C-Architecture- Part 6.pdf
PDF 6 MB Posted
- Solicitation number
- QSE--36C10F24R50018
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs to construct balance of work at the VAMC Manhattan campus in New York. The solicitation number is 36C10F24R50018 and it seeks to complete hurricane recovery program construction at the Manhattan VA medical center. Responses are due by the date specified in the solicitation. The work includes finishing construction left incomplete after Hurricane Sandy damaged the facility. The contract will be awarded to the vendor able to complete the project in accordance with required specifications on schedule.
View the file
Other files
Show 40 more
Latest 50 of 281 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENSET #2
GEN-2
GENSET #3
GEN-3
PARALLELING SWITCHGEAR ROOM
PSR-1
EXIT LIGHT OUTLET WITH FIXTURE - SHADING INDICATES
LOCATION OF FACE(S). ARROWS INDICATE DIRECTIONAL
ARROWS WHERE REQUIRED. WALL MOUNTED SIGNS AT +
90" CENTERED ABOVE DOOR WHERE APPLICABLE
UPRIGHT SPRINKLER
PENDANT INDUSTRIAL LIGHT FIXTURE
(EXTERIOR RATED PER REQUIREMENT OF
ELECTRICAL)
COLUMN MOUNTED SITE LIGHT FIXTURE
WALL MOUNTED BATTERY PACK UNIT LIGHT
WALL MOUNTED EXTERIOR LIGHT FIXTURE
REFLECTED CEILING NOTES:
1. REVIEW PROJECT GENERAL NOTES ON SHEET C-AE002 PRIOR TO START OF WORK.
2. CENTER GRID IN ROOM, IN BOTH DIRECTIONS, UNLESS OTHERWISE NOTED.
3. REFER TO HVAC, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL CEILING DEVICE INFORMATION. BRING CONFLICTS TO ATTENTION OF THE
A/E FOR FINAL COORDINATION AND RESOLUTION.
4. CENTER ALL CEILING FIXTURES, ACCESSORIES AND SPRINKLER HEADS WITHIN ACOUSTICAL CEILING TILE, UNLESS OTHERWISE NOTED.
5. IN GYPSUM BOARD CEILING CONSTRUCTION, ALIGN ALL CEILING FIXTURES, ACCESSORIES AND SPRINKLER HEADS WITH ADJACENT FIXTURES, UNLESS OTHERWISE NOTED. BRING ALL CONFLICTS TO ATTENTION OF A/E FOR FINAL COORDINATION AND RESOLUTION.
6. WHERE PLANS OR RCP CALLS FOR EXPOSED CEILINGS, CONTRACTOR SHALL CLEAN AND PREPARE THE UNDERSIDE OF THE EXISTING STRUCTURE
FOR NEW FINISHES PER DRAWINGS AND SPECIFICATIONS.
7. SURVEY FIELD CONDITIONS AND VERIFY THAT WORK IS BUILDABLE AS SHOWN.REFER TO MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION DRAWINGS AND SPECIFICATIONS FOR THE DESIGN OF EACH SYSTEMS (DUCT SIZE, CIRCUITING, ETC.). DEVICES LOCATIONS SHALL BE AS SHOWN ON THE ARCHITECTURAL RCP's. IN CASES WHERE CONFLICTS ARISE BETWEEN THE LIGHTING AND OTHER CEILING DEVICES, CONTRACTOR SHALL OBTAIN WRITTEN
CLARIFICATION FROM THE A/E PRIOR TO START OF WORK IN QUESTION AND RELATED WORK.
8. LOCATE LIGHT SWITCHES 44 IN. (CL) ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED.
9. CEILING TILE/GRID/HANGERS ARE NOT DESIGNED TO SUPPORT THE WEIGHT OF ADDITIONAL EQUIPMENT OR MATERIALS. SUPPORT CABLE, CONDUIT, FIXTURES, ETC. INDEPENDENTLY FROM THE STRUCTURE.
11. COORDINATE PLACEMENT OF REQUIRED WALL OR CEILING ACCESS PANELS WITH MEP EQUIPMENT REQUIRING ACCESS; A/E TO REVIEW PRIOR TO FRAMING. IMMEDIATELY ALERT A/E TO ACCESS PANELS REQUIRED BUT NOT INDICATED ON THE RCP.
12. LOCATE NEW SPRINKLER HEADS IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13, INTERNATIONAL PLUMBING CODE (IPC) AND OTHER
APPLICABLE CODES.
13. SPRINKLER HEADS SHOWN ON THE ARCHITECTURAL RCP INDICATE HEAD LOCATIONS IN AREAS WHERE COORDINATION WITH ARCHITECTURAL DETAILS IS CRITICAL. CODE COMPLIANCE AND SPECIFIED COVERAGE MUST BE MAINTAINED. REFER TO FIRE PROTECTION DRAWINGS FOR REQUIRED SPRINKLER HEAD COVERAGE AND ADDITIONAL INFORMATION. IN LOCATIONS WHERE THE FIRE PROTECTION AND ARCHITECTURAL DRAWINGS ARE IN CONFLICT, CONTRACTOR SHALL OBTAIN WRITTEN CLARIFICATION FROM THE A/E PRIOR TO START OF WORK.
14. SPRINKLER CONTRACTOR SHALL VERIFY ALL COVERAGE OF NEW AND EXISTING (IF ANY) SPRINKLER HEADS. IF CODE CALLS FOR ADDITIONAL HEADS OR RELOCATION OF HEADS, CONTRACTOR TO INCLUDE THE COST FOR THIS WORK IN HIS BASE CONTRACT WORK PROPOSAL. CONTRACTOR SHALL FURNISH A/E WITH STAMPED SPRINKLER DRAWINGS PRIOR TO INSTALLATION OF SPRINKLER SYSTEM.
15. SUBMIT FIRE SPRINKLER LAYOUT FOR COORDINATION/APPROVAL BY A/E. PATTERN OF SPRINKLER LAYOUT SHALL COORDINATE WITH PATTERN OF
LIGHTING LAYOUT AND WITH OTHER CEILING COMPONENTS.
10. ACCESS PANELS ARE REQUIRED TO BE PROVIDED AS PART OF THE BASE CONTRACT WORK AT ALL GWB CEILINGS WHERE ACCESS TO NEW AND EXISTING FIRE ALARM ELECTRICAL JUNCTION BOXES / DEVICES AND MEP/ FIRE PROTECTION SYSTEM EQUIPMENT REQUIRING MAINTENANCE AND ACCESS.
COORDINATE FINAL MEP AND FIRE PROTECTION SHOP DRAWINGS WITH ACCESS DOOR LOCATIONS..
16. AT CORRIDORS AND ROOMS WITHOUT CEILINGS, OVERHEAD M,E,P SYSTEMS SHALL BE INSTALLED AT A MINIMUM OF 8'-0" CLEAR
GENERATOR PLATFORM - UPPER REFLECTED CEILING PLAN - NEW WORK
D1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-AE870
GENERATOR PLATFORM - REFLECTED
CEILING PLAN
DZ JH/DZ
GENERATOR PLATFORM - LOWER REFLECTED CEILING PLAN - NEW WORK
D5
PLAN
NORTH
PLAN
NORTH
LEGEND
1 PLATFORM LUMINAIRE, SEE DETAIL F6/C-AE570 FOR MOUNTING REQUIREMENTS.
2 PLATFORM LUMINAIRE SHALL BE COORDINATED WITH THE ELECTRICAL DUCTBANK / CANTILEVERED BEAM SUPPORT ASSEMBLY. LUMINAIRE IS TO BE MOUNTED AS HIGH AS
FEASIBLE UNDER THE ASSEMBLY. VERIFY / COORDINATE FIELD CONDITIONS. SEE DETAIL F6/C-AE570 FOR MOUNTING REQUIREMENTS.
