This document provides details for a federal contract solicitation to construct balance of work at the Veterans Affairs Medical Center in Manhattan, New York. The solicitation number is QSE--36C10F24R50018 and is seeking construction services to complete the Manhattan Hurricane Sandy Recovery Program at the VA NY Healthcare System campus. The contracting agency is the Department of Veterans Affairs Office of Construction and Facilities Management. Responses are due by the date specified in the full solicitation. Services required include completing construction of the recovery program at the Manhattan VAMC campus.
View the file
Other files
Show 40 more
Latest 50 of 281 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EE
Z
S
U
R R
T
DN
RAMP
161412
CC
DD
Z
AA
BB
Y
EE
BB
AA
DD
EE
DD
BB
22 23 24 26
V
W
X
BUILDING 1
RAMP DN
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EX
EX
S S
S S
S
S
S
SS
S
S
S
S
S
SSSSS
S S S S
S
S
SS
S
S S
S S
S S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S S
S
S
AA
EX
HH
S S
S
S S
C1S
TC07
M M
H
HEPA
HEPA HEPA
HEPA
C1S
C1S
C1S
TC08
C1S 5
C1S
C1S
6'-0"
LINE OF MAT
FOUNDATION
BELOW
LINE OF MAT
FOUNDATION
BELOW
7'-5"
ICRA SYMBOLS
PROJECT AREA LIMIT
ICRA CONSTRUCTION BARRIER WALL / DOOR
WALL (EXISTING / NEW)
MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)
HEPA FILTERHE
PA
M
H
MAT
TEMPORARY POLYETHYLENE PLASTIC
CONSTRUCTION FILM BARRIER; SEE ICRA
KEYNOTES FOR REQUIREMENTS
TC##
SEE DWG C-GI250 FOR DOOR AND
PARTITION TYPES
1. REFER TO C-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO C-AE002 FOR GENERAL NOTES.
2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS
OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE
RATEDAND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.
6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS
SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.
7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED ON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED
BASED ON SITE CONDITIONS.
8. REFER TO SHEETS C-GI201, C-GI210 & C-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND
EXTENTS OF TEMPORARY WALL CONSTRUCTION.
MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ICRA CONSTRUCTION
BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND
CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.
10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE
COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.
RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF TEMPORARY
PARTITIONS.
13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED
OTHERWISE.
EACH DOOR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER
1 CLOSER C02011/C02021
1 WALL STOP (AT INSWING DOORS) L02101 CONVEX
1 SET SELF-ADHESIVE SEALS R0E154
ICRA NOTES:
11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES
AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,
REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING
CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL
COST TO THE PROJECT/GOVERNMENT.
3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS
AND THEIR REQUIREMENTS.
4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.
INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE
FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.
5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.
9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE
SCHEDULED TO BE MODIFIED OR REPLACED.
12. REFER TO E4/C-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.
1 KICK PLATE J102
1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY
EACH PAIR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT
1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER
1 OVERLAPPING STEEL ASTRAGAL
WITH SELF ADHESIVE SEAL
R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)
1 TYPE 21A
2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY
CLOSERS
KICK PLATES
WALL STOPS
SET SELF ADHESIVE SEALS
COORDINATOR
C02011 / C02021 J102 L02101
ROY154
14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISCPLACED.
15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT /
REDUCE AMOUNT OF FINAL CLEANUP REQUIRED.
1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.
2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA
TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.
3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED
AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.
4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN
PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.
5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER
AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:
a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY
SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER
TO CONTAIN DIRT DEBRIS AND DUST.
b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING
ZONE.
c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE
CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL
BE CHANGED ON A DAILY BASIS.
d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED
MEDICAL CENTER AT THE END OF THE WORK DAY.
e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.
f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO
REPLACEMENT.
g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN
EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.
h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION
OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER
THE REMOVAL.
6. FINAL CLEANUP:
a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION
DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF
THE CONSTRUCTION.
b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.
7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -
SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.
INFECTIOUS DISEASE CONTROL REQUIREMENTS
J b
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SSSS
S
S
S
S
S S
S S
S
S
S
S
H
M
M
MAT
MAT
M
A
T
M
A
T
MAT
MAT
A
C
D
F
G
L
J
E
ICRA KEYNOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022 DZ JH / DZ
8'4'0 16'
PLAN
NORTH
SCALE: 1/16" = 1'-0"
BUILDING 1 - PARTIAL GROUND FLOOR ICRA PLAN
E5
# (SPECIFIC TO THIS
DRAWING ONLY)
BUILDING 1 - PARTIAL GROUND
FLOOR ICRA PLAN
C-GI201
EXISTING WALL TO ACT AS 1 HR CONSTRUCTION BARRIER. FIRESTOP ANY OPENINGS IN WALL TO MAINTAIN INTEGRITY OF CONSTRUCTION BARRIER REQUIREMENTS. EXTEND WALL CONSTRUCTION TO DECK. PROVIDE HEAD OF WALL FIRESTOP TERMINATIONS SIMILAR TO DETAIL D1 / A-GI250.
EXISTING 1 HR CONSTRUCTION BARRIER. FIRESTOP ANY EXISTING OR NEW OPENINGS IN WALL TO MAINTAIN INTEGRITY OF CONSTRUCTION BARRIER REQUIREMENTS. EXTEND WALL CONSTRUCTION TO DECK. PROVIDE HEAD OF WALL FIRESTOP TERMINATIONS SIMILAR TO DETAIL D1 / A-GI250.
PROVIDE TEMP SAFETY BARRIERS AT EXTERIOR WALL / WINDOW / DOOR REMOVAL. TEMP SAFETY BARRIERS SHALL NO IMPACT ON VAMC OPERATIONS.
OBTAIN APPROVAL / COORDINATE WITH VA CFM OFFICE PRIOR TO ANY ERECTION OF SAFETY BARRIERS. TEMP SAFETY BARRIER SHALL BE REMOVED ONCE CONSTRUCTION BARRIER IS COMPLETE. CONSTRUCTION BARRIER SHALL BE BUILT IMMEDIATELY AFTER DEMOLITION OF EXTERIOR WALL / WINDOW
REMOVAL.
4 EXISTING FOOD RECEIVING AREA 0218E AND STAIR 1-1 SHALL REMAIN OPERATIONAL AND ACCESSIBLE DURING THE DURATION OF CONSTRUCTION ACTIVITIES. MAINTAIN CLEAR PATH FOR EGRESS / DELIVERIES AND VAMC OPERATIONAL REFUSE REMOVALS. CONSTRUCTION MATERIALS ARE NOT PERMITTED TO BE STORED WITHIN THIS ROOM / AREAS. NOT LESS THAN WEEKLY, MOP DOWN / CLEAN ROOM TO CONTROL CONSTRUCTION RESIDUE / DUST.
5 REMOVE EXISTING DOOR AND FRAME. INSTALL 1 HR CONSTRUCTION BARRIER WITHIN DOOR OPENING.
6 EXISTING 1 HR CONSTRUCTION BARRIER TO BE DEMOLISHED TO PERMIT INSTALLATION OF MAT FOUNDATION. INSTALL "NEW" 1 HR CONSTRUCTION BARRIER
AS SHOWN WITH A CONTINUITY INTERFACE WITH THE EXISTING CONSTRUCTION BARRIERS.
