| Annual Cost Summary | | |
| CLIN | Description | Totals |
| CLIN 0001 | Base Period Recurring Work | $ - 0 |
| CLIN 0002 | Base Period Non-Recurring Work | $ - 0 |
| Base Period Total | $ - 0 |
| CLIN 0003 | 1st Option Period Recurring Work | $ - 0 |
| CLIN 0004 | 1st Option Period Non-Recurring Work | $ - 0 |
| 1st Option Period Total | $ - 0 |
| CLIN 0005 | 2nd Option Period Recurring Work | $ - 0 |
| CLIN 0006 | 2nd Option Period Non-Recurring Work | $ - 0 |
| 2nd Option Period Total | $ - 0 |
| CLIN 0007 | 3rd Option Period Recurring Work | $ - 0 |
| CLIN 0008 | 3rd Option Period Non-Recurring Work | $ - 0 |
| 3rd Option Period Total | $ - 0 |
| CLIN 0009 | 4th Option Period Recurring Work | $ - 0 |
| CLIN 0010 | 4th Option Period Non-Recurring Work | $ - 0 |
| 4th Option Period Total | $ - 0 |
| CLIN 0011 | 5th Option Period Recurring Work | $ - 0 |
| CLIN 0012 | 5th Option Period Non-Recurring Work | $ - 0 |
| 5th Option Period Total | $ - 0 |
| CLIN 0013 | 6th Option Period Recurring Work | $ - 0 |
| CLIN 0014 | 6th Option Period Non-Recurring Work | $ - 0 |
| 6th Option Period Total | $ - 0 |
| CLIN 0015 | 7th Option Period Recurring Work | $ - 0 |
| CLIN 0016 | 7th Option Period Non-Recurring Work | $ - 0 |
| 7th Option Period Total | $ - 0 |
| Total Recurring Work | | $ - 0 |
| Total Non-Recurring Work | | $ - 0 |
| Total Contract Cost | | $ - 0 |
Base RW
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION NO. |
| EXHIBIT A - CLIN 0001 |
| LINE ITEM 0001 RECURRING WORK PRICE - BASE PERIOD |
| PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINs A001 - A095 |
| ELIN | Sub-ELIN | Recurring Work | Quantity | Unit of Issue | Unit Price | Total |
| | NRL | | | | |
| A001 | | Specification 1501000 Facility Management (FP) | | | | |
| A001 | AA | Work Control (Spec Item 3.1) | 12 | MO | $ - 0 | $ - 0 |
| A001 | AB | Infrastructure Condition Assessment Program (ICAP) Services (Spec Item 3.2) | 12 | MO | $ - 0 | $ - 0 |
| A001 | AC | Control Systems (Spec. Item 3.3) | 12 | MO | $ - 0 | $ - 0 |
| A001 | AD | Technical Support Services (Spec. Item 3.4) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1501000 Facility Management | | | | $ - 0 |
| A002 | | Specification 1502000 Facility Investment (ST) | | | | |
| | Service Orders (Spec. Item 3.1) | | | | |
| A002 | AA | Emergency Service Orders (Spec. Item 3.1.1) | 2,000 | EA | $ - 0 | $ - 0 |
| A002 | AB | Urgent Service Orders (Spec. Item 3.1.2) | 2,000 | EA | $ - 0 | $ - 0 |
| A002 | AC | Routine Service Orders (Spec. Item 3.1.3) | 3,000 | EA | $ - 0 | $ - 0 |
| | Project Work Orders (Spec. Item 3.2) | | | | |
| A002 | AD | Project Work Order Level 1 (Spec. Item 3.2.1) | 50 | EA | $ - 0 | $ - 0 |
| | Preventive Maintenance (PM) Program (Spec. Item 3.3) | | | | |
| A002 | AE | HVAC and Refrigeration Systems (Spec Item 3.3.1) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AF | Interior and Exterior Lighting Systems (Spec Item 3.3.2) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AG | Boilers and UPVs (Spec Item 3.3.3) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AH | Cathodic Protection Systems (Spec Item 3.3.4) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AI | Lighting Arrestors and Grounding Devices (Spec Item 3.3.5) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AJ | Fire Protection Systems (Spec Item 3.3.6) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AK | Compressed Air Systems (Spec Item 3.3.7) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AL | Auxiliary Generators (Spec Item 3.3.8) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AM | Building Control Systems (Spec Item 3.3.9) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AN | Low & Medium Voltage Switchgear (Spec Item 3.3.10) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AP | POL Systems(Spec Item 3.3.11) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AQ | Backflow Preventers(Spec Item 3.3.12) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AR | UPS Systems(Spec Item 3.3.13) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AS | Manual and Automatic Doors(Spec Item 3.3.14) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AT | Roll-up Doors(Spec Item 3.3.15) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AU | Emergency Eye Wash and Emergency Shower Stations(Spec Item 3.3.16) | 12 | MO | $ - 0 | $ - 0 |
| A002 | AV | Emergency Lighting(Spec Item 3.3.17) | 12 | MO | $ - 0 | $ - 0 |
| A003 | | Inspection, Testing, and Certification Program (Spec Item 3.5) | | | | |
| A003 | AA | Boilers and UPVs (Spec Item 3.5.1) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AB | Backflow Prevention Devices (Spec Item 3.5.2) | 12 | MO | $ - 0 | $ - 0 |
| | Other Recurring Services Program (Spec Item 3.6) | | | | |
