Statement of Work 503-21-102.pdf
PDF 104 KB Posted
- Solicitation number
- 36C24426R0017
About this file
This document is a project overview for a VA Medical Center electrical infrastructure upgrade project. The project, titled "Correct FCA Electrical Deficiencies Phase 1", is located at the James E. Van Zandt VA Medical Center in Altoona, PA, with a project number of 503-21-102 and a completion timeline of 365 calendar days. The scope involves comprehensive electrical system improvements based on a Facilities Condition Assessment (FCA) and a 2023 campus-wide power system study, including constructing a new switchgear building, replacing the campus 15KV switchgear, segregating building 1's essential electrical system, and addressing distribution equipment with inadequate short circuit withstand ratings and working clearances.
The project will require multiple trades, including electrical, HVAC, mechanical, telecommunications, fire suppression, fire alarms, plumbing, masonry, carpentry, excavating, painting, and DDC. The anticipated procurement method is a request for proposal, and the detailed project specifications and requirements are contained within a separate Specification and Drawing package. Guarantee Period Services are explicitly not included in this project scope.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: Correct FCA Electrical Deficiencies Phase 1 Location: James E. Van Zandt VA Medical Center, Altoona, PA Project #: 503-21-102 Completion time: 365 calendar days.
It is anticipated that this project will be request for proposal. Guarantee Period Services are not included.
Description:
The Contractor shall provide all necessary tools, labor, materials, equipment, permits, license, and supervision for “Correct FCA Electrical Deficiencies Phase 1”, Project Number 503-21-102, located at the James E. Van Zandt VA Medical Center in Altoona, PA, in accordance with the drawings and specifications. Work includes correcting numerous electrical deficiencies listed as the result of a campus Facilities Condition Assessment (FCA) and a new 2023 campus-wide power system study. The types of deficiencies to be addressed include items such as constructing a new switchgear building, replacement of the campus 15KV switchgear, segregation of the building 1 essential electrical system, distribution equipment with inadequate short circuit withstand ratings and distribution equipment with inadequate working clearances. A detailed Statement of Work is provided within the Specification and Drawing package.
Anticipated Trades:
• Laborer
• Carpentry
• Electrical
• Telecommunications
• Painting
• DDC
• HVAC
• Mechanical
• Fire Suppression
• Fire Alarms
• Plumbing
• Excavating
• Masonry