This document is an Experience Exhibit template for a federal contract proposal, designed to allow offerors to document up to five past projects demonstrating their capabilities and performance history. The comprehensive form requires detailed information about previous projects, including company name, role (prime, subcontractor, or other), project/contract title, location, project number, contract values, completion dates, and project management personnel.

The template also includes a detailed work element breakdown section where offerors can specify which project components were performed in-house, by subcontractors, or were not applicable, covering technical areas such as casework, concrete, electrical, flooring, HVAC, walls/ceiling, masonry, painting, paving, plumbing, roofing, site work, sprinkler systems, and structural steel. Additionally, the form provides space for listing a contact at the owner/government agency and addressing any uniquely relevant technical aspects of the project that might be pertinent to the current solicitation.

View the file

Other files

File Type Posted
36C24426R0017 0002.docx DOCX document
Revised_Statement of Work 503-21-102.pdf PDF
36C24426R0017 0001.docx DOCX document
FCA Electrical Sign In Sheet_1.22.26.pdf PDF
RFI 2.6.2026.docx DOCX document
NewSwitchGearBuildingElevationsDetails_Revision1_02032026.pdf PDF
Pre-bid Site Visit Meeting Location.png PNG image
503-21-102 FCA Electrical Construction Drawings.pdf PDF
503-21-102 CD Specifications_Revised 7-29-25.pdf PDF
36C24426R0017.docx DOCX document
Statement of Work 503-21-102.pdf PDF
S02 36C24426R0017 Liquidated Damages signed.pdf PDF
EXHIBIT C - Past Performance Questionnaire.pdf PDF
503-21-102 Pre-Bid RFI .docx DOCX document
P03 36C244-26-AP-0018 Honeywell Notifier signed_Redacted.pdf PDF
P03 36C244-26-AP-0018 Inpro Contego Signage signed _Redacted.pdf PDF
P03 Sole Source BNOE 503-21-102.pdf PDF
Pre-Bid Site Visit Meeting Location.pdf PDF
P03 36C244-26-AP-0018 Avigilon Camera signed Redacted.pdf PDF
01-EP-501.pdf PDF
072113 Thermal Insulation 09192025.pdf PDF
P03 36C244-26-AP-0018 02_Salto Door signed_Redacted.pdf PDF
P03 36C244-26-AP-0018 Bettwy Systems signed Redacted.pdf PDF
P03 36C244-26-AP-0018 Wattstopper DLM signed Redacted.pdf PDF
P03 36C244-26-AP-0018_Trane Tracer Ensemble signed Redacted.pdf PDF
PA 20260077 01.09.2026.pdf PDF
EXHIBIT D - Price Proposal Breakdown.pdf PDF
Exhibit B - Subcontractor Information and Consent Form.pdf PDF
076000 Flashing.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A: Experience

Provide the following information requested in this format for up to five projects (each project on a separate form), similar in size and scope to this requirement, that your firm has completed in the past five years or is in the process of completing. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use additional space as required.

A. Company Name:

B. Your Role/Relationship with the Prime in This Project:

Prime

Subcontractor

Other (Explain)

C. Project/Contract Title:

D. Project Location:

E. Project Number:

F. Detailed Description:

Current/Final Contract $ Value: G. Original Contract $ Value:

H. Original Completion Date: Current/Final Completion Date:

I. Names of all your Project Managers assigned to this project

J. Names of all your Superintendents assigned to this project

M. Contact for Owner/Government agency Contracting Officer and/or inspector (COR/COTR);

Name:

Phone Number:

Email:

N. Address any technical areas about this project you consider uniquely relevant to this solicitation.

K. For each element of work listed below, mark if was not applicable to this project, performed in-house, or performed by a sub-contractor. If performed by a sub-contractor, provide sub-contractor's company name.

N/A In-House Sub Name of Sub-ContractorElement

Casework

Concrete

Electrical

Flooring

HVAC

Walls/Ceiling

Masonry

Painting

Paving

Plumbing

Roofing

Site Work

Sprinkler

Structural Steel

Other

Other

EXHIBIT A: Experience

A Company Name:
Other Explain:
C ProjectContract Title:
D Project Location:
E Project Number:
G Original Contract Value:
CurrentFinal Contract Value:
H Original Completion Date:
CurrentFinal Completion Date:
Name:
Phone Number:
Email:
Text6:
Group3: Off
F:
Project Description:
Group4: Off
Text5:
Text4:
Electrical Sub:
Group5: Off
Group6: Off
Flooring:
Group7: Off
HVAC Sub:
Group8: Off
Interior Walls Sub:
Group9: Off
Masonry Sub:
Group10: Off
Painting Sub:
Group11: Off
Paving Sub:
Group12: Off
Plumbing Sub:
Group13: Off
Roofing Sub:
Group14: Off
Group15: Off
Group16: Off
Concrete Sub:
Group2: Off
Casework Sub:
Other Sub:
Group17: Off
Sitework Sub:
Sprinkler Sub:
Structural Steel Sub: