Exhibit I Statement and Acknowledgment (Standard Form 1413) (Rev 42013).pdf

PDF 783 KB Posted

Attached to
C0 Service Building Renovation
Solicitation number
ISD_362164_DA
Issued by

About this file

This document is a Standard Form 1413, Statement and Acknowledgment, which is required for subcontracts under a federal prime contract.

The key details are:

  • The prime contract number is DE-AC02-07CH11359, held by Fermi Research Alliance LLC.
  • Fermi Research Alliance LLC awarded a subcontract on 12/XX/20XX for the "C0 Minor Building Renovation" project located at the Fermilab site in Batavia, Illinois.
  • The subcontractor shall furnish all labor, materials, and equipment necessary to perform the work described in the attached Statement of Work, which includes removing and replacing doors, windows, flooring, and plumbing fixtures in the C0 building.
  • The subcontractor acknowledges that the prime contract includes various labor standards clauses that apply to this subcontract.

View the file

Other files

File Type Posted
Question12-Epoxy Flooring Pics_All.pdf PDF
Amendment 02 to RFP 362164_2024_1022.pdf PDF
QandA_RFP 362164_2024_1022.pdf PDF
Exhibit L Construction Environmental Safety Health Certification CESHC.pdf PDF
Business Visitor Registration Instructions Directions.pdf PDF
Exhibit J Proposal Certifications Form PUR-466.pdf PDF
Amendment 01 to RFP 362164.pdf PDF
Exhibit K Subcontractor Annual Representations Certifications SARC Form SARC.pdf PDF
Amendment 01 to RFP 362164_2024_1003.pdf PDF
Exhibit M Davis Bacon Wage Rates IL20240008 Modification 10_09-20-2024.pdf PDF
Exhibit F Bid Bond FL-41 (Rev 12.22).pdf PDF
2.0 Price Proposal Form.pdf PDF
Exhibit N Sample Subcontract.pdf PDF
Exhibit E Construction Insurance Requirements 2024.pdf PDF
Exhibit G Payment Bond FL-42 (Rev 12.22).pdf PDF
Exhibit B Section 010010 General Requirements.pdf PDF
1.0 Request for Proposal_Final.pdf PDF
Exhibit H Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit C Section 013100 ESH Requirements.pdf PDF
Exhibit O Site Map.pdf PDF
Exhibit D FRA General Terms and Conditions for Construction (03.2024).pdf PDF
Summary of Required Solicitation Documents.pdf PDF
Exhibit A SOW C0_Renovation.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT AND ACKNOWLEDGMENT OMB Control Number: 9000-0066 Expiration Date: 5/31/2025

PART I - STATEMENT OF PRIME CONTRACTOR

1. PRIME CONTRACT NUMBER 2. DATE SUBCONTRACT

AWARDED

3. SUBCONTRACT NUMBER

15b. TITLE OF PERSON SIGNING

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1413 (REV. 4/2013)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. PRIME CONTRACTOR 5. SUBCONTRACTOR

a. NAME a. NAME

b. STREET ADDRESS b. STREET ADDRESS

c. CITY d. STATE e. ZIP CODE c. CITY d. STATE e. ZIP CODE

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in item 5 by the following firm:

a. NAME OF AWARDING FIRM

b. DESCRIPTION OF WORK BY SUBCONTRACTOR

8. PROJECT 9. LOCATION

10a. NAME OF PERSON SIGNING 11. BY (Signature) 12. DATE SIGNED

10b. TITLE OF PERSON SIGNING

PART II - ACKNOWLEDGMENT OF SUBCONTRACTOR

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Construction Wage Rate Requirements and Related Regulations

Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility

14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY

A C

B D

15a. NAME OF PERSON SIGNING 16. BY (Signature) 17. DATE SIGNED

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number.

The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1.6 Presentation Agent PDFlib 3.02 (C++/Win32) D:20050617125503-04'00' D:20080212101247-05'00' Presentation Agent Standard Form 1413 - Statement and Acknowledgment

STATEMENT AND ACKNOWLEDGMENT

OMB Control Number: 9000-0066 Expiration Date: 5/31/2025

PART I - STATEMENT OF PRIME CONTRACTOR

1. PRIME CONTRACT NUMBER

2. DATE SUBCONTRACT AWARDED

3. SUBCONTRACT NUMBER

15b. TITLE OF PERSON SIGNING

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1413 (REV. 4/2013)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. PRIME CONTRACTOR

5. SUBCONTRACTOR

a. NAME

a. NAME

b. STREET ADDRESS

b. STREET ADDRESS

c. CITY

d. STATE

e. ZIP CODE

c. CITY

d. STATE

e. ZIP CODE

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in item 5 by the following firm:

a. NAME OF AWARDING FIRM

b. DESCRIPTION OF WORK BY SUBCONTRACTOR

8. PROJECT

9. LOCATION

10a. NAME OF PERSON SIGNING

11. BY (Signature)

12. DATE SIGNED

10b. TITLE OF PERSON SIGNING

PART II - ACKNOWLEDGMENT OF SUBCONTRACTOR

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation (If included in prime contract see Block 6) Payrolls and Basic RecordsWithholding of FundsDisputes Concerning Labor StandardsCompliance with Construction Wage Rate Requirements and Related Regulations Construction Wage Rate Requirements Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility

14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY

A C B D 15a. NAME OF PERSON SIGNING

16. BY (Signature)

17. DATE SIGNED

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0066. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

1. PRIME CONTRACT NUMBER: DE-AC02-07CH11359
4A. NAME: Fermi Research Alliance LLC
4B. STREET ADDRESS: Kirk Road and Wilson Street
4C. CITY: Batavia
7A. NAME OF AWARDING FIRM: Fermi Research Alliance LLC
10A. NAME OF PERSON SIGNING: Danielle Amico
15A. NAME OF PERSON SIGNING:
15B. TITLE OF PERSON SIGNING:
10B. TITLE OF PERSON SIGNING: Procurement Specialist IV
14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY. Line A.:
14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY. Line D.:
14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY. Line C.:
14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY. Line B.:
8. PROJECT: C0 Minor Building Renovation
9. LOCATION: Fermilab Site, 3 miles east of the City of Batavia, in DuPage County, Illinois
7B. DESCRIPTION OF WORK BY SUBCONTRACTOR: The Subcontractor shall furnish all labor, materials, transportation, overhead, insurance, bonding costs, safety oversight, quality control oversight, supervision, and equipment necessary to perform the work described in the Statement of Work entitled, “R164390 - C0 Minor Building Renovation” dated August 19, 2024, Section 010010 - General Requirement (March 2022), Section 013100 - Environment, Safety, and Health Requirements (March 2022) mentioned therein, which the Statement of Work, amendment, and other documents are attached to and hereby made a part of this Subcontract.
5C. CITY:
4E. ZIP CODE: 60510
5E. ZIP CODE:
4D. STATE: IL
5D. STATE:
3. SUBCONTRACT NUMBER:
5A. NAME:
5B. STREET ADDRESS:
2. DATE SUBCONTRACT AWARDED. Enter 2 digit month, 2 digit day and 4 digit year.:
12. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
17. DATE SIGNED. Enter 2 digit month, 2 digit day and 4 digit year.:
6. The prime contract does contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 0
6. The prime contract does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation.": 0
Sign here if you are the Subcontractor.:

File details come from the government source that posted it. Updated .