About this file

This is a single-line electrical diagram for the Department of Veterans Affairs (VA) James E. Van Zandt Veterans Administration Medical Center located in Bel Air, Maryland. The drawing, labeled "FCA Correct Electrical Deficiencies - Phase 1", is part of 100% construction documents dated 02-12-2025 and provides detailed electrical distribution schematics for Building 1. The diagram includes multiple electrical systems components such as automatic transfer switches (ATS), generators (GEN-3 and GEN-4), transformers, panelboards, and circuit breakers across various voltage configurations (208/120V and 480/277V). Key drawing notes specify requirements like providing digital power meters, generator start/stop control circuitry, and specific installation instructions for electrical equipment, with particular attention to life safety branch transfer protocols and coordination of existing and new electrical infrastructure.

View the file

Other files

File Type Posted
36C24426R0017 0002.docx DOCX document
Revised_Statement of Work 503-21-102.pdf PDF
36C24426R0017 0001.docx DOCX document
FCA Electrical Sign In Sheet_1.22.26.pdf PDF
RFI 2.6.2026.docx DOCX document
NewSwitchGearBuildingElevationsDetails_Revision1_02032026.pdf PDF
Pre-bid Site Visit Meeting Location.png PNG image
503-21-102 FCA Electrical Construction Drawings.pdf PDF
503-21-102 CD Specifications_Revised 7-29-25.pdf PDF
36C24426R0017.docx DOCX document
Statement of Work 503-21-102.pdf PDF
S02 36C24426R0017 Liquidated Damages signed.pdf PDF
EXHIBIT C - Past Performance Questionnaire.pdf PDF
503-21-102 Pre-Bid RFI .docx DOCX document
P03 36C244-26-AP-0018 Honeywell Notifier signed_Redacted.pdf PDF
P03 36C244-26-AP-0018 Inpro Contego Signage signed _Redacted.pdf PDF
P03 Sole Source BNOE 503-21-102.pdf PDF
Pre-Bid Site Visit Meeting Location.pdf PDF
P03 36C244-26-AP-0018 Avigilon Camera signed Redacted.pdf PDF
072113 Thermal Insulation 09192025.pdf PDF
P03 36C244-26-AP-0018 02_Salto Door signed_Redacted.pdf PDF
P03 36C244-26-AP-0018 Bettwy Systems signed Redacted.pdf PDF
P03 36C244-26-AP-0018 Wattstopper DLM signed Redacted.pdf PDF
P03 36C244-26-AP-0018_Trane Tracer Ensemble signed Redacted.pdf PDF
PA 20260077 01.09.2026.pdf PDF
EXHIBIT D - Price Proposal Breakdown.pdf PDF
Exhibit B - Subcontractor Information and Consent Form.pdf PDF
Exhibit A - Experience.pdf PDF
076000 Flashing.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1200A

600A 225A40A225A400A

1200A

EDP

208/120V 800A 400A400A

XFMR-EDP

300 KVA

480V-208/120V

600AS

ATS-3 ATS-1-8TH ATS-1 ATS-2

EMDP

480/277V

N E L

01-ATS-PT-1

800A, 208/120V

ECB-ATS-P1

800A

XFMR-EQ

225 KVA

480V-208/120V

1600A

800A200A200A

ATS-P2 ATS-EHP

400A

MDP-3

480/277V

ATS-P2 BH-ATS-32

SCALE: NONE

1 PARTIAL ONE-LINE DIAGRAM - DEMOLITION

1200A

600A 225A40A225A400A

1200A

EDP

208/120V

(RM. BD01A) 800A 400A400A

XFMR-EDP

300 KVA

480V-208/120V

600AS

ATS-3 ATS-1-8TH ATS-1 ATS-2

400A

EMDP

480/277V

(RM. BA13)

400A

N E L

01-ATS-LS

400A, 480/277V

4 POLE, CLOSED TRANSITION

42 KAIC WCR

(RM. BE01A)

CR-L-DP

208/120V

(RM. BE01A)

800A

N E L

01-ATS-PT-1

800A, 208/120V

(RM. BD01A)

ECB-ATS-P1

800A

XFMR-CR

225 KVA

480V-208/120V

N E L

01-ATS-EQ

400A, 208/120V

4 POLE, CLOSED TRANSITION

42 KAIC WCR

(RM. BD01A)

1600A

800A200A200A

ATS-P2 ATS-EHP

400A 200A 400A

ATS-P2 BH-ATS-32

SCALE: NONE

2 PARTIAL ONE-LINE DIAGRAM - NEW WORK

2 2

44 3

MDP-3

480/277V

35 KAIC

(RM. BD01A)

G GEN-3

750 KW

480/277V

1200A

SPARE

EX. PAD MOUNTED

TRANSFORMER

G GEN-3

750 KW

480/277V

1200A

200A

CR-L-2 CR-L-4 CR-L-6

LS-H-DP

480/277V

(RM. BE01A) 50A 100A

100A

100A

100A

100A

100A

EQP

208/120V, 800A

(RM. BD01A)

225A

225A

EQP4

208/120V

100A

EQP4A

208/120V

100A

125A

125A

EQPB

208/120V

225A

225A

EQP2

208/120V

100A

EQP2A

208/120V

100A

225A

225A

EQP1

208/120

100A

EQP1A

208/120V

100A

225A

225A

EQP3

208/120V

100A

EQP3A

208/120V

100A

EQP

208/120V, 800A

225A

225A

EQP4

208/120V

100A

EQP4A

208/120V

100A

125A

125A

EQPB

208/120V

225A

225A

EQP2

208/120V

100A

EQP2A

208/120V

100A

225A

225A

EQP1

208/120

100A

EQP1A

208/120V

100A

225A

225A

EQP3

208/120V

100A

EQP3A

208/120V

100A

LS-L-B

100A

LS-L-2

100A

50A

LS-L-4

100A

50A

LS-L-6

100A

50A

XFMR-LS-B

30 KVA

480V-208/120V

XFMR-LS-2

30 KVA

480V-208/120V

LS-H-2 LS-H-4 LS-H-6

XFMR-LS-4

30 KVA

480V-208/120V

XFMR-LS-6

30 KVA

480V-208/120V

EX. PAD MOUNTED

TRANSFORMER

XFMR-EQ

112.5 KVA

480V-208/120V

ECB-ATS-EQ

400A

10 KAIC

MDS-2

480/277V, 1600A

(RM. 1F69A)

225A 400A 400A225A

N E L

ATS-CATS2

1600A 480/277V

600A 1600A 1600A

MDS-2A

480/277V

MDS-2-MAIN

480/277V

2000A

400A225A40A

XMFR-AC2 ME-MCC1 ME-MCC2 XFMR-300

400A

400A

EQ-H-DP

480/277V

(RM. BE01A)50A 100A

100A

100A

100A

100A

100A

EQ-L-B

100A

EQ-L-2

100A

50A

EQ-L-4

100A

50A

EQ-L-6

100A

50A

XFMR-EQ-B

30 KVA

480V-208/120V

XFMR-EQ-2

30 KVA

480V-208/120V

EQ-H-2 EQ-H-4 EQ-H-6

XFMR-EQ-4

30 KVA

480V-208/120V

XFMR-EQ-6

30 KVA

480V-208/120V

XMFR-AC2 ME-MCC1

EMDP2

480/277V

G GEN-4

2000 KW

480/277V

2500A

EX. PAD MOUNTED

TRANSFORMER

ATS-1 ATS-2 ATS-3

9 9 9

8 8 8 8

9 9 9

8 8 8 8

200A 200A

200A200A200A

F50

F60

F70

F110 F120 F130

F140

F160 F190

F80

F10

F90

F100

F250

F270 F300 F330

FEEDER SCHEDULE

FEEDER NO. WIRING AND CONDUIT

NO. SIZE GND C COMMENTS

F10

F20

F30

F40

F50

F60

F70

F80

F20

F30

F40

F150 F180 F210 F240

F220

F170 F200 F230

F260

F280

F290 F320 F350

F310 F340

F90

F100

FEEDER NO. WIRING AND CONDUIT

NO. SIZE GND C COMMENTS

F110

F120

F130

F140

F150

F160

F170

F180

F190

F200

FEEDER NO. WIRING AND CONDUIT

NO. SIZE GND C COMMENTS

F210

F220

F230

F240

F250

F260

F270

F280

F290

F300

FEEDER NO. WIRING AND CONDUIT

NO. SIZE GND C COMMENTS

F310

F320

F330

F340

F350 3 8 1-1/4"

3 8

3/4"10

1 6 1-1/2"4

3 8 1-1/4"4

3 8 3/4"10

3 8 1-1/4"4

3 8 1-1/4"4

3 8 1-1/4"4

3 8 1-1/4"4

3 8 1-1/4"4

3 8 1-1/4"4

3 8 3/4"10

3 8 3/4"10

3 8 3/4"10

3 8 3/4"10

3 8 3/4"10

3 8 3/4"10

2 8 1-1/2"4

3 8 1-1/4"4

2 8 1-1/2"4

3 8 1-1/4"4

1 6 1-1/2"4

4 500 4"6

4 350 4"6

4 250 4"6

4 3/0 2"3 2 SETS

4 3/0 2"3 2 SETS

4 3/0 2"3 2 SETS

4 3/0 2"3 2 SETS

4 3/0 2"3 2 SETS

4 3/0 2"3 2 SETS

4 3/0 2"3 2 SETS

4 3/0 2"3 2 SETS

4 3/0 2"3

4 300 2-1/2"1/0 3 SETS

DPM 12

BKM# 22016.01

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No. 220202D

JAMES E. VAN ZANDT

VETERANS

ADMINISTRATION

MEDICAL CENTER

2 3 4

Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

I CERTIFY THAT THESE DOCUMENT WERE PREPARED OR

APPROVED BY ME, AND THAT I AM A DULY LICENSED

ENGINEER UNDER THE LAWS OF THE STATE OF

PENNSYLVANIA, LICENSE NUMBER , EXPIRATION

09/30/2025

FCA CORRECT ELECTRICAL

DEFICIENCIES - PHASE 1

AR

L:

G :\2

.0 1\

D ra w in gs \A ca d\

E\

ER

P

- E

PS

S eg re ga tio n\

-E P-

Pl ot te d

By : E ric P in sk y | 3

/3 1/

:1

PM

PE050888E

Consultants:

BURDETTE KOEHLER MURPHY &

ASSOCIATES, INC.

MECHANICAL, ELECTRICAL &

PLUMBING ENGINEERS

6300 Blair Hill Lane, Suite 400 Baltimore, MD 21209 | www.bkma.com 410.323.0600

KELLER ENGINEERS, INC.

CIVIL & SURVEY CONSULTANTS

420 Allegheny Street, Hollidaysburg, PA 16648 Phone: 814-696-7430

SURVEYING AND MAPPING, LLC

(SAM)

SURVEYING & MAPPING

210 Bridgewater Road Unit 4 Aston, PA 19014

OCMI.

Estimating Scheduling PM/CM

202.337.1066 o | 785.393.7009 c ocmi.com | DVBE | SDVOSB

WHITMAN, REQUARDT &

ASSOCIATES, LLP

CIVIL ENGINEERING

801 South Caroline Street Baltimore, MD 21231

410.235.3450 - FAX: 410.243.5716

PROTECTION ENGINEERING

CONSULTANTS

100 Creek Road, Suite 102, Dripping Springs, TX 78620 512.380.1988

100% CONSTRUCTION DOCUMENTS

02-12-2025

503-21-102

2907 PLEASANT VALLEY BLVD.

ALTOONA, PA 16602 102DATE

RAM ERP 01-EP-501

BLDG 1

PARTIAL SINGLE LINE

DIAGRAMS

DRAWING NOTES:GENERAL NOTES:

1. PROVIDE DISTRIBUTION PANELBOARD.

2. PROVIDE AUTOMATIC TRANSFER SWITCH WITH BYPASS AND INTEGRAL

DIGITAL POWER METER. BASIS OF DESIGN IS ASCO SERIES 7000 WITH ASCO

5210 DIGITAL POWER METER. PROVIDE ASCO FULL-RATED NEUTRAL KIT AS

AN ACCESSORY- PART # K475916-004 (400A VERSION). FIELD INSTALL IN ATS.

SEE GENERAL NOTE 3 ON THIS DRAWING.

3. PROVIDE CIRCUIT BREAKER IN EXISTING SPACE IN SWITCHBOARD.

4. CONNECT TO EXISTING SPARE BREAKER.

5. REMOVE FEEDER.

6. PROVIDE NAMEPLATE STATING: "PANELBOARD RE-FED AT 400A".

7. CONNECT NEW FEEDER TO EXISTING PANEL.

8. PROVIDE TRANSFORMER.

9. PROVIDE BRANCH PANELBOARD.

10. PROGRAM EQUIPMENT BRANCH ATS TO TRANSFER AFTER 5 SECOND DELAY.

11. LIFE SAFETY BRANCH ATS SHALL TRANSFER WITH NO DELAY.

12. PROVIDE DIGITAL POWER METER. MOUNT ADJACENT TO PANEL.

13. PROVIDE GENERATOR START/STOP CONTROL CIRCUITRY AS REQUIRED.

COORDINATE WITH OTHER ATS'S ON GEN-3 AND MAINTAIN THE 'PARALLEL'

START, 'SERIES' STOP CONTROL SCENARIO. TRACE OUT EXISTING

GENERATOR CONTROL CIRCUITRY IN ROOM BD01A. UTILIZE EXISTING

CONTROL WIRING AS NEEDED. COORDINATE WITH MANUFACTURERS AS

REQUIRED. INSTALL CONTROL WIRING IN CONDUIT.

1. REFER TO X-EP-001 FOR ELECTRICAL LEGEND, ABBREVIATIONS AND

GENERAL NOTES.

2. UNLESS NOTED OTHERWISE, ELECTRICAL ITEMS SHOWN HEAVY

DASHED ( ) SHALL BE REMOVED, ELECTRICAL ITEMS SHOWN

HEAVY SOLID ( ) SHALL BE NEW AND ELECTRICAL ITEMS SHOWN

LIGHT SOLID ( ) SHALL BE EXISTING TO REMAIN.

3. PROVIDE 4 POLE ATS-LS AND ATS-EQ PER DRAWNG NOTE 2. THESE

ATSs SHALL BE WIRED AS 3 POLE SOLID NEUTRAL ATSs UNDER THIS

PROJECT AND NEUTRALS REWIRED FOR 4 POLE USE AS PART OF A

FUTURE GENERATOR PROJECT. CONTRACTOR SHALL PROVIDE A SOLID

NEUTRAL, NEUTRAL BAR KIT AND FIELD INSTALL IT IN THE ATSs.

COORDINATE WITH THE ATS MANUFACTURER AS REQUIRED FOR

OPTIMUM LOCATION OF NEUTRAL BAR KIT INSDE THE ATS. PROVIDE

ENOUGH SLACK ON THE NEUTRAL CONDUCTORS SO THAT THEY CAN

REACH THE SWITCHED NEUTRAL LUGS (4TH/ POLE) FOR REWIRING IN

THE FUTURE. IF SPACE INSIDE ATS IS INSUFFICIENT FOR THE

ADDITIONAL NEUTRAL CONDUCTOR SLACK, PROVIDE A HEADER BOX

ABOVE THE ATS AND ROUTE FEEDERS THROUGH IT WITH ADDITONAL

NEUTRAL CONDUCTOR COILED IN THE HEADER BOX.

1 1

ADDENDUM 1 09/29/2025

Sheets and Views
Work

File details come from the government source that posted it. Updated .