8 6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL BE SEALED TO CEILING/FLOOR/WALLS FOR DUST AND DEBRIS CONTAINMENT. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL NOT IMPEDE VAMC OPERATIONS OR EGRESS. OBTAIN APPROVAL / COORDINATE / FACILITATE ILSM WITH VA CFM OFFICE PRIOR TO CONSTRUCTION ACTIVITIES AND CONSTRUCTION OF TEMPORARY ICRA CONSTRUCTION FILM BARRIERS.
9 HEPA VACUUM ALL CARPET TILES AND LIGHT FIXTURES WITHIN THE WORK AREA AT THE CONCLUSION OF THE WORK ACTIVITIES.
7 ICRA CONSTRUCTION BARRIER ERECTION / EXTENT SHOWN AT THE EXISTING FOOD SERVICE AREA 0218E SHALL BE COORDINATED / MODIFIED AS REQUIRED BASED UPON THE ICRA CONSTRUCTION BARRIER REQUIRED BY THE TEMPORARY VAMC REFRIGERATOR / FREEZER INSTALLATION SHOWN IN PKG. "A" ICRA
PLANS.
6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL BE SEALED TO CEILING/FLOOR/WALLS FOR DUST AND DEBRIS CONTAINMENT DURING THE CMU OPENING INFILL AT THE ABOVE CEILING CONDUIT AND PULL-BOX REMOVAL. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL NOT IMPEDE VAMC OPERATIONS OR EGRESS. TEMPORARY ICRA CONSTRUCTION BARRIERS AND WILL BE REQUIRED TO BE INSTALLED / REMOVED AFTER-HOURS ON A DAILY BASIS FOR AFTER-HOUR WORK ACTIVITIES. OBTAIN APPROVAL / COORDINATE / FACILITATE ILSM WITH VA CFM OFFICE PRIOR TO CONSTRUCTION ACTIVITIES AND CONSTRUCTION OF TEMPORARY ICRA CONSTRUCTION FILM BARRIERS. HEPA FILTER CLEAN-UP WILL BE
REQUIRED UPON CONCLUSION OF EACH DAYS CONSTRUCTION ACTIVITIES.
SCALE: 1/8" = 1'-0"
8'4'0 16'
BUILDING 1 - PARTIAL GROUND FLOOR ICRA PLAN
F2
PLAN
NORTH
AutoCAD SHX Text
CSSSD
AutoCAD SHX Text G580
AutoCAD SHX Text
CLOTHES DIST.
AutoCAD SHX Text
0148AS
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text 0147S
AutoCAD SHX Text
SPECIMEN CLOS
AutoCAD SHX Text 0170S
AutoCAD SHX Text
SPECIMEN STORAGE
AutoCAD SHX Text 0171S
AutoCAD SHX Text
CANTEEN STORAGE
AutoCAD SHX Text
0252EA
AutoCAD SHX Text
IRM STORAGE
AutoCAD SHX Text
0252EB
AutoCAD SHX Text
VAULT 2
AutoCAD SHX Text 0253E
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 0257E
AutoCAD SHX Text
SUPPLY STORAGE
AutoCAD SHX Text 0253N
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 0253E
AutoCAD SHX Text
EQUIPMENT STOR
AutoCAD SHX Text 0252E
AutoCAD SHX Text
EMS SUPER
AutoCAD SHX Text 0255N
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 0244N
AutoCAD SHX Text
ELEC RM
AutoCAD SHX Text 0247N
AutoCAD SHX Text
LINEN CHUTE RM
AutoCAD SHX Text 0253E
AutoCAD SHX Text
MAIN ELECTRIC-BUILDING 1
AutoCAD SHX Text 0242N
AutoCAD SHX Text
ELEC CL
AutoCAD SHX Text
REFRIGERATOR
AutoCAD SHX Text 0253F
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text 0233E
AutoCAD SHX Text
FOOD RECEIVING
AutoCAD SHX Text 0218E
AutoCAD SHX Text
INGREDIENT CONTROL
AutoCAD SHX Text 0216E
AutoCAD SHX Text
MATERIAL OFFICE
AutoCAD SHX Text 0215E
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 0243N
AutoCAD SHX Text
IT ROOM
AutoCAD SHX Text 0211E
AutoCAD SHX Text
EMPTY GAS CYLINDERS
AutoCAD SHX Text 0210E
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 0212E
AutoCAD SHX Text
SERVICE ENTRY
AutoCAD SHX Text 0211E
AutoCAD SHX Text
COMP GAS
AutoCAD SHX Text
AutoCAD SHX Text
NON FLAM GAS
AutoCAD SHX Text
AutoCAD SHX Text
EQUIPMENT STORAGE
AutoCAD SHX Text 0203E
AutoCAD SHX Text
S P D WAREHOUSE
AutoCAD SHX Text 0250E
AutoCAD SHX Text
EMS EQUIPMENT RM
AutoCAD SHX Text 0251E
AutoCAD SHX Text
LOADING DOCK
AutoCAD SHX Text
AutoCAD SHX Text
GOOD RECEIVING
AutoCAD SHX Text 0214E
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text 0213E
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 0242N
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 0241N
AutoCAD SHX Text
STAIRWELL
AutoCAD SHX Text 0254N
AutoCAD SHX Text
SHARED OFFICE
AutoCAD SHX Text
FLUID CART STORAGE
AutoCAD SHX Text G596
AutoCAD SHX Text
VENDOR LOANER
AutoCAD SHX Text G589
AutoCAD SHX Text
BREAKDOWN
AutoCAD SHX Text G590
AutoCAD SHX Text
EQUIP HOLDING / DISPATCH
AutoCAD SHX Text G595
AutoCAD SHX Text
SOILED RECEIVING
AutoCAD SHX Text G591
AutoCAD SHX Text
MECH RM
AutoCAD SHX Text G703
AutoCAD SHX Text
JAN.
