This document is a review of light fixtures for PCB ballasts at the Ashland Community Center Building in Ashland, Oregon, conducted by Coleman Creek Consulting, Inc. (CCC) for the City of Ashland. The review was performed to determine the location of PCB ballasts in the areas scheduled for renovation, including lighting replacement. Only one fluorescent light fixture was found in the building's basement, indicating the majority of lighting is non-fluorescent. All fluorescent bulbs are recommended to be removed and disposed of as universal waste prior to renovation activities.

The related state and local contracting opportunity is for the rehabilitation of the Community Center and Pioneer Hall facilities in Jackson County, Oregon, managed by the City of Ashland. The project involves selective demolition, structural upgrades, mechanical/electrical/plumbing work, interior and exterior renovations, ADA improvements, and hazardous material abatement. Interested contractors must demonstrate prior experience with similar projects and will be evaluated based on the responsiveness and responsibility of their bids. Bids are due by 2:00 pm PST on April 30, 2024, with a mandatory pre-bid meeting scheduled for April 9, 2024. The solicitation documents do not specify any set-aside designations or restrictions on the types of organizations that can respond, and the incumbent contractor and current contract value are not provided. The project budget and funding sources are also not detailed in the available information.

View the file

Other files

File Type Posted
Exhibit N Pioneer Hall Bid & Permit Drawings (03.13.24).pdf PDF
Attachment 7 to Addendum 2 - Work Agreement.pdf PDF
Attachment 1 to Addendum 2 - Asbestos Specification.pdf PDF
Addendum 1.pdf PDF
20240514 Bid Summary.pdf PDF
Attachment 1 to Addendum 3 - Summary of Changes.pdf PDF
Use of Cooperative Contract Notice -3.19.pdf PDF
Attachment 2 to Addendum 2 - Summary of Changes.pdf PDF
Attachment 4 to Addendum 2 - Revised Pioneer Hall Drawings.pdf PDF
240318 ITB Community & Pioneer Hall -Final.pdf PDF
Exhibit O Pioneer Hall Asbestos Survey 2024.pdf PDF
Addendum 2.pdf PDF
Attachment 3 to Addendum 2 - Revised Community Center Drawings.pdf PDF
Attachment 5 to Addendum 2 - Additional Specifications.pdf PDF
Exhibit M Ashland Community Center & Pioneer Hall Specifications (03.13.24).pdf PDF
Attachment 2 to Addendum 3 - Revised Community Center Drawings.pdf PDF
Exhibit O Pioneer Hall Asbestos 2017.pdf PDF
Exhibit N Ashland Community Center Bid & Permit Drawings (03.13.24).pdf PDF
Exhibit O Community Center Asbestos.pdf PDF
Attachment 6 to Addendum 2 - Bid Schedule.pdf PDF
Exhibit O Community Center Lead.pdf PDF
Exhibit M Ashland Community Center & Pioneer Hall Specifications (03.13.24).pdf PDF
Exhibit N Pioneer Hall Bid & Permit Drawings (03.13.24).pdf PDF
Exhibit O Pioneer Hall Asbestos 2017.pdf PDF
Exhibit O Community Center Asbestos.pdf PDF
Exhibit O Community Center Lead.pdf PDF
Exhibit O Pioneer Hall Asbestos Survey 2024.pdf PDF
Exhibit N Ashland Community Center Bid & Permit Drawings (03.13.24).pdf PDF
Exhibit O Community Center Ballast.pdf PDF
240318 ITB Community & Pioneer Hall -Final.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C3 Coleman Creek Consulting, Inc.

810 Leonard Street, Ashland, Oregon 97520 541-535-7108 Phone

REVIEW OF LIGHT FIXTURES FOR PCB BALLASTS

ASHLAND COMMUNITY CENTER BUILDING

59 Winburn Way, Ashland, Oregon

FOR

CITY OF ASHLAND

INTRODUCTION

Coleman Creek Consulting, Inc. (CCC) was retained by the City of Ashland to perform a PCB ballast light fixture review of the portion of the Community Center Building scheduled for renovation, including replacement of lighting. The purpose of the PCB ballast light fixture review was to determine the location of PCB ballasts in the areas reviewed.

SCOPE OF WORK

It was decided that representative light fixtures would be reviewed for the presence of PCB ballasts.

PCB ballasts were banned in 1979 by the Environmental Protection Agency under the Toxic Substances Control Act (TSCA). TSCA required labeling indicating no PCB’s in the ballasts manufactured after 1979, including, “No PCB’s, “PCB-Free” and “Non-PCB”. Testing of individual ballasts is impractical, therefore, all ballasts that do not contain the above wording should be assumed to contain PCB’s. Recently, the requirement to provide a mention of PCB’s on the label was eliminated, making PCB identification more difficult.

LIGHT FIXTURE BALLAST REVIEW

David W. Fawcett of CCC visited the Ashland Community Center Building June 1, 2023, and reviewed the facility. According to a plaque affixed to the front of the building, original construction was in 1922, and renovation occurred in 1986. Mr. Fawcett the building for the presence of light fixtures that may contain PCB ballasts. The only fluorescent light fixture was noted in the basement, was noted of newer construction. No other fluorescent light fixtures were noted in the Community Center Building.

RECOMMENDATIONS

All fluorescent bulbs to be removed should be removed and disposed as universal waste prior to renovation activities.

David W. Fawcett Director of Consulting Operations