| A003 | AC | Grease Traps (Spec Item 3.6.1) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AD | Exhaust Hoods and Ducts (Spec Item 3.6.2) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AE | HVAC Seasonal Start-Up and Shutdown (Spec Item 3.6.3) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AF | HVAC Water Testing and Treatment Services (Spec Item 3.6.4) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AG | Boiler Seasonal Start-Up and Shutdown (Spec Item 3.6.5) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AH | Boiler Water Testing and Treatment Services (Spec Item 3.6.6) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AI | Building Drainage Systems (Spec Item 3.6.7) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AJ | Drinking Fountains and Water Coolers (Spec Item 3.6.8) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AK | Acid Neutralization Systems (Spec Item 3.6.9) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AL | Miscellaneous Systems and Equipment (Spec Item 3.6.10) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AM | Oil Water Separators (Spec Item 3.6.11) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AN | Mass Notification Systems (Spec Item 3.6.12) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AP | Motorized Gates (Spec Item 3.6.13) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AQ | Dedicated Building Mechanics (Spec Item 3.6.14) | 12 | MO | $ - 0 | $ - 0 |
| A003 | AR | Installation Facilities Monitoring (Spec Item 3.6.15) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1502000 Facility Investment | | | | $ - 0 |
| A004 | | Specification 1503030 Integrated Solid Waste Management (FX) | | | | |
| A094 | | Specification 1503030 Integrated Solid Waste Management (FX) | | | | |
| A004 | AA | Bulky Waste Collction and Removal (Spec Item 3.1) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1503030 1503030 Integrated Solid Waste Management | | | | $ - 0 |
| A005 | | Specification 1503060 Pavement Clearance (FX) | | | | |
| A00 | AA | Pavement Sweeping Services (Spec Item 3.1) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1503060 Pavement Clearance | | | | $ - 0 |
| A006 | | Specification 1601000 Utility Management | | | | |
| A006 | AA | Emergency Service Orders (Spec Item 3.1.1) | 100 | EA | $ - 0 | $ - 0 |
| A006 | AB | Urgent Service Orders (Spec Item 3.1.2) | 100 | EA | $ - 0 | $ - 0 |
| A006 | AC | Routine Service Orders (Spec Item 3.1.3) | 200 | EA | $ - 0 | $ - 0 |
| A006 | AD | Utilities Infrastructure Condition Assessment Program (Spec Item 3.3) | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1601000 Utility Management | | | | $ - 0 |
| A007 | | Specification 1602000 Electrical | | | | |
| A007 | AA | Preventive Maintenance Program as specified in Spec Item 3.5 | 12 | MO | $ - 0 | $ - 0 |
| A007 | AB | Services for Other Recurring services as specified in Spec Item 3.8 | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1602000 Electrical Subtotal | | | | $ - 0 |
| A008 | | Specification 1604000 Wastewater | | | | |
| A008 | AA | Preventive Maintenance Program as specified in Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A008 | AB | Services for Inspection Program as specified in Spec Item 3.4 | | | | |
| A008 | AC | Services for Other Recurring services as specified in Spec Item 3.5 | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1604000 Wastewater Subtotal | | | | |
| A009 | | Specification 1606000 Water | | | | |
| A009 | AA | Preventive Maintenance Program as specified in Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A009 | AB | Services for Other Recurring services as specified in Spec Item 3.5 | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1606000 Water Subtotal | | | | $ - 0 |
| | TOTAL FFP LINE ITEMS | | | TOTAL | $ - 0 |
Base NR
| ATTACHMENT J-0200000-13 | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | |
| SOLICITATION NO. | | | | | |
| EXHIBIT A - CLIN 0002 | | | | | |
| LINE ITEM 0002 NON- RECURRING WORK PRICE - BASE PERIOD | | | | | |
| PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A700 - A703 | | | | | |
| ELIN/Sub- | | | | | |
| ELIN | Short Description | Full Description | Est. Quantity | Unit | Unit Price | Est. Amount |
| Annex 0200000 Management and Administration | | | | | |
| | Unit Priced Labor | | | | |
| A700 | UnSkilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. | | | |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 10,000 | LH | $0.00 | $ - 0 |
| A701 | Skilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. | |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 10,000 | LH | $0.00 | $ - 0 |
| A702 | Material and Equipment - MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor. | |
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2.
| The estitmate quantity (in dollars) is provided. A fully burdened rate shall be entered in the Unit Price column. Burden rate shall include factors for the shipping and handling and the cost for barge shipments. For example, if a vendor's invoice on material is $1,000.00 and the unit price is $1.05, the cost of the material to the government will be $1,050.00. (DO - Dollars) | 100,000 | DO | $0.00 | $ - 0 | | | |
| Annex 1502000 Facility Investment | | | | | | |
| A706 | Asbestos Material Removal | The Contractor shall provide all labor, materials and equipment required to perform asbestos material removal in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order. | | | | |
| 975 | SF | $0.00 | $ - 0 | | | |
| A707 | Lead Material Removal | The Contractor shall provide all labor, materials and equipment required to perform lead abatement in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order. | 750 | SF | $0.00 | $ - 0 |
| A708 | Replace Suspended Ceiling Tile (2'x2') | The Contractor shall provide all labor, materials and equipment required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Work shall be completed within the timeframe specified on the task order. | 750 | SF | $0.00 | $ - 0 |
| A709 | Replace Suspended Ceiling Tile (2'x4') | The Contractor shall provide all labor, materials and equipment required to replace 2’x4’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 8 ceiling tiles. Work shall be completed within the timeframe specified on the task order. | 1,500 | EA | $0.00 | $ - 0 |
| A710 | Replace Suspended Ceiling Grid, Cross Tee 4' | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | 750 | EA | $0.00 | $ - 0 |
| A711 | Replace Suspended Ceiling Grid, Cross Tee 2' | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | 500 | EA | $0.00 | $ - 0 |
| A712 | Replace Suspended Ceiling Grid, Main Runner | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid main runner for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | 750 | EA | $0.00 | $ - 0 |
| A713 | Provide Computer Room Air Conditioning (CRAC) Unit, Split/Heat Pump –type (5 Ton) | The Contractor shall provide labor, management, supervision, tools, material and equipment to provide, connect, run and disconnect a CRAC unit. Price per month to include delivery/removal of CRAC unit to/from the site, installation, setup, required cable and fittings, all electrical connections, required ancillary supplies, all connections to the facility, operation, and maintenance and CFC-free refrigerants. The Contractor shall provide the unit within 1 calendar day or as specified in the order. Price is one unit for one month. | 25 | EA | $0.00 | $ - 0 |
| A714 | Portable Chiller Service - 1 to 50 tons (Monthly) | The Contract shall provide Portable Chiller for capacity range 1 to 50 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification. | 5 | EA | $0.00 | $ - 0 |
| A715 | Portable Chiller Service - 51 to 100 tons (Monthly) | The Contract shall provide Portable Chiller for capacity range 51 to 100 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification. | 5 | EA | $0.00 | $ - 0 |
| A716 | Portable Chiller Service - 101 to 200 tons (Monthly) | The Contract shall provide Portable Chiller for capacity range 101 to 200 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification. | 5 | EA | $0.00 | $ - 0 |
| A717 | Portable Chiller Service - 201 + tons (Monthly) | The Contract shall provide Portable Chiller for capacity range 201 + ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification. | 3 | EA | $0.00 | $ - 0 |
| Specification 1503060 Pavement Clearance | | | | | | |
| A801 | Pavement Patching and Repair | The Contractor shall provide labor, management, supervision, tools, material and equipment to provide pavement patching and repair. Repairs include, but are not limited to crack sealing, filling and patching potholes, spalls, scaling repairs, surface misalignments and surface breaks. Repairs in asphalt shall comply with UFC 3-270-01 Operation and Maintenance: Asphalt Maintenance and Repair and UFC 3-270-02 O&M: Asphalt Crack Repair. Work will be ordered in the increments of 10 SY. The Contractor shall provide all work within 15 calendar day or as specified in the order. | 100 | SY | $0.00 | $ - 0 |
| A802 | Snow and Ice Clearing | The Contractor shall provide provide all labor, management, supervision, tools, material, salt, sand or other deicing material and equipment neccesary to perform snow and ice removal services on installation sidewalks, building entrances, walkways, steps, exterior stairways and porches. Sidewalks and walkways shall be cleared and de-iced to create 4 foot pathways. The Contractor shall maintain cleared and de-iced conditions of serviced areas for up to 24 hours per occurrence. The Contractor shall respond within one hour of request or as specified in the order and remain onsite until work is completed. Areas to be serviced are listed in J-1503060-03. | 10 | EA | $0.00 | $ - 0 |
| Specification 1602000- Electrical | | | | | | |
| Specification 1604000- WasteWater | | | | | | |
| A901 | Sanitary Sewer Overflow Clean- up | The Contractor shall provide immediate mobilization of specialized vacuum equipment and environmental technicians to mitigate a sewage spill, prevent further contamination of surface waters, and restore the affected area to a safe, decontaminated state in compliance with EPA and state environmental regulations. The Contractor shall mobilize to the spill site within two (2) hours of initial notification. | 10 | EA | $0.00 | $ - 0 |
| Specification 1606000- Water | | | | | | |
| A902 | Chlorine Shock Disinfection | The Contractor shall provide all labor, materials, equipment, and certified testing necessary to safely flush, disinfect, and test the repaired section of the potable water distribution system. No repaired line shall be returned to domestic service until satisfactory bacteriological test results are achieved and approved by the Contracting Officer’s Representative (COR) or Base Bioenvironmental Engineer. (6 inch line) | 10 | EA | $0.00 | $ - 0 |
| | TOTAL NON-RECURRING PRICE BASE YEAR | | | | $ - 0 |
Opt 1 RW
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION NO. |
| EXHIBIT A - CLIN 0001 |
| LINE ITEM 0001 RECURRING WORK PRICE - BASE PERIOD |
| PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINs A001 - A095 |
| ELIN | Sub-ELIN | Recurring Work | Quantity | Unit of Issue | Unit Price | Total |
| | NRL | | | | |
| B001 | | Specification 1501000 Facility Management (FP) | | | | |
| B001 | AA | Work Control (Spec Item 3.1) | 12 | MO | $ - 0 | $ - 0 |
| B001 | AB | Infrastructure Condition Assessment Program (ICAP) Services (Spec Item 3.2) | 12 | MO | $ - 0 | $ - 0 |
| B001 | AC | Control Systems (Spec. Item 3.3) | 12 | MO | $ - 0 | $ - 0 |
| B001 | AD | Technical Support Services (Spec. Item 3.4) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1501000 Facility Management | | | | $ - 0 |
| B002 | | Specification 1502000 Facility Investment (ST) | | | | |
| | Service Orders (Spec. Item 3.1) | | | | |
| B002 | AA | Emergency Service Orders (Spec. Item 3.1.1) | 2,000 | EA | $ - 0 | $ - 0 |
| B002 | AB | Urgent Service Orders (Spec. Item 3.1.2) | 2,000 | EA | $ - 0 | $ - 0 |
| B002 | AC | Routine Service Orders (Spec. Item 3.1.3) | 3,000 | EA | $ - 0 | $ - 0 |
| | Project Work Orders (Spec. Item 3.2) | | | | |
| B002 | AD | Project Work Order Level 1 (Spec. Item 3.2.1) | 50 | EA | $ - 0 | $ - 0 |
| | Preventive Maintenance (PM) Program (Spec. Item 3.3) | | | | |
| B002 | AE | HVAC and Refrigeration Systems (Spec Item 3.3.1) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AF | Interior and Exterior Lighting Systems (Spec Item 3.3.2) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AG | Boilers and UPVs (Spec Item 3.3.3) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AH | Cathodic Protection Systems (Spec Item 3.3.4) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AI | Lighting Arrestors and Grounding Devices (Spec Item 3.3.5) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AJ | Fire Protection Systems (Spec Item 3.3.6) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AK | Compressed Air Systems (Spec Item 3.3.7) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AL | Auxiliary Generators (Spec Item 3.3.8) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AM | Building Control Systems (Spec Item 3.3.9) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AN | Low & Medium Voltage Switchgear (Spec Item 3.3.10) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AP | POL Systems(Spec Item 3.3.11) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AQ | Backflow Preventers(Spec Item 3.3.12) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AR | UPS Systems(Spec Item 3.3.13) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AS | Manual and Automatic Doors(Spec Item 3.3.14) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AT | Roll-up Doors(Spec Item 3.3.15) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AU | Emergency Eye Wash and Emergency Shower Stations(Spec Item 3.3.16) | 12 | MO | $ - 0 | $ - 0 |
| B002 | AV | Emergency Lighting(Spec Item 3.3.17) | 12 | MO | $ - 0 | $ - 0 |
| B003 | | Inspection, Testing, and Certification Program (Spec Item 3.5) | | | | |
| B003 | AA | Boilers and UPVs (Spec Item 3.5.1) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AB | Backflow Prevention Devices (Spec Item 3.5.2) | 12 | MO | $ - 0 | $ - 0 |
| | Other Recurring Services Program (Spec Item 3.6) | | | | |
| B003 | AC | Grease Traps (Spec Item 3.6.1) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AD | Exhaust Hoods and Ducts (Spec Item 3.6.2) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AE | HVAC Seasonal Start-Up and Shutdown (Spec Item 3.6.3) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AF | HVAC Water Testing and Treatment Services (Spec Item 3.6.4) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AG | Boiler Seasonal Start-Up and Shutdown (Spec Item 3.6.5) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AH | Boiler Water Testing and Treatment Services (Spec Item 3.6.6) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AI | Building Drainage Systems (Spec Item 3.6.7) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AJ | Drinking Fountains and Water Coolers (Spec Item 3.6.8) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AK | Acid Neutralization Systems (Spec Item 3.6.9) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AL | Miscellaneous Systems and Equipment (Spec Item 3.6.10) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AM | Oil Water Separators (Spec Item 3.6.11) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AN | Mass Notification Systems (Spec Item 3.6.12) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AP | Motorized Gates (Spec Item 3.6.13) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AQ | Dedicated Building Mechanics (Spec Item 3.6.14) | 12 | MO | $ - 0 | $ - 0 |
| B003 | AR | Installation Facilities Monitoring (Spec Item 3.6.15) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1502000 Facility Investment | | | | $ - 0 |
| B004 | | Specification 1503030 Integrated Solid Waste Management (FX) | | | | |
| B004 | AA | Bulky Waste Collction and Removal (Spec Item 3.1) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1503030 1503030 Integrated Solid Waste Management | | | | $ - 0 |
| B005 | | Specification 1503060 Pavement Clearance (FX) | | | | |
| B005 | AA | Pavement Sweeping Services (Spec Item 3.1) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1503060 Pavement Clearance | | | | $ - 0 |
| B006 | | Specification 1601000 Utility Management | | | | |
| B006 | AA | Emergency Service Orders (Spec Item 3.1.1) | 100 | EA | $ - 0 | $ - 0 |
| B006 | AB | Urgent Service Orders (Spec Item 3.1.2) | 100 | EA | $ - 0 | $ - 0 |
| B006 | AC | Routine Service Orders (Spec Item 3.1.3) | 200 | EA | $ - 0 | $ - 0 |
| B006 | AD | Utilities Infrastructure Condition Assessment Program (Spec Item 3.3) | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1601000 Utility Management | | | | $ - 0 |
| B007 | | Specification 1602000 Electrical | | | | |
| B007 | AA | Preventive Maintenance Program as specified in Spec Item 3.5 | 12 | MO | $ - 0 | $ - 0 |
| B007 | AB | Services for Other Recurring services as specified in Spec Item 3.8 | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1602000 Electrical Subtotal | | | | $ - 0 |
| B008 | | Specification 1604000 Wastewater | | | | |
| B008 | AA | Preventive Maintenance Program as specified in Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| B008 | AB | Services for Inspection Program as specified in Spec Item 3.4 | | | | |
| B008 | AC | Services for Other Recurring services as specified in Spec Item 3.5 | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1604000 Wastewater Subtotal | | | | |
| B009 | | Specification 1606000 Water | | | | |
| B009 | AA | Preventive Maintenance Program as specified in Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| B009 | AB | Services for Other Recurring services as specified in Spec Item 3.5 | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1606000 Water Subtotal | | | | $ - 0 |
| | TOTAL FFP LINE ITEMS | | | TOTAL | $ - 0 |
Opt 1 NR
| ATTACHMENT J-0200000-13 | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | |
| SOLICITATION NO. | | | | | |
| EXHIBIT A - CLIN 0002 | | | | | |
| LINE ITEM 0002 NON- RECURRING WORK PRICE - BASE PERIOD | | | | | |
| PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A700 - A703 | | | | | |
| ELIN/Sub- | | | | | |
| ELIN | Short Description | Full Description | Est. Quantity | Unit | Unit Price | Est. Amount |
| Annex 0200000 Management and Administration | | | | | |
| | Unit Priced Labor | | | | |
| B700 | UnSkilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. | | | |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 10,000 | LH | $0.00 | $ - 0 |
| B701 | Skilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. | |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 10,000 | LH | $0.00 | $ - 0 |
| B702 | Material and Equipment - MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor. | |
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2.
| The estitmate quantity (in dollars) is provided. A fully burdened rate shall be entered in the Unit Price column. Burden rate shall include factors for the shipping and handling and the cost for barge shipments. For example, if a vendor's invoice on material is $1,000.00 and the unit price is $1.05, the cost of the material to the government will be $1,050.00. (DO - Dollars) | 100,000 | DO | $0.00 | $ - 0 | | | |
| Annex 1502000 Facility Investment | | | | | | |
| B706 | Asbestos Material Removal | The Contractor shall provide all labor, materials and equipment required to perform asbestos material removal in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order. | | | | |
| 975 | SF | $0.00 | $ - 0 | | | |
| B707 | Lead Material Removal | The Contractor shall provide all labor, materials and equipment required to perform lead abatement in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order. | 750 | SF | $0.00 | $ - 0 |
| B708 | Replace Suspended Ceiling Tile (2'x2') | The Contractor shall provide all labor, materials and equipment required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Work shall be completed within the timeframe specified on the task order. | 750 | SF | $0.00 | $ - 0 |
| B709 | Replace Suspended Ceiling Tile (2'x4') | The Contractor shall provide all labor, materials and equipment required to replace 2’x4’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 8 ceiling tiles. Work shall be completed within the timeframe specified on the task order. | 1,500 | EA | $0.00 | $ - 0 |
| B710 | Replace Suspended Ceiling Grid, Cross Tee 4' | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | 750 | EA | $0.00 | $ - 0 |
| B711 | Replace Suspended Ceiling Grid, Cross Tee 2' | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | 500 | EA | $0.00 | $ - 0 |
| B712 | Replace Suspended Ceiling Grid, Main Runner | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid main runner for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | 750 | EA | $0.00 | $ - 0 |
| B713 | Provide Computer Room Air Conditioning (CRAC) Unit, Split/Heat Pump –type (5 Ton) | The Contractor shall provide labor, management, supervision, tools, material and equipment to provide, connect, run and disconnect a CRAC unit. Price per month to include delivery/removal of CRAC unit to/from the site, installation, setup, required cable and fittings, all electrical connections, required ancillary supplies, all connections to the facility, operation, and maintenance and CFC-free refrigerants. The Contractor shall provide the unit within 1 calendar day or as specified in the order. Price is one unit for one month. | 25 | EA | $0.00 | $ - 0 |
| B714 | Portable Chiller Service - 1 to 50 tons (Monthly) | The Contract shall provide Portable Chiller for capacity range 1 to 50 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification. | 5 | EA | $0.00 | $ - 0 |
| B715 | Portable Chiller Service - 51 to 100 tons (Monthly) | The Contract shall provide Portable Chiller for capacity range 51 to 100 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification. | 5 | EA | $0.00 | $ - 0 |
| B716 | Portable Chiller Service - 101 to 200 tons (Monthly) | The Contract shall provide Portable Chiller for capacity range 101 to 200 ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification. | 5 | EA | $0.00 | $ - 0 |
| B717 | Portable Chiller Service - 201 + tons (Monthly) | The Contract shall provide Portable Chiller for capacity range 201 + ton skid mounted chiller. Contractor shall mobilize portable chiller for requested facility and make all necessary connections to ensure facility has chilled water within 24 hours of notification. Contractor shall inspect the chiller daily to ensure proper operation and refuel as necessary to prevent interruption of chill water service. Contractor shall disconnect portable chiller, cap any added tees, and close any added valves to return current system to its original operating configuration. Any tees and valves installed can remain in place to support a future portable chiller requirement as long as they do not interfere with original system operation. Contractor shall remove the portable chiller from the site and repair any damaged grounds within 48 hours of notification. | 3 | EA | $0.00 | $ - 0 |
| Specification 1503060 Pavement Clearance | | | | | | |
| B801 | Pavement Patching and Repair | The Contractor shall provide labor, management, supervision, tools, material and equipment to provide pavement patching and repair. Repairs include, but are not limited to crack sealing, filling and patching potholes, spalls, scaling repairs, surface misalignments and surface breaks. Repairs in asphalt shall comply with UFC 3-270-01 Operation and Maintenance: Asphalt Maintenance and Repair and UFC 3-270-02 O&M: Asphalt Crack Repair. Work will be ordered in the increments of 10 SY. The Contractor shall provide all work within 15 calendar day or as specified in the order. | 100 | SY | $0.00 | $ - 0 |
| B802 | Snow and Ice Clearing | The Contractor shall provide provide all labor, management, supervision, tools, material, salt, sand or other deicing material and equipment neccesary to perform snow and ice removal services on installation sidewalks, building entrances, walkways, steps, exterior stairways and porches. Sidewalks and walkways shall be cleared and de-iced to create 4 foot pathways. The Contractor shall maintain cleared and de-iced conditions of serviced areas for up to 24 hours per occurrence. The Contractor shall respond within one hour of request or as specified in the order and remain onsite until work is completed. Areas to be serviced are listed in J-1503060-03. | 10 | EA | $0.00 | $ - 0 |
| Specification 1602000- Electrical | | | | | | |
| Specification 1604000- WasteWater | | | | | | |
| B901 | Sanitary Sewer Overflow Clean- up | The Contractor shall provide immediate mobilization of specialized vacuum equipment and environmental technicians to mitigate a sewage spill, prevent further contamination of surface waters, and restore the affected area to a safe, decontaminated state in compliance with EPA and state environmental regulations. The Contractor shall mobilize to the spill site within two (2) hours of initial notification. | 10 | EA | $0.00 | $ - 0 |
| Specification 1606000- Water | | | | | | |
| B902 | Chlorine Shock Disinfection | The Contractor shall provide all labor, materials, equipment, and certified testing necessary to safely flush, disinfect, and test the repaired section of the potable water distribution system. No repaired line shall be returned to domestic service until satisfactory bacteriological test results are achieved and approved by the Contracting Officer’s Representative (COR) or Base Bioenvironmental Engineer. (6 inch line) | 10 | EA | $0.00 | $ - 0 |
| | TOTAL NON-RECURRING PRICE OPTION YEAR 1 | | | | $ - 0 |
Opt 2 RW
| CTTCCHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION NO. |
| EXHIBIT A - CLIN 0001 |
| LINE ITEM 0001 RECURRING WORK PRICE - BASE PERIOD |
| PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINs A001 - A095 |
| ELIN | Sub-ELIN | Recurring Work | Quantity | Unit of Issue | Unit Price | Total |
| | NRL | | | | |
| C001 | | Specification 1501000 Facility Management (FP) | | | | |
| C001 | AA | Work Control (Spec Item 3.1) | 12 | MO | $ - 0 | $ - 0 |
| C001 | AB | Infrastructure Condition Assessment Program (ICAP) Services (Spec Item 3.2) | 12 | MO | $ - 0 | $ - 0 |
| C001 | AC | Control Systems (Spec. Item 3.3) | 12 | MO | $ - 0 | $ - 0 |
| C001 | AD | Technical Support Services (Spec. Item 3.4) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1501000 Facility Management | | | | $ - 0 |
| C002 | | Specification 1502000 Facility Investment (ST) | | | | |
| | Service Orders (Spec. Item 3.1) | | | | |
| C002 | AA | Emergency Service Orders (Spec. Item 3.1.1) | 2,000 | EA | $ - 0 | $ - 0 |
| C002 | AB | Urgent Service Orders (Spec. Item 3.1.2) | 2,000 | EA | $ - 0 | $ - 0 |
| C002 | AC | Routine Service Orders (Spec. Item 3.1.3) | 3,000 | EA | $ - 0 | $ - 0 |
| | Project Work Orders (Spec. Item 3.2) | | | | |
| C002 | AD | Project Work Order Level 1 (Spec. Item 3.2.1) | 50 | EA | $ - 0 | $ - 0 |
| | Preventive Maintenance (PM) Program (Spec. Item 3.3) | | | | |
| C002 | AE | HVAC and Refrigeration Systems (Spec Item 3.3.1) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AF | Interior and Exterior Lighting Systems (Spec Item 3.3.2) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AG | Boilers and UPVs (Spec Item 3.3.3) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AH | Cathodic Protection Systems (Spec Item 3.3.4) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AI | Lighting Arrestors and Grounding Devices (Spec Item 3.3.5) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AJ | Fire Protection Systems (Spec Item 3.3.6) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AK | Compressed Air Systems (Spec Item 3.3.7) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AL | Auxiliary Generators (Spec Item 3.3.8) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AM | Building Control Systems (Spec Item 3.3.9) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AN | Low & Medium Voltage Switchgear (Spec Item 3.3.10) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AP | POL Systems(Spec Item 3.3.11) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AQ | Backflow Preventers(Spec Item 3.3.12) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AR | UPS Systems(Spec Item 3.3.13) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AS | Manual and Automatic Doors(Spec Item 3.3.14) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AT | Roll-up Doors(Spec Item 3.3.15) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AU | Emergency Eye Wash and Emergency Shower Stations(Spec Item 3.3.16) | 12 | MO | $ - 0 | $ - 0 |
| C002 | AV | Emergency Lighting(Spec Item 3.3.17) | 12 | MO | $ - 0 | $ - 0 |
| C003 | | Inspection, Testing, and Certification Program (Spec Item 3.5) | | | | |
| C003 | AA | Boilers and UPVs (Spec Item 3.5.1) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AB | Backflow Prevention Devices (Spec Item 3.5.2) | 12 | MO | $ - 0 | $ - 0 |
| | Other Recurring Services Program (Spec Item 3.6) | | | | |
| C003 | AC | Grease Traps (Spec Item 3.6.1) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AD | Exhaust Hoods and Ducts (Spec Item 3.6.2) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AE | HVAC Seasonal Start-Up and Shutdown (Spec Item 3.6.3) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AF | HVAC Water Testing and Treatment Services (Spec Item 3.6.4) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AG | Boiler Seasonal Start-Up and Shutdown (Spec Item 3.6.5) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AH | Boiler Water Testing and Treatment Services (Spec Item 3.6.6) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AI | Building Drainage Systems (Spec Item 3.6.7) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AJ | Drinking Fountains and Water Coolers (Spec Item 3.6.8) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AK | Acid Neutralization Systems (Spec Item 3.6.9) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AL | Miscellaneous Systems and Equipment (Spec Item 3.6.10) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AM | Oil Water Separators (Spec Item 3.6.11) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AN | Mass Notification Systems (Spec Item 3.6.12) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AP | Motorized Gates (Spec Item 3.6.13) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AQ | Dedicated Building Mechanics (Spec Item 3.6.14) | 12 | MO | $ - 0 | $ - 0 |
| C003 | AR | Installation Facilities Monitoring (Spec Item 3.6.15) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1502000 Facility Investment | | | | $ - 0 |
| C004 | | Specification 1503030 Integrated Solid Waste Management (FX) | | | | |
| C004 | AA | Bulky Waste Collction and Removal (Spec Item 3.1) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1503030 1503030 Integrated Solid Waste Management | | | | $ - 0 |
| C005 | | Specification 1503060 Pavement Clearance (FX) | | | | |
| C005 | AA | Pavement Sweeping Services (Spec Item 3.1) | 12 | MO | $ - 0 | $ - 0 |
| | Total 1503060 Pavement Clearance | | | | $ - 0 |
| C006 | | Specification 1601000 Utility Management | | | | |
| C006 | AA | Emergency Service Orders (Spec Item 3.1.1) | 100 | EA | $ - 0 | $ - 0 |
| C006 | AB | Urgent Service Orders (Spec Item 3.1.2) | 100 | EA | $ - 0 | $ - 0 |
| C006 | AC | Routine Service Orders (Spec Item 3.1.3) | 200 | EA | $ - 0 | $ - 0 |
| C006 | AD | Utilities Infrastructure Condition Assessment Program (Spec Item 3.3) | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1601000 Utility Management | | | | $ - 0 |
| C007 | | Specification 1602000 Electrical | | | | |
| C007 | AA | Preventive Maintenance Program as specified in Spec Item 3.5 | 12 | MO | $ - 0 | $ - 0 |
| C007 | AB | Services for Other Recurring services as specified in Spec Item 3.8 | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1602000 Electrical Subtotal | | | | $ - 0 |
| C008 | | Specification 1604000 Wastewater | | | | |
| C008 | AA | Preventive Maintenance Program as specified in Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| C008 | AB | Services for Inspection Program as specified in Spec Item 3.4 | | | | |
| C008 | AC | Services for Other Recurring services as specified in Spec Item 3.5 | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1604000 Wastewater Subtotal | | | | |
| C009 | | Specification 1606000 Water | | | | |
| C009 | AA | Preventive Maintenance Program as specified in Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| C009 | AB | Services for Other Recurring services as specified in Spec Item 3.5 | 12 | MO | $ - 0 | $ - 0 |
| | Specification 1606000 Water Subtotal | | | | $ - 0 |
| | TOTAL FFP LINE ITEMS | | | TOTAL | $ - 0 |
Opt 2 NR
| ATTACHMENT J-0200000-13 | | | | | |
| EXHIBIT LINE ITEM NUMBERS | | | | | |
| SOLICITATION NO. | | | | | |
| EXHIBIT A - CLIN 0002 | | | | | |
| LINE ITEM 0002 NON- RECURRING WORK PRICE - BASE PERIOD | | | | | |
| PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A700 - A703 | | | | | |
| ELIN/Sub- | | | | | |
| ELIN | Short Description | Full Description | Est. Quantity | Unit | Unit Price | Est. Amount |
| Annex 0200000 Management and Administration | | | | | |
| | Unit Priced Labor | | | | |
| C700 | UnSkilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. | | | |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 10,000 | LH | $0.00 | $ - 0 |
| C701 | Skilled/Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. | |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 10,000 | LH | $0.00 | $ - 0 |
| C702 | Material and Equipment - MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Pre-expended bin supplies and materials will not be included in the list of materials since the cost for these items were included in the labor hour unit price bid. Material prices provided by the Contractor shall be the lowest price available considering the availability of materials and the time constraints of the job. The direct material price shall be adjusted by all discounts and rebates for core value or salvage value that accrue to the Contractor. | |
Contractor owned equipment rental rates shall be based on calculations set forth in US Army Corp of Engineers “Construction Equipment Ownership and Operating Expense Schedule (EP 1110-1-8 (Vol. 11) July 03 or latest revision) Chapter 2.
| The estitmate quantity (in dollars) is provided. A fully burdened rate shall be entered in the Unit Price column. Burden rate shall include factors for the shipping and handling and the cost for barge shipments. For example, if a vendor's invoice on material is $1,000.00 and the unit price is $1.05, the cost of the material to the government will be $1,050.00. (DO - Dollars) | 100,000 | DO | $0.00 | $ - 0 | | | |
| Annex 1502000 Facility Investment | | | | | | |
| C706 | Asbestos Material Removal | The Contractor shall provide all labor, materials and equipment required to perform asbestos material removal in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order. | | | | |
| 975 | SF | $0.00 | $ - 0 | | | |
| C707 | Lead Material Removal | The Contractor shall provide all labor, materials and equipment required to perform lead abatement in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order. | 750 | SF | $0.00 | $ - 0 |
| C708 | Replace Suspended Ceiling Tile (2'x2') | The Contractor shall provide all labor, materials and equipment required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Work shall be completed within the timeframe specified on the task order. | 750 | SF | $0.00 | $ - 0 |
| C709 | Replace Suspended Ceiling Tile (2'x4') | The Contractor shall provide all labor, materials and equipment required to replace 2’x4’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 8 ceiling tiles. Work shall be completed within the timeframe specified on the task order. | 1,500 | EA | $0.00 | $ - 0 |
| C710 | Replace Suspended Ceiling Grid, Cross Tee 4' | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | 750 | EA | $0.00 | $ - 0 |
| C711 | Replace Suspended Ceiling Grid, Cross Tee 2' | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | 500 | EA | $0.00 | $ - 0 |
| C712 | Replace Suspended Ceiling Grid, Main Runner | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid main runner for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | 750 | EA | $0.00 | $ - 0 |