EXHIBIT_L_-_JMMU_RANGE_SITE_SUMMARY_PCs_AND_CAMERA.pdf
PDF 553 KB Posted
- Attached to
- Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep Federal contract opportunity
- Solicitation number
- 140D0426R0084
About this file
This document is an exhibit showing the layout and scope of work for a military range modernization project at JMMU (Joint Munitions Maintenance Unit).
The project aims to upgrade targetry infrastructure to current standards and support aerial gunnery operations. The scope includes installation of five Moving Targets (5-MV with 4 MOD. 1 replacements), fifteen clusters containing 105 Stationary Impact Targets (SITs), three combination SAT/Cluster systems with 12 SITs, thirteen Mobile Impact Targets (MITs), fifty-six Stationary Aerial Targets (SATs) plus three combo SATs for a total of 59, and seventeen power centers. The work encompasses testing and replacement of 2,088 end-to-end fiber optic strands before and after construction, replacement of all target load center and data patch panels, and repair of damaged fiber and power infrastructure. The geographic scope covers multiple locations including JM Tower, General Instruction Building, Central Building, AAR Building, and CC Tower, with camera positions designated as FC-5, FC-6, and FC-7. The map identifies various target positions and the areas designated for LOA (Limit of Authority).
View the file
Other files for this federal contract opportunity
Show all 50
Jack Mountain Multi-Use (JMMU) Range Upgrades, Rep has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POWER CENTERS, CAMERAS, CENTRAL BUILDING, AAR BUILDING, CC TOWER LOCATIONS
PURPOSE: to upgrade targetry to current standards and to support aerial Gunnery.
5-MV (4 MOD. 1 replaced) 15-Clusters (105 SITs) 3- Combination SAT/Cluster (12 SITs) 13 MITs 56 SATs (+ 3 combo SATs (59 Total)
17 Power Centers
JM TOWER
General Instruction Building
CAMERA
FC-5 CAMERA
FC-6
CAMERA
FC-7
PJ1A
PJ1B
PJ2B
PJ2A
PJ3A
PJ4A
PJ5A
PJ6A
PJ7A
PJ8A
PJ9A
PJ8B
PJ7BPJ6B
PJ5B
PJ4B
PJ3B
LOA
EXHIBIT L
2088 End to End fiber optic strands to be tested before and after construction.
Replacing all target load center and data patch panels.
Repair damaged fiber and power infrastructure.