KEYNOTES# (SPECIFIC TO THIS
DRAWING ONLY)
AutoCAD SHX Text 19'-2 "34"
AutoCAD SHX Text 14'-1 "12"
AutoCAD SHX Text 4'-10 "12"
AutoCAD SHX Text 8'-5"
AutoCAD SHX Text 3'-7 "14"
AutoCAD SHX Text 3'-4 "12"
AutoCAD SHX Text 11'-8 "12"
AutoCAD SHX Text 11'-6 "34"
AutoCAD SHX Text 3'-8 "12"
AutoCAD SHX Text 11'-6 "12"
AutoCAD SHX Text 7'-10 "12"
AutoCAD SHX Text 1'-2 "34"
AutoCAD SHX Text 15'-9 "14"
AutoCAD SHX Text 15'-3 "38"
AutoCAD SHX Text 19'-4 "78"
AutoCAD SHX Text 17'-0 "14"
AutoCAD SHX Text 19'-0"
AutoCAD SHX Text 15'-4 "34"
AutoCAD SHX Text 3'-6"
AutoCAD SHX Text 2'-3 "12"
AutoCAD SHX Text 2'-0"
AutoCAD SHX Text D
AutoCAD SHX Text C.1
AutoCAD SHX Text C
AutoCAD SHX Text B.4
AutoCAD SHX Text B
AutoCAD SHX Text A.8
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2.8
AutoCAD SHX Text
AutoCAD SHX Text 3.8
AutoCAD SHX Text
AutoCAD SHX Text 3.5
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYP
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C.1
AutoCAD SHX Text C
AutoCAD SHX Text B.4
AutoCAD SHX Text B
AutoCAD SHX Text A.8
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2.8
AutoCAD SHX Text
AutoCAD SHX Text 3.8
AutoCAD SHX Text
AutoCAD SHX Text 3.5
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
AutoCAD SHX Text 16'
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text NOTE: COORDINATE WITH ENGINEERING DRAWINGS FOR ALL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION WORK.
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
AutoCAD SHX Text 16'
GENERAL NOTES:
MANUFACTURER’S TRADE NAMES AND NUMBERS USED HEREIN ARE ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES AND PATTERNS. PRODUCTS OF OTHER MANUFACTURER’S EQUIVALENT TO COLORS, FINISHES, TEXTURES AND PATTERNS OF MANUFACTURERS LISTED THAT MEET REQUIREMENTS OF TECHNICAL SPECIFICATIONS WILL BE ACCEPTABLE UPON APPROVAL IN WRITING BY CONTRACTING OFFICER FOR FINISH REQUIREMENTS.
DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY COMPONENTS OF THE CONTRACT DOCUMENTS, REVIEW ALL DRAWINGS AND SPECIFICATIONS FOR THE COMPLETE SCOPE OF WORK. NOTIFY ARCHITECT IMMEDIATELY FOR CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS OR OMISSIONS ARE DISCOVERED.
ALL MATERIALS AND SYSTEMS SHALL BE INSTALLED AS PER MANUFACTURE’S SPECIFICATIONS AND ALL CONSTRUCTION SHALL BE INDUSTRY STANDARD OR
BETTER.
ONLY NEW ITEMS OF RECENT MANUFACTURING AND FREE OF DEFECTS SHALL BE PERMITTED IN THE WORK UNLESS OTHERWISE NOTED. REJECTED ITEMS SHALL BE REMOVED IMMEDIATELY FROM THE WORK AND REPLACED WITH ITEMS OF QUALITY SPECIFIED AT NO COST TO THE GOVERNMENT.
WHERE ITEMS OF SURFACES ARE NOT SPECIFICALLY MENTIONED, PAINT THE SAME AS SIMILAR ADJACENT MATERIALS OR AREA. IF COLOR OR FINISH IS NOT
DESIGNATED, ARCHITECT WILL SELECT FROM STANDARD COLORS OR FINISHES AVAILABLE.
PAINT ALL WALLS AND CEILINGS P-1, U.O.N. ALL INTERIOR HM DOORS / FRAMES AND HM WINDOW FRAMES SHALL BE PAINTED, P-4, U.O.N. ALL EXTERIOR HM DOOR
AND FRAME FACES SHALL BE PAINTED P-6 U.O.N.
PAINT OVERHEAD EXPOSED STRUCTURE, PIPING, DUCT WORK, AND OTHER CEILING ELEMENTS NOT PROHIBITED BY CODE, P-2, IN LOCATIONS AS INDICATED ON SCHEDULE. PROTECT SPRINKLERS PRIOR TO PAINTING. REFER TO SPECIFICATIONS FOR INFORMATION REGARDING PAINTING OF MECHANICAL, ELECTRICAL, AND FIRE PROTECTION EQUIPMENT. REFER TO IDENTITY SCHEDULE IN SPECIFICATION FOR LABELING.
DO NOT INCLUDE PAINTING WHEN FACTORY-FINISHING OR INSTALLER FINISHING IS SPECIFIED FOR SUCH ITEMS AS, BUT NOT LIMITED TO, METAL TOILET ENCLOSURES, PRE-FINISHED PARTITION SYSTEMS, ACOUSTICAL MATERIALS, ARCHITECTURAL WOODWORK AND CASEWORK, STAINLESS STEEL ELEVATOR ENTRANCE DOORS AND FRAMES, LIGHT FIXTURES, SWITCHGEAR AND DISTRIBUTION CABINETS. GRILLES, WALL DIFFUSERS ELECTRICAL PANELS, ACCESS PANELS, ETC. WHICH ARE EXPOSED IN FINISH SPACES SHALL BE PAINTED TO MATCH THE SURFACE ON WHICH THEY OCCUR.
WHERE EXISTING PARTITIONS ARE TO BE REMOVED AND INTERSECT PARTITIONS SCHEDULED TO REMAIN, PATCH REMAINING EXISTING PARTITION AND FINISH TO MATCH ADJOINING CONSTRUCTION, UNLESS OTHERWISE NOTES. MATCH FIRE RATING OF EXISTING CONSTRUCTION, UNLESS OTHERWISE NOTED.
