B-Electrical-Part 1.pdf

PDF 4 MB Posted

Attached to
36C10F24R50018 Balance of Work VAMC Manhattan, NY -- Y1DA
Solicitation number
QSE--36C10F24R50018
Issued by

About this file

This document provides details for a federal contract solicitation to construct balance of work at the Veterans Affairs Medical Center in Manhattan, New York. The solicitation number is 36C10F24R50018 and is being issued by the Department of Veterans Affairs Office of Construction and Facilities Management to construct the remaining work from hurricane recovery efforts at the Manhattan VAMC campus. Responses are due by the date specified in the solicitation. The work includes completing construction left unfinished following damage from Hurricane Sandy. All other terms governing the procurement are contained in the solicitation document.

View the file

Other files

File Type Posted
SolicitationCancellation.pdf PDF
SolicitationAmendment0006.pdf PDF
Manhattan VA Asbestos Survey Report 05-2021final (5-24-21).pdf PDF
Manhattan VA Revised Asbestos Survey Report 05-2021Final (Appendix H - First Half).pdf PDF
QA - Balance of Work - 05.08.2024.pdf PDF
Manhattan VA Revised Asbestos Survey Report 05-2021Final (Appendix H - 2nd half).pdf PDF
QA - Balance of Work - 05.02.2024.pdf PDF
SolicitationAmendment0005.pdf PDF
SolicitationAmendment0004.pdf PDF
QA - Balance of Work - 04.16.2024.pdf PDF
C-Mechanical- Part 2.pdf PDF
C-Electrical- Part 5.pdf PDF
B-Mechanical-Part 1.pdf PDF
P03_CDR- Sole Source JA - Access Controls - 11-16-22.pdf PDF
B-Civil.pdf PDF
C-Plumbing- Part 2.pdf PDF
P03_CDR - Sole Source JA - Public Announcement System - 11-16-22.pdf PDF
C-Electrical- Part 4.pdf PDF
A-Architecture-Part 3.pdf PDF
A-ICRA.pdf PDF
C-Architecture- Part 5.pdf PDF
A-Fire Protection-Part 2.pdf PDF
C-Electrical- Part 10.pdf PDF
P03_CDR - Sole Source JA - Triplex Pump 11-16-22.pdf PDF
C-Life Safety.pdf PDF
A-Electrical-Part 1.pdf PDF
VHA Directive 1028_D_2020-02-24.pdf PDF
B-Electrical-Part 2.pdf PDF
B-Architecture-Part 4.pdf PDF
C-Electrical- Part 12.pdf PDF
A-Electrical-Part 3.pdf PDF
C-Electrical- Part 7.pdf PDF
C-Electrical- Part 8.pdf PDF
A-Civil.pdf PDF
A-Structural.pdf PDF
A-General.pdf PDF
QSE 36C10F24R50018.pdf PDF
Amendment 0001 - Missing and Replacement Documents.pdf PDF
B-Electrical-Part 1.pdf PDF
C-Fire Protection- Part 2.pdf PDF
C-Electrical- Part 11.pdf PDF
C-Telecom.pdf PDF
A-Plumbing-Part 2.pdf PDF
C-Architecture- Part 6.pdf PDF
B-Electrical-Part 3.pdf PDF
VAMC CD Refresh IFC Vol 1 Specifications REV 2_ 9-19-23 (Part 3).pdf PDF
C-Mechanical- Part 3.pdf PDF
Shutdown Request Form.pdf PDF
B-Architecture-Part 2.pdf PDF
P03_CD Refresh - Sole Source JA - Fire Alarm System - 11-16-22.pdf PDF
Show 40 more

Latest 50 of 281 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL SYMBOLS - LIGHTING PLAN ELECTRICAL SYMBOLS - POWER PLAN ABBREVIATIONS

ELECTRICAL SYMBOLS - GENERAL

S

S

C1

F6

C-ED462

ELECTRICAL SYMBOLS - LIGHTNING PROTECTION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh 1, 2 and 6

Key Plan

Balance of Work

9/12/2022 SN KS

B-E001

ELECTRICAL SYMBOLS AND

ABBREVIATIONS

GENERAL NOTESDEMOLITION GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh 1, 2 and 6

Key Plan

Balance of Work

9/12/2022 SN KS

B-E002

ELECTRICAL DEMOLITION AND

GENERAL NOTES

LIGHTING FIXTURE SCHEDULE

WIRE AND CONDUIT SCHEDULE **

LIGHTING FIXTURE SCHEDULE

PROPOSED NEW (NOT REPLACEMENT) PANELBOARD DESIGNATIONS

PROPOSED NEW (NOT REPLACEMENT) EQUIPMENT DESIGNATIONS

PROPOSED NEW/REPLACEMENT EQUIPMENT IDENTIFICATION SIGNS

PANEL 1PSL

CRITICAL

208/120V, 3Ø - 4W 225A MCB, 22k AIC

FED FROM: PANEL 1DSL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh

Key Plan

Balance of Work

9/12/2022 SN KS

B-E003

ELECTRICAL SCHEDULES

EE

Z

S

J

O

NN

L

U

R R

Q Q

J

T

2 3 4 5 7 8 9

P

S

Q

R

T

U

Y

38A

H

B

C

E

F

N

O

R

I

T

V

G

S

D

DN

RAMP

161412

V

W W

X

Z

AA

BB

2 3 4 5 7 9

U U

323028

DD

EE

CC

DD

Z

AA

BB

Y

EE

BB

AA

DD

EE

DD

BB

18 20 22 23 24 26

A S S E R L E V Y P LACE

UILDING No. 3

F.6

E.7

D.3

B.7

B.2

A.8

D.1

B.8

39.3

40.5

40.8 40.9

40.3

39.9

C.4

C.1

B.8

B.2

A.8

B

V

W

X

N U E

E A S

T 2 5 th S

T R E

E TSWITCHGEAR / CHILLER

BUILDINGS 4 / 5

BUILDING 1

BUILDING 6

(ABOVE)

Q

RAMP DN

BUILDING No. 2

EX EX EX EX EX EX

EX

EX

EX

EX

EX

EX

EX

EX

S S

S

S

S

S

S

S S

S

S

S S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

SS

S

S

S

S

S

S

S

S

S

S S

S

S S

SSSSSSSS

S S

S S

S

S S

S S

S S

S S

S

S

S S

S

S

SS

S

S S

S S

S

SSSSS

S S S S S

S

S

SS S

S

S

SSSS

S

S S

S

S

S

S S

S S

S S

SS

S S

S

S

S

S

S

S S S S

S

S SS

SS

S

S

S

S

S

S

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S S S

S

S

AA

EX

HH

S S

S

S S

S S

S S

S S

S S

S S

S

S S

X

SCALE: 3/64" = 1'-0"

48'32'16'0

GROUND FLOOR PLAN - REFERENCE - DEMOLITIONF7

PLAN

NORTH

B-EDL101

F8

B-EDP101

F8

B-ED120

D1

GENERAL NOTESB-EDL101

F1

B-EDP101

F1

B-EDL103

F4

B-EDP103

F4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh 1, 2 and 6

Key Plan

Balance of Work

9/12/2022

B-ED010

GROUND FLOOR PLAN -

REFERENCE - DEMOLITION

SN KS

N U E

MAIN ENTRANCE

F.

E.

C.

F.E.C.

F.

E.

C.

F.E.C.

F.E.C.

F.

E.

C.

F.E.C.

38.6

B

25 29 33 35

20 2119

A

SWITCHGEAR / CHILLER

BUILDINGS 4 / 5

BB

AA

EE

BB

AA

18 20 22 23

18 20 22 23 24

40.5

H

I

F.6

E.7

C.1

D.1

39.3

40.9

40.8

40.3

39.9

D.3

C.4

C.1

B.8

B.7

B.2

A.8

B

DD

HH

E

F

H

G

10 11

W

X

Q

R

32302826

Y

V

W

X

Z

AA

U

Z

BUILDING 1

BUILDING 6

U

V

W

X

4 5 7 9

EXTERIOR PLAZA

EMERGENCY GENERATOR

N U E

E A S

T

TH

S

TR

EE

T

BUILDING 6

2 31

EX EX EX EX EX EX

EX

EX

EX

EX

EX

EX

EX EX EX

EX

EX.

S S S S S S

S

SSS

S

S S

S S

S

S S

S

S

S S

S

S S

S

S S

S S

S S

S

S S

S

S

S S S

S S

S S S S

S S

S

S S

S S

S

S

S S S S

S S

S

S

S S

S S

S

SS

S S

S

S

S

S

S

S

SS

S

S

SSSSSSSSSSSS

S

S

SS

S S

S S

S

S S

S

SSS

S

SS

S

S

S

S S

S

SS

CONNECTOR BRIDGE

DD

DD

EX

EX

EE

EX

B

C

D

EMERGENCY GENERATOR TRAILER

TEMP EMERGENCY

GENERATOR AREA

A S S E R L E V Y P LACE

UILDING No. 3

BUILDING No. 2

SCALE: 3/64" = 1'-0"

48'32'16'0

FIRST FLOOR PLAN - REFERENCE - DEMOLITIONF7

NORTH

B-ED121

D1

GENERAL NOTES

B-ED122

D1

B-EP113

F4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh 1, 2 and 6

Key Plan

Balance of Work

9/12/2022

B-ED011

FIRST FLOOR PLAN - REFERENCE -

DEMOLITION

J

O

N

L

R

Q

E

F

G

V

BUILDING 1

S S

S

S

SSSSSSS

S S

S S

S

S

S

S S

S

S

SS

S

S S

S S

S

SSSSS

S S S S S

S

S

SS S

S

S

SSSS

S

S

S S

S S

S S

S

S

S

S

S

SS

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S S S

S

S

S S

S

S S

S S

S S

S S

S S

S S

S

S

BLDG. 1 & 6 - PARTIAL GROUND FLOOR PLAN - LIGHTING - DEMOLITIONF1

NORTH

KEY NOTES

12 13 14 15 16 17 19 20 21 22

BLDG. 1 - PARTIAL GROUND FLOOR PLAN - LIGHTING - DEMOLITIONF8

NORTH

E

F

G

J

L

N

O

Q

R

S

T

U

V

119 10

12 13 14 15 16 17 18 20 21 22119 10

CC

DD

EE

HH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh 1, 2 and 6

Key Plan

Balance of Work

9/12/2022

B-EDL101

BLDG. 1 & 6 - PARTIAL GROUND FLOOR

PLANS - LIGHTING - DEMOLITION

38A

H

I

F.6

E.7

D.3

B.7

B.2

A.8

D.1

B.8

39.3

40.5

40.8 40.

40.3

39.9

C.4

C.1

B.8

B.2

A.8

B

S

S

S

S

SS

S

S

S

S

S

S

SS

S

S

AC

U-3

BLDG. 6 - PARTIAL GROUND FLOOR PLAN - LIGHTING - DEMOLITIONF4

NORTH

36 37

KEY NOTES

GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh 1, 2 and 6

Key Plan

Balance of Work

9/12/2022

B-EDL103

BLDG. 6 - PARTIAL GROUND FLOOR

PLAN - LIGHTING - DEMOLITION

J

O

N

L

R

Q

E

F

G

V

BUILDING 1

S S

S

S

SSSSSSS

S S

S S

S

S

S

S S

S

S

SS

S

S S

S S

S

SSSSS

S S S S S

S

S

SS S

S

S

SSSS

S

S

S S

S S

S S

S

S

S

S

S

SS

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S S S

S

S

S S

S

S S

S S

S S

S S

S S

S S

S

BLDG. 1 & 6 - PARTIAL GROUND FLOOR PLAN - POWER - DEMOLITIONF1

NORTH

KEY NOTES

CC

DD

EE

HH

12 13 14 15 16 17 19 20 21 22

BLDG. 1 - PARTIAL GROUND FLOOR PLAN - POWER - DEMOLITIONF8

NORTH

E

F

G

J

L

N

O

Q

R

S

T

U

V

119 10

12 13 14 15 16 17 18 20 21 22119 10

1 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh 1, 2 and 6

Key Plan

Balance of Work

9/12/2022

B-EDP101

BLDG. 1 & 6 - PARTIAL GROUND FLOOR

PLANS - POWER - DEMOLITION

38A

H

I

F.6

E.7

D.3

B.7

B.2

A.8

D.1

B.8

39.3

40.5

40.8 40.

40.3

39.9

C.4

C.1

B.8

B.2

A.8

B

S

S

S

S

SS

S

S

S

S

S

S

SS

BLDG. 6 - PARTIAL GROUND FLOOR PLAN - POWER - DEMOLITIONF4

NORTH

36 37

KEY NOTES

GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh 1, 2 and 6

Key Plan

Balance of Work

9/12/2022

B-EDP103

BLDG. 1 & 6 - PARTIAL GROUND FLOOR

PLAN - POWER - DEMOLITION

5B

6B

7B

8B

9B

10B 11B 12B 13B 14B 15B 16B 17B 18B 19B 20B 21B 22B 23B

L1

M1

N1

O1

P1

Q1

K1

J1

H1

G1

BLDG. 2 - GROUND FLOOR PLAN - DEMOLITIOND1

NORTH

B-EP420

C2

B-ED120

BLDG. 2 - GROUND FLOOR PLAN -

DEMOLITION

SN KS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh 1, 2 and 6

Key Plan

Balance of Work

9/12/2022

10B 11B 12B 13B 14B 15B 16B 17B 18B 19B 20B 21B 22B 23B

L1

M1

N1

O1

P1

Q1

KEY NOTES# GENERAL NOTES

SCALE: 1/8" = 1'-0"

8'4'0 16'

BLDG. 2 - FIRST FLOOR PLAN - DEMOLITIOND1

NORTH

B-ED121

BLDG. 2 - FIRST FLOOR PLAN -

DEMOLITION

SN KS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh 1, 2 and 6

Key Plan

12B 13B 14B 15B 16B 17B 18B10B 11B

M1

N1

O1

P1

GENERAL NOTES

SCALE: 1/8" = 1'-0"

8'4'0 16'

BLDG. 2 - SECOND FLOOR PLAN - DEMOLITIOND1

NORTH

B-ED122

BLDG. 2 - SECOND FLOOR PLAN -

DEMOLITION

SN KS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

ISSUED FOR

CONSTRUCTION

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

VA NY Manhattan Campus

423 E 23RD Street, New York, NY 10010

630-600A

Project Director

Revisions: Date:

A/E:

AECOM

3101 WILSON BLVD, SUITE 900

ARLINGTON, VA. 22201

703-682-4900

WWW.AECOM.COM

Construction Document Refresh 1, 2 and 6

Key Plan

File details come from the government source that posted it. Updated .