Attachment J-1502000-01 Definitions and Acronyms.pdf

PDF 103 KB Posted

Attached to
NAVAL RESEARCH LABORATORY (NRL) FACILITY SUPPORT SERVICES (FSS)
Solicitation number
N4008027R1001
Issued by

About this file

This document is a definitions and acronyms reference attachment for federal facilities maintenance and management contracting. It establishes standardized terminology for use in contract documents related to facilities stewardship, equipment classification, and maintenance operations.

The definitions section covers four crane categories with specific capacity and application parameters: Category 1 encompasses large mobile and stationary cranes (portal, hammerhead, tower, container, and aircraft crash cranes); Category 2 & 3 includes overhead traveling cranes, gantry cranes, wall cranes, jib cranes, and fixed hoists with capacities of 20,000 pounds or greater; and Category 4 covers commercial truck-mounted cranes and pedestal-mounted assemblies with rated capacities of 2,000 pounds and greater, which require licensed operators. The document also defines three equipment classifications: collateral equipment (built-in and substantially affixed), installed equipment (building-type and large affixed property essential to facility function), and personal property equipment (severable without substantial loss of value). Key maintenance and repair terms are defined, including preventive maintenance (planned activities to reduce breakdowns), repair (restoration to designated purposes), replacement (when equipment reaches end of useful life), restoration (returning real property to intended use), and sustainment (cyclical maintenance and repair activities). The Integrated Maintenance Program (IMP) is defined as a reliability-centered inspection and testing program giving contractors full responsibility for system maintenance without separate emergency or routine work order issuance. Additional definitions address facilities life cycle stages, life-cycle costs analysis, and facilities maintenance management coordination. The acronyms section lists 12 standard abbreviations used throughout facilities contracting documentation, including UFC (Unified Facilities Criteria), HVAC, SRM (Sustainment, Restoration and Modernization), and others relevant to federal facilities operations and infrastructure assessment.

View the file

Other files

File Type Posted
0100000 C General Information.pdf PDF
1602000 C Electrical.pdf PDF
1604000 C Wastewater.pdf PDF
1601000 C Utility Management.pdf PDF
Attachment J-0200000-05(e) Solid Waste Management Report.pdf PDF
1502000 J Facility Investment.pdf PDF
Attachment J-1502000-05 HVAC and Refrigeration Systems.xlsx XLSX spreadsheet
Attachment J-1502000-07 Interior and Exterior Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-10 Lightning Arrestors and Grounding Devices.xlsx XLSX spreadsheet
Attachment J-1502000-13 Auxiliary Generator Systems.xlsx XLSX spreadsheet
Attachment J-1502000-16 POL Systems.xlsx XLSX spreadsheet
Attachment J-1502000-22 Emergency Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-31 Mass Communication Systems.xlsx XLSX spreadsheet
1503030 J Integrated Solid Waste Management.pdf PDF
1503060 J Pavement Clearance.pdf PDF
Attachment J-1601000-04 (c)- NRL Update Utility Drawings - Chilled Water.pdf PDF
Attachment J-1601000-10 Electrical Assets.xlsx XLSX spreadsheet
Attachment J-1601000-13 UEM-DI Meter Group and the Direct Condition Rating.pdf PDF
1502000 C Facility Investment.pdf PDF
1503030 C Integrated Solid Waste Management.pdf PDF
1503060 C Pavement Clearance.pdf PDF
1606000 C Water.pdf PDF
Attachment J-0200000-04 NAVFAC 4330 INVOICE FORM.xlsx XLSX spreadsheet
Attachment J-0200000-05(b) Form Contractor Significant Incident Report.pdf PDF
Attachment J-0200000-05(f) Directions for Process Material Log Sheets.pdf PDF
Attachment J-0200000-05(j) Crane and Rigging Gear Accident Report.pdf PDF
Attachment J-0200000-11 MAXIMO Data Reporting.pdf PDF
Attachment J-0200000-15 ELINs Blank.xlsx XLSX spreadsheet
1501000 J Facility Management.pdf PDF
Attachment J-1501000-04 - NRL Site Map.pdf PDF
Attachment J-1502000-03 Sample of E_U_R Orders.pdf PDF
Attachment J-1502000-08 Boilers and UPVs.xlsx XLSX spreadsheet
Attachment J-1502000-12 Compressed Air.xlsx XLSX spreadsheet
Attachment J-1502000-19 Manual and Automated Doors.xlsx XLSX spreadsheet
Attachment J-1502000-21 Emergency Eye Wash and Emergency Showers.xlsx XLSX spreadsheet
Attachment J-1502000-24 Exhaust Hood and Duct Systems.xlsx XLSX spreadsheet
Attachment J-1502000-26 Boiler Water Testing and Treatment.xlsx XLSX spreadsheet
Attachment J-1502000-30 Miscellaneous Equipment.xlsx XLSX spreadsheet
Attachment J-1502000-32 Installation Facilities Monitoring.pdf PDF
1601000 J Utilities Management.pdf PDF
Attachment J-1601000-01 Points of Demarcation.pdf PDF
Attachment J-1601000-04 (b)- NRL Update Utility Drawings - Domestic Water.pdf PDF
Attachment J-1601000-04 (d) NRL 13.8KV SINGLE LINE REV-11.pdf PDF
Attachment J-1601000-08 Utility Asset Tagging Guidance.pdf PDF
Attachment J-1601000-12 Water Assets.xlsx XLSX spreadsheet
1604000 J Wastewater.pdf PDF
Pre-Solicitation Notice - NRL FSS.pdf PDF
0200000 C Management and Administration.pdf PDF
Attachment J-0200000-05(a) DBIDS Standard Operating Procedures.pdf PDF
Attachment J-0200000-05(g) Contractor Hazardous Material Inventory Log.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-1502000-01 Definitions and Acronyms

Definition Description Crane, Category 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes

(YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.

Crane, Category 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.

Crane, Category 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.

Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.

Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.

Equipment, Personal Property

Personal property equipment includes all equipment other than collateral equipment.

Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.

Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.

Facilities Maintenance Management

The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”

Integrated Maintenance Program (IMP)

IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Emergency, Urgent, and Routine Work Orders will not be issued for accomplishment of repairs on systems and equipment maintained under

IMP.

Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.

Attachment J-1502000-01 Definitions and Acronyms

Definition Description Maintenance, Preventive

Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.

Management Information Systems- Maintenance

A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.

Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair.

The intent of repair is to have the equipment at normal working condition.

Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters.

Replacement is performed when the equipment has reached the end of its useful life;

when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.

Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.

Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.

Weight Handling Equipment (WHE)

Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE.

Acronym Title BPVC Boiler and Pressure Vessel Code HVAC Heating, Ventilation, and Air Conditioning ICAP Infrastructure Condition Assessment Program RPIE Real Property Inventory Equipment SCADA Supervisory Control and Data Acquisition SM Semimonthly SOP Standard Operating Procedures SRM Sustainment, Restoration and Modernization UFC Unified Facilities Criteria UPV Unfired Pressure Vessel VTE Vertical Transportation Equipment

File details come from the government source that posted it. Updated .