Attachment 2 to Addendum 3 - Revised Community Center Drawings.pdf

PDF 14 MB Posted

Attached to
Community Center and Pioneer Hall Rehabilitation
Solicitation number
S-KA0010-00009824
Issued by
Jackson County, Amity City, Oregon

About this file

Attachment 2 to Addendum 3 is related to the state and local contracting opportunity for the rehabilitation of the Community Center and Pioneer Hall facilities in Jackson County, Oregon. This project, managed by the City of Ashland on behalf of Jackson County, involves selective demolition, structural upgrades, mechanical/electrical/plumbing work, interior and exterior renovations, ADA improvements, and hazardous material abatement. The project specifications cover a wide range of construction trade work, including concrete, metals, wood and plastic-laminate construction, thermal and moisture protection, windows and doors, finishes, and utilities. The mandatory pre-bid meeting is scheduled for April 9, 2024, and bids are due by 2:00 pm PST on April 30, 2024.

The solicitation documents do not specify any set-aside designations or restrictions on the types of organizations that can respond. The incumbent contractor and current contract value are also not provided. The project budget and funding sources are also not detailed in the available information. Interested parties should thoroughly review the bid and permit drawings, specifications, and other provided documentation to fully understand the scope of work, response requirements, and evaluation criteria for this state and local contracting opportunity.

View the file

Other files

File Type Posted
Exhibit N Pioneer Hall Bid & Permit Drawings (03.13.24).pdf PDF
Attachment 7 to Addendum 2 - Work Agreement.pdf PDF
Attachment 1 to Addendum 2 - Asbestos Specification.pdf PDF
Addendum 1.pdf PDF
20240514 Bid Summary.pdf PDF
Attachment 1 to Addendum 3 - Summary of Changes.pdf PDF
Exhibit O Community Center Ballast.pdf PDF
Use of Cooperative Contract Notice -3.19.pdf PDF
Attachment 2 to Addendum 2 - Summary of Changes.pdf PDF
Attachment 4 to Addendum 2 - Revised Pioneer Hall Drawings.pdf PDF
240318 ITB Community & Pioneer Hall -Final.pdf PDF
Exhibit O Pioneer Hall Asbestos Survey 2024.pdf PDF
Addendum 2.pdf PDF
Attachment 3 to Addendum 2 - Revised Community Center Drawings.pdf PDF
Attachment 5 to Addendum 2 - Additional Specifications.pdf PDF
Exhibit M Ashland Community Center & Pioneer Hall Specifications (03.13.24).pdf PDF
Exhibit O Pioneer Hall Asbestos 2017.pdf PDF
Exhibit N Ashland Community Center Bid & Permit Drawings (03.13.24).pdf PDF
Exhibit O Community Center Asbestos.pdf PDF
Attachment 6 to Addendum 2 - Bid Schedule.pdf PDF
Exhibit O Community Center Lead.pdf PDF
Exhibit M Ashland Community Center & Pioneer Hall Specifications (03.13.24).pdf PDF
Exhibit N Pioneer Hall Bid & Permit Drawings (03.13.24).pdf PDF
Exhibit O Pioneer Hall Asbestos 2017.pdf PDF
Exhibit O Community Center Asbestos.pdf PDF
Exhibit O Community Center Lead.pdf PDF
Exhibit O Pioneer Hall Asbestos Survey 2024.pdf PDF
Exhibit N Ashland Community Center Bid & Permit Drawings (03.13.24).pdf PDF
Exhibit O Community Center Ballast.pdf PDF
240318 ITB Community & Pioneer Hall -Final.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A101

SIM

A101

A101 1R e f

XX

Name Elevation

N

Room name

150 SF

A101

SIM

View Name A1.1

1/4" = 1'-0"

ROOM NAME

ROOM NUMBER

ROOM AREA

KEYNOTE TAG

REVISION SET TAG

1i

DOOR NUMBER

FINISH TYPE

WINDOW/GLAZING

TAG

LEVEL HEAD

SHEET REFERENCE

ELEVATION REFERENCE

ELEVATION SYMBOL

SHEET REFERENCE

INTERIOR ELEVATION

REFERENCE

INTERIOR

ELEVATION SYMBOL

SHEET REFERENCE

INTERIOR ELEVATION

REFERENCE

BUILDING & WALL

SECTION

SHEET REFERENCE

DRAWING

REFERENCE

DETAIL

REFERENCE

A101

SIM

SHEET REFERENCE

DRAWING

REFERENCE

ENLARGED

PLAN

DESIGNATED AREA

PROJECT NORTH

SHEET REFERENCE

VIEW TITLE

DRAWING SCALE

WALL TYPE TAG

STRUCTURAL

KEYNOTE TAG

CEILING TAG

FLOOR

TRANSITION TAG

CENTER LINE

DELTA w// CURRENT

REVISION NUMBER

PREVIOUS REVISION

CEILING MATERIAL

CEILING HEIGHT

ADDITIONAL NOTES

NOTES

ACT

8'-0"

Remarks

EX#

EX#

ME#

ME#

XX#

XX# FLOOR FINISH

BASE FINISH

ADDITIONAL NOTES

WALL FINISHES

FINISH TAG

TR#

A101

Ref

R e f

R e f

Ref

SHEET REFERENCE

DRAWING

REFERENCE

PHOTO REFERENCE

FINISH TAG

XX

DRAWING NUMBER

1i PLUMBING FIXTURE TAG

1 Ref

R e f

1 Ref

R e f

X

ADDITIONAL KEYNOTE#

PROJECT LOCATION:

74 WINBURN WAY,

ASHLAND, OR 97520

PIONEER HALL

ASHLAND COMMUNITY CENTER - HATCH

INDICATES AREA OF WORK

EXPIRES: 06-30-24

R

D

EG

IS

TE

RE

P

L

ROFESSIONA

81129PE

OREGON

E

RNG

I NE E

Z

S

A . S

J

7, 2

Y

A C

H

AR

S

TO

K Ee un 2

45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588

PROJECT NO.

DATE:

DRAWN:

CHECKED:

