Attachment J-0200000-05(b) Form Contractor Significant Incident Report.pdf

PDF 31 KB Posted

Attached to
NAVAL RESEARCH LABORATORY (NRL) FACILITY SUPPORT SERVICES (FSS)
Solicitation number
N4008027R1001
Issued by

About this file

This is a Contractor Significant Incident Report (CSIR-1) form used by federal contracting activities to document and investigate workplace accidents, injuries, illnesses, fatalities, and other significant incidents occurring on federal construction and service contracts.

The four-page form captures comprehensive incident data including accident classification (injury, illness, fatality, property damage, procedural issues, or environmental), personal information about the affected individual, witness data, and general information about the incident such as date, time, location, equipment involved, contract details, and contractor identification. Section 5 documents injury or illness severity, estimated days lost, hospitalization, restricted duty, affected body parts, and injury nature. Section 6 requires a detailed accident description, first aid/cleanup information, bloodborne pathogen exposure details, site security status, and identification of violated OSHA and EM 385-1-1 standards. Section 7 systematically evaluates causal factors across multiple categories including design, inspection/maintenance, physical condition, operating procedures, job practices, human factors, environmental factors, chemical/physical agents, office factors, support factors, PPE, drugs/alcohol, activity hazard analysis, and management/supervision. Additional sections address worker training, direct and indirect causes, corrective actions with implementation dates, OSHA notification and citation details, and penalty amounts. The form concludes with sign-off requirements from the report preparer (supervisor), contracting officer (management review), and safety/occupational health officer, with options to accept, request amendments, or provide comments referencing NAVFACHQ Construction Safety Program and EM 385-1-1 compliance.

View the file

Other files

File Type Posted
0100000 C General Information.pdf PDF
1602000 C Electrical.pdf PDF
1604000 C Wastewater.pdf PDF
1601000 C Utility Management.pdf PDF
Attachment J-0200000-05(e) Solid Waste Management Report.pdf PDF
1502000 J Facility Investment.pdf PDF
Attachment J-1502000-05 HVAC and Refrigeration Systems.xlsx XLSX spreadsheet
Attachment J-1502000-07 Interior and Exterior Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-10 Lightning Arrestors and Grounding Devices.xlsx XLSX spreadsheet
Attachment J-1502000-13 Auxiliary Generator Systems.xlsx XLSX spreadsheet
Attachment J-1502000-16 POL Systems.xlsx XLSX spreadsheet
Attachment J-1502000-22 Emergency Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-31 Mass Communication Systems.xlsx XLSX spreadsheet
1503030 J Integrated Solid Waste Management.pdf PDF
1503060 J Pavement Clearance.pdf PDF
Attachment J-1601000-04 (c)- NRL Update Utility Drawings - Chilled Water.pdf PDF
Attachment J-1601000-10 Electrical Assets.xlsx XLSX spreadsheet
Attachment J-1601000-13 UEM-DI Meter Group and the Direct Condition Rating.pdf PDF
1502000 C Facility Investment.pdf PDF
1503030 C Integrated Solid Waste Management.pdf PDF
1503060 C Pavement Clearance.pdf PDF
1606000 C Water.pdf PDF
Attachment J-0200000-04 NAVFAC 4330 INVOICE FORM.xlsx XLSX spreadsheet
Attachment J-0200000-05(f) Directions for Process Material Log Sheets.pdf PDF
Attachment J-0200000-05(j) Crane and Rigging Gear Accident Report.pdf PDF
Attachment J-0200000-11 MAXIMO Data Reporting.pdf PDF
Attachment J-0200000-15 ELINs Blank.xlsx XLSX spreadsheet
1501000 J Facility Management.pdf PDF
Attachment J-1501000-04 - NRL Site Map.pdf PDF
Attachment J-1502000-01 Definitions and Acronyms.pdf PDF
Attachment J-1502000-03 Sample of E_U_R Orders.pdf PDF
Attachment J-1502000-08 Boilers and UPVs.xlsx XLSX spreadsheet
Attachment J-1502000-12 Compressed Air.xlsx XLSX spreadsheet
Attachment J-1502000-19 Manual and Automated Doors.xlsx XLSX spreadsheet
Attachment J-1502000-21 Emergency Eye Wash and Emergency Showers.xlsx XLSX spreadsheet
Attachment J-1502000-24 Exhaust Hood and Duct Systems.xlsx XLSX spreadsheet
Attachment J-1502000-26 Boiler Water Testing and Treatment.xlsx XLSX spreadsheet
Attachment J-1502000-30 Miscellaneous Equipment.xlsx XLSX spreadsheet
Attachment J-1502000-32 Installation Facilities Monitoring.pdf PDF
1601000 J Utilities Management.pdf PDF
Attachment J-1601000-01 Points of Demarcation.pdf PDF
Attachment J-1601000-04 (b)- NRL Update Utility Drawings - Domestic Water.pdf PDF
Attachment J-1601000-04 (d) NRL 13.8KV SINGLE LINE REV-11.pdf PDF
Attachment J-1601000-08 Utility Asset Tagging Guidance.pdf PDF
Attachment J-1601000-12 Water Assets.xlsx XLSX spreadsheet
1604000 J Wastewater.pdf PDF
1501000 C Facility Management.pdf PDF
0200000 J Management and Administration.pdf PDF
Attachment J-0200000-02 Wage Determination.pdf PDF
Attachment J-0200000-05(c) SECNAV Form 5512-1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Significant Incident Report (CSIR-1) Page 1 of 4 Report Date: Contracting Activity/ROICC Office

1. Accident Classification:

Injury Illness Fatality Property Damage Procedural Issues Environmental

Involving:

Hazardous Materials Electrical Equip/Motor Vehicle/ Diving Falls Material Handling Confined Space Crane/Rigging Trenching/Entrapment Fire Other Waterfront Operations Demolition/Renovation

2. Personal Data:

A. Name (Last, First, M.) B. Age C. Sex D. Social Security Number

E. Job Description/Title F. Employed By G. Supervisor s Name

3. Witness Data (Attach Witness Summary Statements to Report):

A. Name (Last, First, M.) B. Age C. Sex

D. Job Description/Title E. Employed By

4. General Information:

A. Date of Accident B. Time of Accident C. Exact Location of Accident D. Type of Construction Equipment (Month/Day/Year) (Make, Model, Serial Number, Vin #)

E. Contract Number/Title F. Construction Activity SIC G. Hazardous Material Spill/Release

H. Type of Contract I. Contractor’s Name/Address/Phone Number

Construction (1) Prime:

A/E Service

RAC

CLEAN (2) Sub:

JOC

OTHER_______

J. Safety Manager’s Name Phone # K. Insurance Carrier

L. Work Activity at Time of Accident M. Personal Protective Equipment?

(1) Available & Used (2) Not Required

(3) Available & not used (4) Not Related to mishap

(5) Wrong PPE for job

(6) List Type(s) used:

5. Injury/Illness/Fatality Information:

A. Severity of Illness/Injury B. Estimated Days Lost C. Estimated Days Hospitalized D. Estimated Days Restricted Duty

E. List Body Part(s) Affected F. Nature of Illness/Injury G. Type and Source of Injury/Illness

(1) Type: (2) Source:

6. A. Accident Description (Describe in your own words) (Use additional paper if necessary)

B. Who provided first aid and/or cleanup of mishap site?

C. Any blood borne pathogen exposure by other than EMT’s? If so who?

D. Was site secured and witness interviews taken immediately?

E. List OSHA and EM 385-1-1 standards/requirements that were violated?

7. Causal Factors (Explain yes answers on a supplementary sheet) YES NO

Design - Was design of facility, workplace, or equipment a factor?

Inspection/Maintenance - Were inspection & maintenance procedures a factor?

Persons Physical Condition - In your opinion, was the physical condition of the person a factor?

Operating Procedures - Were operating procedures a factor?

Job Practices - Were any job safety/health practices not followed when the accident occurred?

Human Factors - Did any human factors such as size or strength of person etc., contribute to the accident?

YES NO

Environmental Factors - Did heat, cold, dust, sun, glare, etc., contribute to the accident?

Chemical & Physical Agent Factors - Did exposure to chemical agents, such as dust, fumes, mists, vapors or physical agents such as noise, radiation, etc., contribute to the accident?

Office Factors - Did office setting such as lifting office furniture, carrying, stopping, etc., contribute to the accident?

Support Factors - Were inappropriate tools/resources provided to properly perform the activity task?

Personal Protective Equipment - Did the improper selection use, or maintenance of personal protective equipment contribute to the accident?

Drugs/Alcohol - In your opinion, were drugs or alcohol a factor?

Activity Hazard Analysis - Was the lack of an adequate (IAW EM 385-1-1 Sec 01.A.09) Activity Hazard Analysis a contributing factor?

- Was it site specific and address the type of work/operations performed when the mishap occurred?

Management - Did the lack of adequate supervision contribute to the accident?

- Was inadequate information provided at pre-con meeting?

8. Training:

A. Was/were person(s) trained to perform activity/task?

B. Type of training?

C. Date of most recent formal training? / / D. List topics discussed

9. Fully Explain What Allowed or Caused The Accident, Include Direct and Indirect Causes:

A. Direct Cause

B. Indirect Cause

C. Action(s) taken to prevent re occurrences or provide on-going corrective actions.

D. Corrective Action Dates

(1) Beginning (Mo/Da/Yr) / / (2) Anticipated Completion Date (Mo/Da/Yr) / /

10. OSHA

A. Date OSHA was notified / / C. Date of OSHA Citation / /

B. Date OSHA Investigated / / D. $ Amount of Penalties:

11. Report Preparer

Print Name & Title of Supervisor Completing Report

Signature: _____________________________________ Date (Mo/Da/Yr) _________________

12. Management Review (Contracting Officer)

A. Accepted B. Amendments Required C. Comments (include program improvements required for your Command. NAVFACHQ Construction Safety Program and EM 385-1-1)

D. Print Name & Title of Official Completing Report

Signature: ________________________________ Date: (Mo/Da/Yr) _________________

13. Safety And Occupational Health Officer Review

A. Concur B. Non Concur C. Additional Actions/Comments

D. Print Name & title of Safety Personnel Reviewing

Signature: ____________________________ Date (Mo/Da/Yr) _____________________

File details come from the government source that posted it. Updated .