PATCH ALL CONDITIONS WHERE DEMOLITION OR CONSTRUCTION HAS EFFECTED EXISTING CONDITIONS. FINISH TO MATCH EXISTING. FINISH SHALL EXTEND
THE ENTIRE LENGTH OF WALL TO A CORNER OR INTERVENING WALL.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
KEY ITEM SPEC SECTION MANUFACTURER PRODUCT COLOR NOTES
JOHNSONITE RUBBER WALL BASE 4"(H) x
"(TH) TOE 179 STEEL PROVIDE PRE-MFG INSIDE AND OUTSIDE CORNERS
C SEALED CONCRETE 09 91 00
RAINGUARD INTERNATIONAL
RES-6A RESINOUS FLOORING WITH INTEGRAL COVE BASE 09 67 23.60 DUDICK STERI-CRETE SL CUSTOM MIX LOW GLOSS FINISH
P-1 PAINT 09 91 00 BENJAMIN MOORE SEE SPECIFICATIONS OC-117 SIMPLY WHITE GENERAL PAINT, EGGSHELL (GLOSS LEVEL 3) FINISH
P-4 PAINT 09 91 00 BENJAMIN MOORE SEE SPECIFICATIONS 1594 SHAKER GRAY INTERIOR DOOR AND DOOR FRAMES, METAL STAIRS, HANDRAILS, SEMI-GLOSS (GLOSS LEVEL 5) FINISH
P-2 PAINT 09 91 00 BENJAMIN MOORE SEE SPECIFICATIONS 1594 SHAKER GRAY EXPOSED CEILINGS, EGGSHELL (GLOSS LEVEL 3) FINISH
ROOM FINISH SCHEDULE
ROOM
NUMBER
ROOM NAME
FLOOR WALLS CEILING
NOTESFINISH BASE NORTH EAST SOUTH WEST MATERIAL FINISH
1056S TRAINING ROOM * * * * * * * * * PATCH & REPAIR / APPLY NEW FINISHES TO MATCH EXISTING
1056S-EL ELECTRIC C RB-1 P-1 P-1 P-1 P-1 - PAINT DOOR & FRAME TO MATCH CORRIDOR COLORS
1064 RETAIL STORE * * * * * * * *
* PATCH & REPAIR / APPLY NEW FINISHES TO MATCH EXISTING
1064S-EL ELECTRIC C RB-1 P-1 P-1 P-1 P-1 EXP -
1115AC-EL ELECTRIC C RB-1 P-1 P-1 P-1 P-1 EXP -
1115BC VESTIBULE * RB (COLOR: TBD) P-1 P-1 P-1 P-1 * *
1609A-EL ELECTRIC EXIST EXIST EXIST EXIST EXIST EXIST EXIST EXIST
101 EMERGENCY POWER C RB-1 * P-1 P-1 P-1 P-1 EXP P-2
102 NORMAL POWER C RB-1 * P-1 P-1 P-1 P-1 EXP
103 CORRIDOR C RB-1 P-1 P-1 P-1 P-1 EXP
104 CORRIDOR EXIST EXIST - * * * -
PSR PARALLELING SWITCHGEAR ROOM C RB-1 P-1 P-1 P-1 P-1 EXP P-2
* PAINT FROM METAL FENCE DOWN TO FIN. FLOOR. PAINT DOOR / FRAME P-4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-AF601
FINISH SCHEDULE & FINISH KEY
DZ JH / DZ
RB-1 09 65 13
SATIN -LOK CLEAR
(2) COATS
EXP
P-2
P-2
PAINT DOOR AND FRAME TO MATCH CORRIDOR COLORS - SEMI-GLOSS
* PATCH & REPAIR / APPLY NEW FINISHES TO MATCH EXISTING
PAINT DOOR & FRAME TO MATCH CORRIDOR COLORS - SEMI-GLOSS
RE-PAINT ALL DOORS / FRAME P-4
P-6 PAINT 09 91 00 BENJAMIN MOORE SEE SPECIFICATIONS 1469 EAGLE ROCK EXTERIOR FACE OF DOOR AND DOOR FRAMES, EXTERIOR METAL STAIRS, EXTERIOR HANDRAILS / GUARDS, SEMI-GLOSS (GLOSS LEVEL 5) FINISH - - U.O.N.
SHERWIN WILLIAMS SW4084 SAFETY YELLOW BOLLARDS, EQUIPMENT PADS, EQUIPMENT PAD RESTRAINTS, SEMI-GLOSS (GLOSS LEVEL 5)P-7 PAINT 09 91 00 SEE SPECIFICATIONS
1115AC MEDICAL INFORMATION * * - - - * * *
* PATCH & REPAIR / APPLY NEW FINISHES TO MATCH EXISTING
1095S CORRIDOR * * - - - * * / GWB * / P-8
* PATCH & REPAIR / APPLY NEW FINISHES TO MATCH EXISTING
P-8 PAINT 09 91 00 BENJAMIN MOORE SEE SPECIFICATIONS OC-117 SIMPLY WHITE GWB CEILING PAINT, EGGSHELL (GLOSS LEVEL 3) FINISH
PROVIDE P-8 AT GWB CEILING AT RECESSED ALCOVE ENTRY TO ELECTRIC 1064S-EL
* AT COLUMNS AND WALLS WITHOUT EXPANSION JT COVER
* AT COLUMNS AND WALLS WITHOUT EXPANSION JT COVER
0165S ELECTRIC - - - - - * GWB P-8
0167S ELECTRIC - - - - - * - -
* PATCH & REPAIR / APPLY NEW FINISHES AT WALL (INTERIOR SIDE) TO MATCH
EXISTING AT NEW ENTRY DOOR INSTALLATION (PKG "A"). PAINT INTERIOR FACE OF
DOOR AND FRAME P-4.
0168S LOCKERS * * * * * * GWB P-8 * PATCH & REPAIR / APPLY NEW FINISHES AT WALL (INTERIOR SIDE) TO MATCH
EXISTING AT NEW ENTRY DOOR INSTALLATION (PKG "A"); PATCH AND REPAIR / APPLY
NEW FINISHES AT WALLS AFFECTED BY CEILING DEMOLITION. PAINT INTERIOR FACE
OF DOOR AND FRAME P-4.
* PATCH & REPAIR / APPLY NEW FINISHES AT WALL (INTERIOR SIDE) TO MATCH
EXISTING AT NEW ENTRY DOOR INSTALLATION (PKG "A"); PAINT INTERIOR FACE OF
DOOR AND FRAME P-4.
FINISH KEY
BASE FINISHES
FINISH TYPE
FLOOR FINISHES
WALL FINISHES
CEILING FINISHES
SPECIALTIES
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
BLDG 6
EMERGENCY
EYEWASH
(EWS)
3'- 0"
MA
X.
DIMENSION
TO SPRAY
HEAD
DIMENSION
TO SPRAY
HEAD
EMERGENCY
EYEWASH
GRAVITY FED
STATION
CORNER
GUARD
6" 6'-
0" 6"
6"
EXP BOLT
FASTENERS
EQ
EQ
FIRE ALARM
PULL STATION
C
L
4'- 0"
AUDIO/VISUAL
FIRE ALARM
C
L
6'- 8"
DOOR OPEN
PUSH BUTTON
C
L
3'- 8"
C
L
OCCUPANCY
SENSOR
SWITCH
FAPS
AVFA
CR
C
L
LIGHT
SWITCH
M
A X
WALL
TELEPHONE
C
L
ELECTRICAL
OUTLETS
C
L
1'- 6"
C
L
TEL/DATA
OUTLET
C
L
THERMOSTAT
THERMOSTAT
LIGHT SWITCH DOOR
C
L AL
IG
N
3'- 8"
1'- 4"
C
L
C
L
SIGNAGE
2"
CARD READER
PB
6"
M
A X
RECESSED FIRE
EXTINGUISHER
CABINET
9"
* MOUNT ELECTRICAL OUTLETS AT
GROUND FLOOR AT 44" AFF ONLY (UON)
FIN FLRFIN FLR
A1000
M
A X
WALL MOUNTED
FIRE EXTINGUISHER
FEC
FE
NTSB2
TYP. MOUNTING HEIGHTS -
EMERGENCY FIXTURE
NTSB1
TYP. MOUNTING HEIGHTS -
WALL PROTECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022 DZ JH / DZ
ARCHITECTURAL JSN SCHEDULE - LOGCAT A
JSN# Description
ARCHITECTURAL JSN SCHEDULE - LOGCAT B
JSN# Description A1000 Fire Extinguisher - 2 12 Gallon
SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS
SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS
FF&E SCHEDULE
LOGISTICAL CATEGORY (LOGCAT)
A = CONTRACTOR FURNISHED, CONTRACTOR INSTALLED
B = GOVERNMENT FURNISHED, CONTRACTOR INSTALLED
C-AI201
TYPICAL MOUNTING HEIGHT
ELEVATIONS & DETAILS
NTSB4 TYPICAL MOUNTING HEIGHTS - DEVICES
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
Z.8
AA.2
NORMAL POWER ROOM
EMERGENCY POWER ROOM
AA.2
Z.8
DD.5
DD.5
20.5
22.8 22.9
20.5
22.8 22.9
18.2 20.5
22.8
18.1
22.9
20.5
22.8
18.1 22.9
18.4
DD.8
DD.8
BB.5
BB.5
AA.5
AA.5
AA.5
AA.5
BB
AA
EE
BB
AA
22 23
20 22 23
DD
HH
11 1312
Z
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
DD
DD
EX
EX
EE
EX
102.12 IN-01.31
101.7 IN-01.02
101.8 IN-01.31
101.2 IN-04.02
102.2 IN-04.02 102.3 IN-04.02
1101C IN-04.01
104.1 IN-04.01
105 IN-03.01
103.1 IN-04.01
103.2 IN-01.02
103.3 IN-01.31
101.1 IN-04.02
102.4 IN-01.21A 102.5 IN-01.21A
101.3 IN-04.02
102.9 IN-01.21B
102.8 IN-01.21.B
102.7 IN-01.21B
102.10 IN-01.21B
104.2 IN-01.02
104.3 IN-01.31
102.1 IN-04.02
101.4 IN-01.21A
101.5 IN-01.21A 101.6 IN-01.21A
102.6 IN-01.21A
103.4 IN-01.21C
102.11 IN-01.02
BUILDING 1 - MAIN ELECTRICAL ROOM - PARTIAL FIRST FLOOR SIGNAGE LOCATION PLAN
E2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-AW110
BLDG 1 MAIN ELECTRIC RM
PARTIAL FIRST FLR SIGNAGE
LOCATION PLAN
DZ JH / DZ
1. SEE DETAIL F8 / C-AW502 FOR TYPICAL SIGN MOUNTING REQUIREMENTS.
GENERAL NOTES:
2. WHEN EXACT POSITION, ANGLE, HEIGHT OR LOCATION MOUNTING IS NOT CLEAR, CONTACT THE VA CFM OFFICE FOR RESOLUTION BEFORE INSTALLATION
OCCURS.
KEYNOTES# (SPECIFIC TO THIS
DRAWING ONLY)
AutoCAD SHX Text F1
AutoCAD SHX Text
C-AE301
AutoCAD SHX Text F5
AutoCAD SHX Text
C-AE301
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1095C
AutoCAD SHX Text
CONTROLLED SUB.
AutoCAD SHX Text 1147N
AutoCAD SHX Text
PHARMACY SERVICE
AutoCAD SHX Text 1133N
AutoCAD SHX Text
SUPPORT SVC.
AutoCAD SHX Text 1093C
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text 1097C
AutoCAD SHX Text
MEDICAL DATA
AutoCAD SHX Text 1107C
AutoCAD SHX Text
1110CC
AutoCAD SHX Text
MAS. SUP.
AutoCAD SHX Text
1110BC
AutoCAD SHX Text
CONFERENCE
AutoCAD SHX Text
1115CC
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1159N
AutoCAD SHX Text
UNASSIGNED
AutoCAD SHX Text
1119BN
AutoCAD SHX Text
FEMALE TOILET
AutoCAD SHX Text 1152N
AutoCAD SHX Text
FEMALE LOCKER RM.
AutoCAD SHX Text
1152BN
AutoCAD SHX Text
STAFF LOUNGE
AutoCAD SHX Text 1151N
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1148N
AutoCAD SHX Text
ELECTRICAL CLOS.
AutoCAD SHX Text 1150N
AutoCAD SHX Text
JANITOR CLOS.
AutoCAD SHX Text 1149N
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text 1107 E
AutoCAD SHX Text
STAIR
AutoCAD SHX Text 1-1
AutoCAD SHX Text
MEDICAL ADMINISTRATION RECORDS
AutoCAD SHX Text 1101C
AutoCAD SHX Text
MATERIAL DIST. ROOM
AutoCAD SHX Text
1101AC
AutoCAD SHX Text
MECHANICAL RM.
AutoCAD SHX Text
1099AC
AutoCAD SHX Text
VACANT
AutoCAD SHX Text
1110AC
AutoCAD SHX Text
LOCKER RM.
AutoCAD SHX Text
1117AC
AutoCAD SHX Text
LOCKER RM.
AutoCAD SHX Text
1117BC
AutoCAD SHX Text
CHIEF HEALTH INFO.
AutoCAD SHX Text
1117CC
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 1111C
AutoCAD SHX Text
MALE TOILET
AutoCAD SHX Text
1113AC
AutoCAD SHX Text
FEMALE LOCKERS
AutoCAD SHX Text
1119AC
AutoCAD SHX Text
MALE LOCKERS
AutoCAD SHX Text 1113C
AutoCAD SHX Text
ASSISTANT CHIEF
AutoCAD SHX Text
1117DC
AutoCAD SHX Text
FEMALE TOILET
AutoCAD SHX Text 1119C
AutoCAD SHX Text
EXIST. MECH'L ROOM
AutoCAD SHX Text
MALE TOILET
AutoCAD SHX Text
1153AN
AutoCAD SHX Text
MALE LOCKERS
AutoCAD SHX Text
1153BN
AutoCAD SHX Text
EXIST. MECH'L ROOM
AutoCAD SHX Text
CONF./CLASSROOM
AutoCAD SHX Text 1154N
AutoCAD SHX Text
ASSIST. CHIEF OFF
AutoCAD SHX Text 1158N
AutoCAD SHX Text
CHIEF OFF.
AutoCAD SHX Text 1157N
AutoCAD SHX Text
SECT.
AutoCAD SHX Text 1155N
AutoCAD SHX Text
EXIST. CORRIDOR
AutoCAD SHX Text
EXIST. CORRIDOR
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
1107C-EL
AutoCAD SHX Text
1115AC
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
HVAC
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
SERVICE ELEV.
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
AutoCAD SHX Text 16'
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
1019W.3 IN-01.21C
1019W.2 IN-01.21A
1019W.1 IN-03.01
1003W.1 IN-03.01
1003W.2 IN-01.21A
1003W.3 IN-01.21C
1052C.1 IN-03.01
1052C.1 IN-01.21A
ELEC
1056S-EL
1056S.2 IN-01.21A
1056S.1 IN-03.01
1056S.3 IN-01.21C
1115AC-EL
ELEC
1115AC.2 IN-01.21A
1115BC IN-04.02
1115AC.3 IN-01.21C
1115AC.1 IN-03.01
1107C.1 IN-03.01
1107C.2 IN-01.21A
1107C.3 IN-01.21C
ELEC
1064S-EL
1064S.2 IN-01.21A
1064S.1 IN-03.01
1064S.3 IN-01.21C
1503.3 IN-01.21C
1503.1 IN-03.01
1503.2 IN-01.21A
S
S
S
S
S S
1523.2 IN-01.21A
1523.3 IN-01.21C
1523.1 IN-03.01
S
S
S
S
S S
1609A.2 IN-01.21A
1609A.3 IN-01.21C
1609A.1 IN-03.01
E
F
12 13
13 15
V
Z
WEMERGENCY GENERATOR
X
EMERGENCY GENERATOR
V
C
B
A
D
Y
EMERGENCY GENERATOR
EX
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-AW111
BUILDING 1 - PARTIAL FIRST FLOOR
SIGNAGE LOCATION PLAN
DZ JH / DZ
PARTIAL FLOOR PLAN - ELEC RM # 1019W-EL
B1
PARTIAL FLOOR SIGNAGE PLAN - ELEC RM # 1003W-EL
C1
PARTIAL FLOOR PLAN - ELEC RM # 1056S-EL
F1
PARTIAL FLOOR SIGNAGE PLAN - ELEC RM # 1052C
E1
PARTIAL FLOOR PLAN - ELEC RM # 1064S-EL
B4
PARTIAL FLOOR SIGNAGE PLAN - ELEC RM # 1107C
D4
PARTIAL FLOOR SIGNAGE PLAN - ELEC RM # 1115AC-EL
F4
PARTIAL FLOOR PLAN - ELEC RM # 1503-EL
B7
PARTIAL FLOOR SIGNAGE PLAN - ELEC RM # 1523
C7
PARTIAL FLOOR SIGNAGE PLAN - ELEC RM # 1609A
E7
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
1. SEE DETAIL F8 / C-AW502 FOR TYPICAL SIGN MOUNTING REQUIREMENTS.
GENERAL NOTES:
2. WHEN EXACT POSITION, ANGLE, HEIGHT OR LOCATION MOUNTING IS NOT CLEAR, CONTACT THE VA CFM OFFICE FOR RESOLUTION BEFORE INSTALLATION
OCCURS.
KEYNOTES# (SPECIFIC TO THIS
DRAWING ONLY)
AutoCAD SHX Text F.E.C.
AutoCAD SHX Text 1020W
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
1019W-EL
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
1003W-EL
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
1052C-EL
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1095S
AutoCAD SHX Text
ELEC. CLOS.
AutoCAD SHX Text 1087S
AutoCAD SHX Text 1122N
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text
1115BC
AutoCAD SHX Text
MEDICAL INFORMATION
AutoCAD SHX Text
1115AC
AutoCAD SHX Text
MEDICAL DATA
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
1107C-EL
AutoCAD SHX Text
STAIRS #3
AutoCAD SHX Text 1071S
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
EL. CAB.
AutoCAD SHX Text 1073S
AutoCAD SHX Text 1064S
AutoCAD SHX Text Elect. Cl.
AutoCAD SHX Text Elect. Cl.
AutoCAD SHX Text 1500A
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
1503-EL
AutoCAD SHX Text Tele/Data Closet
AutoCAD SHX Text
AutoCAD SHX Text Toilet
AutoCAD SHX Text
AutoCAD SHX Text Toilet
AutoCAD SHX Text
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text Primary Care Telephone Room
AutoCAD SHX Text
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
1523-EL
AutoCAD SHX Text Tele / Data
AutoCAD SHX Text RAD. Nurse Practitioner
AutoCAD SHX Text RAD Film Processing
AutoCAD SHX Text 1609A
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
1609A-EL
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
AutoCAD SHX Text RAD Film Processing
AutoCAD SHX Text
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
8'
S
S
S
S
S
S
S
S
SSS
SSSS
S
S
S
ACH-1
F.E.C.
F
E
C
A
R
D
H
I
F
E
C
D
D
C
C
B
B
B
A
B
BUILDING 6
EXTERIOR PLAZA
BUILDING 6
S
S
S
S
S
S
S
S
SSS
SSSS
S
S
S
EMERGENCY GENERATOR TRAILER
605.8 IN-01.31
604.8 IN-01.31
604.7 IN-01.02
604.1 IN-04.01
605.1 IN-04.01
605.3 IN-01.21A
604.3 IN-01.21A
605.7 IN-01.02
604.5 IN-01.02
604.6 IN-01.31
604.6 IN-01.31
604.5 IN-01.02
605.2 IN-04.02
604.4 IN-01.21A
605.4 IN-01.21A
604.2 IN-04.02
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
BUILDING 6 - MAIN ELECTRICAL ROOM - PARTIAL FIRST FLOOR SIGNAGE LOCATION PLAN
F1
C-AW112
DZ JH / DZ
BLDG 6 - MAIN ELECT RM PARTIAL
FIRST FLOOR SIGNAGE LOCATION
PLAN
REMOVE EXISTING TENT SIGNAGE AT FIRE EXTINGUISHER CABINET. PATCH AND REPAIR HOLES. PAINT PATCH AREAS TO MATCH ADJACENT WALL SURFACE.
1. SEE DETAIL F8 / C-AW502 FOR TYPICAL SIGN MOUNTING REQUIREMENTS.
GENERAL NOTES:
2. WHEN EXACT POSITION, ANGLE, HEIGHT OR LOCATION MOUNTING IS NOT CLEAR, CONTACT THE VA CFM OFFICE FOR RESOLUTION BEFORE INSTALLATION
OCCURS.
KEYNOTES# (SPECIFIC TO THIS
DRAWING ONLY)
PLAN
NORTH
AutoCAD SHX Text RAD. Blood Gas
AutoCAD SHX Text Office
AutoCAD SHX Text J
AutoCAD SHX Text N
AutoCAD SHX Text
SHARED OFFICE
AutoCAD SHX Text 1555J
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text
AutoCAD SHX Text RAD. X-Ray Viewing
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text RAD. Corridor
AutoCAD SHX Text
AutoCAD SHX Text RAD. Dressing
AutoCAD SHX Text
AutoCAD SHX Text RAD. Dressing
AutoCAD SHX Text
AutoCAD SHX Text RAD. Toilet
AutoCAD SHX Text
AutoCAD SHX Text RAD. Radiography
AutoCAD SHX Text
AutoCAD SHX Text Tele / Data
AutoCAD SHX Text RAD. Nurse Practitioner
AutoCAD SHX Text
AutoCAD SHX Text RAD. Nurse Practitioner
AutoCAD SHX Text
AutoCAD SHX Text RAD Film Processing
AutoCAD SHX Text 1609A
AutoCAD SHX Text RAD. Film & Chem
AutoCAD SHX Text
AutoCAD SHX Text RAD. Toilet
AutoCAD SHX Text
AutoCAD SHX Text RAD. Physician
AutoCAD SHX Text
AutoCAD SHX Text RAD. Physician
AutoCAD SHX Text
AutoCAD SHX Text
DECON EQUIPMENT STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING EQUIPMENT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office
AutoCAD SHX Text
AutoCAD SHX Text AMIS Coordinator
AutoCAD SHX Text
AutoCAD SHX Text Decedent Assistant
AutoCAD SHX Text
AutoCAD SHX Text Mail
AutoCAD SHX Text 1644B
AutoCAD SHX Text Reproduction
AutoCAD SHX Text 1644C
AutoCAD SHX Text RAD. Employee Health
AutoCAD SHX Text
AutoCAD SHX Text
OWCP SHARED OFFICE
AutoCAD SHX Text 1644A
AutoCAD SHX Text
PRIVATE OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
H.A.S. SHARED OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
H.A.S. OFFICE-4 EMPLOYEES
AutoCAD SHX Text
AutoCAD SHX Text
H.A.S. OFFICE-3 EMPLOYEES
AutoCAD SHX Text 1644D
AutoCAD SHX Text Toilet
AutoCAD SHX Text 1644E
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
AutoCAD SHX Text
HAS SHARED OFFICE
AutoCAD SHX Text 1644F
AutoCAD SHX Text
H.A.S. PRIVATE OFFICE
AutoCAD SHX Text 1644G
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text C1-9
AutoCAD SHX Text Office
AutoCAD SHX Text 1644I
AutoCAD SHX Text Corridor
AutoCAD SHX Text C1-10
AutoCAD SHX Text
AREAWAY (E)
AutoCAD SHX Text
RD (E)
AutoCAD SHX Text
RD (E)
AutoCAD SHX Text V (E)
AutoCAD SHX Text V (E)
AutoCAD SHX Text V (E)
AutoCAD SHX Text
RD (E)
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
1609A-EL
AutoCAD SHX Text
ELECTRIC RM
AutoCAD SHX Text
AutoCAD SHX Text
ROOF
AutoCAD SHX Text Normal Power Room
AutoCAD SHX Text
AutoCAD SHX Text Emergency Power Room
AutoCAD SHX Text
AutoCAD SHX Text RAD Film Processing
AutoCAD SHX Text
AutoCAD SHX Text Stair
AutoCAD SHX Text 6-2
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text E
AutoCAD SHX Text
PLANTER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
GENSET #2
GEN-2
GENSET #3
GEN-3
PARALLELING SWITCHGEAR ROOM
PSR-1
BLDG. #5 MAIN ELECTRIC ROOM
MER-5
BUILDINGS 4 / 5
PSR.4 IN-01.21A
PSR.3 IN-01.21A
PSR.5 IN-01.02
PSR.6 IN-01.31
PSR.7 IN-01.02
PSR.8 IN-01.31
PSR.1 IN-04.01
GEN-3.4 IN-04.02
GEN-3.2 IN-04.01
GEN-3.1 IN-04.01
GEN-3.3 IN-01.21A
GEN-2.3 IN-01.21A
GEN-2.1 IN-04.01
GEN-2.2 IN-04.01
GEN-2.4 IN-01.21A
GEN-2.6 IN-01.31
GEN-2.5 IN-01.02
GEN-3.5 IN-01.02
GEN-3.6 IN-01.31
PSR.2 IN-04.01
MER-5.1 IN-01.21B
MER-5.2 IN-01.21B
GEN-ST IN-01.10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
GENERATOR PLATFORM - FIRST FLOOR SIGNAGE PLAN
F1
A-121
C-AW171
GENERATOR PLATFORM - FIRST
FLOOR SIGNAGE PLAN
DZ JH / DZ
1. SEE DETAIL F8 / C-AW502 FOR TYPICAL SIGN MOUNTING REQUIREMENTS.
GENERAL NOTES:
1 SEE DETAIL F1 / C-AE504 FOR INSTALLATION / MOUNTING REQUIREMENTS.
2. WHEN EXACT POSITION, ANGLE, HEIGHT OR LOCATION MOUNTING IS NOT CLEAR, CONTACT THE VA CFM OFFICE FOR RESOLUTION BEFORE INSTALLATION
OCCURS.
KEYNOTES# (SPECIFIC TO THIS
DRAWING ONLY)
PLAN
NORTH
AutoCAD SHX Text
GENERATORS
AutoCAD SHX Text
MASTER
AutoCAD SHX Text
CONTROLS
AutoCAD SHX Text
(GMC)
AutoCAD SHX Text
GEN 1
AutoCAD SHX Text
GEN 2
AutoCAD SHX Text
GEN 3
AutoCAD SHX Text
FB
AutoCAD SHX Text
FB
AutoCAD SHX Text
FB
AutoCAD SHX Text
FB
AutoCAD SHX Text
SPACE FOR PANELS
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
FOR BATTERY RACK
AutoCAD SHX Text
DN
AutoCAD SHX Text D
AutoCAD SHX Text C.1
AutoCAD SHX Text C
AutoCAD SHX Text B.4
AutoCAD SHX Text B
AutoCAD SHX Text A.8
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2.8
AutoCAD SHX Text
AutoCAD SHX Text 3.8
AutoCAD SHX Text
AutoCAD SHX Text 3.5
AutoCAD SHX Text
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
PS3
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
MH (E)
AutoCAD SHX Text
GATE C
AutoCAD SHX Text
GATE D
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
AutoCAD SHX Text
BLDG 6
AutoCAD SHX Text
SCALE: 1/8" = 1'-0"
AutoCAD SHX Text 8'
AutoCAD SHX Text 4'
AutoCAD SHX Text
TBD COLOR PALETTE SHALL MATCH
EXISTING SIGNAGE AT GROUND
FLOOR AND FIRST FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022 XX XXXX XX
SIGNAGE DETAILS
C-AW501
REFER TO LAYOUT DRAWINGS
FOR LETTERING SIZES AND
DIMENSIONS
REFER TO LAYOUT DRAWINGS
FOR LETTERING SIZES AND
DIMENSIONS
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
END VIEW
9"
9" 3/4"
3" 6"
1/2
1 1 /4" 3/8
1/4
3/4
3/4
3/8
3/4"
BRAILLE
Outpatient
Pharmacy
REFER TO IN-03.01
REFER TO VA
STANDARDS FOR
SIZING RELATING TO
MESSAGE LENGTH.
PANEL COLOR B(1).
DIGITALLY PRINTED
TEXT BLACK
2"
RED BACKGROUND
14"
SAFETY YELLOW BACKGROUND
BLACK TEXT
RED PROHIBIT
WHITE BACKGROUND
BLACK BORDER
COMPLY WITH ANSI Z535-2011
SIGN:
40 MIL (.040" ALUMINUM WITH
CLEAR LAMINATE OVER GRAPHICS
PAN HEAD SHEET METAL
SCREWS WITh PAINTED FINISH
TO MATCH BACKGROUND
SAFETY ORANGE
SAFETY YELLOW
BLACK TEXT
WHITE BACKGROUND
BLACK BORDER
14"
COMPLY WITH ANSI Z535-2011
FUTURE
EQUIPMENT/
CONCRETE
LOADS SHALL
NOT EXCEED
150#/SF
SIGN:
40 MIL (.040") ALUMINUM WITH
CLEAR LAMINATE OVER GRAPHICS
PAN HEAD SHEET
METAL SCREWS WITH
PAINTED FINISH
TO MATCH
BACKGROUND
5'
- 3
5'
- 3
5'
- 3
9"
9"
3 4" 4"
5 8" 5 8"
3 4"
5'
- 3
10"
7"
SAFETY YELLOW
BACKGROUND
BLACK TEXT
SIGN:
40 MIL (.040")
ALUMINUM WITH
CLEAR LAMINATE
OVER GRAPHICS
PAN HEAD SHEET METAL
SCREWS WITh PAINTED FINISH
TO MATCH BACKGROUND
3" = 1'-0"
A1
IN-01.02 - FRONT AND MOUNTING ELEVATIONS, TYPICAL
3" = 1'-0"
B1
IN-01.31 - FRONT AND MOUNTING ELEVATIONS, TYPICAL
3" = 1'-0"
D1
IN-09.01-03 - FRONT AND MOUNTING ELEVATIONS, TYPICAL
F1
IN-01.10 - FRONT AND MOUNTING ELEVATIONS, TYPICAL
3" = 1'-0"
B5
IN-04.02 - FRONT ELEVATION, TYPICAL
0 3" 6" 9"
0 3" 6" 9"
0 3" 6" 9"
0 1'-0" 2'-0" 4'-0"
0 3" 6" 9" 3" = 1'-0"
A9
IN-04.01 FRONT ELEVATION, TYPICAL
1/2" = 1'-0"
F8
SIGNAGE DETAIL - MOUNTING REQUIREMENTS
0 3" 6" 9"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022 DZ JH
3" = 1'-0"
F5
IN-01.11 - FRONT AND MOUNTING ELEVATIONS, TYPICAL
0 3" 6" 9"
NTS
D4
IN-01.21A - FRONT AND MOUNTING ELEVATIONS, TYPICAL
NTS
D8
IN-01.21B - FRONT AND MOUNTING ELEVATIONS, TYPICAL
MESSAGE LAYOUT C
3" = 1'-0"
A5
IN-03.01 - FRONT ELEVATION, TYPICAL
0 3" 6" 9"
0 3" 6" 9" 3" = 1'-0"
0 3" 6" 9" 3" = 1'-0"
A8
IN-08.02 FRONT ELEVATION, TYPICAL
T
M
I N
I M
U M
NTS
C8
IN-01.21C - FRONT AND MOUNTING ELEVATIONS, TYPICAL
SIGNAGE TYPES & DETAILS
C-AW502
NOTE: SIGN INSTALLATION
LOCATION IS NOT IN COMPLIANCE
WITH VA CODE AND LIFE SAFETY
SIGNS MANUAL. SIGN INSTALLATION
LOCATION IS PER VA CFM OFFICE
DIRECTION IN RFI #073 (DATED
3/8/21).
