Attachment 4 to Addendum 2 - Revised Pioneer Hall Drawings.pdf
PDF 11 MB Posted
- Attached to
- Community Center and Pioneer Hall Rehabilitation
- Solicitation number
- S-KA0010-00009824
- Issued by
- Jackson County, Amity City, Oregon
About this file
Attachment 4 to Addendum 2 contains revised architectural drawings for the rehabilitation of the Community Center and Pioneer Hall facilities in Jackson County, Oregon. This state and local contracting opportunity is being managed by the City of Ashland on behalf of Jackson County and involves selective demolition, structural upgrades, mechanical/electrical/plumbing work, interior and exterior renovations, ADA improvements, and hazardous material abatement. A mandatory pre-bid meeting is scheduled for April 9, 2024, and bids are due by 2:00 pm PST on April 30, 2024.
The solicitation documents do not specify any set-aside designations or restrictions on the types of organizations that can respond. The incumbent contractor and current contract value are also not provided. The project budget and funding sources are also not detailed in the available information. Interested parties should thoroughly review the bid and permit drawings, specifications, and other provided documentation to fully understand the scope of work, response requirements, and evaluation criteria for this state and local contracting opportunity.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A101
SIM
A101
A101 1R e f
XX
X
Name Elevation
N
Room name
150 SF
A101
SIM
View Name A1.1
1/4" = 1'-0"
ROOM NAME
ROOM NUMBER
ROOM AREA
KEYNOTE TAG
REVISION SET TAG
1i
DOOR NUMBER
FINISH TYPE
WINDOW/GLAZING
TAG
LEVEL HEAD
SHEET REFERENCE
ELEVATION REFERENCE
ELEVATION SYMBOL
SHEET REFERENCE
INTERIOR ELEVATION
REFERENCE
INTERIOR
ELEVATION SYMBOL
SHEET REFERENCE
INTERIOR ELEVATION
REFERENCE
BUILDING & WALL
SECTION
SHEET REFERENCE
DRAWING
REFERENCE
DETAIL
REFERENCE
A101
SIM
SHEET REFERENCE
DRAWING
REFERENCE
ENLARGED
PLAN
DESIGNATED AREA
PROJECT NORTH
SHEET REFRENCE
VIEW TITLE
DRAWING SCALE
WALL TYPE TAG
STRUCTURAL
KEYNOTE TAG
CEILING TAG
FLOOR
TRANSITION TAG
CENTER LINE
DELTA w// CURRENT
REVISION NUMBER
PREVIOUS REVISION
CEILING MATERIAL
CEILING HEIGHT
ADDITIONAL NOTES
NOTES
ACT
8'-0"
Remarks
EX#
EX#
ME#
ME#
XX#
XX# FLOOR FINISH
BASE FINISH
ADDITIONAL NOTES
WALL FINISHES
FINISH TAG
TR#
A101
Ref
R e f
R e f
Ref
SHEET REFERENCE
DRAWING
REFERENCE
PHOTO REFERENCE
FINISH TAG
XX
DRAWING NUMBER
1i PLUMBING FIXTURE TAG
1 Ref
R e f
1 Ref
R e f
ADDITONAL KEYNOTE
PROJECT LOCATION:
73 WINBURN WAY,
ASHLAND, OR 97520
ASHLAND COMMUNITY CENTER
PIONEER HALL - HATCH INDICATES AREA
OF WORK
EXPIRES: 06-30-24
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
81129PE
OREGON
E
RNG
I NE E
Z
S
A . S
J
7, 2
Y
A C
H
AR
S
TO
K Ee un 2
45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L
S C
A L E
/2
/2
:5 :2
A
M A u to d e s k D o c s /M
A s h la n d
P io n e e r H a ll.
R e s tr o o m s /M
A
R C
H R
.r v t
G0.00
COVER SHEET
M-0298-22
PIONEER HALL
RENOVATION
CITY OF ASHLAND
74 WINBURN WAY
ASHLAND, OR 97520
03-13-2024
WYH
JRR
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
B
ID
P E
R M
IT
PIONEER HALL RENOVATION
CITY OF ASHLAND
74 WINBURN WAY
ASHLAND, OR 97520
100% CONSTRUCTION DOCUMENTS | BID & PERMIT
N
PROJECT TEAM SHEET INDEX
A.B. ANCHOR BOLT
A.C. ASPHALT CONCRETE
A.C.B. ACOUSTICAL BOARD
ACI AMERICAN CONCRETE
INSTITUTE
A.C.P. ACOUSTICAL PANEL
A.C.T. ACOUSTICAL CEILING
TILE
ADD'L. ADDITIONAL
A.D. AREA DRAIN
ADJ. ADJUSTABLE
A.F. ACCESS FLOORING
AGGR. AGGREGATE
A.F.F. ABOVE FINISHED FLOOR
AISC AMERICAN INSTITUTE OF
STEEL CONSTRUCTION
ARCH. ARCHITECT
ASCE AMERICAN SOCIETY OF
CIVIL ENGINEERS
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
AWS AMERICAN WELDING
SOCIETY
BD. BOARD
BITUM. BITUMINOUS
BKP. BACKING PLATE
BLDG. BUILDING
BM. BEAM
BOT./B.O. BOTTOM/BOTTOM OF
C.B. CATCH BASIN
CEM. CEMENT
CER. CERAMIC
C.G. CORNER GUARD
C.I. CAST IRON
C.J. CONTROL JOINT
CJP COMPLETE JOINT
PENETRATION
CL CENTERLINE
CLG. CEILING
CLKG. CAULKING
CLO. CLOSET
CLR. CLEAR
CMU CONCRETE MASONRY
UNIT
C.O. CASED OPENING
CONC. CONCRETE
CONN. CONNECTION
CONST. CONSTRUCTION
CORR. CORRIDOR
CPT. CARPET
CTSK. COUNTERSUNK
C.T. CERAMIC TILE
CTR. CENTER
DBA DEFORMED BAR
ANCHOR
D.F. DRINKING FOUNTAIN
D.L. DEAD LOAD
DET. DETAIL
DIA., ⌀ DIAMETER
DISP. DISPENSER
DR. DOOR
DWG. DRAWING
DWR. DRAWER
D.S. DOWNSPOUT
D.S.P. DRY STANDPIPE
(E) EXISTING
E.J. EXPANSION JOINT
ELEC. ELECTRICAL
EL. ELEVATION
EQ. EQUAL
EXPO. EXPOSED
EXP. EXPANSION
EXT. EXTERIOR
F.A. FIRE ALARM
FB. FLAT BAR
F.D. FLOOR DRAIN
FDN. FOUNDATION
FE FIRE EXTINGUISHER
F.H. FLAT HEAD
FIN. FINISH
FLR. FLOOR
F.O.C FACE OF CONCRETE
F.O.F FACE OF FINISH
F.O.S. FACE OF STUDS
F.S. FULL SIZE
FT. FOOT
FTG. FOOTING
FUT. FUTURE
Ga. GAUGE
GALV. GALVANIZED
GL GRID LINE
GLB GLULAM BEAM
G.B. GRAB BAR
GND. GROUND
GYP. GYPSUM
G.W.B. GYPSUM WALL BOARD
H.B. HOSE BIBB
H.C. HOLLOW CORE
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
HSS HOLLOW STRUCTURAL
STEEL
IBC INTERNATIONAL
BUILDING CODE
I.D. INSIDE DIAMETER
IN. INCH
INT. INTERIOR
