crla201801_As-Built_Gas Line.pdf

PDF 4 MB Posted

Attached to
OR NPS CRLA 2018(1), Cleetwood Trail and Marina Improvements
Solicitation number
69056723R000010
Issued by

About this file

This document is a set of technical drawings and specifications for a fuel system replacement project at Cleetwood Cove in Crater Lake National Park. The project involves installing a new 5,000-gallon underground gasoline storage system with associated infrastructure, including a fuel transfer building, underground piping, tanks, and electrical systems. The detailed plans cover site layout, building elevations, fuel system details, and electrical schematics, with a focus on precise engineering specifications for components like underground storage tanks, piping, valves, and electrical connections. The project is designed to meet specific federal standards for fuel storage and transfer, with comprehensive documentation of materials, construction methods, and technical requirements across multiple detailed drawings.

View the file

Other files

File Type Posted
QA_10-30-2025.pdf PDF
QA_10-28-2025.pdf PDF
QA_10-21-2025.pdf PDF
QA_10-15-2025.pdf PDF
Cleetwood Cove Report_Golder_031317-RevA.pdf PDF
Amendment A005.pdf PDF
QA_10-14-2025.pdf PDF
QA_10-06-2025.pdf PDF
QA_09-30-2025.pdf PDF
QA_09-26-2025a.pdf PDF
Amendment A004.pdf PDF
QA_09-24-2025a.pdf PDF
Amendment A003.pdf PDF
QA_09-24-2025.pdf PDF
QA_09-23-2025.pdf PDF
QA_09-22-2025.pdf PDF
Amendment A002.pdf PDF
Site Visit Attendees_Cleetwood Trail.pdf PDF
Interested Vendor List_Cleetwood.pdf PDF
QA_09-19-2025.pdf PDF
Amendment A001.pdf PDF
Visit Requirements _Cleetwood Trail and Marina Improvements.pdf PDF
QA_08-22-2025.pdf PDF
FLH Bridge oversized or overload vehicle permit request form.pdf PDF
FHWA-WFLHD Equipment Inspection Report.pdf PDF
crla201801_GM 32-24 Summit Quarry Material Testing Rev2.pdf PDF
crla201801_Plan_(Set 1 of 3).pdf PDF
crla201801_Plan_(Set 2 of 3).pdf PDF
crla201801_SWPPP-No NPDES Permit.pdf PDF
Physical Data_OR NPS CRLA 2018(1).zip ZIP file
crla201801_Crater Lake No Fly Zone.pdf PDF
crla201801_GR 05-24 Cleetwood Cove Trail and Marina - Geotechnical Report Rev1-3_VOLUME_I.pdf PDF
crla201801_control-points.xlsx XLSX spreadsheet
RFP 69056723R000010.pdf PDF
crla201801_Alignments.pdf PDF
crla201801_Plan_(Set 3 of 3).pdf PDF
crla201801_GR 05-24 Cleetwood Cove Trail and Marina - Geotechnical Report Rev1-3_VOLUME_II.pdf PDF
crla201801_Hydraulics Memo.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHYSICAL DATA

for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

OR NPS CRLA 2018(1)

Cleetwood Trail and Marina Improvements

AS-BUILT GAS LINE

CRLA_106_41080_B_0001_of_0014
CRLA_106_41080_B_0002_of_0014
CRLA_106_41080_B_0003_of_0014
CRLA_106_41080_B_0004_of_0014
CRLA_106_41080_B_0005_of_0014
CRLA_106_41080_B_0006_of_0014
CRLA_106_41080_B_0007_of_0014
CRLA_106_41080_B_0008_of_0014
CRLA_106_41080_B_0009_of_0014
CRLA_106_41080_B_0010_of_0014
CRLA_106_41080_B_0011_of_0014
CRLA_106_41080_B_0012_of_0014
CRLA_106_41080_B_0013_of_0014
CRLA_106_41080_B_0014_of_0014

File details come from the government source that posted it. Updated .