This is a blank pricing template (Attachment J-0200000-15) for a Firm-Fixed Price (FFP) contract to provide facility support services at the U.S. Naval Research Laboratory (NRL) in Washington, DC. The contract structure includes a base period and seven (7) option periods, with each period containing two Contract Line Item Numbers (CLINs): CLIN 0001/recurring work and CLIN 0002/non-recurring work. The template is designed for contractors to input unit prices and calculate total costs across the performance period.

The recurring work line items (CLIN 0001 and corresponding option period CLINs) cover facility management services including work control, infrastructure condition assessment, control systems, and technical support; facility investment services such as emergency/urgent/routine service orders, project work orders, and preventive maintenance programs for HVAC systems, lighting, boilers, fire protection, compressed air, generators, building controls, electrical switchgear, POL systems, backflow preventers, UPS systems, doors, and emergency equipment; integrated solid waste management; pavement clearance and sweeping; utility management with service orders and assessment programs; electrical preventive maintenance; wastewater preventive maintenance and inspection programs; and water preventive maintenance services. The non-recurring work line items (CLIN 0002 and option CLINs) include unit-priced labor (skilled and unskilled hours negotiated by the Contracting Officer), materials and equipment with burden rates, asbestos and lead material removal, suspended ceiling tile and grid replacement, computer room air conditioning units, portable chiller services in multiple tonnage ranges, pavement patching and repair, snow and ice clearing, sanitary sewer overflow cleanup, and chlorine shock disinfection services. All pricing fields in this blank template are currently set to $0.00, awaiting contractor input for proposal submission.

View the file

Other files

File Type Posted
0100000 C General Information.pdf PDF
1602000 C Electrical.pdf PDF
1604000 C Wastewater.pdf PDF
1601000 C Utility Management.pdf PDF
Attachment J-0200000-05(e) Solid Waste Management Report.pdf PDF
1502000 J Facility Investment.pdf PDF
Attachment J-1502000-05 HVAC and Refrigeration Systems.xlsx XLSX spreadsheet
Attachment J-1502000-07 Interior and Exterior Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-10 Lightning Arrestors and Grounding Devices.xlsx XLSX spreadsheet
Attachment J-1502000-13 Auxiliary Generator Systems.xlsx XLSX spreadsheet
Attachment J-1502000-16 POL Systems.xlsx XLSX spreadsheet
Attachment J-1502000-22 Emergency Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-31 Mass Communication Systems.xlsx XLSX spreadsheet
1503030 J Integrated Solid Waste Management.pdf PDF
1503060 J Pavement Clearance.pdf PDF
Attachment J-1601000-04 (c)- NRL Update Utility Drawings - Chilled Water.pdf PDF
Attachment J-1601000-10 Electrical Assets.xlsx XLSX spreadsheet
Attachment J-1601000-13 UEM-DI Meter Group and the Direct Condition Rating.pdf PDF
1502000 C Facility Investment.pdf PDF
1503030 C Integrated Solid Waste Management.pdf PDF
1503060 C Pavement Clearance.pdf PDF
1606000 C Water.pdf PDF
Attachment J-0200000-04 NAVFAC 4330 INVOICE FORM.xlsx XLSX spreadsheet
Attachment J-0200000-05(b) Form Contractor Significant Incident Report.pdf PDF
Attachment J-0200000-05(f) Directions for Process Material Log Sheets.pdf PDF
Attachment J-0200000-05(j) Crane and Rigging Gear Accident Report.pdf PDF
Attachment J-0200000-11 MAXIMO Data Reporting.pdf PDF
1501000 J Facility Management.pdf PDF
Attachment J-1501000-04 - NRL Site Map.pdf PDF
Attachment J-1502000-01 Definitions and Acronyms.pdf PDF
Attachment J-1502000-03 Sample of E_U_R Orders.pdf PDF
Attachment J-1502000-08 Boilers and UPVs.xlsx XLSX spreadsheet
Attachment J-1502000-12 Compressed Air.xlsx XLSX spreadsheet
Attachment J-1502000-19 Manual and Automated Doors.xlsx XLSX spreadsheet
Attachment J-1502000-21 Emergency Eye Wash and Emergency Showers.xlsx XLSX spreadsheet
Attachment J-1502000-24 Exhaust Hood and Duct Systems.xlsx XLSX spreadsheet
Attachment J-1502000-26 Boiler Water Testing and Treatment.xlsx XLSX spreadsheet
Attachment J-1502000-30 Miscellaneous Equipment.xlsx XLSX spreadsheet
Attachment J-1502000-32 Installation Facilities Monitoring.pdf PDF
1601000 J Utilities Management.pdf PDF
Attachment J-1601000-01 Points of Demarcation.pdf PDF
Attachment J-1601000-04 (b)- NRL Update Utility Drawings - Domestic Water.pdf PDF
Attachment J-1601000-04 (d) NRL 13.8KV SINGLE LINE REV-11.pdf PDF
Attachment J-1601000-08 Utility Asset Tagging Guidance.pdf PDF
Attachment J-1601000-12 Water Assets.xlsx XLSX spreadsheet
1604000 J Wastewater.pdf PDF
1501000 C Facility Management.pdf PDF
0200000 J Management and Administration.pdf PDF
Attachment J-0200000-02 Wage Determination.pdf PDF
Attachment J-0200000-05(c) SECNAV Form 5512-1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

Annual Cost Summary
CLINDescriptionTotals
CLIN 0001Base Period Recurring Work$ - 0
CLIN 0002Base Period Non-Recurring Work$ - 0
Base Period Total$ - 0
CLIN 00031st Option Period Recurring Work$ - 0
CLIN 00041st Option Period Non-Recurring Work$ - 0
1st Option Period Total$ - 0
CLIN 00052nd Option Period Recurring Work$ - 0
CLIN 00062nd Option Period Non-Recurring Work$ - 0
2nd Option Period Total$ - 0
CLIN 00073rd Option Period Recurring Work$ - 0
CLIN 00083rd Option Period Non-Recurring Work$ - 0
3rd Option Period Total$ - 0
CLIN 00094th Option Period Recurring Work$ - 0
CLIN 00104th Option Period Non-Recurring Work$ - 0
4th Option Period Total$ - 0
CLIN 00115th Option Period Recurring Work$ - 0
CLIN 00125th Option Period Non-Recurring Work$ - 0
5th Option Period Total$ - 0
CLIN 00136th Option Period Recurring Work$ - 0
CLIN 00146th Option Period Non-Recurring Work$ - 0
6th Option Period Total$ - 0
CLIN 00157th Option Period Recurring Work$ - 0
CLIN 00167th Option Period Non-Recurring Work$ - 0
7th Option Period Total$ - 0
Total Recurring Work$ - 0
Total Non-Recurring Work$ - 0
Total Contract Cost$ - 0

Base RW

ATTACHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
SOLICITATION NO.
EXHIBIT A - CLIN 0001
LINE ITEM 0001 RECURRING WORK PRICE - BASE PERIOD
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINs A001 - A095
ELINSub-ELINRecurring WorkQuantityUnit of IssueUnit PriceTotal
NRL
A001Specification 1501000 Facility Management (FP)
A001AAWork Control (Spec Item 3.1)12MO$ - 0$ - 0
A001ABInfrastructure Condition Assessment Program (ICAP) Services (Spec Item 3.2)12MO$ - 0$ - 0
A001ACControl Systems (Spec. Item 3.3)12MO$ - 0$ - 0
A001ADTechnical Support Services (Spec. Item 3.4)12MO$ - 0$ - 0
Total 1501000 Facility Management$ - 0
A002Specification 1502000 Facility Investment (ST)
Service Orders (Spec. Item 3.1)
A002AAEmergency Service Orders (Spec. Item 3.1.1)2,000EA$ - 0$ - 0
A002ABUrgent Service Orders (Spec. Item 3.1.2)2,000EA$ - 0$ - 0
A002ACRoutine Service Orders (Spec. Item 3.1.3)3,000EA$ - 0$ - 0
Project Work Orders (Spec. Item 3.2)
A002ADProject Work Order Level 1 (Spec. Item 3.2.1)50EA$ - 0$ - 0
Preventive Maintenance (PM) Program (Spec. Item 3.3)
A002AEHVAC and Refrigeration Systems (Spec Item 3.3.1)12MO$ - 0$ - 0
A002AFInterior and Exterior Lighting Systems (Spec Item 3.3.2)12MO$ - 0$ - 0
A002AGBoilers and UPVs (Spec Item 3.3.3)12MO$ - 0$ - 0
A002AHCathodic Protection Systems (Spec Item 3.3.4)12MO$ - 0$ - 0
A002AILighting Arrestors and Grounding Devices (Spec Item 3.3.5)12MO$ - 0$ - 0
A002AJFire Protection Systems (Spec Item 3.3.6)12MO$ - 0$ - 0
A002AKCompressed Air Systems (Spec Item 3.3.7)12MO$ - 0$ - 0
A002ALAuxiliary Generators (Spec Item 3.3.8)12MO$ - 0$ - 0
A002AMBuilding Control Systems (Spec Item 3.3.9)12MO$ - 0$ - 0
A002ANLow & Medium Voltage Switchgear (Spec Item 3.3.10)12MO$ - 0$ - 0
A002APPOL Systems(Spec Item 3.3.11)12MO$ - 0$ - 0
A002AQBackflow Preventers(Spec Item 3.3.12)12MO$ - 0$ - 0
A002ARUPS Systems(Spec Item 3.3.13)12MO$ - 0$ - 0
A002ASManual and Automatic Doors(Spec Item 3.3.14)12MO$ - 0$ - 0
A002ATRoll-up Doors(Spec Item 3.3.15)12MO$ - 0$ - 0
A002AUEmergency Eye Wash and Emergency Shower Stations(Spec Item 3.3.16)12MO$ - 0$ - 0
A002AVEmergency Lighting(Spec Item 3.3.17)12MO$ - 0$ - 0
A003Inspection, Testing, and Certification Program (Spec Item 3.5)
A003AABoilers and UPVs (Spec Item 3.5.1)12MO$ - 0$ - 0
A003ABBackflow Prevention Devices (Spec Item 3.5.2)12MO$ - 0$ - 0
Other Recurring Services Program (Spec Item 3.6)
A003ACGrease Traps (Spec Item 3.6.1)12MO$ - 0$ - 0
A003ADExhaust Hoods and Ducts (Spec Item 3.6.2)12MO$ - 0$ - 0
A003AEHVAC Seasonal Start-Up and Shutdown (Spec Item 3.6.3)12MO$ - 0$ - 0
A003AFHVAC Water Testing and Treatment Services (Spec Item 3.6.4)12MO$ - 0$ - 0
A003AGBoiler Seasonal Start-Up and Shutdown (Spec Item 3.6.5)12MO$ - 0$ - 0
A003AHBoiler Water Testing and Treatment Services (Spec Item 3.6.6)12MO$ - 0$ - 0
A003AIBuilding Drainage Systems (Spec Item 3.6.7)12MO$ - 0$ - 0
A003AJDrinking Fountains and Water Coolers (Spec Item 3.6.8)12MO$ - 0$ - 0
A003AKAcid Neutralization Systems (Spec Item 3.6.9)12MO$ - 0$ - 0
A003ALMiscellaneous Systems and Equipment (Spec Item 3.6.10)12MO$ - 0$ - 0
A003AMOil Water Separators (Spec Item 3.6.11)12MO$ - 0$ - 0
A003ANMass Notification Systems (Spec Item 3.6.12)12MO$ - 0$ - 0
A003APMotorized Gates (Spec Item 3.6.13)12MO$ - 0$ - 0
A003AQDedicated Building Mechanics (Spec Item 3.6.14)12MO$ - 0$ - 0
A003ARInstallation Facilities Monitoring (Spec Item 3.6.15)12MO$ - 0$ - 0
Total 1502000 Facility Investment$ - 0
A004Specification 1503030 Integrated Solid Waste Management (FX)
A094Specification 1503030 Integrated Solid Waste Management (FX)
A004AABulky Waste Collction and Removal (Spec Item 3.1)12MO$ - 0$ - 0
Total 1503030 1503030 Integrated Solid Waste Management$ - 0
A005Specification 1503060 Pavement Clearance (FX)
A00AAPavement Sweeping Services (Spec Item 3.1)12MO$ - 0$ - 0
Total 1503060 Pavement Clearance$ - 0
A006Specification 1601000 Utility Management
A006AAEmergency Service Orders (Spec Item 3.1.1)100EA$ - 0$ - 0
A006ABUrgent Service Orders (Spec Item 3.1.2)100EA$ - 0$ - 0
A006ACRoutine Service Orders (Spec Item 3.1.3)200EA$ - 0$ - 0
A006ADUtilities Infrastructure Condition Assessment Program (Spec Item 3.3)12MO$ - 0$ - 0
Specification 1601000 Utility Management$ - 0
A007Specification 1602000 Electrical
A007AAPreventive Maintenance Program as specified in Spec Item 3.512MO$ - 0$ - 0
A007ABServices for Other Recurring services as specified in Spec Item 3.812MO$ - 0$ - 0
Specification 1602000 Electrical Subtotal$ - 0
A008Specification 1604000 Wastewater
A008AAPreventive Maintenance Program as specified in Spec Item 3.212MO$ - 0$ - 0
A008ABServices for Inspection Program as specified in Spec Item 3.4
A008ACServices for Other Recurring services as specified in Spec Item 3.512MO$ - 0$ - 0
Specification 1604000 Wastewater Subtotal
A009Specification 1606000 Water
A009AAPreventive Maintenance Program as specified in Spec Item 3.212MO$ - 0$ - 0
A009ABServices for Other Recurring services as specified in Spec Item 3.512MO$ - 0$ - 0
Specification 1606000 Water Subtotal$ - 0
TOTAL FFP LINE ITEMSTOTAL$ - 0

Base NR

ATTACHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
SOLICITATION NO.
EXHIBIT A - CLIN 0002
LINE ITEM 0002 NON- RECURRING WORK PRICE - BASE PERIOD
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A700 - A703
ELIN/Sub-
ELINShort DescriptionFull DescriptionEst. QuantityUnitUnit PriceEst. Amount
Annex 0200000 Management and Administration
Unit Priced Labor
A700UnSkilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.10,000LH$0.00$ - 0
A701Skilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.10,000LH$0.00$ - 0
A702Material and Equipment - MUST BE NEGOTIATED BY KO.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.

Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2.

The estitmate quantity (in dollars) is provided. A fully burdened rate shall be entered in the Unit Price column. Burden rate shall include factors for the shipping and handling and the cost for barge shipments. For example, if a vendor's invoice on material is $1,000.00 and the unit price is $1.05, the cost of the material to the government will be $1,050.00. (DO - Dollars)100,000DO$0.00$ - 0
Annex 1502000 Facility Investment
A706Asbestos Material RemovalThe Contractor shall provide all labor, materials and equipment required to perform asbestos material removal in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order.
975SF$0.00$ - 0
A707Lead Material RemovalThe Contractor shall provide all labor, materials and equipment required to perform lead abatement in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order.750SF$0.00$ - 0
A708Replace Suspended Ceiling Tile (2'x2')The Contractor shall provide all labor, materials and equipment required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Work shall be completed within the timeframe specified on the task order.750SF$0.00$ - 0
A709Replace Suspended Ceiling Tile (2'x4')The Contractor shall provide all labor, materials and equipment required to replace 2’x4’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 8 ceiling tiles. Work shall be completed within the timeframe specified on the task order.1,500EA$0.00$ - 0
A710Replace Suspended Ceiling Grid, Cross Tee 4'The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.750EA$0.00$ - 0
A711Replace Suspended Ceiling Grid, Cross Tee 2'The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.500EA$0.00$ - 0
A712Replace Suspended Ceiling Grid, Main RunnerThe Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid main runner for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.750EA$0.00$ - 0
A713Provide Computer Room Air Conditioning (CRAC) Unit, Split/Heat Pump –type (5 Ton)The Contractor shall provide labor, management, supervision, tools, material and equipment to provide, connect, run and disconnect a CRAC unit. Price per month to include delivery/removal of CRAC unit to/from the site, installation, setup, required cable and fittings, all electrical connections, required ancillary supplies, all connections to the facility, operation, and maintenance and CFC-free refrigerants. The Contractor shall provide the unit within 1 calendar day or as specified in the order. Price is one unit for one month.25EA$0.00$ - 0
A714Portable Chiller Service - 1 to 50 tons (Monthly)The Contract shall provide Portable Chiller for capacity range 1 to 50 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification.5EA$0.00$ - 0
A715Portable Chiller Service - 51 to 100 tons (Monthly)The Contract shall provide Portable Chiller for capacity range 51 to 100 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification.5EA$0.00$ - 0
A716Portable Chiller Service - 101 to 200 tons (Monthly)The Contract shall provide Portable Chiller for capacity range 101 to 200 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification.5EA$0.00$ - 0
A717Portable Chiller Service - 201 + tons (Monthly)The Contract shall provide Portable Chiller for capacity range 201 + ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification.3EA$0.00$ - 0
Specification 1503060 Pavement Clearance
A801Pavement Patching and RepairThe Contractor shall provide labor, management, supervision, tools, material and equipment to provide pavement patching and repair. Repairs include, but are not limited to crack sealing, filling and patching potholes, spalls, scaling repairs, surface misalignments and surface breaks. Repairs in asphalt shall comply with UFC 3-270-01 Operation and Maintenance: Asphalt Maintenance and Repair and UFC 3-270-02 O&M: Asphalt Crack Repair. Work will be ordered in the increments of 10 SY. The Contractor shall provide all work within 15 calendar day or as specified in the order.100SY$0.00$ - 0
A802Snow and Ice ClearingThe Contractor shall provide provide all labor, management, supervision, tools, material, salt, sand or other deicing material and equipment neccesary to perform snow and ice removal services on installation sidewalks, building entrances, walkways, steps, exterior stairways and porches. Sidewalks and walkways shall be cleared and de-iced to create 4 foot pathways. The Contractor shall maintain cleared and de-iced conditions of serviced areas for up to 24 hours per occurrence. The Contractor shall respond within one hour of request or as specified in the order and remain onsite until work is completed. Areas to be serviced are listed in J-1503060-03.10EA$0.00$ - 0
Specification 1602000- Electrical
Specification 1604000- WasteWater
A901Sanitary Sewer Overflow Clean- upThe Contractor shall provide immediate mobilization of specialized vacuum equipment and environmental technicians to mitigate a sewage spill, prevent further contamination of surface waters, and restore the affected area to a safe, decontaminated state in compliance with EPA and state environmental regulations. The Contractor shall mobilize to the spill site within two (2) hours of initial notification.10EA$0.00$ - 0
Specification 1606000- Water
A902Chlorine Shock DisinfectionThe Contractor shall provide all labor, materials, equipment, and certified testing necessary to safely flush, disinfect, and test the repaired section of the potable water distribution system. No repaired line shall be returned to domestic service until satisfactory bacteriological test results are achieved and approved by the Contracting Officer’s Representative (COR) or Base Bioenvironmental Engineer. (6 inch line)10EA$0.00$ - 0
TOTAL NON-RECURRING PRICE BASE YEAR$ - 0

Opt 1 RW

ATTACHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
SOLICITATION NO.
EXHIBIT A - CLIN 0001
LINE ITEM 0001 RECURRING WORK PRICE - BASE PERIOD
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINs A001 - A095
ELINSub-ELINRecurring WorkQuantityUnit of IssueUnit PriceTotal
NRL
B001Specification 1501000 Facility Management (FP)
B001AAWork Control (Spec Item 3.1)12MO$ - 0$ - 0
B001ABInfrastructure Condition Assessment Program (ICAP) Services (Spec Item 3.2)12MO$ - 0$ - 0
B001ACControl Systems (Spec. Item 3.3)12MO$ - 0$ - 0
B001ADTechnical Support Services (Spec. Item 3.4)12MO$ - 0$ - 0
Total 1501000 Facility Management$ - 0
B002Specification 1502000 Facility Investment (ST)
Service Orders (Spec. Item 3.1)
B002AAEmergency Service Orders (Spec. Item 3.1.1)2,000EA$ - 0$ - 0
B002ABUrgent Service Orders (Spec. Item 3.1.2)2,000EA$ - 0$ - 0
B002ACRoutine Service Orders (Spec. Item 3.1.3)3,000EA$ - 0$ - 0
Project Work Orders (Spec. Item 3.2)
B002ADProject Work Order Level 1 (Spec. Item 3.2.1)50EA$ - 0$ - 0
Preventive Maintenance (PM) Program (Spec. Item 3.3)
B002AEHVAC and Refrigeration Systems (Spec Item 3.3.1)12MO$ - 0$ - 0
B002AFInterior and Exterior Lighting Systems (Spec Item 3.3.2)12MO$ - 0$ - 0
B002AGBoilers and UPVs (Spec Item 3.3.3)12MO$ - 0$ - 0
B002AHCathodic Protection Systems (Spec Item 3.3.4)12MO$ - 0$ - 0
B002AILighting Arrestors and Grounding Devices (Spec Item 3.3.5)12MO$ - 0$ - 0
B002AJFire Protection Systems (Spec Item 3.3.6)12MO$ - 0$ - 0
B002AKCompressed Air Systems (Spec Item 3.3.7)12MO$ - 0$ - 0
B002ALAuxiliary Generators (Spec Item 3.3.8)12MO$ - 0$ - 0
B002AMBuilding Control Systems (Spec Item 3.3.9)12MO$ - 0$ - 0
B002ANLow & Medium Voltage Switchgear (Spec Item 3.3.10)12MO$ - 0$ - 0
B002APPOL Systems(Spec Item 3.3.11)12MO$ - 0$ - 0
B002AQBackflow Preventers(Spec Item 3.3.12)12MO$ - 0$ - 0
B002ARUPS Systems(Spec Item 3.3.13)12MO$ - 0$ - 0
B002ASManual and Automatic Doors(Spec Item 3.3.14)12MO$ - 0$ - 0
B002ATRoll-up Doors(Spec Item 3.3.15)12MO$ - 0$ - 0
B002AUEmergency Eye Wash and Emergency Shower Stations(Spec Item 3.3.16)12MO$ - 0$ - 0
B002AVEmergency Lighting(Spec Item 3.3.17)12MO$ - 0$ - 0
B003Inspection, Testing, and Certification Program (Spec Item 3.5)
B003AABoilers and UPVs (Spec Item 3.5.1)12MO$ - 0$ - 0
B003ABBackflow Prevention Devices (Spec Item 3.5.2)12MO$ - 0$ - 0
Other Recurring Services Program (Spec Item 3.6)
B003ACGrease Traps (Spec Item 3.6.1)12MO$ - 0$ - 0
B003ADExhaust Hoods and Ducts (Spec Item 3.6.2)12MO$ - 0$ - 0
B003AEHVAC Seasonal Start-Up and Shutdown (Spec Item 3.6.3)12MO$ - 0$ - 0
B003AFHVAC Water Testing and Treatment Services (Spec Item 3.6.4)12MO$ - 0$ - 0
B003AGBoiler Seasonal Start-Up and Shutdown (Spec Item 3.6.5)12MO$ - 0$ - 0
B003AHBoiler Water Testing and Treatment Services (Spec Item 3.6.6)12MO$ - 0$ - 0
B003AIBuilding Drainage Systems (Spec Item 3.6.7)12MO$ - 0$ - 0
B003AJDrinking Fountains and Water Coolers (Spec Item 3.6.8)12MO$ - 0$ - 0
B003AKAcid Neutralization Systems (Spec Item 3.6.9)12MO$ - 0$ - 0
B003ALMiscellaneous Systems and Equipment (Spec Item 3.6.10)12MO$ - 0$ - 0
B003AMOil Water Separators (Spec Item 3.6.11)12MO$ - 0$ - 0
B003ANMass Notification Systems (Spec Item 3.6.12)12MO$ - 0$ - 0
B003APMotorized Gates (Spec Item 3.6.13)12MO$ - 0$ - 0
B003AQDedicated Building Mechanics (Spec Item 3.6.14)12MO$ - 0$ - 0
B003ARInstallation Facilities Monitoring (Spec Item 3.6.15)12MO$ - 0$ - 0
Total 1502000 Facility Investment$ - 0
B004Specification 1503030 Integrated Solid Waste Management (FX)
B004AABulky Waste Collction and Removal (Spec Item 3.1)12MO$ - 0$ - 0
Total 1503030 1503030 Integrated Solid Waste Management$ - 0
B005Specification 1503060 Pavement Clearance (FX)
B005AAPavement Sweeping Services (Spec Item 3.1)12MO$ - 0$ - 0
Total 1503060 Pavement Clearance$ - 0
B006Specification 1601000 Utility Management
B006AAEmergency Service Orders (Spec Item 3.1.1)100EA$ - 0$ - 0
B006ABUrgent Service Orders (Spec Item 3.1.2)100EA$ - 0$ - 0
B006ACRoutine Service Orders (Spec Item 3.1.3)200EA$ - 0$ - 0
B006ADUtilities Infrastructure Condition Assessment Program (Spec Item 3.3)12MO$ - 0$ - 0
Specification 1601000 Utility Management$ - 0
B007Specification 1602000 Electrical
B007AAPreventive Maintenance Program as specified in Spec Item 3.512MO$ - 0$ - 0
B007ABServices for Other Recurring services as specified in Spec Item 3.812MO$ - 0$ - 0
Specification 1602000 Electrical Subtotal$ - 0
B008Specification 1604000 Wastewater
B008AAPreventive Maintenance Program as specified in Spec Item 3.212MO$ - 0$ - 0
B008ABServices for Inspection Program as specified in Spec Item 3.4
B008ACServices for Other Recurring services as specified in Spec Item 3.512MO$ - 0$ - 0
Specification 1604000 Wastewater Subtotal
B009Specification 1606000 Water
B009AAPreventive Maintenance Program as specified in Spec Item 3.212MO$ - 0$ - 0
B009ABServices for Other Recurring services as specified in Spec Item 3.512MO$ - 0$ - 0
Specification 1606000 Water Subtotal$ - 0
TOTAL FFP LINE ITEMSTOTAL$ - 0

Opt 1 NR

ATTACHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
SOLICITATION NO.
EXHIBIT A - CLIN 0002
LINE ITEM 0002 NON- RECURRING WORK PRICE - BASE PERIOD
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A700 - A703
ELIN/Sub-
ELINShort DescriptionFull DescriptionEst. QuantityUnitUnit PriceEst. Amount
Annex 0200000 Management and Administration
Unit Priced Labor
B700UnSkilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.10,000LH$0.00$ - 0
B701Skilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.10,000LH$0.00$ - 0
B702Material and Equipment - MUST BE NEGOTIATED BY KO.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.

Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2.

The estitmate quantity (in dollars) is provided. A fully burdened rate shall be entered in the Unit Price column. Burden rate shall include factors for the shipping and handling and the cost for barge shipments. For example, if a vendor's invoice on material is $1,000.00 and the unit price is $1.05, the cost of the material to the government will be $1,050.00. (DO - Dollars)100,000DO$0.00$ - 0
Annex 1502000 Facility Investment
B706Asbestos Material RemovalThe Contractor shall provide all labor, materials and equipment required to perform asbestos material removal in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order.
975SF$0.00$ - 0
B707Lead Material RemovalThe Contractor shall provide all labor, materials and equipment required to perform lead abatement in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order.750SF$0.00$ - 0
B708Replace Suspended Ceiling Tile (2'x2')The Contractor shall provide all labor, materials and equipment required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Work shall be completed within the timeframe specified on the task order.750SF$0.00$ - 0
B709Replace Suspended Ceiling Tile (2'x4')The Contractor shall provide all labor, materials and equipment required to replace 2’x4’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 8 ceiling tiles. Work shall be completed within the timeframe specified on the task order.1,500EA$0.00$ - 0
B710Replace Suspended Ceiling Grid, Cross Tee 4'The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.750EA$0.00$ - 0
B711Replace Suspended Ceiling Grid, Cross Tee 2'The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.500EA$0.00$ - 0
B712Replace Suspended Ceiling Grid, Main RunnerThe Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid main runner for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.750EA$0.00$ - 0
B713Provide Computer Room Air Conditioning (CRAC) Unit, Split/Heat Pump –type (5 Ton)The Contractor shall provide labor, management, supervision, tools, material and equipment to provide, connect, run and disconnect a CRAC unit. Price per month to include delivery/removal of CRAC unit to/from the site, installation, setup, required cable and fittings, all electrical connections, required ancillary supplies, all connections to the facility, operation, and maintenance and CFC-free refrigerants. The Contractor shall provide the unit within 1 calendar day or as specified in the order. Price is one unit for one month.25EA$0.00$ - 0
B714Portable Chiller Service - 1 to 50 tons (Monthly)The Contract shall provide Portable Chiller for capacity range 1 to 50 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification.5EA$0.00$ - 0
B715Portable Chiller Service - 51 to 100 tons (Monthly)The Contract shall provide Portable Chiller for capacity range 51 to 100 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification.5EA$0.00$ - 0
B716Portable Chiller Service - 101 to 200 tons (Monthly)The Contract shall provide Portable Chiller for capacity range 101 to 200 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification.5EA$0.00$ - 0
B717Portable Chiller Service - 201 + tons (Monthly)The Contract shall provide Portable Chiller for capacity range 201 + ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification.3EA$0.00$ - 0
Specification 1503060 Pavement Clearance
B801Pavement Patching and RepairThe Contractor shall provide labor, management, supervision, tools, material and equipment to provide pavement patching and repair. Repairs include, but are not limited to crack sealing, filling and patching potholes, spalls, scaling repairs, surface misalignments and surface breaks. Repairs in asphalt shall comply with UFC 3-270-01 Operation and Maintenance: Asphalt Maintenance and Repair and UFC 3-270-02 O&M: Asphalt Crack Repair. Work will be ordered in the increments of 10 SY. The Contractor shall provide all work within 15 calendar day or as specified in the order.100SY$0.00$ - 0
B802Snow and Ice ClearingThe Contractor shall provide provide all labor, management, supervision, tools, material, salt, sand or other deicing material and equipment neccesary to perform snow and ice removal services on installation sidewalks, building entrances, walkways, steps, exterior stairways and porches. Sidewalks and walkways shall be cleared and de-iced to create 4 foot pathways. The Contractor shall maintain cleared and de-iced conditions of serviced areas for up to 24 hours per occurrence. The Contractor shall respond within one hour of request or as specified in the order and remain onsite until work is completed. Areas to be serviced are listed in J-1503060-03.10EA$0.00$ - 0
Specification 1602000- Electrical
Specification 1604000- WasteWater
B901Sanitary Sewer Overflow Clean- upThe Contractor shall provide immediate mobilization of specialized vacuum equipment and environmental technicians to mitigate a sewage spill, prevent further contamination of surface waters, and restore the affected area to a safe, decontaminated state in compliance with EPA and state environmental regulations. The Contractor shall mobilize to the spill site within two (2) hours of initial notification.10EA$0.00$ - 0
Specification 1606000- Water
B902Chlorine Shock DisinfectionThe Contractor shall provide all labor, materials, equipment, and certified testing necessary to safely flush, disinfect, and test the repaired section of the potable water distribution system. No repaired line shall be returned to domestic service until satisfactory bacteriological test results are achieved and approved by the Contracting Officer’s Representative (COR) or Base Bioenvironmental Engineer. (6 inch line)10EA$0.00$ - 0
TOTAL NON-RECURRING PRICE OPTION YEAR 1$ - 0

Opt 2 RW

CTTCCHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
SOLICITATION NO.
EXHIBIT A - CLIN 0001
LINE ITEM 0001 RECURRING WORK PRICE - BASE PERIOD
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINs A001 - A095
ELINSub-ELINRecurring WorkQuantityUnit of IssueUnit PriceTotal
NRL
C001Specification 1501000 Facility Management (FP)
C001AAWork Control (Spec Item 3.1)12MO$ - 0$ - 0
C001ABInfrastructure Condition Assessment Program (ICAP) Services (Spec Item 3.2)12MO$ - 0$ - 0
C001ACControl Systems (Spec. Item 3.3)12MO$ - 0$ - 0
C001ADTechnical Support Services (Spec. Item 3.4)12MO$ - 0$ - 0
Total 1501000 Facility Management$ - 0
C002Specification 1502000 Facility Investment (ST)
Service Orders (Spec. Item 3.1)
C002AAEmergency Service Orders (Spec. Item 3.1.1)2,000EA$ - 0$ - 0
C002ABUrgent Service Orders (Spec. Item 3.1.2)2,000EA$ - 0$ - 0
C002ACRoutine Service Orders (Spec. Item 3.1.3)3,000EA$ - 0$ - 0
Project Work Orders (Spec. Item 3.2)
C002ADProject Work Order Level 1 (Spec. Item 3.2.1)50EA$ - 0$ - 0
Preventive Maintenance (PM) Program (Spec. Item 3.3)
C002AEHVAC and Refrigeration Systems (Spec Item 3.3.1)12MO$ - 0$ - 0
C002AFInterior and Exterior Lighting Systems (Spec Item 3.3.2)12MO$ - 0$ - 0
C002AGBoilers and UPVs (Spec Item 3.3.3)12MO$ - 0$ - 0
C002AHCathodic Protection Systems (Spec Item 3.3.4)12MO$ - 0$ - 0
C002AILighting Arrestors and Grounding Devices (Spec Item 3.3.5)12MO$ - 0$ - 0
C002AJFire Protection Systems (Spec Item 3.3.6)12MO$ - 0$ - 0
C002AKCompressed Air Systems (Spec Item 3.3.7)12MO$ - 0$ - 0
C002ALAuxiliary Generators (Spec Item 3.3.8)12MO$ - 0$ - 0
C002AMBuilding Control Systems (Spec Item 3.3.9)12MO$ - 0$ - 0
C002ANLow & Medium Voltage Switchgear (Spec Item 3.3.10)12MO$ - 0$ - 0
C002APPOL Systems(Spec Item 3.3.11)12MO$ - 0$ - 0
C002AQBackflow Preventers(Spec Item 3.3.12)12MO$ - 0$ - 0
C002ARUPS Systems(Spec Item 3.3.13)12MO$ - 0$ - 0
C002ASManual and Automatic Doors(Spec Item 3.3.14)12MO$ - 0$ - 0
C002ATRoll-up Doors(Spec Item 3.3.15)12MO$ - 0$ - 0
C002AUEmergency Eye Wash and Emergency Shower Stations(Spec Item 3.3.16)12MO$ - 0$ - 0
C002AVEmergency Lighting(Spec Item 3.3.17)12MO$ - 0$ - 0
C003Inspection, Testing, and Certification Program (Spec Item 3.5)
C003AABoilers and UPVs (Spec Item 3.5.1)12MO$ - 0$ - 0
C003ABBackflow Prevention Devices (Spec Item 3.5.2)12MO$ - 0$ - 0
Other Recurring Services Program (Spec Item 3.6)
C003ACGrease Traps (Spec Item 3.6.1)12MO$ - 0$ - 0
C003ADExhaust Hoods and Ducts (Spec Item 3.6.2)12MO$ - 0$ - 0
C003AEHVAC Seasonal Start-Up and Shutdown (Spec Item 3.6.3)12MO$ - 0$ - 0
C003AFHVAC Water Testing and Treatment Services (Spec Item 3.6.4)12MO$ - 0$ - 0
C003AGBoiler Seasonal Start-Up and Shutdown (Spec Item 3.6.5)12MO$ - 0$ - 0
C003AHBoiler Water Testing and Treatment Services (Spec Item 3.6.6)12MO$ - 0$ - 0
C003AIBuilding Drainage Systems (Spec Item 3.6.7)12MO$ - 0$ - 0
C003AJDrinking Fountains and Water Coolers (Spec Item 3.6.8)12MO$ - 0$ - 0
C003AKAcid Neutralization Systems (Spec Item 3.6.9)12MO$ - 0$ - 0
C003ALMiscellaneous Systems and Equipment (Spec Item 3.6.10)12MO$ - 0$ - 0
C003AMOil Water Separators (Spec Item 3.6.11)12MO$ - 0$ - 0
C003ANMass Notification Systems (Spec Item 3.6.12)12MO$ - 0$ - 0
C003APMotorized Gates (Spec Item 3.6.13)12MO$ - 0$ - 0
C003AQDedicated Building Mechanics (Spec Item 3.6.14)12MO$ - 0$ - 0
C003ARInstallation Facilities Monitoring (Spec Item 3.6.15)12MO$ - 0$ - 0
Total 1502000 Facility Investment$ - 0
C004Specification 1503030 Integrated Solid Waste Management (FX)
C004AABulky Waste Collction and Removal (Spec Item 3.1)12MO$ - 0$ - 0
Total 1503030 1503030 Integrated Solid Waste Management$ - 0
C005Specification 1503060 Pavement Clearance (FX)
C005AAPavement Sweeping Services (Spec Item 3.1)12MO$ - 0$ - 0
Total 1503060 Pavement Clearance$ - 0
C006Specification 1601000 Utility Management
C006AAEmergency Service Orders (Spec Item 3.1.1)100EA$ - 0$ - 0
C006ABUrgent Service Orders (Spec Item 3.1.2)100EA$ - 0$ - 0
C006ACRoutine Service Orders (Spec Item 3.1.3)200EA$ - 0$ - 0
C006ADUtilities Infrastructure Condition Assessment Program (Spec Item 3.3)12MO$ - 0$ - 0
Specification 1601000 Utility Management$ - 0
C007Specification 1602000 Electrical
C007AAPreventive Maintenance Program as specified in Spec Item 3.512MO$ - 0$ - 0
C007ABServices for Other Recurring services as specified in Spec Item 3.812MO$ - 0$ - 0
Specification 1602000 Electrical Subtotal$ - 0
C008Specification 1604000 Wastewater
C008AAPreventive Maintenance Program as specified in Spec Item 3.212MO$ - 0$ - 0
C008ABServices for Inspection Program as specified in Spec Item 3.4
C008ACServices for Other Recurring services as specified in Spec Item 3.512MO$ - 0$ - 0
Specification 1604000 Wastewater Subtotal
C009Specification 1606000 Water
C009AAPreventive Maintenance Program as specified in Spec Item 3.212MO$ - 0$ - 0
C009ABServices for Other Recurring services as specified in Spec Item 3.512MO$ - 0$ - 0
Specification 1606000 Water Subtotal$ - 0
TOTAL FFP LINE ITEMSTOTAL$ - 0

Opt 2 NR

ATTACHMENT J-0200000-13
EXHIBIT LINE ITEM NUMBERS
SOLICITATION NO.
EXHIBIT A - CLIN 0002
LINE ITEM 0002 NON- RECURRING WORK PRICE - BASE PERIOD
PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A700 - A703
ELIN/Sub-
ELINShort DescriptionFull DescriptionEst. QuantityUnitUnit PriceEst. Amount
Annex 0200000 Management and Administration
Unit Priced Labor
C700UnSkilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.10,000LH$0.00$ - 0
C701Skilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.10,000LH$0.00$ - 0
C702Material and Equipment - MUST BE NEGOTIATED BY KO.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor.

Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2.

The estitmate quantity (in dollars) is provided. A fully burdened rate shall be entered in the Unit Price column. Burden rate shall include factors for the shipping and handling and the cost for barge shipments. For example, if a vendor's invoice on material is $1,000.00 and the unit price is $1.05, the cost of the material to the government will be $1,050.00. (DO - Dollars)100,000DO$0.00$ - 0
Annex 1502000 Facility Investment
C706Asbestos Material RemovalThe Contractor shall provide all labor, materials and equipment required to perform asbestos material removal in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order.
975SF$0.00$ - 0
C707Lead Material RemovalThe Contractor shall provide all labor, materials and equipment required to perform lead abatement in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order.750SF$0.00$ - 0
C708Replace Suspended Ceiling Tile (2'x2')The Contractor shall provide all labor, materials and equipment required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Work shall be completed within the timeframe specified on the task order.750SF$0.00$ - 0
C709Replace Suspended Ceiling Tile (2'x4')The Contractor shall provide all labor, materials and equipment required to replace 2’x4’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 8 ceiling tiles. Work shall be completed within the timeframe specified on the task order.1,500EA$0.00$ - 0
C710Replace Suspended Ceiling Grid, Cross Tee 4'The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.750EA$0.00$ - 0
C711Replace Suspended Ceiling Grid, Cross Tee 2'The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.500EA$0.00$ - 0
C712Replace Suspended Ceiling Grid, Main RunnerThe Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid main runner for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.750EA$0.00$ - 0