regarding Responsibility Matters
MAR 2026
OCT 2018
52.215-20 Requirements for Certified Cost or Pricing Data or OCT 2010
52.228-17
Information Other Than Certified Cost or Pricing Data Individual Surety – Pledge of Assets (Bid Guarantee)
FEB 2021
252.203-
252.204-
Representation Relating to Compensation of Former DoD Officials Compliance With Safeguarding Covered Defense Information Controls
SEP 2022
OCT 2016
PROVISIONS INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Fixed Firm Price (FFP) contract resulting from this solicitation.
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX
LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (MAY 2026)
(a) The Government will not enter into a contract with any corporation that—
(1) Has any unpaid Federal tax liability that has been assessed, for which all…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .