This document provides details for a federal contract solicitation to construct balance of work at the Veterans Affairs Medical Center in Manhattan, New York. The solicitation number is 36C10F24R50018 and is being issued by the Department of Veterans Affairs Office of Construction and Facilities Management to construct the remaining work from hurricane recovery efforts at the Manhattan VAMC campus. Responses are due by the date specified in the solicitation. The work includes completing construction left unfinished following damage from Hurricane Sandy. All other terms governing the procurement are contained in the solicitation document.
View the file
Other files
Show 40 more
Latest 50 of 281 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S S S S S
S S S
S S S S S
GFI
GFI
S
J
E
H
V
T
P
J
W
A
V
FD
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL MANUFACTURERS
ASSOCIATION
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWPA AMERICAN WOOD PRESERVERS' ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL
C CHANNEL CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR CONTRACT
DOCUMENTS
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY OR CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER
CM CONSTRUCTION MANAGEMENT
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CERTIFICATE OF OCCUPANCY,
CLEANOUT, OR COMPANY
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC OR ELECTRICAL
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
EW EACH WAY
EWC
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXT GR EXTERIOR GRADE
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD OR FLAT HEAD SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR FIBERGLASS
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H HIGH
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR HORSEPOWER
HQ HEADQUARTERS
HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER, OR INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX JUNCTION BOX
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE
LHR LEFT HAND REVERSE LATENT HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM
MED MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINUTE OR MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING CONTRACTORS ASSOCIATION
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OUTSIDE DIMENSION
OD OUTSIDE DIMENSION OUTSIDE DIAMETER
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND CEMENT
PCA PORTLAND CEMENT ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PO PURCHASE ORDER OR POST OFFICE
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION
REFR REFRIGERATION REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR, OR SOAP
DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SJI STEEL JOIST INSTITUTE
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL JST STEEL JOIST
STL LNTL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL TEMPERATURE CONTROL
PANEL; TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN
TRTD TREATED
TS TENSILE STRENGTH OR TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE VITRIFIED CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC
VWF VINYL WALL FABRIC
W WIDE OR WEST
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSH WINDOW SHADE
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS
YD YARD
YR YEAR
0 4'-0" 8'-0" 16'-0"
SIM
X
X-XXX
CENTERLINE INDICATOR
CONTRACT LIMIT LINE
DEMOLITION LINE
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
FIRE RESISTIVE RATED LINE, 1 HOUR
FIRE RESISTIVE RATED LINE, 2 HOUR
FIRE RESISTIVE RATED LINE, 3 HOUR
FIRE RESISTIVE RATED LINE, 4 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR
HIDDEN FEATURES LINE
NEW LINE
PROPERTY LINE
ELEVATION INDICATOR
CENTERLINE
SMOKE BARRIER
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT (SEE SECTION INDICATORS,
BUILDING, WITH BREAK STANDARDS)
SIM
X-XXX
X
DETAIL INDICATOR
SIM
X-XXX
X
DETAIL INDICATOR
DETAIL INDICATOR FOR SMALL CONDITIONS
X
X-XXX
XX'-XX" DIMENSION LINE
DOOR OPENING / BORROWED LIGHT (W/ IDENTIFIER)
A9
View Name
1/8" = 1'-0"
WINDOW OPENING IDENTIFIER
0 4'-0" 8'-0" 16'-0"
SIM
X
X-XXX
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR,
MULITPLE VIEW
ELEVATION INDICATOR, INTERIOR,
SINGLE VIEW
XXXX
X
X
X X
XXXX
X
BUILDING SECTION INDICATOR
1i
FURNITURE, FIXTURE, & EQUIPMENT
INDICATOR
A
GRAPHIC SCALE, 1/8" = 1'-0"
ROOM NAME AND NUMBER
COLUMN GRID
KEYNOTE
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
CORNER GUARD
NORTH ARROW
V V ITEM - VA SUPLIED & INSTALLED (OF / OI)
VC ITEM - VA SUPPLIED & CONTRACTOR
INSTALLED (OF/CI)
CC ITEM - CONTRACTOR SUPPLIED &
INSTALLED (CF/CI)
--FEC
CG
Y6
XXXXXX
ROOM
NAME
CONCRETE
GRANULAR FILL
RIGID INSULATION
BATT INSULATIONEARTHWORK
NEW CONSTRUCTION
EXISTING CONSTRUCTION
TO REMAIN
EXISTING CONSTRUCTION
TO BE REMOVED
DUPLEX OUTLET
QUADRUPLEX OUTLET
DUPLEX GROUND FAULT CIRCUIT INTERRUPT OUTLET
QUADRUPLEX GROUND FAULT CIRCUIT INTERRUPT OUTLET
SWITCH
DATA OUTLET
DATA OUTLET CEILING MOUNTED
TEL/DATA OUTLET
PUBLIC ADDRESS SPEAKER
THERMOSTAT
JUNCTION BOX
ROOM ETHYLENE OXIDE SENSOR
ROOM HUMIDSTAT
WALL CLOCKC
VIDEO OUTLET
ROOM PRESSURIZATION MONITOR
EXHAUST AIR REGISTER
SUPPLU AIR DIFFUSER
SECURITY CAMERA
OCCUPANCY SENSOR
EXIT SIGN SINGLE FACED 1 WAY - CEILING MOUNTED
(DIRECTIONAL ARROW FOR PATH OF EGRESS DIRECTION)
EXIT SIGN DOUBLE FACE - CEILING MOUNTED
EXIT SIGN DOUBLE FACE - WALL MOUNTED
EXIT SIGN SINGLE FACE LEFT - WALL MOUNTED
EXIT SIGN SINGLE FACE RIGHT - WALL MOUNTED
EXIT SIGN SINGLE FACE - WALL MOUNTED
CONCEALED SPRINKLER HEAD
SPEAKER CEILING
CEILING JUNCTION BOX
WALL MOUNTED TELEPHONE
2' X 4' FLUORESCENT LIGHT FIXTURE
2' X 4' FLUORESCENT LIGHT FIXTURE
(CRITICAL - EMERGENCY)
2' X 4' FLUORESCENT LIGHT FIXTURE
2' X 4' FLUORESCENT LIGHT FIXTURE
(CRITICAL - EMERGENCY)
1' X 4' FLUORESCENT LIGHT FIXTURE
4' SUSPENDED STRIP FIXTURE
(CRITICAL - EMERGENCY)
DOWN LIGHT (CRITICAL - EMERGENCY)
SINGLE POLE SWITCH
DISCONNECT SWITCH
EMERGENCY POWER OFF PUSH BUTTON
SINGLE POLE SWITCHA
CARD READERCR
OC
S
COMPRESSED AIR
VACUUM
PUSH BUTTON / PLATE - DOOR OPERATORPB
UPRIGHT SPRINKLER HEAD
INTERCOMI
FLOOR DRAIN
JSN JOINT SCHEDULE NUMBER
PLAN
NORTH
XXX
SYMBOLS & MATERIALS
IGU INSULATING GLAZING UNIT
MG MONOLITHIC GLASS
SE SERVICE ELEVATOR
PE PASSENGER ELEVATOR
EXTRUDED POLYSTYRENE BOARD (INSULATION)
VINYL WALL COVERING
DISPENSER
CRITICAL PATH METHOD
STEEL LINTEL
MASONRY
OUT OF SCOPE
MATCH LINE
4' SUSPENDED STRIP FIXTURE
DOWN LIGHT
FIRE EXTINGUISHER--FE
FIRE ALARM MANUAL PULL STATIONP
VA CFM VETERANS AFFAIRS CONSTRUCTION FACILITIES
MANAGEMENT (OFFICE OF)
VAMC VETERANS AFFAIRS MEDICAL CENTER
LOUVER IDENTIFIER
DRAWING BLOCK TITLE, TYPICAL
SEE: XXX
LXXX
WXXX
GYPSUM BOARD
METAL
BRICK
ABBREVIATIONS
EXISTING DOOR OPENING (W/O IDENTIFIER)
ELECTRIC WATER COOLER
FEC (S) FIRE EXTINGUISHER CABINET-SURFACE MOUNTED
TA TEMPERED ANNEALED
ICRA INFECTION CONTROL RISK ASSESSMENT
NOTE: DEMOLITION AND NEW WORK ACTIVITIES MAY BE REQUIRED
TO BE PERFORMED IN THESE AREAS TO MAKE BUILDING SYSTEMS
OPERATIONAL AND BUILDING ASSEMBLIES COMPLETE*
KEY SWITCHKS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh 1, 2 and 6
Key Plan
Balance of Work
9/12/2022
B-AE001
DZ JH / DZ
ABBREVIATIONS & SYMBOLS
GENERAL NOTES:
POST-INSTALLED ANCHORS INSTALLATION:
SEISMIC RESTRAINTS
& BRACES NOTES:
SEISMIC SYSTEM DESIGN:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
P
M
ISSUED FOR
CONSTRUCTION
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
VA NY Manhattan Campus
423 E 23RD Street, New York, NY 10010
630-600A
Project Director
Revisions: Date:
A/E:
AECOM
3101 WILSON BLVD, SUITE 900
ARLINGTON, VA. 22201
703-682-4900
WWW.AECOM.COM
Construction Document Refresh 1, 2 and 6
Key Plan
Balance of Work
9/12/2022
B-AE002
GENERAL NOTES AND
REQUIREMENTS
DZ DZ
AutoCAD SHX Text
21. IF THERE ARE ANY DISCREPANCIES BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR BETWEEN THE CONTRACT DOCUMENTS AND THE EXISTING CONDITIONS, REPORT THEM TO THE ARCHITECT AND VA CFM OFFICE PRIOR TO SUBMITTING BID PROPOSAL. WHERE A DISCREPANCY IS UNRESOLVED THE MOST RESTRICTIVE REQUIREMENTS SHALL APPLY. 22. WHEN SPECIFICATIONS OR DRAWINGS EXCEED CODE REQUIREMENTS AND/OR REGULATIONS OF AUTHORITIES HAVING JURISDICTION, SPECS AND/OR DRAWINGS SHALL TAKE PRECEDENCE. WHEN CODE REQUIREMENTS AND/OR REGULATIONS OF AUTHORITIES HAVING JURISDICTION EXCEED SPECS AND/OR DRAWING REQUIREMENTS, CODE REQUIREMENTS AND/OR REGULATIONS OF THE AUTHORITIES HAVING JURISDICTION SHALL TAKE PRECEDENCE. 23. "OWNER" MEANS NEW YORK VETERANS AFFAIRS MEDICAL CENTER, NEW YORK, NY. 24. OBTAIN HOT WORK PERMIT FROM VAMC SAFETY OFFICE FOR ALL WELDING PROCEDURES COMPLYING WITH LAW, CODES AND SPECIFICATIONS. 25. THE CONTRACTOR SHALL MAINTAIN FREE AND UNOBSTRUCTED ACCESS FROM ALL FLOORS, THROUGH CORRIDORS, FROM ROOMS, AND ADJACENT SPACES INTO THE EXISTING FIRE STAIRS AND OTHER MEANS OF EGRESS TO THE PUBLIC WAY AT ALL TIMES. TOOLS, STAGING AREAS FOR MATERIALS AND TOOLS AND OTHER ITEMS REQUIRED FOR THE EXECUTION OF THE WORK SHALL NOT OBSTRUCT ANY MEANS OF EGRESS. 26. "APPLICABLE CODES"; "CODES" CODES OR APPLICABLE CODES REFERENCES IN THE DOCUMENTS SHALL MEAN THE CURRENT VERSION OF A CODE WHICH IS IN EFFECT AS OF THE DATE SHOWN ON THE CONSTRUCTION DOCUMENTS, EXCEPT WHERE OTHERWISE NOTED. 27. WHERE THE CONTRACTOR SUBMITS A PROPOSED EQUAL PRODUCT FROM THOSE INDICATED ON THE DRAWINGS OR IN THE SPECIFICATIONS AS THE BASIS OF DESIGN, THE CONTRACTOR SHALL SUBMIT A SIDE BY SIDE COMPARISON BETWEEN THE INDICATED PRODUCT AND THE CONTRACTOR'S PROPOSED EQUAL SUBSTITUTION. THE VA CFM OFFICE OR VAMC MAY OR MAY NOT ACCEPT THE PROPOSED SUBSTITUTION. 28. WHERE THE VA CFM OFFICE / VAMC APPROVES THE CONTRACTOR'S PROPOSED EQUAL SUBSTITUTION PRODUCT, THE CONTRACTOR, AT NO ADDITIONAL COST TO THE VA, SHALL BE SOLELY RESPONSIBLE TO MODIFY, ADJUST, ADD TO, AND/OR REVISE ANY AND ALL EXISTING SYSTEMS, COMPONENTS, ITEMS OR CONSTRUCTION AFFECTED BY THE PROPOSED EQUAL SUBSTITUTION, AND SHALL SUBMIT SHOP DRAWINGS OF ANY CHANGES TO THE VA CFM OFFICE FOR APPROVAL. 29. PROVIDE TEMPORARY CONSTRUCTION BARRIERS TO RESTRICT ACCESS TO ALL WORK AREAS PROVIDE TEMPORARY CONSTRUCTION BARRIERS TO RESTRICT ACCESS TO ALL WORK AREAS FROM UNAUTHORIZED PERSONS OR VEHICLES. SUBMIT SHOP DRAWINGS OF ALL TEMPORARY CONSTRUCTION BARRIERS FOR APPROVAL. SEE ICRA PLANS FOR ADDITIONAL REQUIREMENTS. 30. FOR OPERATIONS AND STORAGE AREAS AND THEIR LIMITATIONS, SEE SPECIFICATION SECTION 01 00 00, GENERAL REQUIREMENTS. 31. CONTRACTOR SHALL NOTIFY THE COR/COTR ONE WEEK IN ADVANCE OF DECOMMISSIONING ANY PARKING SPACES DUE TO CONSTRUCTION. CONTRACTOR SHALL PROVIDE TO THE COR/COTR A LIST OF ALL AFFECTED PARKING SPACES. NO PARKING SPACES SHALL BE REMOVED WITHOUT APPROVAL FROM THE COR/COTR. 32. CONTRACTOR SHALL ISOLATE PARKING THAT REMAINS FROM THE WORK ZONE AND SHALL ENSURE THAT SAFE ACCESS IS MAINTAINED TO AND FROM THE PARKING AREA THROUGH AND AROUND THE WORK ZONE. 33. PROVIDE INSPECTIONS OF SCAFFOLDING DAILY BY A COMPETENT PERSON. SUBMIT DAILY WRITTEN REPORT OF THE SCAFFOLDING INSPECTION TO THE RESIDENT ENGINEER / VA CFM OFFICE. 34. ATTEND WEEKLY ON-SITE CONSTRUCTION COORDINATION MEETINGS WITH OTHER CONTRACTORS ATTEND WEEKLY ON-SITE CONSTRUCTION COORDINATION MEETINGS WITH OTHER CONTRACTORS PROVIDING WORK ON THE SITE. THESE REQUIRED WEEKLY COORDINATION MEETINGS WILL BE ATTENDED BY THE VAMC OWNER REPRESENTATIVE(S), THE VA COR/COTR, THE VA RESIDENT ENGINEER AND REPRESENTATIVES FROM THE VA CFM OFFICE 35. BUILDING 1 AND BUILDING 6 (MAIN ELECTRICAL ROOMS - INDUSTRIAL OCCUPANCY) ARE BUILDING 1 AND BUILDING 6 (MAIN ELECTRICAL ROOMS - INDUSTRIAL OCCUPANCY) ARE REQUIRED TO BE SEPARATED FROM HEALTHCARE OCCUPANCIES BY A 2 HOUR FIRE SEPARATION IN ACCORDANCE WITH NFPA 101. EXPOSED STRUCTURAL STEEL COLUMNS AND STEEL BEAMS SUPPORTING THE MAIN ELECTRCAL ROOMS ARE REQUIRED TO BE PROTECTED WITH A 1 HOUR UL FIRE RATING (SPRAY-ON FIREPROOFING, INTUMESCENT COATING OR ENCLOSURE) IN ACCORDANCE WITH NFPA 70 (NATIONAL ELECTRICAL CODE) LATEST EDITION.
AutoCAD SHX Text
1. ALL WORK ON THESE DRAWINGS SHALL BE CONSIDERED NEW WORK WHETHER STATED OR ALL WORK ON THESE DRAWINGS SHALL BE CONSIDERED NEW WORK WHETHER STATED OR NOT EXCEPT WHERE SPECIFICALLY NOTED AS "EXISTING". 2. FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SYSTEMS AND PROCEDURES TO EXECUTE THE FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SYSTEMS AND PROCEDURES TO EXECUTE THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS. 3. ALL WORK SHALL BE INSTALLED SO THAT ALL PARTS REQUIRED ARE READILY ACCESSIBLE ALL WORK SHALL BE INSTALLED SO THAT ALL PARTS REQUIRED ARE READILY ACCESSIBLE FOR INSPECTION, OPERATION, MAINTENANCE AND REPAIR. 4. THE CONTRACTOR SHALL PATCH AND REPAIR ALL FLOORS, WALLS, CEILINGS; ETC. WHICH THE CONTRACTOR SHALL PATCH AND REPAIR ALL FLOORS, WALLS, CEILINGS; ETC. WHICH BECOME DAMAGED OR EXPOSED DUE TO THE WORK AND FINISH THEM TO MATCH ADJOINING FINISHES TO THE CLOSEST EXISTING CORNER. 5. THE CONTRACTOR SHALL RELOCATE, MODIFY, CUT, AND PATCH WITHOUT COMPROMISING THE THE CONTRACTOR SHALL RELOCATE, MODIFY, CUT, AND PATCH WITHOUT COMPROMISING THE QUALITY OF WORK, ANY EXISTING ITEMS THAT INTERFERE WITH THE INSTALLATION OF NEW WORK, WHETHER SHOWN OR NOT, ON THESE DRAWINGS. 6. THE CONTRACTOR SHALL PROVIDE GUARDS, RAILS, BARRICADES, FENCES, CATCH PLATFORMS, THE CONTRACTOR SHALL PROVIDE GUARDS, RAILS, BARRICADES, FENCES, CATCH PLATFORMS, COVERED PATHWAYS, DECKING, AS REQUIRED BY CODE IN ORDER TO PROVIDE ADEQUATE PROTECTION TO PERSONS FROM ALL CONSTRUCTION AND CONSTRUCTION ACTIVITIES. 7. PROVIDE SCHEDULE AND COORDINATE PROJECT INSPECTION REQUIREMENTS AS DESCRIBED IN PROVIDE SCHEDULE AND COORDINATE PROJECT INSPECTION REQUIREMENTS AS DESCRIBED IN THE SPECIFICATIONS INCLUDING TESTING LABORATORY SERVICES. 8. THE CONTRACT DOCUMENTS HAVE BEEN PREPARED BASED UPON INFORMATION PROVIDED BY THE CONTRACT DOCUMENTS HAVE BEEN PREPARED BASED UPON INFORMATION PROVIDED BY THE VAMC. THE A/E ASSUMES NO RESPONSIBILITY OR LIABILITY FOR THE ACCURACY OR RELIABILITY OF SUCH INFORMATION. THE A/E HAS MADE REASONABLE ESTIMATIONS OF CONDITIONS CONCERNING INACCESSIBLE OR CONCEALED AREAS OF THE SITE, THE EXISTING BUILDING OR SYSTEMS AS SUCH ITEMS MAY RELATE TO THE WORK AND SHALL NOT BE HELD RESPONSIBLE OR LIABLE FOR THE ACCURACY OF SAME. 9. DETAILS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER AND ACCEPTABLE DETAILS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR PROPER AND ACCEPTABLE CONSTRUCTION, INSTALLATION OR OPERATION OF ANY PART OF THE WORK AS DETERMINED BY THE ARCHITECT SHALL BE INCLUDED IN THE BASE CONTRACT WORK THE SAME AS IF SPECIFIED OR INDICATED AT NO ADDITIONAL COST TO THE VAMC. 10. CONTRACTING OFFICER' REPRESENTATIVE (COR) REFERS TO THE VA PROJECT ENGINEER AS CONTRACTING OFFICER' REPRESENTATIVE (COR) REFERS TO THE VA PROJECT ENGINEER AS THE CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (COTR) AS DELEGATED BY THE VA CONTRACTING OFFICER. 11. COORDINATE THE WORK OF ALL TRADES, AND SUBCONTRACTORS. COORDINATE THE WORK OF ALL TRADES, AND SUBCONTRACTORS. 12. VERIFY, CONFIRM AND CORRELATE ALL EXISTING QUANTITIES AND DIMENSIONS. SELECT VERIFY, CONFIRM AND CORRELATE ALL EXISTING QUANTITIES AND DIMENSIONS. SELECT FABRICATION PROCESSES, SEQUENCES AND TECHNIQUES OF CONSTRUCTION. SUPERVISE ALL WORK. 13. PERFORM ALL WORK IN A SAFE AND SATISFACTORY MANNER IN ACCORDANCE WITH OSHA, PERFORM ALL WORK IN A SAFE AND SATISFACTORY MANNER IN ACCORDANCE WITH OSHA, NEW YORK STATE AND VA STANDARDS. 14. PROTECT AND SECURE WORK AREAS, CONSTRUCTION MATERIALS AND TOOLS FROM ACCESS PROTECT AND SECURE WORK AREAS, CONSTRUCTION MATERIALS AND TOOLS FROM ACCESS BY PERSONS OTHER THAN CONSTRUCTION PERSONNEL. PROVIDE APPROPRIATE BARRIERS. MAINTAIN CLEARLY MARKED EXIT PATHS. SECURE WORK AREAS, CONSTRUCTION MATERIALS AND TOOLS AT THE END OF EACH DAY AND WHEN THEY ARE NOT UNDER THE DIRECT OBSERVATION AND CONTROL OF CONTRACTOR PERSONNEL. PROTECT PERSONS FROM INJURY. BE SOLELY RESPONSIBLE FOR SITE SAFETY AND SECURITY. ERECT AND MAINTAIN ALL NECESSARY DEVICES, SYSTEMS, PROCEDURES TO PROTECT BUILDING, ITS' CONTENTS, CONSTRUCTION MATERIALS AND TOOLS FROM THEFT. 15. PROTECT PERSONS, BUILDING WORK AREAS, CONSTRUCTION MATERIALS, EQUIPMENT AND PROTECT PERSONS, BUILDING WORK AREAS, CONSTRUCTION MATERIALS, EQUIPMENT AND TOOLS FROM FIRES. MAINTAIN FIRE EXTINGUISHERS AT WORK AREAS INVOLVING MATERIALS AND PROCEDURES WHICH MIGHT CAUSE FIRES. 16. REMOVE ALL DEBRIS DAILY AND DISPOSE OF SAW DUST AS PER CONTAINMENT PROCEDURES REMOVE ALL DEBRIS DAILY AND DISPOSE OF SAW DUST AS PER CONTAINMENT PROCEDURES SPECIFIED ON ICRA NOTES ON THE ICRA PLANS. 17. THE CONTRACTOR SHALL APPLY FOR, OBTAIN AND PAY FOR ANY PERMITS REQUIRED TO THE CONTRACTOR SHALL APPLY FOR, OBTAIN AND PAY FOR ANY PERMITS REQUIRED TO PERFORM WORK ON SITE OR OUTSIDE OF THE OWNER'S PROPERTY AS MAY BE REQUIRED BY AUTHORIZED JURISDICTIONS. THE VA SHALL REIMBURSE THE CONTRACTOR FOR SUCH FEES WITHOUT MARKUP UPON PRESENTATIONS OF PROOF OF PAYMENT. 18. THE WORD "PROVIDE" MEANS: THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS AND THE WORD "PROVIDE" MEANS: THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT TO FURNISH AND INSTALL, COMPLETE AND OPERATIVE. "INDICATED" MEANS: SHOWN OR POINTED OUT. 19. COMPLY WITH ALL OSHA AND EPA REGULATIONS INCLUDING HAZARD COMMUNICATION STANDARD AND RESOURCE CONSERVATION AND RECOVERY ACT, CONCERNING HAZARDOUS MATERIALS. 20. ALL PROPOSED CHANGES TO DRAWING AND/OR SPECIFICATION REQUIREMENTS SHALL BE SUBMITTED TO THE ARCHITECT AND ENGINEERS AND VA CFM OFFICE FOR REVIEW AND APPROVAL BY THE VA CFM OFFICE AND VAMC PRIOR TO START OF THE WORK.
AutoCAD SHX Text
1. IDENTIFY POSITION OF REINFORCING STEEL AND OTHER EMBEDDED ITEMS PRIOR TO DRILLING IDENTIFY POSITION OF REINFORCING STEEL AND OTHER EMBEDDED ITEMS PRIOR TO DRILLING HOLES FOR POST-INSTALLED ANCHORS. 2. DO NOT DAMAGE EXISTING REINFORCING OR EMBEDDED ITEMS DURING CORING OR DRILLING. DO NOT DAMAGE EXISTING REINFORCING OR EMBEDDED ITEMS DURING CORING OR DRILLING. NOTIFY THE STRUCTURAL ENGINEER IF REINFORCING STEEL OR OTHER EMBEDDED ITEMS ARE ENCOUNTERED DURING DRILLING. LOCATE AND AVOID PRESTRESSED TENDONS, ELECTRICAL AND TELECOMMUNICATIONS CONDUIT AND GAS LINES. 3. DO NOT DRILL HOLES IN CONCRETE OR MASONRY UNTIL CONCRETE, MORTAR, OR GROUT DO NOT DRILL HOLES IN CONCRETE OR MASONRY UNTIL CONCRETE, MORTAR, OR GROUT HAS ACHIEVED FULL DESIGN STRENGTH. 4. WEDGE ANCHORS: PROTECT THREADS FROM DAMAGE DURING ANCHOR INSTALLATION. WEDGE ANCHORS: PROTECT THREADS FROM DAMAGE DURING ANCHOR INSTALLATION. 5. HEAVY-DUTY SLEEVE ANCHORS SHALL BE INSTALLED WITH SLEEVE FULLY ENGAGED IN THE HEAVY-DUTY SLEEVE ANCHORS SHALL BE INSTALLED WITH SLEEVE FULLY ENGAGED IN THE STRUCTURAL ELEMENT TO WHICH ANCHOR IS TO BE FASTENED. 6. ADHESIVE ANCHORS: CLEAN HOLES TO REMOVE LOOSE MATERIAL AND DRILLING DUST ADHESIVE ANCHORS: CLEAN HOLES TO REMOVE LOOSE MATERIAL AND DRILLING DUST PRIOR TO INSTALLATION OF ADHESIVE. 7. PLACE ADHESIVE IN HOLES PROCEEDING FROM THE BOTTOM OF THE HOLE AND PLACE ADHESIVE IN HOLES PROCEEDING FROM THE BOTTOM OF THE HOLE AND PROGRESSING TOWARD THE SURFACE IN SUCH A MANNER AS TO AVOID INTRODUCTION OF AIR POCKETS IN THE ADHESIVE. 8. SET ANCHORS TO MANUFACTURER'S RECOMMENDED TORQUE, USING A TORQUE WRENCH. SET ANCHORS TO MANUFACTURER'S RECOMMENDED TORQUE, USING A TORQUE WRENCH. 9. PROVIDE ZINC-COATED STEEL ANCHORS FOR INTERIOR AND STAINLESS-STEEL ANCHORS FOR PROVIDE ZINC-COATED STEEL ANCHORS FOR INTERIOR AND STAINLESS-STEEL ANCHORS FOR EXTERIOR APPLICATIONS. POST-INSTALLED ANCHORS - LOAD TESTING AND SPECIAL INSPECTIONS 10. PROVIDE EVIDENCE OF RECENT CALIBRATION OF TEST EQUIPMENT BY A TESTING AGENCY PROVIDE EVIDENCE OF RECENT CALIBRATION OF TEST EQUIPMENT BY A TESTING AGENCY ACCEPTABLE TO VAMC AND ARCHITECT-ENGINEER. 11. SCHEDULE TEST WITH VAMC, THROUGH ARCHITECT, BEFORE CONNECTING ANCHORAGE DEVICE SCHEDULE TEST WITH VAMC, THROUGH ARCHITECT, BEFORE CONNECTING ANCHORAGE DEVICE TO RESTRAINED COMPONENT (UNLESS POST CONNECTION TESTING HAS BEEN APPROVED), AND WITH AT LEAST SEVEN DAYS' ADVANCE NOTICE. 12. OBTAIN VAMC AND ARCHITECT'S APPROVAL BEFORE APPLYING TEST LOADS TO STRUCTURE. OBTAIN VAMC AND ARCHITECT'S APPROVAL BEFORE APPLYING TEST LOADS TO STRUCTURE. 13. PROVIDE TEMPORARY LOAD-SPREADING MEMBERS. PROVIDE TEMPORARY LOAD-SPREADING MEMBERS. 14. TEST AT LEAST FOUR OF EACH TYPE AND SIZE OF INSTALLED ANCHORS AND FASTENERS TEST AT LEAST FOUR OF EACH TYPE AND SIZE OF INSTALLED ANCHORS AND FASTENERS SELECTED BY ARCHITECT-ENGINEER AT EACH PROJECT WORK AREA. 15. TEST TO 90 PERCENT OF RATED PROOF LOAD OF DEVICE. TEST TO 90 PERCENT OF RATED PROOF LOAD OF DEVICE. 16. MEASURE ISOLATOR RESTRAINT CLEARANCE. MEASURE ISOLATOR RESTRAINT CLEARANCE. 17. MEASURE ISOLATOR DEFLECTION. MEASURE ISOLATOR DEFLECTION. 18. IF A DEVICE FAILS TEST, MODIFY ALL INSTALLATIONS OF SAME TYPE AND RETEST UNTIL IF A DEVICE FAILS TEST, MODIFY ALL INSTALLATIONS OF SAME TYPE AND RETEST UNTIL SATISFACTORY RESULTS ARE ACHIEVED. 19. PROVIDE WRITTEN FASTENER LOAD TEST REPORTS OF EACH PHASE OF THE PROJECT WORK PROVIDE WRITTEN FASTENER LOAD TEST REPORTS OF EACH PHASE OF THE PROJECT WORK IMMEDIATELY AFTER THE FASTENERS ARE TESTED FOR THAT PHASE' WORK BUT BEFORE INSTALLING, ATTACHING OR SUSPENDING THAT PHASE' WORK FROM THE INSTALLED FASTENERS. 20. PROVIDE INTERMITTENT SPECIAL INSPECTIONS OF POST INSTALLED FASTENERS OF EACH PROVIDE INTERMITTENT SPECIAL INSPECTIONS OF POST INSTALLED FASTENERS OF EACH PHASE OF THE PROJECT WORK.
AutoCAD SHX Text
36. GENERATOR BUILDING ENVELOPE IS REQUIRED TO BE PROTECTED WITH A 1 HOUR FIRE RATING, EXCEPT AT THE SEPARATION BETWEEN GENERATOR BUILDING AND ADJACENT EXISTING EGRESS STAIR OF CHILLER BUILDING WHICH REQUIRES A 2 HOUR FIRE SEPARATION IN ACCORDANCE WITH NFPA 101. EXPOSED STRUCTURAL STEEL COLUMNS AND STEEL BEAMS SHALL BE PROTECTED WITH A 1 HOUR UL RATED FIRE RATING (SPRAY-ON FIREPROOFING, INTUMESCENT COATING OR ENCLOSURE) IN ACCORDANCE WITH VAMC PHYSICAL-SECURITY DESIGN MANUAL DATED JULY 2007.
AutoCAD SHX Text
1. PROJECT WORK REQUIRES THAT CERTAIN NON-STRUCTURAL COMPONENTS HAVE SEISMIC PROJECT WORK REQUIRES THAT CERTAIN NON-STRUCTURAL COMPONENTS HAVE SEISMIC RESTRAINT BRACES. 2. THE ACTUAL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION SERVICES, UTILITIES THE ACTUAL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION SERVICES, UTILITIES AND/ OR LINES THAT REQUIRE SEISMIC RESTRAINTS MAY VARY FROM THOSE INDICATED AND INCLUDED IN THE PROJECT' SCOPE OF WORK. 3. THE CONTRACTOR SHALL RETAIN A NEW YORK STATE LICENSED STRUCTURAL PROFESSIONAL THE CONTRACTOR SHALL RETAIN A NEW YORK STATE LICENSED STRUCTURAL PROFESSIONAL ENGINEER TO DESIGN THE SEISMIC RESTRAINT AND TO PREPARE LAYOUT DRAWINGS OF THE TYPES, CONFIGURATIONS, LOCATIONS AND QUANTITIES OF REQUIRED SEISMIC RESTRAINT BRACES.
AutoCAD SHX Text
1. PREPARE AND SUBMIT LAYOUT DRAWINGS OF THE TYPES, CONFIGURATIONS AND NUMBER OF PREPARE AND SUBMIT LAYOUT DRAWINGS OF THE TYPES, CONFIGURATIONS AND NUMBER OF RESTRAINTS AND/OR BRACES REQUIRED BASED ON THE CONDITIONS, APPLICABLE CODES AND ON THE LIMITS OF SPECIFICATION SECTION 13 05 41. 2. THE SEISMIC RESTRAINT DESIGNER SHALL BE RESPONSIBLE FOR THE SELECTION OF THE THE SEISMIC RESTRAINT DESIGNER SHALL BE RESPONSIBLE FOR THE SELECTION OF THE ATTACHMENT HARDWARE AS REQUIRED TO ATTACH SNUBBERS/RESTRAINTS TO BOTH THE EQUIPMENT AND SUPPORTING STRUCTURE ON VIBRATION ISOLATED EQUIPMENT, OR TO DIRECTLY ATTACH EQUIPMENT TO THE BUILDING STRUCTURE FOR NON-ISOLATED EQUIPMENT. 3. THE CONTRACTOR SHALL FURNISH, TO THE SEISMIC RESTRAINT MANUFACTURER, A COMPLETE THE CONTRACTOR SHALL FURNISH, TO THE SEISMIC RESTRAINT MANUFACTURER, A COMPLETE SET OF APPROVED SHOP DRAWINGS OF ALL EQUIPMENT THAT IS TO BE RESTRAINED, FROM WHICH THE SELECTION AND DESIGN OF SEISMIC RESTRAINT DEVICES AND/OR ATTACHMENT HARDWARE WILL BE COMPLETED. THE SHOP DRAWINGS FURNISHED SHALL INCLUDE, AT A MINIMUM, BASIC EQUIPMENT LAYOUT, LENGTH AND WIDTH DIMENSIONS, AND INSTALLED OPERATING WEIGHTS OF THE EQUIPMENT RESTRAINED. 4. ALL PIPING AND DUCTWORK SHALL BE RESTRAINED TO MEET CODE REQUIREMENTS. AT A ALL PIPING AND DUCTWORK SHALL BE RESTRAINED TO MEET CODE REQUIREMENTS. AT A MINIMUM, THE SEISMIC RESTRAINT DESIGNER SHALL PROVIDE DOCUMENTATION ON MAXIMUM RESTRAINT SPACING FOR VARIOUS RESTRAINT SIZES AND ANCHORS, AS WELL AS " WORST CASE" REACTION LOADS FOR EACH RESTRAINT AND/OR ANCHOR SIZE. 5. THE CONTRACTOR SHALL ENSURE THAT ALL PROJECT HOUSEKEEPING PADS USED ARE THE CONTRACTOR SHALL ENSURE THAT ALL PROJECT HOUSEKEEPING PADS USED ARE ADEQUATELY REINFORCED AND ARE PROPERLY DOWELED TO THE BUILDING STRUCTURE SO AS TO WITHSTAND CALCULATED SEISMIC FORCES. IN ADDITION, THE SIZES AND THICKNESS OF THE HOUSEKEEPING PADS ARE TO BE COORDINATED WITH SEISMIC RESTRAINT MANUFACTURER TO ENSURE THAT ADEQUATE EDGE DISTANCES AND EMBEDMENT DEPTHS EXIST IN ORDER TO OBTAIN THE DESIRED EQUIPMENT ANCHOR CAPACITIES. 6. COMPLY WITH METAL DECKING SPECIFICATIONS LIMITS ON LOADS APPLIED TO ANY ONE COMPLY WITH METAL DECKING SPECIFICATIONS LIMITS ON LOADS APPLIED TO ANY ONE DECKING TAB.
AutoCAD SHX Text
37. ALL DIMENSIONS ARE TO FINISH FACE OF WALLS. 38. PATCH ALL EXISTING FIRE-RATED CONSTRUCTION WITHIN LIMITS OF WORK AREAS AS REQUIRED. FIRESTOP ALL PENETRATIONS, NEW OR EXISTING, IN FIRE-RATED CONSTRUCTION PENETRATIONS, NEW OR EXISTING, IN FIRE-RATED CONSTRUCTION AS REQUIRED TO MAINTAIN RATING. REFER TO LIFE SAFETY DRAWINGS FOR EXISTING FIRE-RATED PARTITIONS. 39. FIRE SEPARATIONS SHALL BE CONTINUOUS THROUGH ANY CONCEALED SPACE IN FLOOR OR FIRE SEPARATIONS SHALL BE CONTINUOUS THROUGH ANY CONCEALED SPACE IN FLOOR OR ROOF CONSTRUCTION. IF EXISTING FIRE RATED WALL CONSTRUCTION WITHIN THE SCOPE OF WORK PROJECT AREA LIMIT IS DISCOVERED TO HAVE A COMPROMISED RATING, WORK PROJECT AREA LIMIT IS DISCOVERED TO HAVE A COMPROMISED RATING, REPAIR THE WALL TO MAINTAIN INTENDED LEVEL OF FIRE PROTECTION. IF EXISTING FIRE RATED CONSTRUCTION OUTSIDE SCOPE OF WORK PROJECT AREA LIMIT IS DISCOVERED TO HAVE A COMPROMISED RATING, CONTRACTOR SHALL IMMEDIATELY BRING IT TO THE SHALL IMMEDIATELY BRING IT TO THE ATTENTION OF THE VA CFM OFFICE. 40. PATCH ANY PENETRATIONS IN EXISTING CONSTRUCTION TO REMAIN, FOUND OR CREATED DURING THE COURSE OF DEMOLITION SCOPE. PATCH REPAIRS SHALL MAINTAIN FIRE-RATED CONSTRUCTION ASSEMBLIES. 41. INFILL SLAB PENETRATIONS IN EXISTING CONSTRUCTION TO REMAIN, FOUND OR CREATED DURING THE COURSE OF DEMOLITION SCOPE AS REQUIRED AND PROVIDE AS REQUIRED FIREPROOFING OR FIRESTOPPING TO MAINTAIN A (2) HR FIRE RESISTANCE RATING. 42. CONTRACTOR TO CHALK OUT ALL PARTITION AND DOOR LOCATIONS FOR VA CFM OFFICE OR ARCHITECT'S REVIEW AND APPROVAL PRIOR TO INSTALLATION OF TRACKS / CMU PARTITIONS. 43. PROVIDE SEALANT AT ALL INTERIOR JOINTS, CREVICES, GAPS AND OPENINGS, IN ACCORDANCE WITH SCHEDULE IN SPECIFICATION. 44. GENERAL CONTRACTOR TO PROVIDE REQUIRED BLOCKING IN THE WALLS FOR PROPER SUPPORT AND FASTENING OF THE OF THE MILLWORK AND CASEWORK. 45. PATCH AND REPAIR ALL EXISTING FLOORING, WALL, AND CEILING FINISHES IMPACTED BY DEMOLITION AND CONSTRUCTION TO MATCH ADJACENT ADJACENT SURFACES. 46. DRAWINGS INCLUDE TYPICAL DETAILS THAT ARE NOT ALL CROSS-REFERENCED WITHIN THE SET, DUE TO GENERIC AND WIDESPREAD NATURE. DETAILS APPLY TO ALL CONSTRUCTION AS PROJECT CONDITIONS PRESENT THEMSELVES. 47. DRAWINGS OF BASE BUILDING CONDITIONS ARE BASED ON EXISTING BUILDING DRAWINGS AND LIMITED FIELD OBSERVATION. ACTUAL CONDITIONS MAY DIFFER FROM THOSE SHOWN. 48. VERIFY EXISTING CONSTRUCTION, CONDITIONS, SLAB / GRADE ELEVATIONS AND DIMENSIONS PRIOR TO THE FABRICATION AND INSTALLATION OF MATERIALS AND PRODUCTS. CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE VA CFM OFFICE / A/E PRIOR TO START OF WORK. COMMENCEMENT OF WORK IMPLIES ACCEPTANCE OF EXISTING CONDITIONS. 49. IF DOCUMENTS ARE AT VARIANCE WITH ONE ANOTHER, THE CONTRACTOR SHALL BASE HIS PROPOSAL ON THE BETTER QUALITY OR MORE EXPENSIVE OF THE CONDITIONS. ITEMS OR MORE EXPENSIVE OF THE CONDITIONS. ITEMS OR EQUIPMENT SPECIFIED UNDER ONE TRADE SHALL BE BINDING AS IF SPECIFIED UNDER ALL APPLICABLE TRADES. 50. VERIFY DRAWINGS ARE THE LATEST ISSUE PRIOR TO COMMENCING CONSTRUCTION. CONSTRUCTION. 51. IN CASE OF CONFLICT BETWEEN A/E'S DRAWINGS IN LOCATION OF MATERIALS / EQUIPMENT, NOTIFY THE VA CFM OFFICE / A/E IN WRITING PRIOR TO START OF WORK. 52. DIMENSIONS AND NOTES FOR A GIVEN CONDITION ARE TYPICAL FOR SIMILAR CONDITIONS, UNLESS OTHERWISE NOTED. 53. DO NOT SCALE DRAWINGS. CLARIFICATION OF INFORMATION REQUIRED BY CONTRACTOR WILL BE FURNISHED BY THE VA CFM OFFICE / A/E, UPON WRITTEN REQUEST. DIMENSIONS AND CONDITIONS SHOWN ON DRAWINGS SHALL BE VERIFIED AT THE SITE BY CONTRACTOR BEFORE ORDERING / FABRICATING ANY MATERIALS OR PERFORMING WORK. 54. DO NOT INTERRUPT UTILITIES SERVING EXISTING VAMC FACILITIES EXCEPT WHEN AUTHORIZED IN WRITING BY THE VA AND ALL AUTHORITIES HAVING JURISDICTION. PROVIDE AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING CONSTRUCTION ACTIVITIES AS ACCEPTABLE TO THE VA AND GOVERNING AUTHORITIES AS A PART OF BASE CONTRACT WORK. 55. NOTIFY ALL VA CFM OFFICE AND APPLICABLE PERSONS WITH OVERSIGHT OF UTILITIES AT LEAST 72 HOURS PRIOR TO START OF ANY OPERATION. OBTAIN NECESSARY PERMITS FROM APPROPRIATE GOVERNING AUTHORITIES, PRIOR TO THE DEMOLITION AND REMOVAL OF THE WORK ON THE SITE. PERMITS AND CERTIFICATIONS SHALL BE DELIVERED TO AND RETAINED PERMITS AND CERTIFICATIONS SHALL BE DELIVERED TO AND RETAINED RETAINED BY THE VA. 56. REMOVE AND LEGALLY DISPOSE OF ALL DEBRIS AND ADDITIONAL MATERIALS FROM SITE. 57. PROTECT AND BE RESPONSIBLE FOR ADJACENT STRUCTURES AND SPACES WITHIN AREA OF SPACES WITHIN AREA OF OPERATION UNDER THIS CONTRACT. ANY DAMAGE OR DISTURBANCE RESULTING FROM WORK DONE UNDER THIS CONTRACT SHALL BE PROMPTLY RESTORED, REPLACED OR REPAIRED AT NO ADDITIONAL COST TO THE VA. 58. ADEQUATELY BRACE AND PROTECT WORK DURING CONSTRUCTION AGAINST DAMAGED, BREAKAGE, COLLAPSE, DISTORTION, AND/OR MISALIGNMENT IN ACCORDANCE WITH APPLICABLE CODES, STANDARDS AND GOOD PRACTICES. WORK AND/OR CONSTRUCTION STANDARDS AND GOOD PRACTICES. WORK AND/OR CONSTRUCTION OPERATIONS SHALL NOT UNDERMINE THE STRUCTURAL INTEGRITY OF THE BUILDING. 59. MAINTAIN FOR THE ENTIRE LENGTH OF THE CONTRACT, EXITS, EXIT LIGHTING, FIRE PROTECTION DEVICES AND ALARMS TO CONFORM WITH VA REQUIREMENT. PROVIDE AND VA REQUIREMENT. PROVIDE AND MAINTAIN NECESSARY COVERINGS, BOARDS, TEMPORARY PARTITIONS AND DOORS / HARDWARE AS REQUIRED TO PROTECT EXISTING WORK, CONSTRUCTION AREAS, REQUIRED TO PROTECT EXISTING WORK, CONSTRUCTION AREAS, MATERIALS AND FINISHES TO REMAIN. 60. LOCATE DOOR OPENINGS 4" (FOUR INCHES) FROM ADJACENT PERPENICULAR WALL, UNLESS OTHERWISE NOTED. DOOR OPENINGS ADJACENT TO CASEWORK, MILLWORK, OR OTHER FIXED EQUIPMENT, SHALL BE FOUR INCHES FROM THE FACE OF EQUIPMENT, UNLESS OTHERWISE NOTED. 61. PROVIDE CONTROL JOINTS AT 25'-0" O.C. MAXIMUM FOR CMU AND GYPSUM BOARD PARTITIONS, UNLESS OTHERWISE NOTED. 62. VERIFY EXISTING COLUMN CENTERLINES, SIZES AND LOCATIONS PRIOR TO THE START OF WORK BRING ANY DISCREPANCIES TO THE VA CFM OFFICE / A/E'S ATTENTION PRIOR TO OFFICE / A/E'S ATTENTION PRIOR TO TO THE START OF WORK IN THAT AREA. 63. IN AREAS WHERE PREVIOUS DEMOLITION OR EXISTING CONDITIONS HAVE CAUSED UNEVENNESS OF THE FLOOR SLAB, CONTRACTOR SHALL PATCH AND LEVEL EXISTING SLAB TO MATCH ADJACENT SLAB CONSTRUCTION. COORDINATE WITH FINISH PLANS AND DETAILS. DETAILS. 64. SUB-FLOOR SHALL BE CLEAN AND FREE OF DUST, SOLVENTS, SEALERS, ADHESIVE RESIDUE, AND OTHER FOREIGN MATERIALS PRIOR TO FINISH FLOOR INSTALLATION. VERIFY ALL WALL AND FLOOR SUBSTRATES ARE ACCEPTABLE FOR FLOORING AND BASE APPLICATION. PREPARE SURFACE ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. SEE SPECIFICATIONS FOR FURTHER INFORMATION. 65. PATCH EXISTING AND NEW SURFACES TO MATCH ADJACENT IN A MANNER SUITABLE TO RECEIVE FINISHES. 66. PROVIDE LINTEL AT ALL DOOR LOCATIONS WITHIN A MASONRY WALL. SEE SHEETS AE601 & AE603 FOR LINTEL SCHEDULE AND DOOR DIMENSIONS. 67. ALL PARTITIONS TO BE TYPE Y6, UNLESS OTHERWISE NOTED. 68. WOOD MATERIALS SHALL BE FIRE RETARDANT-TREATED WOOD WHERE APPLICABLE. 69. REFER TO M/E/P DWGS. FOR ADDITIONAL SCOPE OF WORK. 70. ALL FIRE EXTINGUISHERS WILL BE AT LEAST 2.5 GALLON (PRESSURIZED WATER) IN SIZE. FIRE EXTINGUISHER CABINETS SHALL BE SIZED TO FIT 2.5 GALLON FIRE EXTINGUISHERS.
SPECIAL INSPECTION, MATERIAL TESTING
& STRUCTURAL OBSERVATION ITEMS
REQUIRED BY CHAPTER 17 OF THE 2018 IBC
INDICATE ITEMS REQUIRING SPECIAL INSPECTION, STRUCTURAL TESTING, OR STRUCTURAL OBSERVATIONS BY
CHECKING THE APPROPRIATE BOX. ALL ITEMS NOT REQUIRING INSPECTION/TESTING SHOULD BE REMOVED FROM
THE FORM. FOR ITEMS REQUIRING CONTINUOUS INSPECTION, A SPECIAL INSPECTOR MUST BE PRESENT ONSITE
DURING THE PERFORMANCE OF THAT TASK. IN MOST CASES “PERIODIC” INSPECTIONS/TESTS SHALL BE PERFORMED
PRIOR TO COMMENCING THE TASK, INTERMITTENTLY DURING THE TASK, AND AT THE COMPLETION OF THE TASK.
THE “DETAILED INSTRUCTIONS & FREQUENCY” PROVIDES A DESCRIPTION OF THE PRESUMED REQUIREMENTS FOR
TASKS REQUIRING “PERIODIC” INSPECTIONS. THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHOULD
REVISE THE REQUIREMENTS AS NEEDED ON A PROJECT-SPECIFIC BASIS.
Required In-plant □ Steel Construction □ Concrete Construction □ Wood Construction
Inspections □ Cold-formed Construction □ Other____________ □ Other : ________________
APPROVED FABRICATOR YES NO
FABRICATORS (IBC 1704.2.5)
UNAPPROVED FABRICATOR YES NO
FABRICATOR'S NAME YES
FABRICATOR'S PLANT LOCATION
ITEM COMMENTS
PRIOR TO WELDING (TABLE N5.4-1, AISC 360-16):
Verify welding procedures (WPS) and consumable certificates
Material Identification
Verify type and grade of material.
Welder identification
A system shall be maintained by which a welder who has welded a joint or member can be identified.
Fit-up groove welds
Verify joint preparation, dimensions, cleanliness, tacking, and backing.
Access holes
Verify configuration and finish.
Fit-up of fillet welds
Verify alignment, gaps at root, cleanliness of steel surfaces, and tack weld quality and location.
DURING WELDING (TABLE N5.4-2, AISC 360-16)
Use of qualified welders Verify that welders are appropriately qualified.
Control and handling of welding consumables
Verify packaging and exposure control.
Cracked tack welds
Verify that welding does not occur over cracked tack welds.
Environmental conditions
Verify win speed is within limits as well as precipitation and temperature.
WPS followed
Verify items such as settings on welding equipment, travel speed, welding materials, shielding gas type/flow rate, preheat applied, interpass temperature maintained, and proper position.
Welding techniques
Verify interpass and final cleaning, each pass is within profile limitations, and quality of each pass.
AFTER WELDING (TABLE N5.4-3, AISC 360-16):
Welds cleaned
Verify that welds have been properly cleaned.
Size, length, and location of welds
Welds meet visual acceptance criteria
Arc Strikes k-area
Backing & weld tabs removed
Repair activities
Document acceptance or rejection of welded joint/member
NONDESTRUCTIVE TESTING (SECTION N5.5, AISC 360-16):
CJP welds (Risk Cat. II)
Ultrasonic testing shall be performed on 10% of CJP groove welds in butt, T- and corner joints subject to transversely applied tension loading in materials
5/16- inch thick or greater. Testing rate must be increased if > 5% of welds tested have unacceptable defects.
CJP welds (Risk Cat. III or IV) A reduction in the rate of ultrasonic testing is allowed
Access holes (flange > 2”)
Welded joints subject to fatigue
PRIOR TO BOLTING (TABLE N5.6-1, AISC 360-16):
» Not required if only snug-tight joints are specified [per Section N5.6(1) of AISC
360-10].
Certifications of fasteners
Fasteners marked
Verify that fasteners have been marked in accordance
Proper fasteners for joint
Verify grade, type, and bolt length if threads are excluded from the shear plane.
Proper bolting procedure Verify proper procedure is used for the joint detail.
Connecting elements
Verify appropriate faying surface condition and hole preparation, if specified, meet requirements.
Pre-installation verification testing
Observe and document verification testing by installation personnel for fastener assemblies and methods used.
Proper storage
Verify proper storage of bolts, nuts, washers, and other fastener components.
DURING BOLTING (TABLE N5.6-2, AISC 360-16):
» Not required if only snug-tight joints are specified [per Section N5.6(1) of AISC 360-16].
» Not required for pretensioned joints using turn-of-the-nut method with match-marking, direct-tension-indicators, or twist-off type tension control method [per Section N5.6(2) of
AISC 360-16].
Fastener assemblies
Verify that fastener assemblies are of suitable condition, paced in all holes, and washers are positioned as required.
Snug-tight prior to pretensioning
Verify that joints are brought to snug-tight condition prior to pretensioning operation.
N/A
Fastener component
Verify that fastener component is not turned by wrench prevented from rotating.
Pretensioned fasteners
Verify that fasteners are Pretensioned in accordance with RCSC Specification, progressing systematically from the most rigid point toward the free edges.
N/A
AFTER BOLTING (TABLE N5.6-3, AISC 360-16):
Document acceptance or rejection of bolted connections
Document acceptance or rejection of bolted connections
OTHER STEEL…