J.B. JUNCTION BOX
J.O.H. JAMB OPENING HEIGHT
J.O.W. JAMB WIDTH
JT. JOINT
K KIPS
KSF KIPS PER SQUARE FOOT
KSI KIPS PER SQUARE INCH
LAM. LAMINATE
LB. POUND
L.L. LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC. LOCATION
LONG. LONGITUDINAL
L.P. LOW POINT
LVF LOW VELOCITY FASTENER
MAX. MAXIMUM
MBMA METAL BUILDING
MANUFACTURERS
ASSOCIATION
M.C. MEDICINE CABINET
M.D.F. MEDIUM DENSITY
FIBERBOARD
M.D.O. MEDIUM DENSITY
OVERLAY
MECH. MECHANICAL
MEMB. MEMBRANE
MFR. MANUFACTURER
MH. MANHOLE
MIN. MINIMUM
MIR. MIRROR
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
M.P. MIDPOINT
MPH MILES PER HOUR
M.S. MACHINE SCREW
MT MAGNETIC PARTICLE
TESTING
MTD. MOUNTED
MUL. MULLION
(N) NEW
N.I.C. NOT IN CONTRACT
NOM. NOMINAL
N.T.S. NOT TO SCALE
OBS. OBSCURE
o.c. ON CENTER
O.C.D. OVERHEAD COILING
DOOR
O.C.G OVERHEAD COILING
GRILLE
O.D. OUTSIDE DIAMETER
O.F.C.I. OWNER FURNISHED
CONTRACTOR
INSTALLED
O.F.D. OVERFLOW DRAIN
O.F.O.I. OWNER FURNISHED
OWNER INSTALLED
OH. OPPOSITE HAND
OPP. OPPOSITE
OWJ OPEN WEB JOIST
-GENERAL-
G0.00 COVER SHEET
G1.00 CODE PLAN - PIONEER HALL
G2.00 TYPICAL ADA STANDARDS - EXISTING
G2.10 TYPICAL ADA STANDARDS - EXISTING
-ARCHITECTURAL-
A0.00 ASSEMBLIES & DOOR & WINDOW SCHEDULE
A0.10 FINISH SCHEDULES
A1.10 FINISH FLOOR PLAN
A2.00 REFLECTED CEILING PLAN
A3.00 ENLARGED PLANS & INTERIOR ELEVATIONS
A3.10 ENLARGED PLANS & INTERIOR ELEVATIONS
A3.11 ENLARGED PLANS & INTERIOR ELEVATIONS
A4.00 BUILDING SECTION
A5.00 INTERIOR DETAILS
OWNER:
CONTACT: JASON STRAIGHT PM
CITY OF ASHLAND PUBLIC WORKS
51 WINBURN WAY
ASHLAND, OR 97520
T 541.552.2419
ARCHITECTURE:
STAMPING REGISTRANT: ZACH STOKES, P.E.
CONTACT: JESSI RUSSELL, ARCHITECT
ZCS ENGINEERING & ARCHITECTURE
127 NW D ST.
GRANTS PASS, OR 97526
T 541.479.3865
STRUCTURAL ENGINEERING:
ENGINEER OF RECORD: MATT SMITH, P.E. S.E.
CONTACT: STEPHEN CHASE
ZCS ENGINEERING & ARCHITECTURE
127 NW D ST.
GRANTS PASS, OR 97526
T 541.479.3865
GENERAL CONTRACTOR:
TBD
1. ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS
SHALL BE FIELD VERIFIED. THE CONTRACTOR SHALL
NOTIFY THE PROJECT TEAM OF ANY SIGNIFICANT
DISCREPANCIES FROM CONDITIONS SHOWN ON THE
DRAWINGS.
2. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL CONSTRUCTION MEANS AND METHODS.
RESPONSIBILITY SHALL INCLUDE BUT NOT LIMITED TO
DEMOLITION AND CONSTRUCTION MEANS AND METHODS,
TECHNIQUES, SEQUENCING, AND SAFETY REQUIRED TO
COMPLETE CONSTRUCTION.
3. BEFORE STARTING A SECTION OF WORK THE
CONTRACTOR SHALL CAREFULLY EXAMINE PREPARATORY
WORK THAT HAS BEEN EXECUTED. ENSURE THAT WORK
AND ADJACENT RELATED WORK WILL FINISH TO PROPER
PLANES AND LEVELS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ALL MATERIALS AND WORKMANSHIP IN ACCORDANCE
WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL
CODES.
5. CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL
CONTRACT DOCUMENTS, FIELD CONDITIONS, AND
DIMENSIONS FOR ACCURACY AND CONFIRMING THAT
WORK IS BUILDABLE AS SHOWN BEFORE PROCEEDING
WITH THE CONSTRUCTION. IF THERE ARE ANY QUESTIONS,
THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING A
CLARIFICATION FROM THE PROJECT TEAM BEFORE
PROCEEDING WITH THE WORK IN QUESTION OR RELATE
WORK.
6. THE CONTRACTOR SHALL NOT SCALE DRAWINGS. WRITTEN
DIMENSIONS SHALL ALWAYS GOVERN. CONTRACTOR
REQUIRING DIMENSIONS NOT NOTED SHALL ALWAYS
CONTACT THE PROJECT TEAM FOR SUCH INFORMATION
PRIOR TO PRECEDING WITH WORK RELATED TO THOSE
DIMENSIONS
7. THE CONTRACTOR SHALL PROTECT, PATCH, AND REPAIR
TO MATCH ANY WALLS, FLOORS, CEILINGS, AND/OR OTHER
SURFACES WHICH MAY BE DISTURBED DURING THE
INSTALLATION OF MECHANICAL, ELECTRICAL, PLUMBING
OR OTHER OWNER WORK.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
CUTTING AND PATCHING REQUIRED FOR PROPER
INSTALLATION OF MATERIAL AND EQUIPMENT. PROVIDE
DEMOLITION AND PATCH/REPAIR IN ALL AREAS (WHETHER
SPECIFICALLY SHOWN OR NOT) TO ACCOMMODATE ALL
WORK.
9. IF THE CONTRACTOR ENCOUNTERS A CONDITION NOT
COVERED IN THE CONSTRUCTION DOCUMENTS, THE
CONTRACTOR SHALL NOTIFY AND RESOLVE THE ISSUE
WITH THE PROJECT TEAM BEFORE COMMENCING ANY
WORK.
10. ALL PERMITS ASSOCIATED WITH THE PROJECT SHALL BE
PAID AND OBTAINED BY THE CONTRACTOR.
11. GENERAL CONTRACTOR SHALL BE SOLELY AND
COMPLETELY RESPONSIBLE FOR JOB CONDITIONS OF THE
JOB SITE, INCLUDING SAFETY OF PERSONS AND PROPERTY
AND COMPLIANCE WITH OSHA SAFETY STANDARDS.
12. WHEN PORTIONS OF THE WORK ARE PERFORMED BY THE
CONTRACTOR ON A DESIGN-BUILD BASIS, THE
CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE
DESIGN OF SUCH SYSTEMS AND FOR THE SECURING OF
ALL ASSOCIATED PERMITS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE COORDINATION OF ALL DESIGN
BUILD SUB CONTRACTORS.
13. CONTRACTOR SHALL AVOID INTERFERENCE AND CONFLICT
WITH THE BUILDING'S NORMAL OPERATION. CONTRACTOR
TO COMPLY WITH THE BUILDING RULES AND REGULATIONS
REGARDING SCHEDULING AND USE OF ELEVATORS AND
LOADING DOCKS FOR DELIVERY AND HANDLING OF
MATERIALS, EQUIPMENT, AND DEBRIS.
14. ALL KEY NOTES INDICATE NEW ITEMS TYPICALLY U.N.O.
15. CONTRACTOR TO REVIEW ABATEMENT REPORT PRIOR TO
START OF CONSTRUCTION.
