crla201801_Hydraulics Memo.pdf

PDF 1 MB Posted

Attached to
OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements
Solicitation number
69056723R000010
Issued by

About this file

This document is a Final Waterway Design Hydraulics Memorandum for the Cleetwood Trail & Marina project at Crater Lake National Park, prepared by the Western Federal Lands Highway Division (WFLHD). The project involves replacing an existing bulkhead at the end of Cleetwood Cove trail, which was constructed in 2011 and has experienced significant wave-generated erosion. The memorandum provides detailed hydraulic analysis and recommendations for the new bulkhead design, including specific requirements for riprap protection and slope stabilization.

Key recommendations include setting the new bulkhead above the maximum wave runup elevation of 6184.1 feet, protecting side slopes with Class 5 or Class 6 riprap depending on slope angle, and ensuring project improvements remain above the 10 percent wave elevation of 6182.0 feet. The analysis considered historical lake water levels, wind speeds (up to 40.7 MPH), and wave characteristics, utilizing the USACE Coastal Engineering Manual methodology. The project aims to mitigate erosion and provide a stable shoreline structure, with minimal impact on the regulatory floodplain. Riprap specifications vary based on slope inclination, with thickness ranging from 38 to 48 inches and specific gravity and particle size carefully calculated to withstand wave forces.

View the file

Other files

File Type Posted
QA_10-30-2025.pdf PDF
QA_10-28-2025.pdf PDF
QA_10-21-2025.pdf PDF
QA_10-15-2025.pdf PDF
Cleetwood Cove Report_Golder_031317-RevA.pdf PDF
Amendment A005.pdf PDF
QA_10-14-2025.pdf PDF
QA_10-06-2025.pdf PDF
QA_09-30-2025.pdf PDF
QA_09-26-2025a.pdf PDF
Amendment A004.pdf PDF
QA_09-24-2025a.pdf PDF
Amendment A003.pdf PDF
QA_09-24-2025.pdf PDF
QA_09-23-2025.pdf PDF
QA_09-22-2025.pdf PDF
Amendment A002.pdf PDF
Site Visit Attendees_Cleetwood Trail.pdf PDF
Interested Vendor List_Cleetwood.pdf PDF
QA_09-19-2025.pdf PDF
Amendment A001.pdf PDF
Visit Requirements _Cleetwood Trail and Marina Improvements.pdf PDF
QA_08-22-2025.pdf PDF
FLH Bridge oversized or overload vehicle permit request form.pdf PDF
FHWA-WFLHD Equipment Inspection Report.pdf PDF
crla201801_GM 32-24 Summit Quarry Material Testing Rev2.pdf PDF
crla201801_Plan_(Set 1 of 3).pdf PDF
crla201801_Plan_(Set 2 of 3).pdf PDF
crla201801_SWPPP-No NPDES Permit.pdf PDF
crla201801_As-Built_Gas Line.pdf PDF
Physical Data_OR NPS CRLA 2018(1).zip ZIP file
crla201801_Crater Lake No Fly Zone.pdf PDF
crla201801_GR 05-24 Cleetwood Cove Trail and Marina - Geotechnical Report Rev1-3_VOLUME_I.pdf PDF
crla201801_control-points.xlsx XLSX spreadsheet
RFP 69056723R000010.pdf PDF
crla201801_Alignments.pdf PDF
crla201801_Plan_(Set 3 of 3).pdf PDF
crla201801_GR 05-24 Cleetwood Cove Trail and Marina - Geotechnical Report Rev1-3_VOLUME_II.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLEETWOOD TRAIL & MARINA

FINAL WATERWAY DESIGN HYDRAULICS MEMO

To: Carrie Warren, WFLHD Project Manager From: James Neighorn, P.E., WFLHD Hydraulics Engineer Date: Revised May 29, 2024 Project: OR NPS CRLA 2018(1) – Cleetwood Trail and Marina

Background U.S. National Park Service (NPS) is replacing the existing bulkhead located at the end of Cleetwood Cove trail on the Crater Lake shoreline. The existing bulkhead was constructed in 2011 and serves as a trail rest area and a staging area for boat tours. The existing bulkhead was constructed within the wave zone and has experience significant damage due to wave-generated erosion beneath and behind the exterior block wall. During the geotechnical assessment conducted by Golder Associates in 2017, the NPS indicated they do not wish to rebuild the bulkhead within the wave zone along the lake.

Water levels in the lake have been continuously monitored since 1901. The data indicates that the lake level can be subject to abrupt changes, rising or falling over 2 to 3-feet in a single year. The lake level reached a historic high in 1975, reaching an elevation of 6,179.34-feet. Lichen stains on rocks and the presence of existing trees near the shore both indicate that the historical high water level may not have exceeded 6180.50-feet.

A weather station located on the lake (approximately 7,500-feet offshore from the existing bulkhead) has been collecting continuous weather data since 1991. The wind speed data indicates that it is not uncommon for the lake to experience high winds between 36 to 38 MPH each year. The highest recorded wind speed occurred in November of 2001, with a speed of 40.7 MPH with gusts up to 51.8 MPH.

Western Federal Lands Highway Division (WFLHD) is designing the new bulkhead. Recommendations for the initial bulkhead minimum low chord elevation and riprap erosion control are presented.

Recommendations

• Set the new bulkhead above the point of maximum wave runup, elevation 6184.1-feet.

• Project improvements (walls, dock attachments, etc.) that must project below the wave runup zone should be kept above the 10 percent wave, elevation 6182.0-feet.

• Side slopes including or flatter than 2.25(h):1(v) should be protected with Class 5 riprap with a thickness of 38-inches.

• Side slopes 2(h):1(v) and up to 1.5(h):1(v) should be protected with Class 6 riprap with a thickness of 48-inches.

• The limits of Crater Lake are mapped within a Zone A floodplain. Given the minimal improvements along the shoreline, impacts on regulatory floodplain will be negligible. Hydraulic modeling is not anticipated.

Western Federal Lands Highway Division

610 E. Fifth Street Vancouver, WA 98661-3801

Attachments: Figure 1 – Location Map Figure 2 – FEMA FIRM Map Figure 3 – Lake Water Surface Elevations Figure 4 – Weather Station Information Calculations: Wave Height, Runup Height, and Riprap Size

Project Site Location

Map from Google Earth Pro, image date 12/30/2016.

N FIGURE 1

CLEETWOOD MARINA

SITE LOCATION

0 3 miles

Project Site

Weather Station

CRATER LAKE

Rosenburg

Medford

Granite Pass

Approximate Project Location

FEMA FIRM extracted using F-MIT On-Line

FIGURE 2

CLEETWOOD MARINA

FIRM MAP

Data printed from NPS website: https://www.nps.gov/crla/learn/nature/craterlakelevel.htm

N

FIGURE 3

CLEETWOOD MARINA

LAKE WATER SURFACE

ELEVATIONS

maximum windspeed recorded: 40.7 MPH on 11/2001 *adjusted from ~3m to 10m:

Map printed from USGS StreamStats

FIGURE 4

CLEETWOOD MARINA

WEATHER STATION

INFORMATION

Hydraulic Analysis Report

Project Data Project Title: Cleetwood Wave Attack

Designer: James Neighorn

Project Date: October 10, 2023

Project Units: U.S. Customary Units

Notes: Revised calculations from original September 4, 2019, report by Matthew Dillin.

Riprap Analysis: Cleetwood Wave Attack - 2.25:1 Notes:

Input Parameters Riprap Type: Wave Attack

Wave Input Parameters Calculate Wave Parameters

See USACE Coastal Engineering Manual for more information on wind speed, fetch length, and still water depth.

Wind Speed: 60 ft/s

Fetch Length: 25000 ft

Still Water Depth: 4.5 ft

Wave Result Parameters

Wind Velocity Coefficient: 0.0107

Coefficient of Drag: 0.001742

Friction Velocity: 2.50424 ft/s

Dimensionless Fetch Length: 128365

Dimensionless Wave Height: 14.797

10% Wave Height: 3.65992 ft

10% Wave Height = 1.27 * Significant Wave Height

5% Wave Height: 3.97692 ft

5% Wave Height = 1.38 * Significant Wave Height

1% Wave Height: 4.81265 ft

1% Wave Height = 1.67 * Significant Wave Height

Dimensionless Wave Period: 36.4273

Significant Wave Height: 2.88182 ft

This is the lesser of the calculated value or 0.8 * still water depth

Wave Period: 2.833 s

Wave Attack Input Parameters 3

Angle of Slope Inclination: 2.25:1 H:V

Freeboard: 0 ft

Armor Roughness Coefficient: 0.55

Specific Gravity of Riprap: 2.5

A lot of riprap used in coastal areas have specific gravity values less than 2.65, designers should not assume specific gravity equal to 2.65

Specific Gravity of Water: 1

Fresh water = 1.0, sea water = 1.03

Hudson Method is Selected

Design Wave Height: 3.66 ft

Minimum value is the Ten Percent Wave

Empirical Riprap Coefficient: 2.2

Result Parameters Unit Weight of Riprap: 156 lb/ft^3

Weight of Median Riprap Particle Size: 457.814 lb

Dimensionless Breaker Parameter: 1.66883

0-0.5: Spilling wave, 0.5-2.5: Plunging wave, 2.5-3.5: Collapsing Wave, >3.5: Surging wave

Computed D50: 460.677 mm

Riprap Class

Riprap Class Name:CLASS V

Riprap Class Order:5 The following values are an 'average' of the size fraction range for the selected riprap class.

D100: 914.40 mm

D85: 647.70 mm

D50: 469.90 mm

D15: 330.20 mm

Layout Recommendations Wave Runup: 4.23217 ft

Lesser of computed or 1.76*Hs

Vertical Height of Riprap above the Toe of Slope: 12.3922 ft

Thickness of Riprap Protection: 37 ft

No channel used in calculations

Riprap Analysis: Cleetwood Wave Attack - 2:1 Notes:

Input Parameters Riprap Type: Wave Attack

Wave Input Parameters Calculate Wave Parameters

See USACE Coastal Engineering Manual for more information on wind speed, fetch length, and still water depth.

Wind Speed: 60 ft/s

Fetch Length: 25000 ft

Still Water Depth: 4.5 ft

Wave Result Parameters

Wind Velocity Coefficient: 0.0107

Coefficient of Drag: 0.001742

Friction Velocity: 2.50424 ft/s

Dimensionless Fetch Length: 128365

Dimensionless Wave Height: 14.797

10% Wave Height: 3.65992 ft

10% Wave Height = 1.27 * Significant Wave Height

5% Wave Height: 3.97692 ft

5% Wave Height = 1.38 * Significant Wave Height

1% Wave Height: 4.81265 ft

1% Wave Height = 1.67 * Significant Wave Height

Dimensionless Wave Period: 36.4273

Significant Wave Height: 2.88182 ft

This is the lesser of the calculated value or 0.8 * still water depth

Wave Period: 2.833 s

Wave Attack Input Parameters 3

Angle of Slope Inclination: 2:1 H:V

Freeboard: 0 ft

Armor Roughness Coefficient: 0.55

Specific Gravity of Riprap: 2.5

A lot of riprap used in coastal areas have specific gravity values less than 2.65, designers should not assume specific gravity equal to 2.65

Specific Gravity of Water: 1

Fresh water = 1.0, sea water = 1.03

Hudson Method is Selected

Design Wave Height: 3.66 ft

Minimum value is the Ten Percent Wave

Empirical Riprap Coefficient: 2.2

Result Parameters Unit Weight of Riprap: 156 lb/ft^3

Weight of Median Riprap Particle Size: 515.041 lb

Dimensionless Breaker Parameter: 1.87744

0-0.5: Spilling wave, 0.5-2.5: Plunging wave, 2.5-3.5: Collapsing Wave, >3.5: Surging wave

Computed D50: 479.124 mm

Riprap Class

Riprap Class Name:CLASS VI

Riprap Class Order:6 The following values are an 'average' of the size fraction range for the selected riprap class.

D100: 1066.80 mm

D85: 762.00 mm

D50: 546.10 mm

D15: 381.00 mm

Layout Recommendations Wave Runup: 4.76119 ft

Lesser of computed or 1.76*Hs

Vertical Height of Riprap above the Toe of Slope: 12.9212 ft

Thickness of Riprap Protection: 43 ft

No channel used in calculations

Riprap Analysis: Cleetwood Wave Attack - 1.5:1 Notes:

Input Parameters Riprap Type: Wave Attack

Wave Input Parameters Calculate Wave Parameters

See USACE Coastal Engineering Manual for more information on wind speed, fetch length, and still water depth.

Wind Speed: 60 ft/s

Fetch Length: 25000 ft

Still Water Depth: 4.5 ft

Wave Result Parameters

Wind Velocity Coefficient: 0.0107

Coefficient of Drag: 0.001742

Friction Velocity: 2.50424 ft/s

Dimensionless Fetch Length: 128365

Dimensionless Wave Height: 14.797

10% Wave Height: 3.65992 ft

10% Wave Height = 1.27 * Significant Wave Height

5% Wave Height: 3.97692 ft

5% Wave Height = 1.38 * Significant Wave Height

1% Wave Height: 4.81265 ft

1% Wave Height = 1.67 * Significant Wave Height

Dimensionless Wave Period: 36.4273

Significant Wave Height: 2.88182 ft

This is the lesser of the calculated value or 0.8 * still water depth

Wave Period: 2.833 s

Wave Attack Input Parameters 3

Angle of Slope Inclination: 1.5:1 H:V

Freeboard: 0 ft

Armor Roughness Coefficient: 0.55

Specific Gravity of Riprap: 2.5

A lot of riprap used in coastal areas have specific gravity values less than 2.65, designers should not assume specific gravity equal to 2.65

Specific Gravity of Water: 1

Fresh water = 1.0, sea water = 1.03

Hudson Method is Selected

Design Wave Height: 3.66 ft

Minimum value is the Ten Percent Wave

Empirical Riprap Coefficient: 2.2

Result Parameters Unit Weight of Riprap: 156 lb/ft^3

Weight of Median Riprap Particle Size: 686.721 lb

Dimensionless Breaker Parameter: 2.50325

0-0.5: Spilling wave, 0.5-2.5: Plunging wave, 2.5-3.5: Collapsing Wave, >3.5: Surging wave

Computed D50: 527.344 mm

Riprap Class

Riprap Class Name:CLASS VI

Riprap Class Order:6 The following values are an 'average' of the size fraction range for the selected riprap class.

D100: 1066.80 mm

D85: 762.00 mm

D50: 546.10 mm

D15: 381.00 mm

Layout Recommendations Wave Runup: 5.07201 ft

Lesser of computed or 1.76*Hs

Vertical Height of Riprap above the Toe of Slope: 13.232 ft

Thickness of Riprap Protection: 43 ft

No channel used in calculations

To: Carrie Warren, WFLHD Project Manager
Project: OR_NPS_CRLA_2018(1) – Cleetwood Trail and Marina
Background
Recommendations
Cleetwood_Waterway_Hydraulics_Memo_2019-9-4.pdf
To: Helen Oppenheimer, WFLHD Project Manager
Project: OR_NPS_CRLA_2018(1) – Cleetwood Trail and Marina
Background
Recommendations
Cleetwood_Waterway_Hydraulics_Memo_2019-9-4 TXT.pdf
To: Helen Oppenheimer, WFLHD Project Manager
Project: OR_NPS_CRLA_2018(1) – Cleetwood Trail and Marina
Background
Recommendations
Cleetwood_Waterway_Hydraulics_Memo_2019-9-4 TXT.pdf
To: Helen Oppenheimer, WFLHD Project Manager
Project: OR_NPS_CRLA_2018(1) – Cleetwood Trail and Marina
Background
Recommendations
WaveAttack - JGN.pdf
Project Data
Riprap Analysis: Cleetwood Wave Attack - 2.25:1
Input Parameters
Wave Input Parameters
Result Parameters
Riprap Class
Riprap Class Name:CLASS V
Riprap Class Order:5
Layout Recommendations
Riprap Analysis: Cleetwood Wave Attack - 2:1
Input Parameters
Wave Input Parameters
Result Parameters
Riprap Class
Riprap Class Name:CLASS VI
Riprap Class Order:6
Layout Recommendations
Riprap Analysis: Cleetwood Wave Attack - 1.5:1
Input Parameters
Wave Input Parameters
Result Parameters
Riprap Class
Riprap Class Name:CLASS VI
Riprap Class Order:6
Layout Recommendations
Cleetwood Waterway - Final Hydraulics Memo.pdf
To: Carrie Warren, WFLHD Project Manager
Project: OR NPS CRLA 2018(1) – Cleetwood Trail and Marina
Background
Recommendations