Attachment 6 to Addendum 2 - Bid Schedule.pdf

PDF 175 KB Posted

Attached to
Community Center and Pioneer Hall Rehabilitation
Solicitation number
S-KA0010-00009824
Issued by
Jackson County, Amity City, Oregon

About this file

This document is a Bid Schedule attachment for Addendum 2 related to a state and local contract opportunity for the rehabilitation of the Community Center and Pioneer Hall facilities in Jackson County, Oregon. The project is being managed by the City of Ashland on behalf of Jackson County and involves selective demolition, structural upgrades, mechanical/electrical/plumbing work, interior and exterior renovations, ADA improvements, and hazardous material abatement. The Bid Schedule includes line items for the base scope of work as well as several bid alternatives for the Community Center, including an ADA accessible kitchen, quartz countertops, exterior painting, a stage ramp, wood floor refinishing, interior painting, carpet tiles, hardscapes and stormwater, and a concrete stem wall. There are also bid alternatives for providing HVAC systems for both the Community Center and Pioneer Hall. The bid is due by 2:00 pm PST on April 30, 2024, with a mandatory pre-bid meeting scheduled for April 9, 2024.

The solicitation documents do not specify any set-aside designations or restrictions on the types of organizations that can respond. The incumbent contractor and current contract value are also not provided. The project budget and funding sources are also not detailed in the available information. Interested parties should thoroughly review the bid and permit drawings, specifications, and other provided documentation to fully understand the scope of work, response requirements, and evaluation criteria for this state and local contracting opportunity.

View the file

Other files

File Type Posted
Exhibit N Pioneer Hall Bid & Permit Drawings (03.13.24).pdf PDF
Attachment 7 to Addendum 2 - Work Agreement.pdf PDF
Attachment 1 to Addendum 2 - Asbestos Specification.pdf PDF
Addendum 1.pdf PDF
20240514 Bid Summary.pdf PDF
Attachment 1 to Addendum 3 - Summary of Changes.pdf PDF
Exhibit O Community Center Ballast.pdf PDF
Use of Cooperative Contract Notice -3.19.pdf PDF
Attachment 2 to Addendum 2 - Summary of Changes.pdf PDF
Attachment 4 to Addendum 2 - Revised Pioneer Hall Drawings.pdf PDF
240318 ITB Community & Pioneer Hall -Final.pdf PDF
Exhibit O Pioneer Hall Asbestos Survey 2024.pdf PDF
Addendum 2.pdf PDF
Attachment 3 to Addendum 2 - Revised Community Center Drawings.pdf PDF
Attachment 5 to Addendum 2 - Additional Specifications.pdf PDF
Exhibit M Ashland Community Center & Pioneer Hall Specifications (03.13.24).pdf PDF
Attachment 2 to Addendum 3 - Revised Community Center Drawings.pdf PDF
Exhibit O Pioneer Hall Asbestos 2017.pdf PDF
Exhibit N Ashland Community Center Bid & Permit Drawings (03.13.24).pdf PDF
Exhibit O Community Center Asbestos.pdf PDF
Exhibit O Community Center Lead.pdf PDF
Exhibit M Ashland Community Center & Pioneer Hall Specifications (03.13.24).pdf PDF
Exhibit N Pioneer Hall Bid & Permit Drawings (03.13.24).pdf PDF
Exhibit O Pioneer Hall Asbestos 2017.pdf PDF
Exhibit O Community Center Asbestos.pdf PDF
Exhibit O Community Center Lead.pdf PDF
Exhibit O Pioneer Hall Asbestos Survey 2024.pdf PDF
Exhibit N Ashland Community Center Bid & Permit Drawings (03.13.24).pdf PDF
Exhibit O Community Center Ballast.pdf PDF
240318 ITB Community & Pioneer Hall -Final.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

No. Description Bid Unit Qty

Line Total

Work scope for Pioneer Hall and the Community Center as described in the bid documents EA 1

(A) Alternative Community Center – ADA Accessible

Kitchen and Lighting EA 1

(A-1) Alternative Community Center – Quartz Countertop and Backsplash in Kitchen EA 1

(B) Alternative Community Center – Paint Exterior Siding and Trim at Front Elevation EA 1 5 (C) Alternative Community Center - Stage Ramp EA 1 6 (D) Alternative Community Center - Refinish Wood Floors EA 1

(E) Alternative Community Center - Paint All Interior

Walls and Stain All Doors and Interior Tri, EA 1 8 (F) Alternative Community Center - Carpet Tiles at Offices EA 1

(G) Alternative Community Center – Hardscapes and

Stormwater EA 1

(H) Alternative Community Center – Paint Entire Exterior Siding and Trim (if this alternative is selected, alternative

B will not be) EA 1

(I) Alternative Community Center – Concrete Stem Wall Around All Other Perimeter Walls Per Sheet S1.10 and

Details 2/S5.10, 3/S5.10 and 4/A8.00 EA 1 12 (J) Alternative Pioneer Hall – Paint Interior Walls EA 1

Alternative – Provide HVAC System for the Community Center as Described in the Drawings and Specifications EA 1

Alternative – Provide HVAC System for Pioneer Hall as

Described in the Drawings and Specifications EA 1

Discovered work, additional work caused by unintended, unavoidable damage created while performing the identified scope of work and additional work arising from regulatory requirements which have not been fully described EA 1

BID TOTAL ($)

Name of Authorized Representative Total Written in Dollars

Authorized Representative Signature Date

File details come from the government source that posted it. Updated .