PAF POWDER ACTUATED
FASTENER
P/C PRECAST (CONCRETE)
PCF POUNDS PER CUBIC
FOOT
PL PLATE
P.LAM. PLASTIC LAMINATE
PLAS. PLASTER
P.C.P. PORTLAND CEMENT
PLASTER
PJP PARTIAL JOINT
PENETRATION
PR. PAIR
PSF POUNDS PER FOOT
PSI POUNDS PER INCH
P/T POST-TENSIONED
P.T. PRESSURE TREATED
PTN. PARTITION
(R) REMOVE
R., RAD. RADIUS
R.C.P. REFLECTED CEILING
PLAN
R.D. ROOF DRAIN
REF. REFERENCE
REINF. REINFORCING
REQ'D. REQUIRED
RL. RELOCATE
R.O. ROUGH OPENING
RWD. REDWOOD
REV. REVERSED
S.C. SOLID CORE or SLIP
CRITICAL
S.C.D. SEE CIVIL DRAWINGS
SCHED. SCHEDULE
SHR. SHOWER
SIM. SIMILAR
S.J. SCORE JOINT
S.L.D. SEE LANDSCAPING
DRAWINGS
SLRS SEISMIC LOAD RESISTING
SYSTEM
S.M. SHEET METAL
S.M.D SEE MECHANICAL
DRAWINGS
S.O.G. SLAB ON GRADE
SPEC. SPECIFICATION
SQ. SQUARE
S.S.D. SEE STRUCTURAL
DRAWINGS
S.S. STAINLESS STEEL
SSMA STEEL STUD
MANUFACTURERS
ASSOCIATION
STD. STANDARD
STRUCT. STRUCTURAL
S.T.S. SELF TAPPING SCREW
SUSP. SUSPENDED
SYM. SYMMETRICAL
THRU THROUGH
TYP. TYPICAL
TRD. TREAD
T.B. TOWEL BAR
T.C. TOP OF CURB
T & G TONGUE AND GROOVE
THK. THICK
TJ TRUSS JOIST
T.P. TOP OF PAVEMENT
TRANS. TRANSVERSE
T.W. TOP OF WALL
U.N.O. UNLESS NOTED
OTHERWISE
U.T. ULTRASONIC TESTING
VERT. VERTICAL
V.I.F. VERIFY IN FIELD
V.T.R. VENT THROUGH ROOF
w/ WITH w/o WITHOUT
W.C. WATER CLOSET
WF WIDE FLANGE
W.O. WINDOW OPENING
W.P. WORK POINT
EXTERIOR PHOTOPROJECT NOTES PROJECT TEAMABBREVIATIONS PROJECT NARRATIVE SHEET INDEX
AERIAL PHOTO
SYMBOLS LEGEND
VICINITY MAP
N
-DEMO-
D1.00 DEMO FLOOR PLAN
D2.00 DEMO REFLECTED CEILING PLAN
D3.00 DEMO PHOTOS
THE SCOPE OF THIS PROJECT CONSISTS OF VOLUNTARY STRUCTURAL
IMPROVEMENTS TO THE EXISTING ROOF FRAMING AND FLOOR FRAMING,
RECONFIGURING THE RESTROOMS TO PROVIDE AN ADA ACCESSIBLE RESTROOM,
AND THE ADDITION OF PRIVATE OFFICE SPACE WITHIN THE EXISTING OPEN OFFICE
SPACE.
-STRUCTURAL-
S0.10 STRUCTURAL GENERAL NOTES
S1.10 FOUNDATION PLAN
S2.10 ROOF FRAMING PLAN
S3.10 STRUCTURAL DETAILS
DESIGN BUILD SCOPE
G.C. AND SUBCONTRACTORS TO REVIEW PLANS, VERIFY EXISTING CONDITIONS AND
PROVIDE CODE REQUIRED MEP DESIGN IN COORDINATION WITH THE
ARCHITECTURAL PLANS. FURTHER MODIFICATIONS MAY BE REQUIRED.
MECHANICAL:
1. REROUTE/REINSTALL (E) DUCT WORK AS NEEDED TO IMPLEMENT
STRUCTURAL IMPROVEMENTS IN CEILING.
2. DEMO (E) AND RELOCATE/REPLACE (N) EXHAUST FANS.
3. DEMO (E) FURNACE AND REPLACE w/ (N) ELECTRIC HVAC SYSTEM.
PLUMBING:
1. DEMO (E) PLUMBING FIXTURES AND REPLACE WITH (N). MODIFY
WATER/WASTE/VENT LINES AS NECESSARY TO ACCOMMODATE (N) FIXTURE
LOCATIONS.
2. RELOCATE (E) WATER HEATER.
ELECTRICAL:
1. DEMO (E) LIGHT FIXTURES AND REPLACE WITH (N).
DEFERRED SUBMITTALS
ZCS SHALL PERFORM GENERAL REVIEW OF ANY DEFERRED
SUBMITTAL DESIGNS PRIOR TO SUBMITTING TO THE AHJ AND
PRIOR TO CONSTRUCTION IMPLEMENTATION FOR GENERAL
CONFORMANCE TO THE DESIGN INTENT. DEFERRED SUBMITTAL
ITEMS SHALL NOT BE SPECIALLY FABRICATED OR INSTALLED UNTIL
APPROVED BY THE AHJ AND ZCS.
ALTERNATES
A. PAINT ALL (E) INTERIOR WALLS. REFINISH ALL (E) WOOD BASE AND INTERIOR
DOOR AND WINDOW TRIM - STAIN TO MATCH (E).
B. PROVIDE NEW DESIGN BUILD HVAC SYSTEM AS SHOWN ON SHEETS M1.00
AND E1.00.
REVISION ID: DATE:
1 ADDENDUM 2 04/25/2024
-MECHANICAL-
M1.00 DESIGN BUILD MECHANICAL PLAN
-ELECTRICAL-
M1.00 DESIGN BUILD MECHANICAL PLAN
A
B
C
1 2 3
1 1
OPEN OFFICE
DINING
KITCHEN
MEETING HALL
MEN'S R.R. WOMEN'S R.R.OFFICE
JANITOR
121 119 120
TYP.
3 3
TYP.
1 1 1
9 TYP.
11 11
A. ALL EXISTING BUILDING COLUMNS STRUCTURAL MEMBERS TO
REMAIN, U.N.O.
B. CONTRACTORS SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL
DEBRIS. PATCH AND REPAIR OF INTERIOR SPACE.
C. OBTAIN DEMOLITION PERMITS AND INCLUDE ALL COSTS OF SAME
IN CONTRACT PRICE.
D. FURNISH ALL LABOR AND MATERIALS/EQUIPMENT TO COMPLETE
DEMOLITION AND REMOVAL OF ALL ITEMS AS INDICATED.
CONTRACTOR SHALL KEEP CONSTRUCTION AREA FREE OF DUST
AND DEBRIS FOR THE DURATION OF CONSTRUCTION. IF ANY
QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL,
CLARIFY THE POINT IN QUESTION WITH THE PROJECT TEAM
BEFORE PROCEEDING.
E. IN PARTITIONS TO BE REMOVED, REMOVE AND CAP ALL OUTLETS,
SWITCHES, WIRES, THERMOSTATS, ETC., TO THEIR SOURCE.
REMOVE ALL ABANDONED ELECTRICAL CONDUIT, CABLING
BACKBOARD AND EQUIPMENT, TYPICAL THROUGHOUT ENTIRE
SPACE. AT COMPLETION OF DEMOLITION WORK
F. WHERE INTERIOR PARTITIONS, COLUMN FURRING, FIXTURES,
CABINETRY, DOORS AND DOOR FRAMES, ARE SCHEDULED FOR
REMOVAL, DISPOSE OF ALL DEBRIS AND PATCH FLOOR AND
WALLS AS REQUIRED. PREPARE SURFACES FOR NEW FINISHES
U.N.O. TYPICAL THROUGHOUT ENTIRE SPACE.
G. RELOCATION OF SMOKE DETECTORS, AND FIRE ALARM
EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL BE
ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS. NO
ACTIVE SMOKE DETECTOR SHALL BE PERMANENTLY COVERED
OR OTHERWISE REMOVED OR USED FOR OTHER THAN ITS
INTENDED PURPOSE. REMOVE TEMPORARY COVERS DAILY.
DEMO RCP GENERAL NOTES
(E) GYPSUM BOARD CEILING, CEILING
FRAMING AND ATTIC INSULATION TO BE
DEMOLISHED
DEMO RCP LEGEND
(E) GYPSUM BOARD CEILING
(E) LIGHTING FIXTURES
(E) HVAC REGISTERS
(E) CEILING AND FRAMING TO BE DEMOLISHED
(E) LIGHTING FIXTURES TO BE DEMOLISHED
(E) HVAC REGISTERS TO BE DEMOLISHED
1. DEMO (E) LIGHTING FIXTURE
2. REMOVE AND SALVAGE (E) PENDANT LIGHTS
3. DEMO (E) EXHAUST FAN
4. REMOVE (E) UPPER CASEWORK AND PREP FOR
REINSTALLATION
5. (E) COLLAR TIE TO REMAIN - COORDINATE W/
ENGINEER OF RECORD IF CONFLICTS ARISE WITH
CEILING DEMO
6. DEMO (E) CEILING FRAMING, TYP. THROUGHOUT
ENTIRE ROOM - PROVIDE TEMPORARY FLOOR
PROTECTION AS NEEDED
7. DEMO (E) WOOD TRIM AT TOP OF WALLS, TYP.
THROUGHOUT ENTIRE ROOM
8. REMOVE (E) SPRAY FOAM AT TOP OF WALL
9. REMOVE (E) HVAC REGISTERS AND PREP FOR
REINSTALLATION, TYP. THROUGHOUT ENTIRE ROOM
10. DEMO (E) ATTIC ACCESS
11. (E) SKYLIGHT TO REMAIN
# DEMO RCP KEYNOTES
EXPIRES: 06-30-24
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
81129PE
OREGON
E
RNG
I NE E
Z
S
A . S
J
7, 2
Y
A C
H
AR
S
TO
K Ee un 2
45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L
S C
A L E
/2
/2
:4 :3
P
M A u to d e s k D o c s /M
A s h la n d
P io n e e r H a ll.
R e s tr o o m s /M
A
R C
H R
.r v t
D2.00
DEMO REFLECTED
CEILING PLAN
M-0298-22
PIONEER HALL
RENOVATION
CITY OF ASHLAND
74 WINBURN WAY
ASHLAND, OR 97520
03-13-2024
WYH
JRR
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
B
ID
P E
R M
IT
D2.00 3/16" = 1'-0"
DEMO REFLECTED CEILING PLAN1
N
REVISION ID: DATE:
JessiRussell Snapshot
JessiRussell Snapshot
4 4
5 5
1. REMOVE AND SALVAGE (E) PENDANT LIGHTS AND
PREP FOR REINSTALLATION
2. (E) COLLAR TIE TO REMAIN - COORDINATE W/
ENGINEER OF RECORD IF CONFLICTS ARISE WITH
CEILING DEMO
3. REMOVE (E) HVAC REGISTERS AND PREP FOR
REINSTALLATION, TYP. THROUGHOUT ENTIRE ROOM
4. DEMO (E) WOOD TRIM AT TOP OF WALLS, TYP.
THROUGHOUT ENTIRE ROOM
5. DEMO (E) CEILING FRAMING, TYP. THROUGHOUT
ENTIRE ROOM
6. DEMO (E) VCT FLOOR FINISH DOWN TO SUB FLOOR.
REMOVE (E) WOOD BASE AND TRIM AND PREP FOR
REINSTALLATION
# DEMO PHOTO KEYNOTES
EXPIRES: 06-30-24
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
81129PE
OREGON
E
RNG
I NE E
Z
S
A . S
J
7, 2
Y
A C
H
AR
S
TO
K Ee un 2
45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L
S C
A L E
/2
/2
:5 :1
P
M A u to d e s k D o c s /M
A s h la n d
P io n e e r H a ll.
R e s tr o o m s /M
A
R C
H R
.r v t
D3.00
DEMO PHOTOS
M-0298-22
PIONEER HALL
RENOVATION
CITY OF ASHLAND
74 WINBURN WAY
ASHLAND, OR 97520
03-13-2024
WYH
JRR
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
B
ID
P E
R M
IT
N.T.S.D3.00
DEMO PHOTO1
REVISION ID: DATE:
JessiRussell Snapshot
A. REFER TO ARCHITECTURAL FLOOR PLAN FOR
ADDITIONAL DIMENSIONS.
B. ALL DIMENSIONS ARE REFERENCED TO FACE OF
FINISH U.N.O.
C. ALL HEIGHT REFERENCES ARE TAKEN FROM
DATUM-T.O.S. FOR AREA INDICATED.
D. PROVIDE WALL BACKING FOR REINFORCEMENT AS
REQUIRED.
E. PROVIDE SOLID BLOCKING FOR ALL 'J' BOXES
SUSPENDED LIGHT AND CEILING FAN FIXTURES,
TELEVISION SUPPORT, ARTIFACT SHELVES AND
ANY OTHER CEILING MOUNTED EQUIPMENT.
F. ALL LIGHT FIXTURE TRIM RINGS, EXPOSED
CONDUITS, 'J' BOXES, HVAC GRILLS, EMERGENCY
LIGHT FIXTURES, DUPLEX OUTLETS AND FACE
PLATES SHALL BE PAINTED TO MATCH THE
ADJACENT FINISH U.N.O.
G. ANY LIGHT NOT DIMENSIONALLY LOCATED TO BE
CENTERED IN THE CEILING TILE, CEILING AREA, OR
ROOM AS APPLICABLE. ALL "CAN" TYPE FIXTURES
TO BE MOUNTED IN THE CENTER OF THE CEILING
TILES U.N.O.
H. ALL EXPOSED CONDUITS AND 'J' BOXES SHALL BE
PAINTED TO MATCH THE ADJACENT FINISH U.N.O.
RCP GENERAL NOTES:
CEILING LEGEND :
(N) GYPSUM BOARD CEILING, CEILING
FRAMING PER STRUCT. AND R-49 INSULATION
(E) GYPSUM BOARD CEILING
CEILING FINISHES
GYP GYPSUM BOARD - PAINT
LIGHTING HVAC
REGISTERS
CEILING HEIGHT
VAR VARIES
M.E. MATCH EXISTING
ADDITIONAL NOTES
1. NOT USED
CEILING MATERIAL
CEILING HEIGHT
ADDITIONAL NOTESNOTES
ACT
8'-0"
REFLECTED CEILING LEGEND:
1. (N) KITCHEN VENT HOOD - CONNECT TO (E)
EXHAUST DUCT
2. REINSTALL (E) PENDANT LIGHT FIXTURE
3. REINSTALL (E) UPPER CASE WORK
4. REINSTALL (E) MECHANICAL REGISTERS
5. INSTALL 2'-0" x 2'-0" ATTIC ACCESS HATCH AT (E)
LOCATION
6. PAINT (E) CEILING PT3
7. (E) SKYLIGHTS TO REMAIN
8. INSTALL (N) DRYWALL CONTROL JOINT WHERE
TOP OF WALL MEETS CEILING - PATCH CEILING
AND WALLS AND TEXTURE TO MATCH ADJACENT
FINISH
9. (E) MECHANICAL REGISTER
10. (E) LIGHT FIXTURE
11. (N) POST AND BEAM PER STRUCT. STAIN TO
MATCH (E)
12. (E) COLLAR TIE - COORDINATE W/ ENGINEER OF
RECORD IF CONFLICTS ARISE WITH
INSTALLATION OF (N) CEILING
# REFLECTED CEILING KEYNOTES
A
B
C
1 2 3
F1
F1
GYP
8' - 8"
GYP
8' - 8"
F1
77 SF
ADA R.R.
GYP
VAR
GYP
VAR
4 1/2" / 12" 4 1/2" / 12"
899 SF
MEETING HALL
144 SF
KITCHEN
256 SF
DINING
320 SF
OPEN OFFICE
GYP
8' - 8"1
TYP.
F1 F1 F1 F1
F1 F1 F1 F1
EF
37 SF
R.R.
GYP
8' - 0"
79 SF
OFFICE
9 SF
CLOSET
121A
GYP
8' - 8"
231 SF
OFFICE
V1 V1
EF
F1
F1
TYP.
F2
E Q
E Q
F2 F2
A4.00
TYP.
TYP.
3' - 11" 7' - 10" 7' - 10" 3' - 11"
3' - 2" 6' - 4" 6' - 4" 6' - 4" 3' - 2"
TYP
F1 RECESSED CAN
EF EXHAUST FAN
V1 VANITY LIGHT
FIXTURE SCHEDULE
EXPIRES: 06-30-24
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
81129PE
OREGON
E
RNG
I NE E
Z
S
A . S
J
7, 2
Y
A C
H
AR
S
TO
K Ee un 2
45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L
S C
A L E
/2
/2
:4 :5
P
M A u to d e s k D o c s /M
A s h la n d
P io n e e r H a ll.
R e s tr o o m s /M
A
R C
H R
.r v t
A2.00
REFLECTED
CEILING PLAN
M-0298-22
PIONEER HALL
RENOVATION
CITY OF ASHLAND
74 WINBURN WAY
ASHLAND, OR 97520
03-13-2024
WYH
JRR
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
B
ID
P E
R M
IT
A2.00 3/16" = 1'-0"
REFLECTED CEILING PLAN1
N
REVISION ID: DATE:
JessiRussell Snapshot
WH
A3.00
A3.006
5 3
(E) BLDG.
ø 60"
MIN. CLR
5' - 0"1'-6"
C L
R
M
IN
C
L R
P01
P02
P01
P02
2' - 4 1/2" 7' - 9 1/2"
FURNACE
R.R.
ADA R.R.
OFFICE
M
IN
7' - 5"
2' - 6" 2' - 6"
M
IN
FLOORING
BASE
EX# EXISTING TO REMAIN
RB# RUBBER BASE
WB# WOOD BASE
WALLS
EX# EXISTING TO REMAIN
ME# MATCH EXISTING
PT# PAINT
EP# EPOXY PAINT
FRP# FIBERGLASS REINFORCED PANELS
FT# FRP TRIM
MISC.
TD# TOILET PAPER DISPENSER
PD# PAPER TOWEL DISPENSER
SD# SOAP DISPENSER
MR# MIRROR
SND SANITARY NAPKIN DISPOSAL
WR WASTE RECEPTACLE
V# VANITY LIGHT
PNL PARTITION PANELS
PL# PLASTIC LAMINATE
FLOORING TRANSITIONS
TR# TRANS PROFILE #
SV# SHEET VINYL FLOORING
ROOM FINISH ABBREVIATIONS:
SND
PT1
TP RB
FRP
1 TYP.
T Y
P
PT1
RB
FRP
T Y
P
1 TYP.
PT1
RB PL1PL2
PD1
1' - 3"
T Y
P
1 TYP.
PT1
PL1RB PL2
FRP
1 TYP.
T Y
P
PT1
TP
GB
RBSND FRP
T Y
P
1 TYP.
PT1
RBPD2
1' - 8"
T Y
P
FRP
RBPL1 PL2 SD
FRP
MR
V1
T Y
P
1 TYP.
FT1
FT1
T Y
P
FT1
SD
MR
V1
PL1 PL2
FRP
GB
RB
T Y
P
1 TYP.
FT1
FT1
FT1
T Y
P
1. INSTALL ANODIZED ALUMINUM FRP TRIM AT ALL
EDGES, TYP.
# ENLARGED PLAN KEYNOTES
EXPIRES: 06-30-24
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
81129PE
OREGON
E
RNG
I NE E
Z
S
A . S
J
7, 2
Y
A C
H
AR
S
TO
K Ee un 2
45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L
S C
A L E
/2
/2
:4 :3
P
M A u to d e s k D o c s /M
A s h la n d
P io n e e r H a ll.
R e s tr o o m s /M
A
R C
H R
.r v t
A3.00
ENLARGED PLANS
& INTERIOR
ELEVATIONS
M-0298-22
PIONEER HALL
RENOVATION
CITY OF ASHLAND
74 WINBURN WAY
ASHLAND, OR 97520
03-13-2024
WYH
JRR
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
B
ID
P E
R M
IT
A3.00 1/2" = 1'-0"
PIONEER HALL MEN'S & WOMEN'S ENLARGED R.R. PLAN1
A3.00 1/2" = 1'-0"
R.R. RM 119 - INT. ELEVATION "B"3
A3.00 1/2" = 1'-0"
R.R. RM 119 - INT. ELEVATION "C"4
A3.00 1/2" = 1'-0"
R.R. RM 119 - INT. ELEVATION "D"5
A3.00 1/2" = 1'-0"
ADA R.R. RM 120 - INT. ELEVATION "A"6
A3.00 1/2" = 1'-0"
ADA R.R. RM 120 - INT. ELEVATION "C"8
A3.00 1/2" = 1'-0"
ADA R.R. RM 120 - INT. ELEVATION "D"9
A3.00 1/2" = 1'-0"
R.R. RM 119 - INT, ELEVATION "A"2
A3.00 1/2" = 1'-0"
ADA R.R. RM 120 - INT. ELEVATION "B"7
REVISION ID: DATE:
JessiRussell Snapshot
FLOORING
BASE
EX# EXISTING TO REMAIN
RB# RUBBER BASE
WB# WOOD BASE
WALLS
EX# EXISTING TO REMAIN
ME# MATCH EXISTING
PT# PAINT
EP# EPOXY PAINT
FRP# FIBERGLASS REINFORCED PANELS
FT# FRP TRIM
MISC.
TD# TOILET PAPER DISPENSER
PD# PAPER TOWEL DISPENSER
SD# SOAP DISPENSER
MR# MIRROR
SND SANITARY NAPKIN DISPOSAL
WR WASTE RECEPTACLE
V# VANITY LIGHT
PNL PARTITION PANELS
PL# PLASTIC LAMINATE
FLOORING TRANSITIONS
TR# TRANS PROFILE #
SV# SHEET VINYL FLOORING
ROOM FINISH ABBREVIATIONS:
PT1
A
2 6
TYP.
PT3
TYP.
A
5 TYP. 4 TYP. 36
TYP.
PT1
A
TYP.
1. (E) COLLAR TIE
2. INSTALL (N) GYP BOARD - TEXTURE AND PAINT TO
MATCH (E) FINISH
3. (N) CEILING FINISH PER REFLECTED CEILING
PLAN - CREATE SMOOTH TRANSITION TO (E) WALL
FINISH
4. LIGHT FIXTURE PER REFLECTED CEILING PLAN
5. MECHANICAL REGISTER PER REFLECTED CEILING
PLAN
6. INSTALL (N) GYP BOARD AT (E) WALL CHASE -
TEXTURE AND PAINT TO MATCH (E) FINISH AND
PROVIDE ADDITIONAL FRAMING AS NECESSARY
7. REINSTALL (E) WOOD BASE AND TRIM, TYP.
# ELEVATION KEYNOTES
PT3 PT1
TYP.
TYP.
A
TYP.
EACH OF THE FOLLOWING ITEMS SHALL BE BID AS
ADDITIVE ALTERNATES:
A. PAINT ALL (E) INTERIOR WALLS. REFINISH ALL (E)
WOOD BASE AND INTERIOR DOOR AND WINDOW
TRIM - STAIN TO MATCH (E).
# ALTERNATE KEYNOTES
EXPIRES: 06-30-24
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
81129PE
OREGON
E
RNG
I NE E
Z
S
A . S
J
7, 2
Y
A C
H
AR
S
TO
K Ee un 2
45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L
S C
A L E
/2
/2
:4 :0
P
M A u to d e s k D o c s /M
A s h la n d
P io n e e r H a ll.
R e s tr o o m s /M
A
R C
H R
.r v t
A3.10
ENLARGED PLANS
& INTERIOR
ELEVATIONS
M-0298-22
PIONEER HALL
RENOVATION
CITY OF ASHLAND
74 WINBURN WAY
ASHLAND, OR 97520
03-13-2024
WYH
JRR
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
B
ID
P E
R M
IT
A3.10 1/2" = 1'-0"
MEETING HALL - INT. ELEVATION 11
A3.10 1/2" = 1'-0"
MEETING HALL - INT. ELEVATION 22
A3.10 1/2" = 1'-0"
MEETING HALL - INT. ELEVATION 33
A3.10 1/2" = 1'-0"
MEETING HALL - INT. ELEVATION 44
REVISION ID: DATE:
JessiRussell Snapshot
A A
A A
A A
(E) POLE RAFTER
(E) PLYWOOD SHEATHING
OVER (E) SKIP SHEATHING
(E) LOG WALL
LEDGER PER PLAN w/ (3) #10x4" WOOD SCREWS @ 24" o.c.
HANGER PER PLAN w/ SLOPED
SEAT
RAFTER PER PLAN
SECTION A-A
SISTER RAFTER TO (E)
RAFTER PER PLAN
(E) TIMBER COLLAR TIE TO
REMAIN, TYP.
(E) PLYWOOD SHEATHING
OVER (E) SKIP SHEATHING
(E) LOG WALL
LEDGER PER PLAN w/ (3) #10x4" WOOD SCREWS @ 24" o.c.
HANGER PER PLAN w/ SLOPED
SEAT
CEILING JOIST PER PLAN
(E) TIMBER COLLAR TIE TO
REMAIN, TYP.
(E) PLYWOOD SHEATHING
OVER (E) SKIP SHEATHING
RAFTER PER PLAN
(E) POLE RAFTER
GLB PER PLAN
HANGER PER PLAN
SIMPSON THA213 HANGER TYP. GLB PER PLAN
CEILING JOIST PER PLAN. BIRDS
MOUTH NOTCH @ HANGER
12" MAX.
SECTION A-A
(E) TRUSS TOP CHORD
CEILING JOIST PER PLAN
SISTER TO (E) TRUSS
BOTTOM CHORD w/
(3) 3"x0.148"⌀ NAILS @ 12" o.c.
STAGGER NAILING
(E) ROOF SHEATHING
(E) TRUSS BOTTOM CHORD
(E) STUD WALL
NOTCH AS REQUIRED
CEILING JOIST PER PLAN
SISTER TO (E) TRUSS
BOTTOM CHORD w/
(3) 3"x0.148"⌀ NAILS @ 12" o.c.
STAGGER NAILING
(E) TRUSS TOP CHORD TOE
NAIL TO PONY WALL TOP
PLATE w/ (2) 3"x0.148"⌀ NAILS
(E) TRUSS FRAMING
(E) ROOF SHEATHING
PONY WALL PER PLAN NAIL
TO EACH CEILING JOIST w/
(2) 3"x0.148"⌀ NAILS
CEILING JOIST PER PLAN
(E) TRUSS BOTTOM CHORD
(3) #10x5" WOOD SCREWS @ 12" o.c. STAGGER SCREW
2x8 BLOCKING AS REQ'D FOR
ATTACHMENT OF SISTERED
MEMBER
(E) PLYWOOD SHEATHING
OVER (E) SKIP SHEATHING
(E) POLE BEAM
AS REQ'D TO FIT TIGHT TO
(N) RIDGE BEAM NOTCH (E)
POST AND ATTACH w/ (4) # 8x5" WOOD SCREWS
AS REQ'D TO FIT TIGHT
NOTCH (E) POLE BEAM
AND ATTACH w/ (4) #8x5"
WOOD SCREWS
RAFTER PER PLAN TOE
SCREW TO BEAM w/
(2) #8 WOOD SCREWS
BEAM PER PLANAS REQ'D TO FIT TIGHT
NOTCH TIMBER POST PER
PLAN AND ATTACH TO POLE
BEAM w/ (4) #8x5" WOOD
SCREWS
(E) PLYWOOD SHEATHING
OVER (E) SKIP SHEATHING
(E) POLE RAFTER
GLB PER PLAN
CEILING JOIST PER PLAN
2x4 LEDGER w/ #8x3" WOOD SCREWS @ 12" o.c.
SIMPSON HGU3.63-SDS
FACEMOUNT HANGER, MIN
16" DEEP HANGER TO BE
ORDERED
(E) LOG WALL
RAFTER PER PLAN
1' - 0" MIN. 1' - 0" MIN.
GLB PER PLAN
WALL PENETRATION
FOR DUCTING
WALL PENETRATION
FOR DUCTING
SECTION A-A
M
IN
(E) PLYWOOD SHEATHING
OVER (E) SKIP SHEATHING
(E) POLE RAFTER. ATTACH
TO BEAM w/ (2) #8x5" WOOD
SCREWS
(E) LOG WALL
POLE BEAM PER PLAN NOTCH END
AND ALIGN w/ JOINT IN LOG WALL.
ATTACH w/ (4) SIMPSON SDWH27800G
TIMBER SCREWS SCREWS.
AT RIDGE TO FIT TIGHT NOTCH BEAM &
ATTACH w/ (4) #8x5" WOOD SCREWS.
POLE BEAM PER PLAN COPE
END AND ALIGN w/ FACE OF LOG WALL. ATTACH w/ (4)
SIMPSON SDWH27800G
TIMBER SCREWS.
WHERE NOT ALIGNED TO JOINT IN LOG WALL
SECTION A-A
(E) STUD WALL FRAMING
FASTENING PER PLAN.
STAGGER FASTENERS
(E) FLOOR FRAMING
(E) STEM WALL
MAX
6"
FLOOR FRAMING PER PLAN
(E) FLOOR SHEATHING
FASTENER PER PLAN.
STAGGER FASTENERS
(E) FLOOR FRAMING
(E) BEAM
FLOOR FRAMING PER PLAN
(E) FLOOR SHEATHING
MAX
6"
MAX
6"
FASTENER PER PLAN.
STAGGER FASTENERS
S
EXPIRES: 06-30-24
LT R
U C T U R A
R
D
EG
IS
TE
RE
P
L
ROFESS IONA
J
70888
OREGON
E RNG
I NE E
4u l y 08, 201
M
HA
T
THEW R .
SM
I T
524 Main Street, Suite 2, Oregon City, Oregon 97045 | 503-659-2205
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L
S C
A L E
REVISION ID: DATE:
/2
/2
:3
:3
P
M A u to d e s k D o c s /M
A s h la n d
P io n e e r H a ll.
R e s tr o o m s /M
S
T R
U C
T R
.r v t
S3.10
STRUCTURAL
DETAILS
M-0298-23
PIONEER HALL
RENOVATION
CITY OF ASHLAND
74 WINBURN WAY
ASHLAND, OR 97520
03-13-2024
PWR
JAG
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
B
ID
P E
R M
IT
S3.10 1" = 1'-0"
LOG WALL TO PERPENDICULAR RAFTERS1
S3.10 1" = 1'-0"
LOG WALL TO PERPENDICULAR CEILING JOIST2
S3.10 1" = 1'-0"
FRAMING TO RIDGE BEAM CONNECTION3
S3.10 1" = 1'-0"
STUD WALL TO PERPENDICULAR ROOF FRAMING4
S3.10 1" = 1'-0"
ATTIC PONY WALL TO FRAMING5
S3.10 3" = 1'-0"
CEILING JOIST TO OFFSET BOTTOM CHORD6
S3.10 1" = 1'-0"
POLE BEAM TO POST CONNECTION9
S3.10 1" = 1'-0"
RIDGE BEAM TO WALL7
S3.10 1" = 1'-0"
POLE BEAM TO WALL CONNECTION8
S3.10 1" = 1'-0"
STEM WALL TO PERPENDICULAR FLOOR FRAMING10
S3.10 1" = 1'-0"
BEAM TO PERPENDICULAR FLOOR FRAMING11
JessiRussell Snapshot
B
C
1 2 3
J. PROVIDE ALTERNATE PRICING FOR NEW HVAC SYSTEM
AS SHOWN ON SHEETS M1.00 AND E1.00.
MECHANICAL NOTES
45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L
S C
A L E
/2
/2
:2 :5
P
M A u to d e s k D o c s /M
A s h la n d
P io n e e r H a ll.
R e s tr o o m s /M
A
R C
H R
.r v t
M1.00
DESIGN BUILD
MECHANICAL PLAN
M-0298-22
PIONEER HALL
RENOVATION
CITY OF ASHLAND
74 WINBURN WAY
ASHLAND, OR 97520
03-13-2024
WYH
JRR
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
B
ID
P E
R M
IT
M1.00 3/16" = 1'-0"
DESIGN BUILD MECHANICAL PLAN1
N
REVISION ID: DATE:
nwarfield Rectangle nwarfield Text Box
MEP LEGEND
nwarfield Line nwarfield Line nwarfield Text Box
SUPPLY AIR DUCT
nwarfield Line nwarfield Text Box
RETURN AIR DUCT
nwarfield Line nwarfield Text Box
CONDENSATE DRAIN PIP
nwarfield PolyLine nwarfield Text Box
BALANCE DAMPER
nwarfield Line nwarfield Text Box
OUTSIDE AIR DUCT
nwarfield Line nwarfield Text Box
EXHAUST AIR DUCT
nwarfield Ellipse nwarfield Polygon nwarfield Pen Be.
nwarfield Polygon nwarfield Pen Be.
nwarfield Pen nwarfield Text Box
POINT OF CONNECTION
nwarfield Rectangle Sketch to Scale
1.92 sf nwarfield Line nwarfield Line nwarfield Rectangle Sketch to Scale
1.92 sf nwarfield Line nwarfield Rectangle Sketch to Scale
1.92 sf nwarfield Line nwarfield Text Box M nwarfield Rectangle nwarfield Text Box
MOTORIZED DAMPER
nwarfield PolyLine nwarfield Line nwarfield Line nwarfield PolyLine nwarfield Line nwarfield Line nwarfield Line nwarfield Ellipse nwarfield Polygon nwarfield Pen Be.
nwarfield Polygon nwarfield Pen Be.
nwarfield Pen nwarfield Arrow nwarfield Rectangle nwarfield Line nwarfield Line nwarfield Callout
(E) SA PLENUM
nwarfield Text Box
(N) ERV
nwarfield PolyLine nwarfield PolyLine nwarfield PolyLine nwarfield Rectangle Sketch to Scale
1.92 sf nwarfield Line nwarfield Line nwarfield Rectangle Sketch to Scale
1.85 sf nwarfield Line nwarfield Line nwarfield Rectangle Sketch to Scale
1.85 sf nwarfield Line nwarfield Line nwarfield Rectangle Sketch to Scale
1.85 sf nwarfield Line nwarfield Line nwarfield Rectangle nwarfield Rectangle nwarfield Line nwarfield Rectangle nwarfield Arrow nwarfield Line nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle Sketch to Scale
1.92 sf nwarfield Line nwarfield Line nwarfield PolyLine nwarfield Arrow nwarfield Rectangle Sketch to Scale
15.28 sf nwarfield Rectangle Sketch to Scale
7.33 sf nwarfield Line nwarfield Line nwarfield Callout 44"x24" ACCESS nwarfield Rectangle Sketch to Scale
0.5 sf nwarfield Rectangle Sketch to Scale
0.5 sf nwarfield Length Measurement 10'-0" nwarfield Callout
18"X30" LOUVER, TYP. 2
nwarfield Callout
14"X14" TITUS 355RL RETURN GRILLE HIGH ON WALL
nwarfield Text Box
690CFM
nwarfield Text Box
210CFM
nwarfield Text Box
210CFM
nwarfield Text Box
210CFM
nwarfield Callout
CAP
nwarfield Callout
CAP
nwarfield Text Box
95CFM
nwarfield Text Box
30CFM
nwarfield Text Box
50CFM
nwarfield Text Box
15CFM
nwarfield Text Box
50CFM
nwarfield Text Box
70CFM
nwarfield Text Box
70CFM
nwarfield Callout REMOVE EXISTING CEILNG EXHAUST FAN AND ASSOCIATED DUCTWORK AND ROOF PENETRATION. PATCH ROOF TO MATCH EXISTING. REPLACE WITH TITUS 50F EXHAUST GRILLE, TYP. 2 nwarfield PolyLine nwarfield PolyLine nwarfield PolyLine nwarfield PolyLine nwarfield PolyLine nwarfield PolyLine nwarfield PolyLine nwarfield Arrow nwarfield Arrow nwarfield Callout
(E) SUPPLY AIR
nwarfield Callout
(N) 14"Ø EA
nwarfield Callout
(N) 14"Ø OA
nwarfield Callout
(N) 14"Ø EA
nwarfield Callout
(N) 6"Ø SA
nwarfield Text Box
HP-1
nwarfield Text Box
HP-2
nwarfield Text Box
FC-1
nwarfield Text Box
FC-2
nwarfield Text Box
FC-3
nwarfield Text Box
FC-4
nwarfield Text Box
FC-5
nwarfield Text Box
FC-7
nwarfield Callout
REUSE EXISTING SUPPLY DIFFUSER, TYP. 5
nwarfield Callout 18MBh nwarfield Callout 18MBh nwarfield Callout 18MBh nwarfield Callout 12MBh nwarfield Callout 12MBh nwarfield Callout 12MBh nwarfield Callout
4MXS36RMVJU
nwarfield Callout
4MXS36RMVJU
nwarfield Text Box
75CFM
nwarfield Rectangle nwarfield Text Box
HP-3
nwarfield Callout
4MXS36RMVJU
nwarfield Rectangle nwarfield Text Box
FC-6
nwarfield Callout 18MBh nwarfield Line nwarfield Ellipse Sketch to Scale
0.19 sf nwarfield Line nwarfield Ellipse Sketch to Scale
0.19 sf nwarfield Line nwarfield Ellipse Sketch to Scale
0.19 sf nwarfield Line nwarfield Ellipse Sketch to Scale
0.19 sf nwarfield Callout
3/4" CD TO EXTERIOR LANDSCAPING. DISCHARGE 6" ABOVE GROUND, TURNED DOWN, TYP.
nwarfield Line nwarfield Ellipse Sketch to Scale
0.19 sf nwarfield Line nwarfield Ellipse Sketch to Scale
0.19 sf nwarfield Ellipse Sketch to Scale
0.19 sf nwarfield Ellipse Sketch to Scale
0.19 sf nwarfield PolyLine nwarfield Callout
3/4" CD UP
nwarfield Callout
3/4" CD DOWN IN WALL TO LAV TAILPIECE
nwarfield Rectangle nwarfield Text Box
MEP SCOPE OF WORK
nwarfield Line nwarfield Text Box
1. New multi split heat pumps and wall mounted fan coils serving the Pioneer Hall, meeting the performance requirements of specification section 2.2 and 2.3 of 23 00 00. Daikin BRC1E73 thermostats to serve each fan coil zone.
2. New energy recovery ventilator serving the Pioneer Hall meeting the performance requirements of specification section 2.4 of 23 00 00.
3. Condensate from fan coils shall be routed to nearest sink/lavatory tailpiece or to building perimeter landscaping. Condensate may be routed to dry well where above mentioned options are not feasible. Provide condensate lift pumps where needed. See specification section 22 00 00.
4. Provide electrical power provisions to new heat pump units, energy recovery ventilator, and fan coils. See specification section 26 00 00.
5. Patch walls and ceilings as required and paint walls to match existing.
nwarfield Callout EACH NEW AIR TERMINAL SHALL BE PROVIDED WITH A MANUAL BALANCE DAMPER IN THE BRANCH DUCT nwarfield Callout ALL NEW DUCTWORK SHALL BE RIGID, EXCEPT FOR THE LAST 5FT ON BRANCH DUCTS SERVING AIR TERMINALS nwarfield Arc nwarfield Arc nwarfield Callout
(E) SA TO OFFICES
nwarfield Callout
MAINTAIN MINIMUM 10FT BETWEEN OUTSIDE AIR AND EXHAUST LOUVERS
nwarfield Callout
TITUS TDC SUPPLY DIFFUSER, TYP. 2
nwarfield Callout
TITUS 50F EXHAUST GRILLE
nwarfield Callout
WALL MOUNTED FAN COIL, TYP.
nwarfield Callout
MULTI ZONE HEAT PUMP, TYP.
nwarfield Rectangle Sketch to Scale
1.85 sf nwarfield Line nwarfield Line nwarfield Text Box M nwarfield Rectangle nwarfield PolyLine nwarfield PolyLine nwarfield Text Box M nwarfield Rectangle nwarfield Callout ERV-1 SHALL HAVE INTEGRAL MOTORIZED DAMPERS ON THE SUPPLY AND EXHAUST AIR OUTLETS
JessiRussell Snapshot
WH
B
C
1 2 3
A3.10
4 2
A3.11
A3.11 1
J. PROVIDE ALTERNATE PRICING FOR NEW HVAC SYSTEM
AS SHOWN ON SHEETS M1.00 AND E1.00.
ELECTRICAL NOTES
45 Hawthorne Street, Medford, Oregon 97504 | 541-500-8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L
S C
A L E
/2
/2
:2 :5
P
M A u to d e s k D o c s /M
A s h la n d
P io n e e r H a ll.
R e s tr o o m s /M
A
R C
H R
.r v t
E1.00
DESIGN BUILD
ELECTRICAL PLAN
M-0298-22
PIONEER HALL
RENOVATION
CITY OF ASHLAND
74 WINBURN WAY
ASHLAND, OR 97520
03-13-2024
WYH
JRR
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
B
ID
P E
R M
IT
E1.00 3/16" = 1'-0"
DESIGN BUILD ELECTRICAL PLAN1
N
REVISION ID: DATE:
nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle Sketch to Scale
15.28 sf nwarfield Rectangle nwarfield Rectangle nwarfield Rectangle Sketch to Scale
0.8 sf nwarfield Text Box nwarfield Text Box M nwarfield Ellipse nwarfield Polygon nwarfield Ellipse nwarfield Polygon nwarfield Ellipse nwarfield Polygon nwarfield Ellipse nwarfield Polygon nwarfield Ellipse nwarfield Polygon nwarfield Ellipse nwarfield Polygon nwarfield Ellipse nwarfield Polygon nwarfield Ellipse nwarfield Polygon nwarfield Ellipse nwarfield Polygon nwarfield Ellipse nwarfield Polygon nwarfield Ellipse nwarfield Polygon nwarfield Rectangle nwarfield PolyLine nwarfield Rectangle nwarfield PolyLine nwarfield Rectangle nwarfield PolyLine nwarfield Text Box 30 A
WP
nwarfield Text Box 30 A
WP
nwarfield Text Box 30 A
WP
nwarfield Arc nwarfield Arc nwarfield Arrow nwarfield Callout
(N) 3/4"C-2#12,1#12G nwarfield Callout
(N) HP-1
nwarfield Callout
(N) ERV-1
nwarfield Arc nwarfield Arc nwarfield Arc nwarfield Arc nwarfield Arrow nwarfield Arrow nwarfield Callout
(N) 3/4"C-2#12,1#12G nwarfield Callout
(N) 3/4"C-2#12,1#12G nwarfield Callout
(E) PANEL PH
nwarfield Callout
(N) FC-2
nwarfield Callout
(N) FC-1
nwarfield Callout
(N) FC-3
nwarfield Callout
(N) FC-4
nwarfield Callout
(N) FC-5
nwarfield Callout
(N) FC-6
nwarfield Callout
(N) FC-7
nwarfield Callout
(N) HP-3
nwarfield Callout
(N) HP-2
nwarfield Arc nwarfield Arc nwarfield Arrow nwarfield Callout
(N) 1/2"C-2#12,1#12G nwarfield Arc nwarfield Arrow nwarfield Callout
(N) 1/2"C-2#12,1#12G nwarfield Text Box
PH-21,23
nwarfield Arc nwarfield Callout
(N) 1/2"C-2#12,1#12G nwarfield Text Box
PH-21,23
nwarfield Arrow nwarfield Arc nwarfield Callout
(N) 1/2"C-2#12,1#12G nwarfield Text Box
PH-21,23
nwarfield Arrow nwarfield Arc nwarfield Arrow nwarfield Callout
(N) 1/2"C-2#12,1#12G nwarfield Text Box
PH-21,23
nwarfield Arc nwarfield Arrow nwarfield Callout
(N) 1/2"C-2#12,1#12G nwarfield Text Box
PH-21,23
nwarfield Arc nwarfield Arrow nwarfield Callout
(N) 1/2"C-2#12,1#12G nwarfield Text Box
PH-21,23
nwarfield Arc nwarfield Arrow nwarfield Callout
(N) 1/2"C-2#12,1#12G nwarfield Text Box
PH-21,23
nwarfield Text Box
PH-29
nwarfield Text Box
PH-20,22
nwarfield Text Box
PH-24,26
nwarfield Text Box
PH-28,30
nwarfield Rectangle nwarfield Text Box
MEP SCOPE OF WORK
nwarfield Line nwarfield Text Box
1. New multi split heat pumps and wall mounted fan coils serving the Pioneer Hall, meeting the performance requirements of specification section 2.2 and 2.3 of 23 00 00. Daikin BRC1E73 thermostats to serve each fan coil zone.
2. New energy recovery ventilator serving the Pioneer Hall meeting the performance requirements of specification section 2.4 of 23 00 00.
3. Condensate from fan coils shall be routed to nearest sink/lavatory tailpiece or to building perimeter landscaping. Condensate may be routed to dry well where above mentioned options are not feasible. See specification section 22 00 00.
4. Provide electrical power provisions to new heat pump units, energy recovery ventilator, ducted fan coils. See specification section 26 00 00.
5. Patch walls and ceilings as required and paint walls to match existing.
nwarfield Snapshot nwarfield Polygon nwarfield Text Box nwarfield Polygon nwarfield Text Box nwarfield Polygon nwarfield Text Box nwarfield Polygon nwarfield Text Box nwarfield Polygon nwarfield Text Box nwarfield Polygon nwarfield Text Box nwarfield Polygon nwarfield Text Box nwarfield Text Box
KEYED NOTES
nwarfield Text Box
RELOCATE BREAKER FOR EXISTING EQUIPMENT AS SHOWN. MODIFY PANEL AS REQUIRED.
PROVIDE NEW BREAKER TO SERVE NEW EQUIPMENT. MODIFY PANEL AS REQUIRED.
PROVIDE BREAKER WITH PROVISIONS CAPABLE OF BEING LOCKED IN THE OPEN POSITION IN ACCORDANCE WITH CEC 422.31.
nwarfield Polygon nwarfield Text Box nwarfield Polygon nwarfield Text Box nwarfield Polygon nwarfield Text Box
JessiRussell Snapshot
| D2.00 |
| D3.00 |
| a2.00 |
| A3.00 |
| A3.10 |
File details come from the government source that posted it. Updated .