AutoCAD SHX Text G598
AutoCAD SHX Text
KITCHENETTE
AutoCAD SHX Text 0142C
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
CAB
AutoCAD SHX Text G001W
AutoCAD SHX Text
MALE TOILET
AutoCAD SHX Text G382
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
ELEV LOBBY
AutoCAD SHX Text G001
AutoCAD SHX Text
WASHER DRYER
AutoCAD SHX Text G003
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text G004
AutoCAD SHX Text
IT (TR-D)
AutoCAD SHX Text
0209SA
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 0209S
AutoCAD SHX Text
RADIOACTIVE RM
AutoCAD SHX Text G206S
AutoCAD SHX Text
LAUNDRY
AutoCAD SHX Text 0184S
AutoCAD SHX Text
INTERIM STORAGE
AutoCAD SHX Text
PUMPS
AutoCAD SHX Text 0166S
AutoCAD SHX Text
PUMP ROOM
AutoCAD SHX Text 0175S
AutoCAD SHX Text
FIRE COMMAND / ATS SWITCH
AutoCAD SHX Text 0273N
AutoCAD SHX Text
EQUIPMENT HOLDING
AutoCAD SHX Text
0230AE
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text G245N
AutoCAD SHX Text
STAIR
AutoCAD SHX Text 1-1
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
PE #1
AutoCAD SHX Text
PE #2
AutoCAD SHX Text
PE #3
AutoCAD SHX Text
PE #4
AutoCAD SHX Text
PE #5
AutoCAD SHX Text
PE #6
AutoCAD SHX Text
PE #7
AutoCAD SHX Text
PE #8
AutoCAD SHX Text
SE #12
AutoCAD SHX Text
SE #11
AutoCAD SHX Text
SE #10
AutoCAD SHX Text
SE #9
AutoCAD SHX Text
SE #13
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
DOCK LEVELER
AutoCAD SHX Text #1
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
DOCK LEVELER
AutoCAD SHX Text #2
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
DOCK LEVELER
AutoCAD SHX Text #3
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
REST RM
AutoCAD SHX Text 0213F
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
ELECTRIC ROOM
AutoCAD SHX Text G706
AutoCAD SHX Text
TELE. RM.
AutoCAD SHX Text G706A
AutoCAD SHX Text
HLD
AutoCAD SHX Text G535
AutoCAD SHX Text
SCOPE WASH
AutoCAD SHX Text G501
AutoCAD SHX Text
ETO ABATOR
AutoCAD SHX Text
AUTHORIZED ASSEMBLY WORKSTATIONS
AutoCAD SHX Text
DECONTAMINATION
AutoCAD SHX Text G504
AutoCAD SHX Text
DETERGENT
AutoCAD SHX Text G512
AutoCAD SHX Text
WATER TREATMENT
AutoCAD SHX Text G511
AutoCAD SHX Text
PPE
AutoCAD SHX Text G508
AutoCAD SHX Text
MALE LOCKER
AutoCAD SHX Text G507
AutoCAD SHX Text
JAN
AutoCAD SHX Text G505
AutoCAD SHX Text
MALE TOILET
AutoCAD SHX Text G506
AutoCAD SHX Text
FEMALE LOCKER
AutoCAD SHX Text G509
AutoCAD SHX Text
FEMALE TOILET
AutoCAD SHX Text G510
AutoCAD SHX Text
CART STAGING
AutoCAD SHX Text G513
AutoCAD SHX Text
CART STAGING
AutoCAD SHX Text G502
AutoCAD SHX Text
LINEN RM
AutoCAD SHX Text G503
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text G500
AutoCAD SHX Text
BUILDING SUPPORT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV LOBBY
AutoCAD SHX Text
CG-2
AutoCAD SHX Text
STAIR #3
AutoCAD SHX Text
AutoCAD SHX Text
CORR.
AutoCAD SHX Text 258A
AutoCAD SHX Text
HSKP
AutoCAD SHX Text G711
AutoCAD SHX Text G733
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text G736
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text G735
AutoCAD SHX Text
RECEPT
AutoCAD SHX Text G715
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text G714
AutoCAD SHX Text
COPY
AutoCAD SHX Text G716
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text G710
AutoCAD SHX Text
CORR.
AutoCAD SHX Text 258B
AutoCAD SHX Text
TEL & SIG
AutoCAD SHX Text G630A
AutoCAD SHX Text
FUTURE AUDITORIUM
AutoCAD SHX Text G701
AutoCAD SHX Text
FUTURE AUDITORIUM STORAGE
AutoCAD SHX Text G704
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text G601
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text G600
AutoCAD SHX Text
IT (TR-B)
AutoCAD SHX Text G707
AutoCAD SHX Text
WAITING AREA
AutoCAD SHX Text G713
AutoCAD SHX Text
COAT CLOSET
AutoCAD SHX Text G709
AutoCAD SHX Text
STAIR
AutoCAD SHX Text 6-1
AutoCAD SHX Text
KITCHENETTE
AutoCAD SHX Text G708
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
BUILDING SUPPORT
AutoCAD SHX Text G705
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
AutoCAD SHX Text
BLDG 6
Z.8
AA.2
NORMAL POWER ROOM
1115AC-EL
EMERGENCY POWER ROOM
ELEC
1056S-EL
ELEC
1064S-EL
ELEC
S S S S
S S
S
S
S
S
S
S S
S S
AA.2
Z.8
DD.5
DD.5
20.5
22.8 22.9
20.5
22.8
22.9
18.2 20.5
22.8
18.1
22.9
20.5
22.8
18.1 22.9
18.4
DD.8
DD.8
BB.5
BB.5
AA.5
AA.5
AA.5
AA.5
HH
32302826
Y
V
W
X
Z
AA
U
BUILDING 1
W
X
4 5 7 9
EXTERIOR PLAZA
EMERGENCY GENERATOR
U
V
DD
11 1312
E A S
T
TH
S
TR
EE
T
2 31
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
AA
BB
EX.
EE
22 23
BB
AA
Z
X
W
R
25 29
S S S S
S S
S
S
S
S
S
S S
S S
C
O
N
N
E
C
T
O
R
B
I
D
G
E
EE
EX
DD
DD
EX
EX
EMERGENCY GENERATOR TRAILER
TEMP EMERGENCY
GENERATOR AREA
BUILDING No. 2
B-GI250
B8
C-GI250
B6
C-GI250
B1
C-GI250
B3
MA
T
MA
T
C2S
HE
PA
6'-0"
MA
T
MA
T
C2S
ALT
2 4
TC02
TC01
5'- 0"
M
IN
CL
R
5'- 0"
M
IN
CL
R
5'-0"MIN
CLR
ICRA SYMBOLS
PROJECT AREA LIMIT
ICRA CONSTRUCTION BARRIER WALL / DOOR
WALL (EXISTING / NEW)
MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)
HEPA FILTERHE
PA
M
H
MAT
TEMPORARY POLYETHYLENE PLASTIC
CONSTRUCTION FILM BARRIER; SEE ICRA
KEYNOTES FOR REQUIREMENTS
TC##
TEMPORARY LIGHT FIXTURE.
SEE DWG C-GI250 FOR DOOR AND
PARTITION TYPES
1. REFER TO C-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO C-AE002 FOR GENERAL NOTES.
2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS
OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE
RATEDAND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.
6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS
SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.
7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED ON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED
BASED ON SITE CONDITIONS.
8. REFER TO SHEETS C-GI201, C-GI210 & C-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND
EXTENTS OF TEMPORARY WALL CONSTRUCTION.
MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ICRA CONSTRUCTION
BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND
CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.
10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE
COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.
RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF TEMPORARY
PARTITIONS.
13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED
OTHERWISE.
EACH DOOR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER
1 CLOSER C02011/C02021
1 WALL STOP (AT INSWING DOORS) L02101 CONVEX
1 SET SELF-ADHESIVE SEALS R0E154
ICRA NOTES:
11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES
AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,
REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING
CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL
COST TO THE PROJECT/GOVERNMENT.
3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS
AND THEIR REQUIREMENTS.
4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.
INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE
FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.
5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.