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
WAYFINDING - MESSAGE SCHEDULE - BUILDING 1 / FIRST FLOOR & ELECTRICAL SUBSTATION #1
Location Sign Type
Room
Number Room Name Message Side A Message Side B Comments Mounting
WAYFINDING - MESSAGE SCHEDULE - BUILDING 1 / FIRST FLOOR & ELECTRICAL SUBSTATION #1
Location Sign Type
Room
Number Room Name Message Side A Message Side B Comments Mounting
101.1 IN-04.02 101
[TBD]
EMERGENCY
POWER
ROOM 101
1XXXX [TBD]
(BRAILLE)
Emergency Power
Room
Wall - Flat
101.2 IN-04.02 101
[TBD]
EMERGENCY
POWER
ROOM 101
Wall - Flat
102.7 IN-01.21B Wall - Flat
WAYFINDING MESSAGE SCHEDULE SUBMITTAL PRELIMINARY - NOT FOR CONSTRUCTION
MESSAGE TEXT FOR ALL SIGN TYPES SHALL BE COORDINATED WITH THE CONTRACTING OFFICER
PRIOR TO FABRICATION. REFER TO DRAWINGS AND
LOCATION PLANS FOR COMPLETE INFORMATION.
TEXT WITHIN PARENTHESIS IN MESSAGE COLUMN IS NOT PART OF SIGN MESSAGE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-AW601
SIGNAGE MESSAGE SCHEDULE
DZ DZ
1XXXX [TBD]
(BRAILLE)
Normal Power
Room
101.3 IN-04.02 101
[TBD]
EMERGENCY
POWER
ROOM 101
Wall - Flat1XXXX [TBD]
(BRAILLE)
Normal Power
Room
102.1 Wall - FlatIN-04.02 102
[TBD]
NORMAL POWER
ROOM 102
1XXXX [TBD]
(BRAILLE)
Normal Power
Room
102.2 Wall - FlatIN-04.02 NORMAL POWER
ROOM 102
1XXXX [TBD]
(BRAILLE)
Emergency Power
Room
102.3 Wall - FlatIN-04.02 NORMAL POWER
ROOM 102
1XXXX [TBD]
(BRAILLE)
Emergency Power
Room
NORMAL POWER
ROOM 102
102.8 Verify message prior to fabrication
"WARNING" red ext
Wall - FlatNORMAL POWER
ROOM 102
102.9 Wall - FlatNORMAL POWER
ROOM 102
102.10 Wall - FlatNORMAL POWER
ROOM 102
103.1 IN-04.01 103
[TBD]
Wall - FlatCORRIDOR 103
Wall - Flat
1XXXX [TBD]
(BRAILLE)
SUBSTATION #1
Emergency Power
Room
104.1 IN-04.01 CORRIDOR 104 1XXXX [TBD]
(BRAILLE)
SUBSTATION #1
Normal Power
Room
105 IN-03.01 105
[TBD]
HVAC 105 1XXXX [TBD]
(BRAILLE)
Wall - Flat
104.2 IN-01.02 104
[TBD]
CORRIDOR 104 (Extinguisher Picto)
Fire Equipment
Wall - Flat
104.3 IN-01.31 104
[TBD]
CORRIDOR 104 (Extinguisher Picto)
Fire Equipment
(Extinguisher Picto)
Fire Equipment
T-Mount
103.2 IN-01.02 CORRIDOR 103 (Extinguisher Picto)
Fire Equipment
Wall - Flat
103.3 IN-01.31 CORRIDOR 103 (Extinguisher Picto)
Fire Equipment
(Extinguisher Picto)
Fire Equipment
T-Mount
101.7 IN-01.02 101
[TBD]
(Extinguisher Picto)
Fire Equipment
Wall - Flat
101.8 IN-01.31 101
[TBD]
(Extinguisher Picto)
Fire Equipment
(Extinguisher Picto)
Fire Equipment
T-Mount
EMERGENCY POWER
ROOM 101
EMERGENCY POWER
ROOM 101
102.11 IN-01.02 (Extinguisher Picto)
Fire Equipment
Wall - Flat
102.12 IN-01.31 (Extinguisher Picto)
Fire Equipment
(Extinguisher Picto)
Fire Equipment
T-Mount
NORMAL POWER
ROOM 102
NORMAL POWER
ROOM 102
1003W.1 IN-03.01 1003W-EL ELECTRIC 1003W-EL
(BRAILLE)
Wall - Flat
Wall - Flat
Wall - Flat
Wall - Flat
1019W.1 IN-03.01 1019W-EL ELECTRIC 1019W-EL
(BRAILLE)
1052C.1 IN-03.01 1052C-EL ELECTRIC 1052C-EL
(BRAILLE)
1056S.1 IN-03.01 1056S-EL ELECTRIC 1056S-EL
(BRAILLE)
1064S.1 IN-03.01 1064S-EL ELECTRIC 1064S-EL
(BRAILLE)
Wall - Flat
1107C.1 IN-03.01 1107C-EL ELECTRICAL 1107C-EL
(BRAILLE)
Wall - Flat
1115AC.1 IN-03.01 1115AC-EL ELECTRIC 1115AC-EL
(BRAILLE)
Wall - Flat
1523.1 IN-03.01 1523-EL ELECTRIC 1523-EL
(BRAILLE)
Wall - Flat
1101C IN-04.01 1101C MEDICAL
ADMINISTRATION
RECORDS
1101C
(BRAILLE)
Medical Administration
Records
Wall - Flat
1609A.1 IN-03.01 1609A-EL ELECTRIC 1609A-EL
(BRAILLE)
Wall - Flat
1503.1 IN-03.01 1503-EL ELECTRIC 1503-EL
(BRAILLE)
Wall - Flat
Verify message prior to fabricationIN-01.21A (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Wall - Flat101.4
Verify message prior to fabricationIN-01.21A (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Door - Flat101.5
Verify message prior to fabricationIN-01.21A (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Door - Flat101.6
[TBD]
EMERGENCY
POWER
ROOM 101
[TBD]
EMERGENCY
POWER
ROOM 101
[TBD]
EMERGENCY
POWER
ROOM 101
Verify message prior to fabricationIN-01.21A (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Door - Flat
Verify message prior to fabricationIN-01.21A (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Door - Flat
102.4 NORMAL POWER
ROOM 102
102.5 NORMAL POWER
ROOM 102
Verify message prior to fabricationIN-01.21A (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Door - Flat102.6 NORMAL POWER
ROOM 102
Verify message prior to fabricationIN-01.21A (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Door - Flat
Verify message prior to fabricationIN-01.21A (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Door - Flat
1003W.2 1003W-EL ELECTRIC
1019W.2 1019W-EL ELECTRIC
Verify message prior to fabricationIN-01.21A Door - FlatELECTRIC
Verify message prior to fabricationIN-01.21A Door - FlatELECTRIC
Verify message prior to fabricationIN-01.21A Door - FlatELECTRIC
(Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
(Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
(Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
1052C.2 1052C-EL
1056S.2 1056S-EL
1064S.2 1064S-EL
Verify message prior to fabricationIN-01.21A Door - FlatELECTRIC (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Verify message prior to fabricationIN-01.21A Door - FlatELECTRIC (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Verify message prior to fabricationIN-01.21A Door - FlatELECTRIC (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Verify message prior to fabricationIN-01.21A Door - FlatELECTRIC (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
1115AC.2 1115AC-EL
1503.2 1503-EL
1609A.2 1609A-EL
1523.2 1523-EL
Verify message prior to fabricationIN-01.21A Door - FlatELECTRIC1107C.2 1107C-EL (Exclamation Pt. Pitco) DANGER
(Voltage Picto) High Voltage
KEEP OUT
(Hand stop Picto) Authorized personnel only.
Message Layout A; Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard.
(Exclamation Pt. WARNING
(Picto) Future Equipment /
Concrete Loads
(Exclamation Pt. Shall Not Exceed
(Picto) 150# / SF
IN-01.21B (Exclamation Pt. WARNING
(Picto) Future Equipment /
Concrete Loads
(Exclamation Pt. Shall Not Exceed
(Picto) 150# / SF
IN-01.21B (Exclamation Pt. WARNING
(Picto) Future Equipment /
Concrete Loads
(Exclamation Pt. Shall Not Exceed
(Picto) 150# / SF
IN-01.21B (Exclamation Pt. WARNING
(Picto) Future Equipment /
Concrete Loads
(Exclamation Pt. Shall Not Exceed
(Picto) 150# / SF
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
Message Layout A; Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard.
Message Layout A; Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard.
Message Layout A; Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard.
Message Layout A; Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard.
Message Layout A; Verify message prior to fabrication
Sign style to match existing 1st floor
VAMC standard.
Verify message prior to fabrication
"WARNING" red ext
Verify message prior to fabrication
"WARNING" red ext
Verify message prior to fabrication
"WARNING" red ext
[TBD]
[TBD]
[TBD]
[TBD]
[TBD]
[TBD]
[TBD]
[TBD]
[TBD]
[TBD]
[TBD]
[TBD]
[TBD]
[TBD]
IN-01.21C Door - FlatELECTRIC1064S.3 1064S-EL CAUTION
OPEN DOOR SLOWLY
IN-01.21C Door - FlatELECTRIC CAUTION
OPEN DOOR SLOWLY
1115AC.3 1115AC-EL
IN-01.21C Door - FlatELECTRIC CAUTION
OPEN DOOR SLOWLY
1107C.3 1107C-EL
IN-01.21C Door - FlatELECTRIC CAUTION
OPEN DOOR SLOWLY
1019W.3 1019W-EL
IN-01.21C Door - FlatELECTRIC CAUTION
OPEN DOOR SLOWLY
1003W.3 1003W-EL
IN-01.21C Door - FlatELECTRIC CAUTION
OPEN DOOR SLOWLY
1503.3 1503-EL
IN-01.21C Door - FlatELECTRIC CAUTION
OPEN DOOR SLOWLY
1609A.3 1609A-EL
IN-01.21C Door - FlatELECTRIC CAUTION
OPEN DOOR SLOWLY
1523.3 1523-EL
IN-01.21C Door - FlatELECTRIC CAUTION
OPEN DOOR SLOWLY
103.4 103
[TBD]
1115BC IN-04.02 1115BC VESTIBULE 1115BC
(BRAILLE)
Electric Room
Vestibule
Wall - FlatSign style to match existing 1st floor
VAMC standard
Verify message prior to fabrication
GENERAL NOTES
IN-01.21C ELECTRIC1056S.3 1056S-EL CAUTION
OPEN DOOR SLOWLY
Door - Flat
AutoCAD SHX Text F I R S T A V E N U E
AutoCAD SHX Text A S S E R L E V Y P L A C E
AutoCAD SHX Text E A S T 2 3 r d. S T R E E T
AutoCAD SHX Text
BLDG 3
AutoCAD SHX Text
BLDG 2
AutoCAD SHX Text
BLDG 4 / 5
AutoCAD SHX Text
E A S T 25 TH STREET
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text N
WAYFINDING - MESSAGE SCHEDULE - GENERATOR PLATFORM
Location Sign Type
Room
Number Room Name Message Side A Message Side B Comments Mounting
WAYFINDING MESSAGE SCHEDULE SUBMITTAL
PRELIMINARY - NOT FOR CONSTRUCTION
MESSAGE TEXT FOR ALL SIGN TYPES SHALL BE
COORDINATED WITH THE CONTRACTING OFFICER
PRIOR TO FABRICATION. REFER TO DRAWINGS AND
LOCATION PLANS FOR COMPLETE INFORMATION.
TEXT WITHIN PARENTHESIS IN MESSAGE COLUMN
IS NOT PART OF SIGN MESSAGE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh
1 & GEN PLTFRM
Key Plan
Balance of Work
9/12/2022
C-AW602
SIGNAGE MESSAGE SCHEDULE
(CONTINUED)
DZ DZ
GEN
PLATFORM
PSR.1
IN-04.01 PSR PARALLELING
SWITCHGEAR ROOM
1XXXX [TBD]
(BRAILLE)
Paralleling Switchgear
Room
Verify message prior to fabrication
Exterior mounted; UV Resistant Sign
Door (inactive leaf) - Flat
Verify message prior to fabrication
Exterior mounted; UV Resistant Sign
GEN
PLATFORM
PSR.2
IN-04.01 PSR PARALLELING
SWITCHGEAR ROOM
1XXXX [TBD]
(BRAILLE)
Paralleling Switchgear
Room
Wall - Flat
T - Mount
IN-01.02 PSR (Extinguisher Picto)
Fire Equipment
IN-01.31 PSR (Extinguisher Picto)
Fire Equipment
(Extinguisher Picto)
Fire Equipment
Wall - Flat
T - Mount
IN-01.02 PSR (Extinguisher Picto)
Fire Equipment
IN-01.31 PSR (Extinguisher Picto)
Fire Equipment
(Extinguisher Picto)
Fire Equipment
GEN PLAT
PSR.5
PARALLELING
SWITCHGEAR ROOM
GEN PLAT
PS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .