Exhibit O Community Center Ballast.pdf

PDF 122 KB Posted

Attached to
Community Center and Pioneer Hall Rehabilitation
Solicitation number
S-KA0010-00009824
Issued by
Jackson County, Amity City, Oregon

About this file

This document is a review of light fixtures for PCB ballasts at the Ashland Community Center Building in Ashland, Oregon, conducted by Coleman Creek Consulting, Inc. on behalf of the City of Ashland. The review found only one fluorescent light fixture in the basement, which was noted to be of newer construction. The report recommends that all fluorescent bulbs be removed and disposed of as universal waste prior to renovation activities.

The related state and local contract opportunity is for the rehabilitation of the Community Center and Pioneer Hall, located in Jackson County, Oregon. No additional details on the scope, timeline, or procurement process are provided.

View the file

Other files

File Type Posted
Exhibit N Pioneer Hall Bid & Permit Drawings (03.13.24).pdf PDF
Attachment 7 to Addendum 2 - Work Agreement.pdf PDF
Attachment 1 to Addendum 2 - Asbestos Specification.pdf PDF
Addendum 1.pdf PDF
20240514 Bid Summary.pdf PDF
Attachment 1 to Addendum 3 - Summary of Changes.pdf PDF
Exhibit O Community Center Ballast.pdf PDF
Use of Cooperative Contract Notice -3.19.pdf PDF
Attachment 2 to Addendum 2 - Summary of Changes.pdf PDF
Attachment 4 to Addendum 2 - Revised Pioneer Hall Drawings.pdf PDF
240318 ITB Community & Pioneer Hall -Final.pdf PDF
Exhibit O Pioneer Hall Asbestos Survey 2024.pdf PDF
Addendum 2.pdf PDF
Attachment 3 to Addendum 2 - Revised Community Center Drawings.pdf PDF
Attachment 5 to Addendum 2 - Additional Specifications.pdf PDF
Exhibit M Ashland Community Center & Pioneer Hall Specifications (03.13.24).pdf PDF
Attachment 2 to Addendum 3 - Revised Community Center Drawings.pdf PDF
Exhibit O Pioneer Hall Asbestos 2017.pdf PDF
Exhibit N Ashland Community Center Bid & Permit Drawings (03.13.24).pdf PDF
Exhibit O Community Center Asbestos.pdf PDF
Attachment 6 to Addendum 2 - Bid Schedule.pdf PDF
Exhibit O Community Center Lead.pdf PDF
Exhibit M Ashland Community Center & Pioneer Hall Specifications (03.13.24).pdf PDF
Exhibit N Pioneer Hall Bid & Permit Drawings (03.13.24).pdf PDF
Exhibit O Pioneer Hall Asbestos 2017.pdf PDF
Exhibit O Community Center Asbestos.pdf PDF
Exhibit O Community Center Lead.pdf PDF
Exhibit O Pioneer Hall Asbestos Survey 2024.pdf PDF
Exhibit N Ashland Community Center Bid & Permit Drawings (03.13.24).pdf PDF
240318 ITB Community & Pioneer Hall -Final.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C3 Coleman Creek Consulting, Inc.

810 Leonard Street, Ashland, Oregon 97520 541-535-7108 Phone

REVIEW OF LIGHT FIXTURES FOR PCB BALLASTS

ASHLAND COMMUNITY CENTER BUILDING

59 Winburn Way, Ashland, Oregon

FOR

CITY OF ASHLAND

INTRODUCTION

Coleman Creek Consulting, Inc. (CCC) was retained by the City of Ashland to perform a PCB ballast light fixture review of the portion of the Community Center Building scheduled for renovation, including replacement of lighting. The purpose of the PCB ballast light fixture review was to determine the location of PCB ballasts in the areas reviewed.

SCOPE OF WORK

It was decided that representative light fixtures would be reviewed for the presence of PCB ballasts.

PCB ballasts were banned in 1979 by the Environmental Protection Agency under the Toxic Substances Control Act (TSCA). TSCA required labeling indicating no PCB’s in the ballasts manufactured after 1979, including, “No PCB’s, “PCB-Free” and “Non-PCB”. Testing of individual ballasts is impractical, therefore, all ballasts that do not contain the above wording should be assumed to contain PCB’s. Recently, the requirement to provide a mention of PCB’s on the label was eliminated, making PCB identification more difficult.

LIGHT FIXTURE BALLAST REVIEW

David W. Fawcett of CCC visited the Ashland Community Center Building June 1, 2023, and reviewed the facility. According to a plaque affixed to the front of the building, original construction was in 1922, and renovation occurred in 1986. Mr. Fawcett the building for the presence of light fixtures that may contain PCB ballasts. The only fluorescent light fixture was noted in the basement, was noted of newer construction. No other fluorescent light fixtures were noted in the Community Center Building.

RECOMMENDATIONS

All fluorescent bulbs to be removed should be removed and disposed as universal waste prior to renovation activities.

David W. Fawcett Director of Consulting Operations

LIGHT FIXTURE BALLAST REVIEW
RECOMMENDATIONS

File details come from the government source that posted it. Updated .