9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE
SCHEDULED TO BE MODIFIED OR REPLACED.
12. REFER TO E4/C-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.
1 KICK PLATE J102
1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY
EACH PAIR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT
1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER
1 OVERLAPPING STEEL ASTRAGAL
WITH SELF ADHESIVE SEAL
R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)
1 TYPE 21A
2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY
CLOSERS
KICK PLATES
WALL STOPS
SET SELF ADHESIVE SEALS
COORDINATOR
C02011 / C02021 J102 L02101
ROY154
14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISCPLACED.
15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT /
REDUCE AMOUNT OF FINAL CLEANUP REQUIRED.
1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.
2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA
TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.
3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED
AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.
4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN
PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.
5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER
AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:
a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY
SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER
TO CONTAIN DIRT DEBRIS AND DUST.
b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING
ZONE.
c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE
CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL
BE CHANGED ON A DAILY BASIS.
d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED
MEDICAL CENTER AT THE END OF THE WORK DAY.
e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.
f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO
REPLACEMENT.
g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN
EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.
h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION
OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER
THE REMOVAL.
6. FINAL CLEANUP:
a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION
DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF
THE CONSTRUCTION.
b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.
7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -
SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.
INFECTIOUS DISEASE CONTROL REQUIREMENTS
ICRA KEYNOTES
3 DAILY ENTRY / USE RESTRICTED. INSTALL TEMPORARY SIGN ON DOOR INDICATING "EMERGENCY EXIT USE ONLY".
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-GI210
BUILDING 1 - FIRST FLOOR ICRA
PLAN
DZ JH / DZ
8'4'0 16'
PLAN
NORTH
SCALE: 1/16" = 1'-0"
FIRST FLOOR ICRA PLAN - BUILDING 1
E1
1 6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT. TEMPORARY ICRA CONSTRUCTION FILM BARRIER SHALL BE ERECTED OUTSIDE VAMC OPERATION HOURS. THE CONSTRUCTION OF THE PERMANENT ROOM WALLS WHICH WILL ACT AS THE CONSTRUCTION BARRIER SHALL BE EXPEDITED. ONCE THE PERMANENT ROOM PARTITION IS 100% COMPLETE, THE TEMPORARY CONSTRUCTION FILM BARRIER SHALL BE REMOVED. TIME DURATION TO COMPLETE PERMANENT ROOM WALLS AND RESTORE ADJACENT CEILING AND WALL SURFACES / FINISHES AFFECTED BY CONSTRUCTION IS LIMITED TO A MAXIMUM OF 5 CONSECUTIVE WORKDAYS. OBTAIN APPROVAL / COORDINATE / FACILITATE ILSM WITH THE VA CFM OFFICE PRIOR TO ERECTION OF TEMPORARY ICRA
CONSTRUCTION FILM BARRIERS FOR CONSTRUCTION ACTIVITIES.
4 HEPA VACUUM BACKSIDE OF ALL ACT PANELS AS THEY ARE REMOVED FOR CEILING ACCESS REQUIRED TO INSTALL LIGHTS / ELECTRICAL SYSTEMS.
5 MOVE ALL FURNITURE / EQUIPMENT AS REQUIRED TO PROVIDE CLEARANCES TO CONSTRUCT THE TEMPORARY CONSTRUCTION FILM BARRIER. AFTER COMPLETITION OF WORK, FURNITURE / EQUIPMENT SHALL BE PUT BACK IN IT'S ORIGINAL LOCATION. ROOM SHALL BE CLEANED AS INDICATED IN
INFECTIOUS DISEASE CONTROL REQUIREMENTS ABOVE.
6 EXISTING DOOR TO BE REMOVED AND WALL OPENING TO BE ENLARGED TO ACCOMMODATE NEW DOOR WIDTH. TEMPORARY HM CONSTRUCTION DOOR AND FRAME TO BE USED FOR DURATION OF THE ELECTRICAL ROOM CONSTRUCTION. AT COMPLETION OF CONSTRUCTION / PROJECT INSTALL
SCHEDULED SCWD DOOR AND HARDWARE.
# (SPECIFIC TO THIS
DRAWING ONLY)
6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS
CONTAINMENT.
7 EXISTING CORRIDOR WALL/WALLS IS TO ACT AS THE 1 HR RATED ICRA CONSTRUCTION BARRIER. FIRESTOP / SEAL ALL ABOVE CEILING THROUGH
WALL PENETRATIONS.
8 6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS AND SELF-ADHESIVE ZIPPER ENTRY. TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT. TO MINIMIZE IMPACT ON VAMC OPERATIONS, CORRIDOR WALL / DOOR MODIFICATION ARE TO BE EXPEDITED. CONSTRUCTION IS LIMITED TO A MAXIMUM OF 5 CONSECUTIVE WORKDAYS. OBTAIN APPROVAL / COORDINATE / FACILITATE ILSM WITH THE VA CFM OFFICE PRIOR TO
ERECTION OF TEMPORARY ICRA CONSTRUCTION FILM BARRIERS.
9 6 MIL THICK, FIRE RETARDANT, ANTI-STATIC, POLYETHYLENE PLASTIC, CONSTRUCTION FILM / TEMPORARY ICRA BARRIER WITH POLE SUPPORTS.TEMPORARY ICRA CONSTRUCTION BARRIER SHALL BE SEALED TO CEILING / FLOOR / WALLS FOR DUST AND DEBRIS CONTAINMENT (ALONG ENTIRE LENGTH OF EXISTING FENCE PARTITION) TO MINIMIZE IMPACT ON VAMC OPERATIONS, / MEDICAL ADMINISTRATION RECORDS AREA. OBTAIN APPROVAL / COORDINATE WITH THE VA CFM OFFICE PRIOR TO ERECTION OF TEMPORARY ICRA CONSTRUCTION FILM BARRIERS.
AutoCAD SHX Text F1
AutoCAD SHX Text
C-AE301
AutoCAD SHX Text F5
AutoCAD SHX Text
C-AE301
AutoCAD SHX Text
ELEV. SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV. SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
SERVICE ELEV.
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV. SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV. SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV. SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV. SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV. SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV. SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
DUCT SHAFT
AutoCAD SHX Text
EL. CAB.
AutoCAD SHX Text 1073S
AutoCAD SHX Text
STAIRS #3
AutoCAD SHX Text 1071S
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
INTERVIEW
AutoCAD SHX Text 1078S
AutoCAD SHX Text
INTERVIEW
AutoCAD SHX Text 1077S
AutoCAD SHX Text
INTERVIEW
AutoCAD SHX Text 1076S
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 1075S
AutoCAD SHX Text
CHIEF OF VOLUNTEER
AutoCAD SHX Text 1074S
AutoCAD SHX Text
LOUNGE
AutoCAD SHX Text 1072S
AutoCAD SHX Text
BOARD OF ED.
AutoCAD SHX Text 1071S
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 1070S
AutoCAD SHX Text
INTERVIEW
AutoCAD SHX Text 1080S
AutoCAD SHX Text
P16 ELEV
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text 1082S
AutoCAD SHX Text
W. TOILET
AutoCAD SHX Text 1083S
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 1085S
AutoCAD SHX Text
WAITING
AutoCAD SHX Text 1079S
AutoCAD SHX Text
VACANT
AutoCAD SHX Text
1089AS
AutoCAD SHX Text
EL. CAB.
AutoCAD SHX Text 1073A-S
AutoCAD SHX Text
SECONDARY MANIFOLD RM
AutoCAD SHX Text 1091S
AutoCAD SHX Text
PATIENT FUNDS
AutoCAD SHX Text 1114C
AutoCAD SHX Text
MEN'S TOILET
AutoCAD SHX Text 1052C
AutoCAD SHX Text
STAFF FEM.
AutoCAD SHX Text 1038C
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1095S
AutoCAD SHX Text
MED / AIR RM
AutoCAD SHX Text 1092S
AutoCAD SHX Text
BARBER SHOP
AutoCAD SHX Text 1090S
AutoCAD SHX Text
FA ATS
AutoCAD SHX Text 1093S
AutoCAD SHX Text
RETAIL STORE AREA
AutoCAD SHX Text 1064S
AutoCAD SHX Text
ELEC. CLOS.
AutoCAD SHX Text 1087S
AutoCAD SHX Text
QA OFFICE
AutoCAD SHX Text 1086S
AutoCAD SHX Text
SVC. ORGANIZATION
AutoCAD SHX Text 1089S
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 1058S
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 1059S
AutoCAD SHX Text
COMMNUNICATION
AutoCAD SHX Text 1060S
AutoCAD SHX Text
SECRETARY
AutoCAD SHX Text
1060AS
AutoCAD SHX Text
RECEPTION
AutoCAD SHX Text
1053AS
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 1057S
AutoCAD SHX Text
TRAINING RM.
AutoCAD SHX Text 1056S
AutoCAD SHX Text
WOMEN'S
AutoCAD SHX Text 1055S
AutoCAD SHX Text
MEN'S LOCKER
AutoCAD SHX Text 1054S
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1053S
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1095C
AutoCAD SHX Text
CENTRAL PHARMACY
AutoCAD SHX Text 1165 N
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
STAIR
AutoCAD SHX Text 1134 N
AutoCAD SHX Text
PHARM. REFER.
AutoCAD SHX Text
CONTROLLED SUB.
AutoCAD SHX Text 1147N
AutoCAD SHX Text
PHARMACY SERVICE
AutoCAD SHX Text 1133N
AutoCAD SHX Text
ELEC. CLOSET
AutoCAD SHX Text 1132N
AutoCAD SHX Text
CONSULTATION
AutoCAD SHX Text
1125BN
AutoCAD SHX Text
CONSULTATION
AutoCAD SHX Text
1125AN
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
1124AN
AutoCAD SHX Text
OUTPATIENT PHARM. SUPR.
AutoCAD SHX Text 1122N
AutoCAD SHX Text
AGENT CASHIER
AutoCAD SHX Text 1161N
AutoCAD SHX Text
SUPPORT SVC.
AutoCAD SHX Text 1093C
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text 1097C
AutoCAD SHX Text
POLICE OFFICE
AutoCAD SHX Text
1106AC
AutoCAD SHX Text
SUB CORRIDOR
AutoCAD SHX Text 1101C
AutoCAD SHX Text
MEDICAL DATA
AutoCAD SHX Text 1107C
AutoCAD SHX Text
SUPPORT SERV.
AutoCAD SHX Text
1110CC
AutoCAD SHX Text
MAS. SUP.
AutoCAD SHX Text
1110BC
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text
1115BC
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
1115CC
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1159N
AutoCAD SHX Text
UNASSIGNED
AutoCAD SHX Text
1119BN
AutoCAD SHX Text
STAT.
AutoCAD SHX Text 1144N
AutoCAD SHX Text
FEMALE TOILET
AutoCAD SHX Text 1152N
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1150N
AutoCAD SHX Text
I.V. STORAGE
AutoCAD SHX Text
1141CN
AutoCAD SHX Text
STAIR #6
AutoCAD SHX Text
I.V. PREP.
AutoCAD SHX Text
1141BN
AutoCAD SHX Text
I.V. ANTE RM.
AutoCAD SHX Text
1141AN
AutoCAD SHX Text
FLAM. STOR.
AutoCAD SHX Text 1140N
AutoCAD SHX Text
FEMALE LOCKER RM.
AutoCAD SHX Text
1152BN
AutoCAD SHX Text
STAFF LOUNGE
AutoCAD SHX Text 1151N
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1148N
AutoCAD SHX Text
CARTS
AutoCAD SHX Text 1142N
AutoCAD SHX Text
INPATIENT PHARMACY SUPER.
AutoCAD SHX Text 1139N
AutoCAD SHX Text D.F.
AutoCAD SHX Text
PHARM. OFFICE
AutoCAD SHX Text
1121AN
AutoCAD SHX Text
PHARM. OFFICE
AutoCAD SHX Text
1121BN
AutoCAD SHX Text
GAS METERS
AutoCAD SHX Text
1107AC
AutoCAD SHX Text
ELECTRICAL CLOS.
AutoCAD SHX Text 1150N
AutoCAD SHX Text
JANITOR CLOS.
AutoCAD SHX Text 1149N
AutoCAD SHX Text
WATER DISTILLATION
AutoCAD SHX Text 1143N
AutoCAD SHX Text
POLICE OFFICE
AutoCAD SHX Text 1106C
AutoCAD SHX Text
POLICE OFFICE
AutoCAD SHX Text
1106BC
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text 1107 E
AutoCAD SHX Text
STAIR
AutoCAD SHX Text 1-1
AutoCAD SHX Text
MEDICAL ADMINISTRATION RECORDS
AutoCAD SHX Text 1101C
AutoCAD SHX Text
MATERIAL DIST. ROOM
AutoCAD SHX Text
1101AC
AutoCAD SHX Text
MECHANICAL RM.
AutoCAD SHX Text
1099AC
AutoCAD SHX Text
VACANT
AutoCAD SHX Text
1110AC
AutoCAD SHX Text
LOCKER RM.
AutoCAD SHX Text
1117AC
AutoCAD SHX Text
LOCKER RM.
AutoCAD SHX Text
1117BC
AutoCAD SHX Text
CHIEF HEALTH INFO.
AutoCAD SHX Text
1117CC
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 1111C
AutoCAD SHX Text
MALE TOILET
AutoCAD SHX Text
1113AC
AutoCAD SHX Text
FEMALE LOCKERS
AutoCAD SHX Text
1119AC
AutoCAD SHX Text
MALE LOCKERS
AutoCAD SHX Text 1113C
AutoCAD SHX Text
ASSISTANT CHIEF
AutoCAD SHX Text
1117DC
AutoCAD SHX Text
FEMALE TOILET
AutoCAD SHX Text 1119C
AutoCAD SHX Text
EXIST. MECH'L ROOM
AutoCAD SHX Text
MALE TOILET
AutoCAD SHX Text
1153AN
AutoCAD SHX Text
MALE LOCKERS
AutoCAD SHX Text
1153BN
AutoCAD SHX Text
EXIST. MECH'L ROOM
AutoCAD SHX Text
CONF./CLASSROOM
AutoCAD SHX Text 1154N
AutoCAD SHX Text
ASSIST. CHIEF OFF
AutoCAD SHX Text 1158N
AutoCAD SHX Text
CHIEF OFF.
AutoCAD SHX Text 1157N
AutoCAD SHX Text
SECT.
AutoCAD SHX Text 1155N
AutoCAD SHX Text
EXIST. CORRIDOR
AutoCAD SHX Text
EXIST. CORRIDOR
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text
RD
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
1107C-EL
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
1052C-EL
AutoCAD SHX Text
MEDICAL INFORMATION
AutoCAD SHX Text
1115AC
AutoCAD SHX Text
VACANT
AutoCAD SHX Text 1130 N
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
DRESSING ROOM
AutoCAD SHX Text 1067S
AutoCAD SHX Text
HVAC
AutoCAD SHX Text
AutoCAD SHX Text
WAITING
AutoCAD SHX Text
1115CC
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
1115DC
AutoCAD SHX Text
SERVICE ELEV.
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
SERVICE ELEV.
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
SERVICE ELEV.
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
SERVICE ELEV.
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
ELEV. SHAFT
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text 1133N
AutoCAD SHX Text
FUEL OIL ROOM
AutoCAD SHX Text
DN
AutoCAD SHX Text
GUARD
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text E
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
ICRA SYMBOLS
PROJECT AREA LIMIT
ICRA CONSTRUCTION BARRIER WALL / DOOR
WALL (EXISTING / NEW)
MAT WALK-OFF MAT(2 MATS AT DOUBLE DOORS)
M
MAT
TEMPORARY POLYETHYLENE PLASTIC
CONSTRUCTION FILM BARRIER; SEE ICRA
KEYNOTES FOR REQUIREMENTS
TC##
SEE DWG C-GI250 FOR DOOR AND
PARTITION TYPES
MAT
MAT
1115AC-EL
ELEC
MA
T
MA
T
MAT
MAT
C1S
C1S
TC05
TC
MA
T
MA
T
EISTING PARTITION TO
ACT AS 1 HR RATED
CONSTRUCTION
BARRIER. SEAL ALL
PLENUM PENETRATIONS
AND OPENINGS WITH 1
HR FIRE STOP
ASSEMBLIES.
FLOOR LINE
5/8" TYPE "X" GWB BOTH SIDES
(1 LAYER - 1HOUR; 2 LAYERS - 2
HOUR (EACH SIDE)
SOUND ATTENUATION BATTS
(SAB) PER SCHEDULE.
CEILING LINE; REMOVE AND
MODIFY EXISTING CEILING TO
REMAIN AS REQUIRED TO
CONSTRUCT TEMP PARTITION
STRUCTURAL DECK
METAL STUDS, SIZE PER
SCHEDULE
3/4" FIRE RETARDANT TREATED
PLYWOOD AT ALL PARTITIONS
ADJACENT TO AREAS WHERE
CONSTRUCTION ACTIVITIES WILL
IMPACT
TYP
C-GI250
D1
NOTE: ALL THRU WALL
PENETRATIONS SHALL HAVE A
FIRESTOP ASSEMBLY EQUAL TO
THE HOURLY RATING OF THE
PARTITION THAT IT PENETRATES
PUBLIC SIDE CONSTRUCTION SIDE
PAINT (SEMI GLOSS - WHITE)
SEALANT EACH SIDE
CAULK ALL
AROUND (BOTH SIDES)
HM FRAME (WELDED)
3 5/8" 5/8" 5/8"
5/8" GWB ( 1 LAYER - 1 HR; 2
LAYERS - 2 HR (EA SIDE)
2"
RETURN ON
FRAME
2" 5/8
1/2"
1. REFER TO C-AE001 FOR TYPICAL PLAN LEGENDS AND SYMBOLS. REFER TO C-AE002 FOR GENERAL NOTES.
2. ICRA CONSTRUCTION BARRIERS SHALL BE PROVIDED AT ENTRY POINTS AT ALL LOCATIONS
OF ACTIVE CONSTRUCTION. ALL ICRA CONSTRUCTION BARRIERS SHALL BE A MINIMUM OF 1-HOUR FIRE
RATEDAND PREVENT CONTAMINATION OF ADJACENT OCCUPIED SPACES AT ALL TIMES.
6. BASED ON THE PROJECT SCOPE, OFF-HOUR / WEEKEND ICRA CONSTRUCTION BARRIER AND DEMO / NEW WORK CONSTRUCTION WILL BE REQUIRED. COORDINATE OFF-HOURS / WEEKEND WORK WITH THE VA CFM OFFICE IN ADVANCE. OFF-HOURS / WEEKEND WORK SHALL BE INCLUSIVE OF THE CONTRACTOR AND HIS
SUB-CONTRACTORS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA.
7. MAINTAIN NEGATIVE PRESSURE AT SPACES WHERE CONSTRUCTION IS OCCURRING BASED ON ICRA POLICY / PERMIT. THE ABILITY TO ACHIEVE THE REQUIRED NEGATIVE AIR PRESSURE WILL BE DETERMINED
BASED ON SITE CONDITIONS.
8. REFER TO SHEETS C-GI201, C-GI210 & C-GI250 FOR ADDITIONAL TEMPORARY WALL DIMENSIONS AND
EXTENTS OF TEMPORARY WALL CONSTRUCTION.
MODIFY/REMOVE EXISTING CEILING CONSTRUCTION AS REQUIRED TO ICRA CONSTRUCTION
BARRIERS. STORE ALL ACOUSTICAL CEILING PANELS, GRID, LIGHT FIXTURES AND
CEILING ACCESSORIES AS DIRECTED BY THE VA. WHERE NEW CEILINGS ARE NOT SCHEDULED, EXISTING CEILINGS ARE TO BE RESTORED TO ORIGINAL CONDITION AFTER REMOVAL OF ICRA CONSTRUCTION BARRIERS.
10. MODIFY EXISTING MEP/FP (INCLUDING BUT NOT LIMITED TO; DIFFUSERS AND REGISTERS, LIGHT FIXTURES SPRINKLER HEADS) AS REQUIRED TO MAINTAIN APPROPRIATE
COVERAGE/LIGHTING/SERVICE TO ALL OCCUPIED SPACES DURING CONSTRUCTION ACTIVITIES.
RESTORE ALL INFRASTRUCTURE TO ORIGINAL CONDITION AFTER REMOVAL OF TEMPORARY
PARTITIONS.
13. ALL HARDWARE FOR TEMPORARY DOORS ON ICRA PLANS IS AS FOLLOWS, UNLESS NOTED
OTHERWISE.
EACH DOOR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 PUSH-BUTTON COMBINATION LOCK ENTRY x KEY OVERIDE x LEVER
1 CLOSER C02011/C02021
1 WALL STOP (AT INSWING DOORS) L02101 CONVEX
1 SET SELF-ADHESIVE SEALS R0E154
ICRA NOTES:
11. CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL PUBLIC SPACES
AT AREAS OF CONSTRUCTION. CONTRACTOR SHALL PATCH, REPAIR, PAINT, RESTORE,
REPLACE CONSTRUCTION DAMAGED MATERIALS IN PUBLIC SPACES TO MATCH EXISTING
CONDITIONS AS A PART OF THE PROJECTS SCOPE / BASE CONTRACT WORK AT NO ADDITIONAL
COST TO THE PROJECT/GOVERNMENT.
3. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER AREAS OF WORK FOR THIS PACKAGE ONLY. COORDINATE WITH / REFER TO OTHER SETS / PACKAGES OF DRAWINGS FOR ADDITIONAL ICRA PLANS
AND THEIR REQUIREMENTS.
4. ICRA PLANS PROVIDED IN THIS SET / PACKAGE OF DRAWINGS COVER MAJOR AREAS OF WORK ONLY.
INCIDENTAL ICRA PLANS WILL BE REQUIRED AND SHALL BE PREPARED AND EXECUTED AS BASE CONTRACT WORK AT NO ADDITIONAL COST TO THE VA. CONTRACTOR SHALL SUBMIT ICRA PLANS TO THE VA CFM OFFICE
FOR REVIEW AND APPROVAL PRIOR TO START OF WORK.
5. SET UP ICRA CONSTRUCTION BARRIER TO ENCLOSE AREA OF WORK BEING DONE ACCORDING TO PHASING.
9. COORDINATE WITH REFLECTED CEILING PLANS / FINISH SCHEDULE WHERE CEILINGS ARE
SCHEDULED TO BE MODIFIED OR REPLACED.
12. REFER TO E4/C-GI250 FOR SCHEDULE FOR ALL ICRA TEMPORARY DOORS AND FRAMES, U.O.N.
1 KICK PLATE J102
1 AUTO DOOR BOTTOM ROY346 - HEAVY DUTY
EACH PAIR TO HAVE
HINGES QUANTITY AND TYPE AS REQUIRED
1 SET AUTO FLUSH BOLTS TYPE 25 LESS BOTTOM BOLT
1 PUSH-BUTTON COMBINATION LOCK F07 x KEYLESS ENTRY / KEYPAD x LEVER
1 OVERLAPPING STEEL ASTRAGAL
WITH SELF ADHESIVE SEAL
R0Y634 x ROY154 x THRU-BOLTS (INACTIVE LEAF)
1 TYPE 21A
2 AUTO DOOR BOTTOMS ROY346 - HEAVY DUTY
CLOSERS
KICK PLATES
WALL STOPS
SET SELF ADHESIVE SEALS
COORDINATOR
C02011 / C02021 J102 L02101
ROY154
14. CONTRACTOR TO IMMEDIATELY REPLACE CEILING TILE IF REPLACED / DISCPLACED.
15. SEAL JUNCTION BOXES, OUTLETS, PANEL BOARDS ETC. DURING CONSTRUCTION TO PREVENT /
REDUCE AMOUNT OF FINAL CLEANUP REQUIRED.
100 SQ. IN. MAX
4" X 25"
FIRE
RESISTANT
(FR-1)
3'- 6"
9" 2
A
2"
2"
AS SCHEDULED
DETAIL D1 - "FIRE-RATED WALLS"- ADDITIONAL NOTES:
1. CONDITIONS INDICATED TO SHOW DESIGN INTENT. THEY ARE NOT INTENDED TO BE PROPRIETARY. CONTRACTOR MAY EMPLOY SIMILAR UL-APPROVED TOP-OF-WALL DESIGNS THAT ARE APPROPRIATE FOR CONDITIONS. OBTAIN VA APPROVAL PRIOR TO INSTALLATION.
2. REFER TO FIRESTOPPING SPECS FOR ADDITIONAL REQUIREMENTS REGARDING HEAD-OF-WALL CONDITION FOR FIRE-RATED WALLS.
SLOTTED TOP TRACK
STUD
DESIGN BASIS: UL-HW-D-0042
METAL DECK
(PERPENDICULAR TO FLUTES)
DESIGN BASIS: UL-HW-D-0264
METAL DECK
(PARALLEL TO FLUTES)
1" 1" 2"x20 GA STRAPS @ 16" O.C.
DESIGN BASIS: UL-HW-D-0259
STEEL BEAM
20 GA Z-BARS TO
ACCOMMODATE
SFRM
SPRAY-APPLIED
FIRE-RESISTIVE
MATERIAL (SFRM) - 2HR
PATCH AND REPAIR AS
REQUIRED
SAB
1 OR 2 LAYERS OF GWB; SEE
WALL TYPE
FIRE STOP JOINT SPRAY
MINERAL WOOL FORMING
MATERIAL
5/8
5/8
FIRE STOP JOINT SPRAY
SLOTTED TOP TRACK
STUD
SAB
1 OR 2 LAYERS OF GWB; SEE
WALL TYPE
5/8
MINERAL WOOL FORMING
MATERIAL
SLOTTED TOP TRACK
STUD
DESIGN BASIS: UL-HW-D-0209
CONCRETE SLAB DECK
SAB
1 OR 2 LAYERS OF GWB; SEE
WALL TYPE
FIRE STOP JOINT SPRAY
MA
X
3 4" / M
IN
5 8"
ELEC
1064S-EL
MAT
MA
T
C1SC1S
TC04
MA
T
MA
T
ELEC
1056S-EL
MAT
MAT
MAT
MA
T
C1SC1S
TC03
1'- 2 3
/4"
PUBLIC SIDE CONSTRUCTION SIDE
TYP
C-GI250
D1
STRUCTURAL DECK
CEILING-REMOVE AND REPLACE
WHEN DISTURBED BY
CONSTRUCTION ACTIVITIES
TAPE AND SPACKLE
CONTINUOUS
INTUMESCENT SEALANT
OR FIRE RATED TAPE
NOTE: ALL THRU-WALL PENETRATIONS SHALL HAVE A FIRESTOP
ASSEMBLY EQUAL TO THE HOURLY RATING OF THE PARTITION
THAT IT PENETRATES
7'- 4"
M
IN
C
LE
AR
C-H STUDS @ 24" O.C.
STEEL RUNNER
1" GWB LINER PANEL
8"TYPE 'X' GWB
8" TYPE 'X' GWB
(1 LAYER-1 HR
2 LAYER-2HR)
FIRE RESISTANCE
TEST AER-0903B
RATED TEMPORARY WALL PER DETAIL D6 /
C-GI250 AND ICRA PLANS
EXISTING 6" CMU WALL OR GWB
PARTITION
FLOOR LINE
NOTES:
1. THIS ALTERNATE 1-HR ICRA CONSTRUCTION BARRIER SHALL ONLY BE USED WHEN THE
PLENUM AREA WILL NOT PERMIT A FULL HEIGHT 1-HR TEMPORARY WALL TYPE D6 / C-GI250
TO BE BUILT. APPROVAL TO CONSTRUCT THIS ALTERNATE SHALL BE BY THE VA CFM
OFFICE.
2. ALL OPENINGS IN THE EXISTING PARTITION NOT CONTAINED WITHIN THE ALTERNATE
1-HOUR ICRA CONSTRUCTION BARRIER SHALL BE UPGRADED TO A MINIMUM 45 MINUTE
RATING.
3. THIS ALTERNATE AS A 2-HR TEMPORARY WALL SHALL BE USED AT NORMAL POWER ROOM
102.
C2S
ALT
FASTENER BY UL ASSEMBLY
Z
X
1. IMPLEMENT THE REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT (ICRA) TEAM.
2. ESTABLISH AND MAINTAIN A DUST CONTROL PROGRAM AS PART OF THE CONTRACTOR'S INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE GUIDELINES PROVIDED BY ICRA GROUP. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT- SPECIFIC DUST PROTECTION MEASURES, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT TO RESIDENT ENGINEER AND FACILITY ICRA
TEAM FOR REVIEW FOR COMPLIANCE WITH CONTRACT REQUIREMENTS.
3. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED
AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE MEDICAL CENTER.
4. DO NOT PERFORM DUST PRODUCING TASKS WITHIN OCCUPIED AREAS OR EXTERIOR AREAS WITHIN
PROXIMITY OF OUTSIDE AIR INTAKES WITHOUT THE APPROVAL OF THE RESIDENT ENGINEER.
5. FOR CONSTRUCTION IN ANY AREAS THAT WILL REMAIN JOINTLY OCCUPIED BY THE MEDICAL CENTER
AND CONTRACTOR'S WORKERS, THE CONTRACTOR SHALL:
a. PROVIDE DUST PROOF ONE-HOUR FIRE RATED ICRA CONSTRUCTION BARRIERS TO COMPLETELY
SEPARATE CONSTRUCTION FROM THE OPERATIONAL AREAS OF THE MEDICAL CENTER IN ORDER
TO CONTAIN DIRT DEBRIS AND DUST.
b. HEPA FILTRATION IS REQUIRED WHERE THE EXHAUST DUST MAY REENTER THE BREATHING
ZONE.
c. ADHESIVE WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE
CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREAS. ADHESIVE WALK-OFF MATS SHALL
BE CHANGED ON A DAILY BASIS.
d. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED
MEDICAL CENTER AT THE END OF THE WORK DAY.
e. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE RESIDENT ENGINEER AND THE MEDICAL CENTER.
f. USING A HEPA VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILES PRIOR TO
REPLACEMENT.
g. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN
EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS.
h. AT COMPLETION, CAREFULLY REMOVE ICRA CONSTRUCTION BARRIERS AND CEILING PROTECTION
OUTSIDE OF NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER
THE REMOVAL.
6. FINAL CLEANUP:
a. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION
DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF
THE CONSTRUCTION.
b. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.
7. REFER TO SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND SECTION 01 35 26 -
SAFETY REQUIREMENTS FOR MAJOR PROJECTS FOR ADDITIONAL INFORMATION.
INFECTIOUS DISEASE CONTROL REQUIREMENTS
Y
EX
WEMERGENCY GENERATOR
V
V
MARK
STUD
SIZE
FIRE
RATING
FIRE-RESISTANCE
SOUND ATTENUATION
TEST SAB STC TEST
C1S 3 5/8" 1 HR / SMK U465, U450 3 1/2" 49 TL-93-325
C2S 3 5/8" 2 HR / SMK U419 3 1/2" 49 TL-93-325
ICRA DOOR AND FRAME SCHEDULE
IDENTIFICATION DIMENSIONS PANEL FRAME
FIRE
RATING HARDWARE GROUP NOTESDOOR NO ROOM NO ROOM NAME
WIDTH
H TYPE MATERIAL TYPE MATERIAL
DETAILS
W1 HEAD JAMB
TC01 102 NORMAL POWER 3' - 0" 7' - 0" 6 HM A HM F7/C-GI250 90 REFER TO ICRA NOTES
TC02 103 CORRIDOR 103 3' - 0" 7' - 0" 2 HM A HM 90 REFER TO ICRA NOTES
TC03 1056S-EL ELEC 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES
TC04 1064S-EL ELEC 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES
TC05 1115AC-EL ELEC 3' - 0" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES
TC06 1115AC-EL ELEC 3' - 6" 7' - 0" 6 HM A HM 45 REFER TO ICRA NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-GI250
ENLARGED ICRA PLANS DETAILS
& REQUIREMENTS
DZ JH / DZ
ENLARGED ICRA PLAN
B1
PLAN
NORTH
ENLARGED ICRA PLAN
B3
PLAN
NORTH
ENLARGED ICRA PLAN
B6
PLAN
NORTH
ENLARGED ICRA PLAN
B8
PLAN
NORTH
ICRA HEAD OF WALL CONDITION DETAILS
D1 SCALE: NTS
ICRA CONSTRUCTION BARRIER
D6 SCALE: NTS
ICRA DOOR AND FRAME SCHEDULE
E4 SCALE: NTS
ICRA DOOR FRAME TYPE
F4 SCALE: NTS
ICRA SIDE HINGED DOOR TYPES
F5 SCALE: NTS
ICRA DOOR FRAMES
F7 SCALE: NTS
W2
F7/C-GI250
1-HR / 2-HR ICRA CONSTRUCTION BARRIER - ALTERNATE
F1 SCALE: NTS
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
LEVEL
F7/C-GI250 F7/C-GI250
F7/C-GI250 F7/C-GI250
F7/C-GI250 F7/C-GI250
F7/C-GI250 F7/C-GI250
TEMPORARY PLASTIC WARNING SIGN " EMERGENCY EXIT USE ONLY"
ICRA DOOR FRAME IS TO REMAIN AS PERMANENT FRAME IN EXISTING
WALL. COORDINATE FRAME WITH SCHEDULED FINAL HDW. REMOVE
FRAME LABEL AT CONCLUSION OF THE PROJECT.
DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-1.
D5-C /
C-AE601
D5-D /
C-AE601
DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-1.
DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-1.
TC07 0216E INGREDIENT CONTROL 3' - 0" 7' - 0" 2 HM A HM 45 REFER TO ICRA NOTES- 3 F7/C-GI250 F7/C-GI250 DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-6.
TC08 - EXTERIOR 3' - 4" 7' - 0"
(VIF)
2/6 HM - HM 45 REFER TO ICRA NOTES3 - -3' - 4" ICRA DOORS ARE TO BE INSTALLED IN EXISTING FRAME. VERIFY FIELD
CONDITIONS / COORDINATE SCHEDULED HARDWARE ACCORDINGLY.
DOOR AND FRAME SURFACES AT PUBLIC SIDE SHALL BE PAINTED P-6.
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
1107C-EL
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text
1115BC
AutoCAD SHX Text
PHARM. OFFICE
AutoCAD SHX Text
MEDICAL INFORMATION
AutoCAD SHX Text
1115AC
AutoCAD SHX Text
STAIRS #3
AutoCAD SHX Text 1071S
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
EL. CAB.
AutoCAD SHX Text 1073S
AutoCAD SHX Text
RETAIL STORE AREA
AutoCAD SHX Text 1064S
AutoCAD SHX Text
ELEC. CLOS.
AutoCAD SHX Text 1087S
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3…