O N

E I N

C H

E Q

U A

L S

F U

L L

S C

A L E

/8

/2

:5

:3

A M

A u to d e s k D o c s /M

.A s h la n d

C o m m u n it y C e n te r

P io n e e r

H a ll/

M

A

R C

H

R

.r v t

G0.00

COVER SHEET

M-0298-22

ASHLAND

COMMUNITY

CENTER

RENOVATION

CITY OF ASHLAND

74 WINBURN WAY

ASHLAND, OR 97520

03-13-2024

WYH

JRR

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

B

ID

P E

R M

IT

ASHLAND COMMUNITY CENTER RENOVATION

CITY OF ASHLAND

74 WINBURN WAY

ASHLAND, OR 97520

100% CONSTRUCTION DOCUMENTS | BID & PERMIT

N

SHEET INDEX

A.B. ANCHOR BOLT

A.C. ASPHALT CONCRETE

A.C.B. ACOUSTICAL BOARD

ACI AMERICAN CONCRETE

INSTITUTE

A.C.P. ACOUSTICAL PANEL

A.C.T. ACOUSTICAL CEILING

TILE

ADD'L. ADDITIONAL

A.D. AREA DRAIN

ADJ. ADJUSTABLE

A.F. ACCESS FLOORING

AGGR. AGGREGATE

A.F.F. ABOVE FINISHED FLOOR

AISC AMERICAN INSTITUTE OF

STEEL CONSTRUCTION

ARCH. ARCHITECT

ASCE AMERICAN SOCIETY OF

CIVIL ENGINEERS

ASTM AMERICAN SOCIETY FOR

TESTING AND MATERIALS

AWS AMERICAN WELDING

SOCIETY

BD. BOARD

BITUM. BITUMINOUS

BKP. BACKING PLATE

BM. BEAM

BOT./B.O. BOTTOM/BOTTOM OF

C.B. CATCH BASIN

CEM. CEMENT

CER. CERAMIC

C.G. CORNER GUARD

C.I. CAST IRON

C.J. CONTROL JOINT

CJP COMPLETE JOINT

PENETRATION

CL CENTERLINE

CLG. CEILING

CLKG. CAULKING

CLO. CLOSET

CLR. CLEAR

CMU CONCRETE MASONRY

UNIT

C.O. CASED OPENING

CONC. CONCRETE

CONN. CONNECTION

CONST. CONSTRUCTION

CORR. CORRIDOR

CPT. CARPET

CTSK. COUNTERSUNK

C.T. CERAMIC TILE

CTR. CENTER

DBA DEFORMED BAR

ANCHOR

D.F. DRINKING FOUNTAIN

D.L. DEAD LOAD

DET. DETAIL

DIA., ⌀ DIAMETER

DISP. DISPENSER

DR. DOOR

DWG. DRAWING

DWR. DRAWER

D.S. DOWNSPOUT

D.S.P. DRY STANDPIPE

(E) EXISTING

E.J. EXPANSION JOINT

ELEC. ELECTRICAL

EL. ELEVATION

EQ. EQUAL

EXPO. EXPOSED

EXP. EXPANSION

EXT. EXTERIOR

F.A. FIRE ALARM

FB. FLAT BAR

F.D. FLOOR DRAIN

FDN. FOUNDATION

FE FIRE EXTINGUISHER

F.H. FLAT HEAD

FIN. FINISH

FLR. FLOOR

F.O.C FACE OF CONCRETE

F.O.F FACE OF FINISH

F.O.S. FACE OF STUDS

F.S. FULL SIZE

FT. FOOT

FTG. FOOTING

FUT. FUTURE

Ga. GAUGE

GALV. GALVANIZED

GL GRID LINE

GLB GLULAM BEAM

G.B. GRAB BAR

GND. GROUND

GYP. GYPSUM

G.W.B. GYPSUM WALL BOARD

H.B. HOSE BIBB

H.C. HOLLOW CORE

H.M. HOLLOW METAL

HORIZ. HORIZONTAL

HSS HOLLOW STRUCTURAL

STEEL

IBC INTERNATIONAL

BUILDING CODE

I.D. INSIDE DIAMETER

IN. INCH

INT. INTERIOR

J.B. JUNCTION BOX

J.O.H. JAMB OPENING HEIGHT

J.O.W. JAMB WIDTH

JT. JOINT

K KIPS

KSF KIPS PER SQUARE FOOT

KSI KIPS PER SQUARE INCH

LAM. LAMINATE

LB. POUND

L.L. LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LOC. LOCATION

LONG. LONGITUDINAL

L.P. LOW POINT

LVF LOW VELOCITY FASTENER

MAX. MAXIMUM

MBMA METAL BUILDING

MANUFACTURERS

ASSOCIATION

M.C. MEDICINE CABINET

M.D.F. MEDIUM DENSITY

FIBERBOARD

M.D.O. MEDIUM DENSITY

OVERLAY

MECH. MECHANICAL

MEMB. MEMBRANE

MFR. MANUFACTURER

MH. MANHOLE

MIN. MINIMUM

MIR. MIRROR

MISC. MISCELLANEOUS

M.O. MASONRY OPENING

M.P. MIDPOINT

MPH MILES PER HOUR

M.S. MACHINE SCREW

MT MAGNETIC PARTICLE

TESTING

MTD. MOUNTED

MUL. MULLION

(N) NEW

N.I.C. NOT IN CONTRACT

NOM. NOMINAL

N.T.S. NOT TO SCALE

OBS. OBSCURE

o.c. ON CENTER

O.C.D. OVERHEAD COILING

DOOR

O.C.G OVERHEAD COILING

GRILLE

O.D. OUTSIDE DIAMETER

O.F.C.I. OWNER FURNISHED

CONTRACTOR

INSTALLED

O.F.D. OVERFLOW DRAIN

O.F.O.I. OWNER FURNISHED

OWNER INSTALLED

OH. OPPOSITE HAND

OPP. OPPOSITE

OWJ OPEN WEB JOIST

-GENERAL-

G0.00 COVER SHEET

G1.00 CODE PLAN - COMMUNITY CENTER

G2.00 TYPICAL ADA STANDARDS - EXISTING

G2.10 TYPICAL ADA STANDARDS - EXISTING

-ARCHITECTURAL-

A0.00 ASSEMBLIES AND DOOR SCHEDULES

A0.10 FINISH SCHEDULES

A1.00 FLOOR PLAN

A1.10 ROOF PLAN

A2.00 REFLECTED CEILING PLAN

A3.00 FINISH FLOOR PLAN

A4.00 EXTERIOR ELEVATIONS

A4.10 EXTERIOR ELEVATIONS

A5.00 BUILDING SECTIONS

A5.10 WALL SECTIONS

A6.00 STAIRS AND RAMP SECTIONS

A7.00 ENLARGED PLANS & INTERIOR ELEVATIONS

A7.10 ENLARGED PLANS & INTERIOR ELEVATIONS

A7.11 ENLARGED PLANS & INTERIOR ELEVATIONS

A8.00 EXTERIOR DETAILS

A8.10 EXTERIOR DETAILS

A9.00 INTERIOR DETAILS

OWNER:

CONTACT: JASON STRAIGHT PM

CITY OF ASHLAND PUBLIC WORKS

51 WINBURN WAY

ASHLAND, OR 97520

T 541.552.2419

ARCHITECTURE:

STAMPING REGISTRANT: ZACH STOKES, P.E.

CONTACT: JESSI RUSSELL, ARCHITECT

ZCS ENGINEERING & ARCHITECTURE

127 NW D ST.

GRANTS PASS, OR 97526

T 541.479.3865

STRUCTURAL ENGINEERING:

ENGINEER OF RECORD: MATT SMITH P.E. S.E.

CONTACT: STEPHEN CHASE

ZCS ENGINEERING & ARCHITECTURE

127 NW D ST.

GRANTS PASS, OR 97526

T 541.479.3865

CIVIL ENGINEERING:

ENGINEER OF RECORD: SYLAS ALLEN, P.E.

CONTACT: LUCAS GOWEY

ZCS ENGINEERING & ARCHITECTURE

127 NW D ST.

GRANTS PASS, OR 97526

T 541.479.3865

SURVEY:

CONTACT: JOHN R. PARIANI PLS

PARIANI LAND SURVEYING

17 S PLATT ST. SUITE C

EAGLE POINT, OR 97524

T 541.890.1131

GENERAL CONTRACTOR:

TBD

1. ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS

SHALL BE FIELD VERIFIED. THE CONTRACTOR SHALL

NOTIFY THE PROJECT TEAM OF ANY SIGNIFICANT

DISCREPANCIES FROM CONDITIONS SHOWN ON THE

DRAWINGS.

2. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR

ALL CONSTRUCTION MEANS AND METHODS.

RESPONSIBILITY SHALL INCLUDE BUT NOT LIMITED TO

DEMOLITION AND CONSTRUCTION MEANS AND METHODS,

TECHNIQUES, SEQUENCING, AND SAFETY REQUIRED TO

COMPLETE CONSTRUCTION.

3. BEFORE STARTING A SECTION OF WORK THE

CONTRACTOR SHALL CAREFULLY EXAMINE PREPARATORY

WORK THAT HAS BEEN EXECUTED. ENSURE THAT WORK

AND ADJACENT RELATED WORK WILL FINISH TO PROPER

PLANES AND LEVELS.

4. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING

ALL MATERIALS AND WORKMANSHIP IN ACCORDANCE

WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL

CODES.

5. CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL

CONTRACT DOCUMENTS, FIELD CONDITIONS, AND

DIMENSIONS FOR ACCURACY AND CONFIRMING THAT

WORK IS BUILDABLE AS SHOWN BEFORE PROCEEDING

WITH THE CONSTRUCTION. IF THERE ARE ANY QUESTIONS,

THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING A

CLARIFICATION FROM THE PROJECT TEAM BEFORE

PROCEEDING WITH THE WORK IN QUESTION OR RELATE

WORK.

6. THE CONTRACTOR SHALL NOT SCALE DRAWINGS. WRITTEN

DIMENSIONS SHALL ALWAYS GOVERN. CONTRACTOR

REQUIRING DIMENSIONS NOT NOTED SHALL ALWAYS

CONTACT THE PROJECT TEAM FOR SUCH INFORMATION

PRIOR TO PRECEDING WITH WORK RELATED TO THOSE

DIMENSIONS

7. THE CONTRACTOR SHALL PROTECT, PATCH, AND REPAIR

TO MATCH ANY WALLS, FLOORS, CEILINGS, AND/OR OTHER

SURFACES WHICH MAY BE DISTURBED DURING THE

INSTALLATION OF MECHANICAL, ELECTRICAL, PLUMBING

OR OTHER OWNER WORK.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

CUTTING AND PATCHING REQUIRED FOR PROPER

INSTALLATION OF MATERIAL AND EQUIPMENT. PROVIDE

DEMOLITION AND PATCH/REPAIR IN ALL AREAS (WHETHER

SPECIFICALLY SHOWN OR NOT) TO ACCOMMODATE ALL

WORK.

9. IF THE CONTRACTOR ENCOUNTERS A CONDITION NOT

COVERED IN THE CONSTRUCTION DOCUMENTS, THE

CONTRACTOR SHALL NOTIFY AND RESOLVE THE ISSUE

WITH THE PROJECT TEAM BEFORE COMMENCING ANY

WORK.

10. ALL PERMITS ASSOCIATED WITH THE PROJECT SHALL BE

PAID AND OBTAINED BY THE CONTRACTOR.

11. GENERAL CONTRACTOR SHALL BE SOLELY AND

COMPLETELY RESPONSIBLE FOR JOB CONDITIONS OF THE

JOB SITE, INCLUDING SAFETY OF PERSONS AND PROPERTY

AND COMPLIANCE WITH OSHA SAFETY STANDARDS.

12. WHEN PORTIONS OF THE WORK ARE PERFORMED BY THE

CONTRACTOR ON A DESIGN-BUILD BASIS, THE

CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE

DESIGN OF SUCH SYSTEMS AND FOR THE SECURING OF

ALL ASSOCIATED PERMITS. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR THE COORDINATION OF ALL DESIGN

BUILD SUB CONTRACTORS.

13. CONTRACTOR SHALL AVOID INTERFERENCE AND CONFLICT

WITH THE BUILDING'S NORMAL OPERATION. CONTRACTOR

TO COMPLY WITH THE BUILDING RULES AND REGULATIONS

REGARDING SCHEDULING AND USE OF ELEVATORS AND

LOADING DOCKS FOR DELIVERY AND HANDLING OF

MATERIALS, EQUIPMENT, AND DEBRIS.

14. ALL KEY NOTES INDICATE NEW ITEMS TYPICALLY U.N.O.

15. CONTRACTOR TO REVIEW ABATEMENT REPORT PRIOR TO

START OF CONSTRUCTION.

PAF POWDER ACTUATED

FASTENER

P/C PRECAST (CONCRETE)

PCF POUNDS PER CUBIC

FOOT

PL PLATE

P.LAM. PLASTIC LAMINATE

PLAS. PLASTER

P.C.P. PORTLAND CEMENT

PLASTER

PJP PARTIAL JOINT

PENETRATION

PR. PAIR

PSF POUNDS PER FOOT

PSI POUNDS PER INCH

P/T POST-TENSIONED

P.T. PRESSURE TREATED

PTN. PARTITION

(R) REMOVE

R., RAD. RADIUS

R.C.P. REFLECTED CEILING

PLAN

R.D. ROOF DRAIN

REF. REFERENCE

REINF. REINFORCING

REQ'D. REQUIRED

RL. RELOCATE

R.O. ROUGH OPENING

RWD. REDWOOD

REV. REVERSED

S.C. SOLID CORE or SLIP

CRITICAL

S.C.D. SEE CIVIL DRAWINGS

SCHED. SCHEDULE

SHR. SHOWER

SIM. SIMILAR

S.J. SCORE JOINT

S.L.D. SEE LANDSCAPING

DRAWINGS

SLRS SEISMIC LOAD RESISTING

SYSTEM

S.M. SHEET METAL

S.M.D SEE MECHANICAL

DRAWINGS

S.O.G. SLAB ON GRADE

SPEC. SPECIFICATION

SQ. SQUARE

S.S.D. SEE STRUCTURAL

DRAWINGS

S.S. STAINLESS STEEL

SSMA STEEL STUD

MANUFACTURERS

ASSOCIATION

STD. STANDARD

STRUCT. STRUCTURAL

S.T.S. SELF TAPPING SCREW

SUSP. SUSPENDED

SYM. SYMMETRICAL

THRU THROUGH

TYP. TYPICAL

TRD. TREAD

T.B. TOWEL BAR

T.C. TOP OF CURB

T & G TONGUE AND GROOVE

THK. THICK

TJ TRUSS JOIST

T.P. TOP OF PAVEMENT

TRANS. TRANSVERSE

T.W. TOP OF WALL

U.N.O. UNLESS NOTED

OTHERWISE

U.T. ULTRASONIC TESTING

VERT. VERTICAL

V.I.F. VERIFY IN FIELD

V.T.R. VENT THROUGH ROOF

w/ WITH w/o WITHOUT

W.C. WATER CLOSET

WF WIDE FLANGE

W.O. WINDOW OPENING

W.P. WORK POINT

EXTERIOR PHOTOPROJECT NOTES PROJECT TEAMABBREVIATIONS PROJECT NARRATIVE SHEET INDEX

AERIAL PHOTO

SYMBOLS LEGEND

VICINITY MAP

N

-DEMO-

D1.00 DEMO FLOOR PLAN

D1.10 DEMO ROOF PLAN

D2.00 DEMO REFLECTED CEILING PLAN

D3.00 DEMO EXTERIOR ELEVATIONS

D4.00 DEMO PHOTOS

PROJECT SCOPE:

THE SCOPE OF THIS PROJECT CONSISTS OF VOLUNTARY STRUCTURAL

IMPROVEMENTS TO THE EXISTING ROOF FRAMING, EXISTING FLOOR FRAMING, AND

ADDITIONAL IMPROVEMENTS FOR ACCESSIBILITY AND ADA PURPOSES.

-CIVIL-

C0.00 CIVIL COVER SHEET

C0.01 EROSION AND SEDIMENT CONTROL NOTES

C1.00 EXISTING CONDITIONS AND DEMOLITION PLAN

C2.00 SITE IMPROVEMENT PLAN

C3.00 PRIVATE CIVIL DETAILS

C4.00 AGENCY STANDARD DETAILS

ALTERNATES

A. (N) ADA ACCESSIBLE KITCHEN AND LIGHTING

B. PAINT EXTERIOR SIDING AND TRIM AT FRONT ELEVATION TO MATCH (E)

C. (N) RAMP

D. REFINISH (E) WOOD FLOORS

E. PAINT ALL INTERIOR WALLS AND STAIN ALL DOORS & INTERIOR TRIM

F. INSTALL (N) CARPET TILES

G. (N) CONCRETE SIDEWALK, STORM IMPROVEMENTS, AND DOWNSPOUT BOOT

REPLACEMENT

H. PAINT ENTIRE EXTERIOR SIDING AND TRIM

I. CONSTRUCT (N) CONCRETE STEM WALLS AROUND OTHER PERIMETER

WALLS PER SHEET S1.10 AND DETAILS 2/S5.10, 3/S5.10 AND 4/A8.00.

J. PROVIDE NEW DESIGN BUILD HVAC SYSTEM PER SHEETS M1.00, M2.00, E1.00

AND E2.00.

-STRUCTURAL-

S0.10 STRUCTURAL GENERAL NOTES

S1.10 FOUNDATION PLAN

S2.10 CEILING FRAMING PLAN

S3.10 ROOF FRAMING PLAN

S4.10 TRUSS ELEVATIONS

S4.11 TRUSS DETAILS

S5.10 FOUNDATION DETAILS

S6.10 FRAMING DETAILS

DESIGN BUILD SCOPE

G.C. AND SUBCONTRACTORS TO REVIEW PLANS, VERIFY EXISTING CONDITIONS AND

PROVIDE CODE REQUIRED MEP DESIGN IN COORDINATION WITH THE

ARCHITECTURAL PLANS. FURTHER MODIFICATIONS MAY BE REQUIRED.

MECHANICAL:

1. DEMO (E) EXHAUST FANS AND REPLACE WITH (N)

2. DEMO (E) FLOOR VENTS AND REPLACE WITH (N)

3. DEMO (E) GAS HVAC SYSTEM AND REPLACE WITH (N) ELECTRIC HVAC

SYSTEM. RE-USE (E) DUCTWORK. REMOVE AND REINSTALL (E) DUCTS AS

NECESSARY FOR STRUCTURAL UPGRADES

PLUMBING:

1. DEMO (E) PLUMBING FIXTURES AND REPLACE WITH (N) - RECONFIGURE

WATER AND WASTE LINES AS NECESSARY TO ACCOMMODATE (N) PLUMBING

FIXTURES

2. PROVIDE NEW FLOOR DRAINS IN RESTROOMS

ELECTRICAL:

1. REMOVE (E) ELECTRICAL PANEL AND REINSTALL AS REQUIRED TO COMPLETE

STRUCTURAL SCOPE. PAINT CONDUIT TO MATCH

2. DEMO (E) LIGHT FIXTURES AND REPLACE WITH (N)

3. PROVIDE POWER FOR (N) SUMP PUMP

ZCS SHALL PERFORM GENERAL REVIEW OF ANY DEFERRED

SUBMITTAL DESIGNS PRIOR TO SUBMITTING TO THE AHJ AND

PRIOR TO CONSTRUCTION IMPLEMENTATION FOR GENERAL

CONFORMANCE TO THE DESIGN INTENT. DEFERRED SUBMITTAL

ITEMS SHALL NOT BE SPECIALLY FABRICATED OR INSTALLED UNTIL

APPROVED BY THE AHJ AND ZCS.

REVISION ID: DATE:

1 ADDENDUM 2 04/25/2024

2 ADDENDUM 3 05/08/2024

-MECHANICAL-

M1.00 DESIGN BUILD DEMO MECHANICAL PLAN

M2.00 DESIGN BUILD MECHANICAL PLAN

DEFERRED SUBMITTALS

-ELECTRICAL-

M1.00 DESIGN BUILD DEMO MECHANICAL PLAN

M2.00 DESIGN BUILD MECHANICAL PLAN

WH

A. ALL EXISTING BUILDING COLUMNS, EXTERIOR WALLS AND

STRUCTURAL MEMBERS TO REMAIN, U.N.O.

B. CONTRACTORS SHALL BE RESPONSIBLE FOR DISPOSAL

OF ALL DEBRIS. PATCH AND REPAIR OF INTERIOR SPACE.

C. OBTAIN DEMOLITION PERMITS AND INCLUDE ALL COSTS OF

SAME IN CONTRACT PRICE.

D. FURNISH ALL LABOR AND MATERIALS/EQUIPMENT TO

COMPLETE DEMOLITION AND REMOVAL OF ALL ITEMS AS

INDICATED. CONTRACTOR IS RESPONSIBLE FOR DISPOSAL

OF ALL DEBRIS.CONTRACTOR SHALL KEEP

CONSTRUCTION AREA FREE OF DUST AND DEBRIS FOR

THE DURATION OF CONSTRUCTION. IF ANY QUESTIONS

ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY

THE POINT IN QUESTION WITH DESIGNER BEFORE

PROCEEDING.

E. IN PARTITIONS TO BE REMOVED, REMOVE AND CAP ALL

OUTLETS, SWITCHES, WIRES, THERMOSTATS, ETC., TO

THEIR SOURCE.

F. WHERE INTERIOR PARTITIONS, COLUMN FURRING,

FIXTURES, CABINETRY, DOORS AND DOOR FRAMES, ARE

SCHEDULED FOR REMOVAL, DISPOSE OF ALL DEBRIS AND

PATCH FLOOR AND WALLS AS REQUIRED. PREPARE

SURFACES FOR NEW FINISHES U.N.O. TYPICAL

THROUGHOUT ENTIRE SPACE.

G. REMOVE ALL ABANDONED ELECTRICAL CONDUIT, CABLING

BACKBOARD AND EQUIPMENT, TYPICAL THROUGHOUT

ENTIRE SPACE. AT COMPLETION OF DEMOLITION WORK,

THE CONSTRUCTION AREA(S) SHALL BE LEFT IN “BROOM

CLEAN” CONDITION. ALL DEBRIS AND MISCELLANEOUS

MATERIAL SHALL BE REMOVED.

H. IN ADDITION TO SPECIFIC DEMOLITION SCOPE IDENTIFIED,

PERFORM MISCELLANEOUS DEMOLITION AS REQUIRED TO

SUPPORT NEW CONSTRUCTION. PROVIDE TEMPORARY

SHORING AS REQUIRED.

I. NO EXISTING SMOKE DETECTOR, PUBLIC ADDRESS

SPEAKER, FIRE ALARM BOX OR SIMILAR DEVICE,

INCLUDING THE ASSOCIATED WIRING SHALL BE DAMAGED

DURING DEMOLITION AND SUBSEQUENT CONSTRUCTION.

J. RELOCATION OF SMOKE DETECTORS, AND FIRE ALARM

EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION,

SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER

THE PLANS. NO ACTIVE SMOKE DETECTOR SHALL BE

PERMANENTLY COVERED OR OTHERWISE REMOVED OR

USED FOR OTHER THAN ITS INTENDED PURPOSE.

REMOVE TEMPORARY COVERS DAILY.

K. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND

CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND

TELEPHONE SHALL BE VERIFIED WITH OWNER/TENANT

AND THE PROJECT TEAM.

DEMO PLAN GENERAL NOTES

(E) WALL TO REMAIN

(E) WALL TO BE DEMOLISHED

(E) ELEMENT TO BE DEMOLISHED

(E) DOOR TO BE DEMOLISHED

DEMO PLAN LEGEND

1 2 3 4 5

A

B

C

D

E

1 4

C

D3.00 1

D3.00

UP

UP

UP

DN

UP DN

D3.003

A

D3.00

9 99 9

BB

B

B

B

D D

D

F

F

F

A

D4.10 12

OFFICE

MAIN HALL

OFFICE

OFFICE

HALLWAY

WOMEN'S RR

JAN.

105A

MEN'S RR

KITCHEN

STAGE

STORAGE

STORAGE

SIDE STAGE

STORAGE ENTRY

G

13 13

EACH OF THE FOLLOWING ITEMS SHALL BE BID AS

ADDITIVE ALTERNATES:

A. DEMO ALL CASEWORK, REMOVE AND SALVAGE

SINKS, REFRIGERATOR, RANGE AND ALL OTHER

APPLIANCES TO RETURN TO OWNER. DEMO

PORTIONS OF WALL AND CASEWORK IN BUTLER'S

PANTRY. DEMO FLOOR FINISH AND PREP FOR (N)

B. PREP EXTERIOR SIDING AND TRIM FOR (N) PAINT

C. DEMO DOOR AND PORTION OF WALL FOR (N)

RAMP

D. PREP WOOD FLOOR FOR (N) FINISH

E. PREP ALL INTERIOR WALLS FOR PAINT AND PREP

ALL DOORS & INTERIOR TRIM FOR (N) STAIN

F. REMOVE CARPET AND PREP FOR (N) FLOORING

G. DEMO (E) PATHWAY FOR (N) PAVED SIDEWALK

# DEMO ALTERNATE KEYNOTES

1. DEMO (E) WINDOW

2. DEMO ALL (E) PLUMBING FIXTURES, TOILET

PARTITIONS, AND RESTROOM ACCESSORIES

3. DEMO (E) STAIRS, RAILING AND DECK

4. DEMO (E) STAIR

5. DEMO (E) RAMP AND RAILING

6. DEMO (E) CONCRETE PAD

7. DEMO (E) RAILING

8. DEMO PORTION OF (E) WALL FOR (N) OPENING

9. DEMO (E) COLUMN

10. DEMO (E) FLOOR VENT - PATCH FLOOR FRAMING/

SHEATHING AS NECESSARY AND PREP FOR (N)

FLOORING

11. REMOVE (E) DOOR AND PREP FOR REINSTALLATION.

REMOVE HINGES AND STRIKE ON (E) DOOR FRAME

AND PREP FOR REINSTALLATION

12. DEMO (E) WALL FINISH AND PROTECT IN PLACE (E)

WINDOWS

13. DEMO (E) WALL FINISH FOR (N) COLUMNS PER

STRUCT. REMOVE (E) TRIM AND PREP FOR

REINSTALLATION

14. DEMO (E) FLOOR FINISH AND PREP FOR (N)

# BASE BID DEMO PLAN KEYNOTES

EXPIRES: 06-30-24

R

D

EG

IS

TE

RE

P

L

ROFESSIONA

81129PE

OREGON

E

RNG

I NE E

Z

S

A . S

J

7, 2

Y

A C

H

AR

S

TO

K Ee un 2

45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588

PROJECT NO.

DATE:

DRAWN:

CHECKED:

O N

E I N

C H

E Q

U A

L S

F U

L L

S C

A L E

/7

/2

:4

:2

P M

A u to d e s k D o c s /M

.A s h la n d

C o m m u n it y C e n te r

P io n e e r

H a ll/

M

A

R C

H

R

.r v t

D1.00

DEMO FLOOR

PLAN

M-0298-22

ASHLAND

COMMUNITY

CENTER

RENOVATION

CITY OF ASHLAND

74 WINBURN WAY

ASHLAND, OR 97520

03-13-2024

WYH

JRR

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

B

ID

P E

R M

IT

D1.00 3/16" = 1'-0"

DEMO FLOOR PLAN1

N

REVISION ID: DATE:

1 ADDENDUM 2 04/25/2024

2 ADDENDUM 3 05/08/2024

EXPIRES: 06-30-24

R

D

EG

IS

TE

RE

P

L

ROFESSIONA

81129PE

OREGON

E

RNG

I NE E

Z

S

A . S

J

7, 2

Y

A C

H

AR

S

TO

K Ee un 2

45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588

PROJECT NO.

DATE:

DRAWN:

CHECKED:

O N

E I N

C H

E Q

U A

L S

F U

L L

S C

A L E

/8

/2

:4

:3

A M

A u to d e s k D o c s /M

.A s h la n d

C o m m u n it y C e n te r

P io n e e r

H a ll/

M

A

R C

H

R

.r v t

A0.10

FINISH

SCHEDULES

M-0298-22

ASHLAND

COMMUNITY

CENTER

RENOVATION

CITY OF ASHLAND

74 WINBURN WAY

ASHLAND, OR 97520

03-13-2024

WYH

JRR

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

B

ID

P E

R M

IT

CPT CARPET TILE ROOMS 102, 103, & 106 BENTLEY MILLS SERVE IT UP, SLICE AND DICE - ALTERNATE F: (N) CARPET TILES

WD WOOD ROOMS 101 & 111 - - - ALTERNATE D: REFINISH WOOD FLOORS

ROOMS 105, 105A, 107, & 108

MANNINGTON

COMMERCIAL

LINO, STONE - -

SV SHEET VINYL ROOM 109

MANNINGTON

COMMERCIAL

LINO, STONE - ALTERNATE A: PROVIDE NEW FLOORING IN KITCHEN

FINISH

CODE

MATERIAL LOCATION MANUFACTURER STYLE / COLOR PRODUCT NOTES INSTALLATION NOTES

FLOOR FINISHES

WB WOOD BASE INTERIOR - COLOR TO MATCH EXISTING BASE 1X8 TRIM -

RB RUBBER BASE RESTROOMS ROPPE BLACK BROWN 4"

PROVIDE PREFORMED INSIDE & JOB FORMED

OUTSIDE CORNERS

FINISH

CODE

MATERIAL LOCATION MANUFACTURER STYLE / COLOR SIZE / THICKNESS INSTALLATION NOTES

WALL BASE FINISHES

CLD ACOUSTIC PANEL MAIN HALL ARMSTRONG DIRECT-ATTACH CEILING PANELS 24"x48"/24"x72" SURFACE-MOUNTED

GYP GYPSUM INTERIOR CERTAINTEED - 5/8" -

FINISH

CODE

MATERIAL LOCATION MANUFACTURER STYLE / COLOR SIZE/NRC RATING INSTALLATION NOTES

CEILING FINISHES

FT2 FRP TRIM RESTROOMS SCHLUTER VINPRO-RO, 3MM ALUMINUM BRUSHED CHROME ANODIZED INSTALL AT OUTSIDE CORNERS

FT1 FRP TRIM RESTROOMS SCHLUTER VINPRO-S, 3MM ALUMINUM BRUSHED CHROME ANODIZED

INSTALL AT TOP EDGES AND INNER CORNERS -

MITER EDGES AT INNER CORNERS

FRP

FIBERGLASS REINFORCED

PANELS

RESTROOMS MARLITE SYMMETRIX, SUBWAY, WHITE - PROVIDE ON ALL WALLS UP TO 4'-0" A.F.F.

EP EPOXY PAINT RESTROOMS SHERWIN WILLIAMS AGREEABLE GRAY SEE FINISH NOTES -

PT3 PAINT DOORS, FRAMES, TRIM SHERWIN WILLIAMS PURE WHITE SEE FINISH NOTES ALTERNATE E: PAINT ALL INTERIOR DOORS AND TRIM

PT2 PAINT EXTERIOR WALLS, U.N.O. SHERWIN WILLIAMS MATCH EXISTING SEE FINISH NOTES

ALTERNATE B: PAINT EXTERIOR WALLS ON WEST

ELEVATION

PT1 PAINT INTERIOR WALLS, U.N.O. SHERWIN WILLIAMS AGREEABLE GRAY SEE FINISH NOTES ALTERNATE E: PAINT ALL INTERIOR WALLS

FINISH

CODE

MATERIAL LOCATION MANUFACTURER STYLE / COLOR FINISH SHEEN INSTALLATION NOTES

PAINT/WALL FINISHES

GENERAL NOTES:

A. PROVIDE TRAP PRIMER CONNECTION AS REQUIRED BY CODE.

B. IF ‘ADA’ IS INDICATED ON THE DRAWINGS, INSTALL ALL COMPONENTS TO MEET ADA REQUIREMENTS.

C. ALL PIPING SHALL BE CONCEALED IN WALLS OR ABOVE CEILING, U.N.O. ON PLANS.

D. SUPPORT PIPES TIGHT TO STRUCTURE WHEREEVER POSSIBLE.

E. ALL HORIZONTAL WASTE LINES TO HAVE MINIMUM OF ¼” PER FOOT SLOPE U.N.O.

F. PROVIDE FULL-WAY COLD WATER AND HOT WATER SUPPLY SHUT-OFF VALVES AT EACH UNIT FIXTURE.

G. PROVIDE ACCESS PANEL TO SHUTOFF VALVES WHERE REQUIRED.

H. PROVIDE MECHANICAL WATER HAMMER ARRESTOR AT QUICK-ACTING VALVES, SIZED AND INSTALLED IN ACCORDANCE WITH MANUFACTURER’S SPECIFICATIONS.

I. PROVIDE CLEANOUTS AT THE BASE OF ALL WASTE STACKS, AT UPPER TERMINALS OF HORIZONTAL DRAINAGE PIPES, IN LOCATIONS REQUIRED BY CODE AND/OR AS SHOWN IN DRAWINGS.

J. HEAT TRACE AND INSULATE ALL WASTE AND WATER PIPING EXPOSED TO FREEZING.

K. ALL FLOOR DRAINS AND FLOOR SINKS AND SIMILAR TRAPS SHALL BE PROVIDED WITH AN APPROVED AUTOMATIC MEANS OF MAINTAINING THEIR WATER SEAL. UNLESS TRAP PRIMER

P04 MOP SINK FLORESTONE MSR-2424/MSR-3624 - - - - - - 24" x 24"

P03

WALL MOUNTED

URINAL

AMERICAN STANDARD 6002001.020 - - -

MANUAL FLUSH

VALVE

AMERICAN STANDARD 6045.051.002 -

P02

FLOOR MOUNTED

TOILET

SLOAN ST-2029 - - - TOILET SEAT BEMIS

1955CT/1955SSCT &

2155CT/2155SSCT

INSTALL PER ADA STANDARDS

P01 DROP IN SINK KOHLER K-2699-1-0 - - - FAUCET KOHLER K-28126-4N-BL INSTALL PER ADA STANDARDS

TYPE DESCRIPTION MANUFACTURER MODEL NUMBER W CW HW DESCRIPTION MANUFACTURER MODEL NUMBER NOTES

FIXTURE CONNECTIONS TRIM / ACCESSORIES

PLUMBING SCHEDULE - B.O.D. (DESIGN / BUILD SCOPE) DESIGN / BUILD SCOPE. PLUMBER TO VERIFY BALANCE

OF FIXTURES & ACCESSORIES. INSTALL PER CODE.

LUMINAIRE SCHEDUL NOTES

1. INCLUDES BATTERY BACKUP.

2. EXHUAST FAN SHALL BE ENERGY STAR CERTIFIED AND OPERATIONAL AT

50CFM CONTINUOUS WHILE OCCUPIED OR 70CFM INTERMITTENTLY.

3. PROVIDE OCCUPANCY SENSORS

GENERAL NOTES:

A. DIMMING CONTROL PROTOCOL (0-10VDC, LINE VOLTAGE, DALI, ETC.) COMPARABLE WITH LIGHTING CONTROL SYSTEM AS SPECIFIED AND SHOWN IN DRAWINGS.

B. PROVIDE ± 12” ADJUSTABILITY IN AIRCRAFT CABLE LENGTH WHERE USED.

C. COORIDNATE ALL CEILING TYPES WITH LUMINAIRE LOCATIONS PRIOR TO ORDERING LUMINAIRES. COORIDNATE INSTALLATION WITH REFLECTED CEILING PLANS.

D. SPECIFIED MANUFACTURERS ARE APPROVED TO SUBMIT BID. INCLUSION DOES NOT RELIEVE MANUFACTURER FROM SUPPLYING PRODUCT AS DESCRIBED.

E. PROVIDE SUBMITTALS THAT INCLUDE THE LUMINAIRE, LAMP AND BALLAST INFORMATION OF EACH LUMINAIRE, WITH APPLICABLE OPTIONS CLEARLY CHECKED OR HIGHLIGHTED. PROVIDE SHOP DRAWINGS FOR ARCH. REVIEW.

F. REMOTE BALLAST/DRIVERS: UL LISTED FOR THEIR APPLICATION. BALLASTS/DRIVERS MARKED AS UL RECOGNIZED COMPONENT BUT NOT UL LISTED ARE SUBJECT TO REMOVAL AND REPLACEMENT AT NO COST TO OWNER.

G. PROVIDE COMMISSIONING OF THE LIGHTING AND LIGHTING CONTROLS IN ACCORDANCE WITH OREGON STATE LIGHTING COMMISSIONING REQUIREMENTS.

H. PROVIDE OCCUPANCY SENSORS TO ALL ROOMS AS REQUIRED BY ASHRAE STANDARD 90.1-2019

EF EXHAUST FAN BROAN QTXE 110 18W C BY CONTRACTOR - - - 2, 3

V1 VANITY LIGHT WAC LIGHTING WS-35020-AB 27W 120 BY CONTRACTOR 1439 3000 K OCCUPANCY SENSOR 3

X1 LED EXIT SIGN

LITHONIA

LIGHTING

EXRD EL M6 1W 120 - - - - 1

F4 PENDANT G LIGHTING

GL-2555-BB0-E-PAB-24”

STEM

48W 120 BY CONTRACTOR 4567 3500 K DIMMING TO 10% -

F3 LED ROUND G LIGHTING GL-3560-BB0-E-PAB 48W 120 BY CONTRACTOR 4567 3500 K DIMMING TO 10% 3

F2 PENDANT G LIGHTING

GL-2555-BB0-E-PAB-36”

STEM

48W 120 BY CONTRACTOR 4567 3500 K DIMMING TO 10% -

F1 6" RECESSED CAN

LITHONIA

LIGHTING

LDN6 40/20 LO6WR - 120 BY CONTRACTOR 2000 3500 K OCCUPANCY SENSOR 3

TYPE DESCRIPTION MANUFACTURER MODEL NUMBER / NAME

INPUT

WATTS

VOLTAGE

DRIVER / POWER

SUPPLY

LUMENS

COLOR

TEMPERATURE

LIGHTING CONTROLS NOTES

LUMINAIRE SCHEDULE - B.O.D. (DESIGN / BUILD SCOPE) DESIGN / BUILD SCOPE. ELECTRICTIAN TO VERIFY

BALANCE OF FIXTURES & ACCESSORIES.

NOTE: ALL MATERIALS ARE BASIS OF DESIGN. SEE SPECIFICATION FOR FURTHER INFORMATION. SUBSTITUTIONS REQUIRE SHOP DRAWINGS / CUT SHEETS AND PHYSICAL SAMPLES FOR SELECTION AND APPROVAL BY

ARCHITECT / OWNER. ALLOW 15 BUSINESS DAY'S FOR APPROVAL REVIEW.

PNL TOILET PARTITIONS SEE PLANS SCRANTON TRADITIONAL 2600 72: PANEL HEIGHT

BRONZE, ROTARY

BRUSHED

SND SANITARY NAPKIN DISPOSAL SEE PLANS BOBRICK B-254 10 11/16" W, 15 1/8" H, 4 1/16" D

304-STAINLESS W/

SATIN-FINISH

SEE ADA TYPICAL MOUNTING

REQUIREMENT DIAGRAM

TP

SURFACE MOUNTED TOILET PAPER

DISPENSER

SEE PLANS BOBRICK B-4288 6 1/16" W, 11" H, 5 15/16" D

304-STAINLESS W/

SATIN-FINISH

SEE ADA TYPICAL MOUNTING

REQUIREMENT DIAGRAM

SD SURFACE-MOUNTED SOAP DISPENSER SEE PLANS BOBRICK B-2111 4 3/4" W, 8 1/8" H, 3 1/2" D

304-STAINLESS W/

SATIN-FINISH

SEE ADA TYPICAL MOUNTING

REQUIREMENT DIAGRAM

PD2

SURFACE-MOUNTED CONVERTIBLE PAPER

TOWEL DISPENSER/WASTER RECEPTACLE

SEE PLANS BOBRICK B-3949 17 1/2" W, 56 5/16" H, 4 1/8" D

304-STAINLESS W/

SATIN-FINISH

SEE ADA TYPICAL MOUNTING

REQUIREMENT DIAGRAM

MR WALL MOUNTED MIRROR - TEMPERED SEE PLANS KOHLER K-26052 22" W, 34" H CPL POLISHED CHROME

SEE ADA TYPICAL MOUNTING

REQUIREMENT DIAGRAM

GB ADA COMPLIANT GRAB BARS SEE PLANS BOBRICK B-6806 x 18, x 36, x 42 18" L, 36" L, 42" L

304-STAINLESS W/

SATIN-FINISH

SEE ADA TYPICAL MOUNTING

REQUIREMENT DIAGRAM

ACCESSORY

CODE

ACCESSORY LOCATION MANUFACTURER MANUFACTURER CODE SIZE FINISH INSTALLATION NOTES

RESTROOM ACCESSORIES

PL2 PLASTIC LAMINATE CABINETRY/SHELVING WILSONART BLONDE ECHO - -

PL1 PLASTIC LAMINATE COUNTERTOPS/BACKSPLASH WILSONART BLACK ALICANTE - -

FINISH

CODE

MATERIAL LOCATION MANUFACTURER STYLE / COLOR SIZE NOTES

CASEWORK FINISHES

TR4 ALUMINUM NGP NGP 713 HALF SADDLE THRESHOLD CONCRETE TO WOOD FLOOR

TR3 ALUMINUM NGP NGP 659 OFFSET SADDLE THRESHOLD COMPOSITE DECKING TO SHEET VINYL

TR2 ALUMINUM SCHLUTER VINPRO-T (E) CARPET TILE TO SHEET VINYL

TR1 ALUMINUM SCHLUTER VINPRO-U (E) CARPET TILE TO WOOD FLOOR ALTERNATE: 'C' AND 'F'

FINISH

CODE

MATERIAL MANUFACTURER STYLE / COLOR PRODUCT NOTES INSTALLATION NOTES

FLOORING TRANSITIONS

REVISION ID: DATE:

2 ADDENDUM 3 05/08/2024

A. REFER TO ARCHITECTURAL FLOOR PLAN FOR

ADDITIONAL DIMENSIONS.

B. ALL DIMENSIONS ARE REFERENCED TO FACE OF

FINISH U.N.O.

C. ALL HEIGHT REFERENCES ARE TAKEN FROM

DATUM-T.O.S. FOR AREA INDICATED.

D. PROVIDE WALL BACKING FOR REINFORCEMENT AS

REQUIRED.

E. PROVIDE SOLID BLOCKING FOR ALL 'J' BOXES

SUSPENDED LIGHT AND CEILING FAN FIXTURES,

TELEVISION SUPPORT, ARTIFACT SHELVES AND

ANY OTHER CEILING MOUNTED EQUIPMENT.

F. ALL LIGHT FIXTURE TRIM RINGS, EXPOSED

CONDUITS, 'J' BOXES, HVAC GRILLS, EMERGENCY

LIGHT FIXTURES, DUPLEX OUTLETS AND FACE

PLATES SHALL BE PAINTED TO MATCH THE

ADJACENT FINISH U.N.O.

G. ANY LIGHT NOT DIMENSIONALLY LOCATED TO BE

CENTERED IN THE CEILING TILE, CEILING AREA, OR

ROOM AS APPLICABLE. ALL "CAN" TYPE FIXTURES

TO BE MOUNTED IN THE CENTER OF THE CEILING

TILES U.N.O.

RCP GENERAL NOTES:

CEILING LEGEND :

(N) GYPSUM BOARD CEILING AND INSULATION

(E) GYPSUM BOARD CEILING

CEILING FINISHES

GYP GYPSUM BOARD - PAINT PT1

LIGHTING HVAC

REGISTERS

CEILING HEIGHT

VAR VARIES

M.E. MATCH EXISTING

ADDITIONAL NOTES

1. NOT USED

CEILING MATERIAL

CEILING HEIGHT

ADDITIONAL NOTESNOTES

ACT

8'-0"

REFLECTED CEILING LEGEND:

1. (N) TIMBER TRUSS PER STRUCT. - STAIN

2. (E) SKYLIGHT TO REMAIN

3. (N) SURFACE MOUNTED ACOUSTIC PANEL

4. (N) COLUMN PER STRUCT.

5. PATCH PORTION OF CEILING

6. (N) ATTIC HATCH 20"x30"

7. (N) TRIM FOR (E) ATTIC HATCH

8. (N) HEADER PER STRUCT. - PROVIDE (N) WOOD

TRIM

9. PAINT (N) ROOF RAFTERS - MATCH (E)

# REFLECTED CEILING KEYNOTES

1 2 3 4 5

A

B

C

D

E

GYP

10' - 4"

GYP

10' - 4"

GYP

10' - 4"

MEN'S RR

WOMEN'S RR

HALLWAY

F1

F1

F1

F1

F1

X1

EF

EF

V1

A

GYP

VAR

GYP

14' - 9"

GYP

VAR

GYP

VAR

MAIN HALL

F1 F1

F3

F3

44 4 4

GYP

9' - 0"

GYP

VAR

STORAGE

F1

F1

STAGE

EQ. 9' - 0" EQ.

F1

A7.10

2 2

TYP.

V1

E Q

E Q

E Q

E Q

E Q

E Q

E Q

E Q

EQ EQ EQ EQ

C1

C1

C1

C1 C1

C1

C1

F2

F2

F4 F4

E Q

E

Q

F2

F2

EQ EQ

E Q

E Q

E Q

E Q

EQ EQ

EQ. EQ.

C2

GYP

10'-4"

F4

F1 RECESSED CAN

F2 PENDANT

F3 SURFACE MOUNT ROUND CEILING LIGHT

F4 PENDANT

X1 EXIT SIGN

EF EXHAUST FAN

V1 VANITY LIGHT

FIXTURE SCHEDULE

EXPIRES: 06-30-24

R

D

EG

IS

TE

RE

P

L

ROFESSIONA

81129PE

OREGON

E

RNG

I NE E

Z

S

A . S

J

7, 2

Y

A C

H

AR

S

TO

K Ee un 2

45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588

PROJECT NO.

DATE:

DRAWN:

CHECKED:

O N

E I N

C H

E Q

U A

L S

F U

L L

S C

A L E

/7

/2

:4

:4

P M

A u to d e s k D o c s /M

.A s h la n d

C o m m u n it y C e n te r

P io n e e r

H a ll/

M

A

R C

H

R

.r v t

A2.00

REFLECTED

CEILING PLAN

M-0298-22

ASHLAND

COMMUNITY

CENTER

RENOVATION

CITY OF ASHLAND

74 WINBURN WAY

ASHLAND, OR 97520

03-13-2024

WYH

JRR

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

B

ID

P E

R M

IT

A2.00 3/16" = 1'-0"

REFLECTED CEILING PLAN1

N

REVISION ID: DATE:

1 ADDENDUM 2 04/25/2024

2 ADDENDUM 3 05/08/2024

C

A7.00 3

A7.00

5' - 8"

114 SF

MEN'S RR

98 SF

WOMEN'S RR

105A

P02

P03 P03

P02

P02

P01

P01

P04

C L R

C L R

1'-5" 2'-10" 1'-5"1' - 6"

1' - 6"

9' - 1" 2' - 0 1/2"

8' - 5"

7 1/2"

2' - 0 1/2"

A5.10

RB

EP

PD2

PL1 PL2 FRP

FT1

FT2

EP

RBFRP

FT1

FT1

FT2

RB GB

EP

TPFRP PNL

FT1

RB

EP

FRP

SD PL2PL1

MR

V1

A9.00

SIM.

FT1

RB

EP

GB SND TP

FRP

FT1

TP SND RB

EP

FRP

FT2

FT1

V1

EP

RBPD2 PL1 PL2

FRP

FT1

RB

EP

FRP

PL2 PL1

SD

MR

V1

A9.00

SIM.

FT1

FLOORING

BASE

EX# EXISTING TO REMAIN

RB# RUBBER BASE

WB# WOOD BASE

WALLS

EX# EXISTING TO REMAIN

ME# MATCH EXISTING

PT# PAINT

EP# EPOXY PAINT

FT# FRP TRIM

FRP FIBERGLASS PANELS

RESTROOM ACCESSORIES

TP# TOILET PAPER DISPENSER

MR# MIRROR

GB GRAB BAR

SD# SOAP DISPENSER

PD# PAPER TOWEL DISPENSER

SND SANITARY NAPKIN DISPOSAL

FLOORING TRANSITIONS

TR# TRANS PROFILE #

CASEWORK

EX# EXISTING TO REMAIN

ME# MATCH EXISTING

PL# PLASTIC LAMINATE

WALL PROTECTION

EX# EXISTING TO REMAIN

ME# MATCH EXISTING

CG# CORNER GUARD

EX# EXISTING TO REMAIN

ME# MATCH EXISTING

SV SHEET VINYL

WD WOOD FLOORING

CPT CARPET TILE

ROOM FINISH ABBREVIATIONS:

MISC.

WC# WINDOW COVERINGS

CLD ACOUSTIC PANEL

1. PROVIDE OPAQUE FILM

2. (N) FLOOR VENT

3. (N) STAINLESS STEEL FLOOR DRAIN WITH

SURFACE MEMBRANE CLAMP

# FINISH KEYNOTES

1. (N) FLOOR FINISH SHALL EXTEND UNDER CASEWORK

2. PAINT ALL WALLS BEHIND CASEWORK

A. ALL PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURERS INSTRUCTIONS, USING

MANUFACTURERS ADHESIVES, TOOLS AND METHODS.

B. REFER TO SPECIFICATIONS AND FINISH SCHEDULES

FOR FURTHER FINISH MATERIAL PRODUCT

INFORMATION.

C. SEE ELEVATIONS FOR ADDITIONAL FINISHES

D. FOR CEILING HEIGHTS AND ADDITIONAL FINISHES SEE

RCP'S

E. COORDINATE ALL OWNER FURNISHED EQUIPMENT,

ACCESSORIES, AND FURNITURE WITH OWNER.

F. FIELD VERIFY ALL DIMENSIONS PRIOR TO

FABRICATION.

G. ALL FLOOR TRANSITIONS ARE TO OCCUR DIRECTLY

BENEATH DOOR U.N.O.

H. ALL FLOOR TRANSITIONS ARE TO BE ADA COMPLIANT.

I. PROVIDE STAINLESS STEEL TRANSITION

STRIPS/REDUCERS AT ALL LOCATIONS WHERE

CERAMIC TILE MEETS A DIFFERENT MATERIAL.

PROVIDE APPROPRIATE TRANSITIONS

STRIPS/REDUCERS AT ALL OTHER LOCATIONS

BETWEEN DIFFERING MATERIALS U.N.O. SEE

TRANSITION CALL OUTS. ALL TRANSITIONS TO MEET

ADA REQUIREMENTS.

J. REFER TO FINISH PLAN FOR LOCATION OF CORNER

GUARDS. ALL CORNER GUARDS ARE TO BE

INSTALLED WITH BOTTOM OF CORNER GUARD AT TOP

OF WALL BASE AND EXTEND 48" AFF.

K. ALL GYPSUM CEILING AND SOFFITS TO BE PAINTED

PT1 U.N.O.

L. ALL METAL ACCESS PANELS, COVER PLATES, VENTS

AND GRILLES TO BE PAINTED TO MATCH THE

SURFACE IT IS LOCATED ON, UNLESS PREFINISHED.

M. ALL BASE CABINETS AND UPPER CABINETS ARE TO

RECEIVE PLASTIC ON ALL EXPOSED EXTERIOR

SURFACES AS INDICATED ON INTERIOR ELEVATIONS.

ALL INTERIOR SURFACES TO RECEIVE WHITE

MELAMINE ON ALL CONCEALED SURFACES. RUN

WOOD GRAIN IN VERTICAL DIRECTIONS AND USE

0.020" THICK MATCHING VINYL EDGEBAND ON

CABINET DOORS AND DRAWERS.

N. ALL COUNTERTOPS ARE RECEIVE BACKSLASHES TO

MATCH. PROVIDE PAINTABLE SEALANT AT WALL.

O. PAINT VISIBLE PORTION OF INSIDE OF DUCT WORK

FLAT BLACK.

P. PAINT SHEEN - WALL: SATIN/EGG SHELL, CEILING:

FLAT/MATTE, TRIM & DOOR FRAMES: SEMI-GLOSS

Q. INSTALL (N) 1/4" APA PLYWOOD UNDERLAYMENT

OVER ALL EXISTING WOOD SUBFLOORS TO RECIEVE

(N) FINISHES. INSTALL WITH SCREWS 2" O.C. AT

PERIMITER AND 4" ACCROSS FIELD. OFFSET PANELS

12" MIN.

GENERAL FINISH NOTES:

ADDITIONAL NOTES:

EXPIRES: 06-30-24

R

D

EG

IS

TE

RE

P

L

ROFESSIONA

81129PE

OREGON

E

RNG

I NE E

Z

S

A . S

J

7, 2

Y

A C

H

AR

S

TO

K Ee un 2

45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588

PROJECT NO.

DATE:

DRAWN:

CHECKED:

O N

E I N

C H

E Q

U A

L S

F U

L L

S C

A L E

/7

/2

:4

:4

P M

A u to d e s k D o c s /M

.A s h la n d

C o m m u n it y C e n te r

P io n e e r

H a ll/

M

A

R C

H

R

.r v t

A7.00

ENLARGED PLANS

& INTERIOR

ELEVATIONS

M-0298-22

ASHLAND

COMMUNITY

CENTER

RENOVATION

CITY OF ASHLAND

74 WINBURN WAY

ASHLAND, OR 97520

03-13-2024

WYH

JRR

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

B

ID

P E

R M

IT

A7.00 1/4" = 1'-0"

ENLARGED RESTROOM PLAN - BASE BID1

A7.00 1/4" = 1'-0"

MEN'S RR - WEST2

A7.00 1/4" = 1'-0"

MEN'S RR - NORTH3

A7.00 1/4" = 1'-0"

MEN'S RR - EAST4

A7.00 1/4" = 1'-0"

MEN'S RR - SOUTH5

A7.00 1/4" = 1'-0"

WOMEN'S RR - WEST6

A7.00 1/4" = 1'-0"

WOMEN'S RR - NORTH7

A7.00 1/4" = 1'-0"

WOMEN'S RR - EAST8

A7.00 1/4" = 1'-0"

WOMEN'S RR - SOUTH9

REVISION ID: DATE:

2 ADDENDUM 3 05/08/2024

Sheets
A0.10 - FINISH SCHEDULES
A2.00 - REFLECTED CEILING PLAN
A7.00 - ENLARGED PLANS & INTERIOR ELEVATIONS
D1.00 - DEMO FLOOR PLAN
G0.00 - COVER SHEET

File details come from the government source that posted it. Updated .