This document is a project overview for a federal construction contract opportunity with the Department of Veterans Affairs.

The project, titled "Correct FCA Electrical Deficiencies Phase 1" (Project #503-21-102), is located at the James E. Van Zandt VA Medical Center in Altoona, Pennsylvania, with an anticipated completion time of 18 months. The project will be awarded on a lowest bid basis, and guarantee period services are not included. The contractor must provide all necessary tools, labor, materials, equipment, permits, licenses, and supervision to correct electrical deficiencies identified through a Facilities Condition Assessment and a 2023 campus-wide power system study. Specific work includes constructing a new switchgear building, replacing the campus 15KV switchgear, segregating the building 1 essential electrical system, and addressing distribution equipment with inadequate short circuit withstand ratings and working clearances. Detailed requirements are contained within the Specification and Drawing package.

The project encompasses multiple construction trades, including laborer, carpentry, electrical, telecommunications, painting, DDC, HVAC, mechanical, fire suppression, fire alarms, plumbing, excavating, and masonry work. A detailed Statement of Work is provided in the Specification and Drawing package accompanying the solicitation.

View the file

Other files

File Type Posted
36C24426R0017 0002.docx DOCX document
36C24426R0017 0001.docx DOCX document
RFI 2.6.2026.docx DOCX document
FCA Electrical Sign In Sheet_1.22.26.pdf PDF
NewSwitchGearBuildingElevationsDetails_Revision1_02032026.pdf PDF
Pre-bid Site Visit Meeting Location.png PNG image
503-21-102 FCA Electrical Construction Drawings.pdf PDF
503-21-102 CD Specifications_Revised 7-29-25.pdf PDF
36C24426R0017.docx DOCX document
Statement of Work 503-21-102.pdf PDF
S02 36C24426R0017 Liquidated Damages signed.pdf PDF
EXHIBIT C - Past Performance Questionnaire.pdf PDF
503-21-102 Pre-Bid RFI .docx DOCX document
P03 36C244-26-AP-0018 Inpro Contego Signage signed _Redacted.pdf PDF
P03 Sole Source BNOE 503-21-102.pdf PDF
Pre-Bid Site Visit Meeting Location.pdf PDF
P03 36C244-26-AP-0018 Avigilon Camera signed Redacted.pdf PDF
P03 36C244-26-AP-0018 Honeywell Notifier signed_Redacted.pdf PDF
01-EP-501.pdf PDF
072113 Thermal Insulation 09192025.pdf PDF
P03 36C244-26-AP-0018 02_Salto Door signed_Redacted.pdf PDF
P03 36C244-26-AP-0018 Bettwy Systems signed Redacted.pdf PDF
P03 36C244-26-AP-0018 Wattstopper DLM signed Redacted.pdf PDF
P03 36C244-26-AP-0018_Trane Tracer Ensemble signed Redacted.pdf PDF
PA 20260077 01.09.2026.pdf PDF
EXHIBIT D - Price Proposal Breakdown.pdf PDF
Exhibit B - Subcontractor Information and Consent Form.pdf PDF
Exhibit A - Experience.pdf PDF
076000 Flashing.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project: Correct FCA Electrical Deficiencies Phase 1 Location: James E. Van Zandt VA Medical Center, Altoona, PA Project #: 503-21-102 Completion time: 18 months

It is anticipated that this project will be lowest bid. Guarantee Period Services are not included.

Description:

The Contractor shall provide all necessary tools, labor, materials, equipment, permits, license, and supervision for “Correct FCA Electrical Deficiencies Phase 1”, Project Number 503-21-102, located at the James E. Van Zandt VA Medical Center in Altoona, PA, in accordance with the drawings and specifications. Work includes correcting numerous electrical deficiencies listed as the result of a campus Facilities Condition Assessment (FCA) and a new 2023 campus-wide power system study. The types of deficiencies to be addressed include items such as constructing a new switchgear building, replacement of the campus 15KV switchgear, segregation of the building 1 essential electrical system, distribution equipment with inadequate short circuit withstand ratings and distribution equipment with inadequate working clearances. A detailed Statement of Work is provided within the Specification and Drawing package.

Anticipated Trades:

• Laborer

• Carpentry

• Electrical

• Telecommunications

• Painting

• DDC

• HVAC

• Mechanical

• Fire Suppression

• Fire Alarms

• Plumbing

• Excavating

• Masonry