QA_09-22-2025.pdf
PDF 419 KB Posted
- Solicitation number
- 69056723R000010
About this file
This document is a Questions and Answers (Q&A) file for the Cleetwood Trail and Marina Improvements project (OR NPS CRLA 2018(1)) for the National Park Service. The document contains eight technical and general questions from potential bidders, addressing topics such as contact information, technical evaluation requirements, dock specifications, and subcontractor experience. Key responses include confirmation that the solicitation contact number is 360.619.7520, a refusal to adjust dock live load specifications from 50 PSF, and clarification that snowload is not considered concurrent with live load. Multiple questions focused on relaxing Technical Evaluation Factor 1 requirements, which the government indicates will be addressed in Amendment A002, potentially allowing proposed subcontractors' experience to be used for Construction and Operational Elements. The Q&A document also provides guidance on obtaining an Interested Vendors List through SAM.gov, with a Federal Service Desk contact number of 866-606-8220 for additional assistance.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR NPS CRLA 2018(1)
Cleetwood Trail and Marina Improvements
# General Technical Question Answer Date
1 X I'd like to confirm the correct contact phone number for FHWA, as I am seeing multiple used in the RFP
For questions on this solicitation please use the following: 360.619.7520
8/21/2025
2 X Floating Docks are Specifies 50 PSF live Load which far Exceeds Industry Standard, Can this be Readjusted to 20 PSF or 30 PSF?
No change in the live loading specified, bid as shown
9/15/2025
3 X Are live load and Snow Load to be Considered Concurrent Loads for the Docks and Gangway.
Snowload is not considered concurrent with live load
9/15/2025
4 X
The listed requirements for Technical Evaluation Factor 1 are overly restrictive and will preclude some capable / qualified contractors from bidding on this opportunity. Please consider relaxing the requirements for Technical Evaluation Factor 1 by modifying the current requirement to meet all of the Construction Elements and Operational Elements with experience on previous projects. A suggestion might be to modify the language to ‘a minimum of six (6) of the Construction Elements and a minimum of four (4) of the Operational Elements are collectively represented.’
This will be addressed in Amendment A002.
Proposed subcontractors' experience may be used for Construction and Operational Elements. There will be no other changes at this time.
9/19/2025
5 X
The listed requirements for Technical Evaluation Factor 1 are overly restrictive and will preclude some capable / qualified contractors from bidding on this opportunity. Please consider relaxing the requirements for Technical Evaluation Factor 1 by reducing the project value required for Operational Element 3, ‘Performance heavily dependent on air support for delivery of equipment and materials’ to $1 million and remove the multi-year requirement
At this time, there are no changes. Please submit proposal accordingly.
9/19/2025
6 X
The listed requirements for Technical Evaluation Factor 1 are overly restrictive and will preclude some capable / qualified contractors from bidding on this opportunity. Please consider relaxing the requirements for Technical Evaluation Factor 1 by allowing subcontractors to carry the experience for the Construction Elements and Operational Elements.
This will be addressed in Amendment A002.
Proposed subcontractors' experience may be used for Construction and Operational Elements.
9/19/2025
Check General or Technical
7 X
In the event that the Prime Contractor meets the General Requirements, all of the Operational Elements, and all but 1 of the Construction Elements, (specifically Construction Element Item 1), can this requirement be meet utilizing the experience of a Listed Qualified Subcontractor who would be performing that portion of the work?
This will be addressed in Amendment A002.
Proposed subcontractors' experience may be used for Construction and Operational Elements.
9/22/2025
8 X Can you provide a full prime bidders list for the above referenced project?
The Government does not provide this since bidders may obtain the Interested Vendors List (similar to prime bidder list) from sam.gov after linking their entity to their registration. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov.
Link to Federal Help Desk on how to view and add your company to the Interested Vendor List:
https://www.fsd.gov/gsafsd_sp/en/how-do-i-add-myself-to-the-interested-vendors-list?id=kb_article_v…
If you need additional assistance, you can reach the Federal Service Desk at 866-606- 8220.
9/22/2025
File details come from the government source that posted it. Updated .