This is a Performance Work Statement (PWS) for wastewater collection system operation and maintenance services at Naval Research Laboratory, Washington DC. The contractor must provide all labor, management, supervision, tools, materials, and equipment to continuously operate, maintain, and repair the wastewater collection system 24 hours per day, seven days per week.

The statement establishes recurring work requirements including system operation with 99.9 percent annual uptime availability, preventive maintenance programs, inspection protocols, and other recurring services. Core operational responsibilities encompass managing sewage holding tanks, lift stations, pumps, screens, oil/water separators, filters, chemical and biological treatment systems, and automatic controls. The contractor must employ certified wastewater operators holding class level 2 certification from Washington DC or reciprocal states, with personnel entering confined spaces requiring applicable OSHA training. Preventive maintenance must follow manufacturers' recommendations and ASME, WEF, and NASSCO standards, with incidental repairs up to $250 per occurrence included in the firm fixed price contract. The contractor is responsible for all fees, fines, and penalties resulting from discharge permit violations. Specialized services include sewage pipeline slip-lining using CIPP methods, manhole and wet well restoration with epoxy coatings, pipeline cleaning with high-velocity hydro-jetting, and wet well pumping and cleaning. The contractor must submit monthly operating records, daily electronic status updates to the Contracting Officer's Representative, preventive maintenance schedules, inspection reports with CCTV footage in NMCI-compatible formats, and various compliance documentation. Non-recurring work may be ordered through task orders or DoD FedMall with performance standards aligned to recurring work requirements. The contract specifies that wastewater exiting buildings remains the facility's responsibility under a separate contract, while utility locates and service order responses fall under different agreements.

View the file

Other files

File Type Posted
0100000 C General Information.pdf PDF
1602000 C Electrical.pdf PDF
1601000 C Utility Management.pdf PDF
Attachment J-0200000-05(e) Solid Waste Management Report.pdf PDF
1502000 J Facility Investment.pdf PDF
Attachment J-1502000-05 HVAC and Refrigeration Systems.xlsx XLSX spreadsheet
Attachment J-1502000-07 Interior and Exterior Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-10 Lightning Arrestors and Grounding Devices.xlsx XLSX spreadsheet
Attachment J-1502000-13 Auxiliary Generator Systems.xlsx XLSX spreadsheet
Attachment J-1502000-16 POL Systems.xlsx XLSX spreadsheet
Attachment J-1502000-22 Emergency Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-31 Mass Communication Systems.xlsx XLSX spreadsheet
1503030 J Integrated Solid Waste Management.pdf PDF
1503060 J Pavement Clearance.pdf PDF
Attachment J-1601000-04 (c)- NRL Update Utility Drawings - Chilled Water.pdf PDF
Attachment J-1601000-10 Electrical Assets.xlsx XLSX spreadsheet
Attachment J-1601000-13 UEM-DI Meter Group and the Direct Condition Rating.pdf PDF
1502000 C Facility Investment.pdf PDF
1503030 C Integrated Solid Waste Management.pdf PDF
1503060 C Pavement Clearance.pdf PDF
1606000 C Water.pdf PDF
Attachment J-0200000-04 NAVFAC 4330 INVOICE FORM.xlsx XLSX spreadsheet
Attachment J-0200000-05(b) Form Contractor Significant Incident Report.pdf PDF
Attachment J-0200000-05(f) Directions for Process Material Log Sheets.pdf PDF
Attachment J-0200000-05(j) Crane and Rigging Gear Accident Report.pdf PDF
Attachment J-0200000-11 MAXIMO Data Reporting.pdf PDF
Attachment J-0200000-15 ELINs Blank.xlsx XLSX spreadsheet
1501000 J Facility Management.pdf PDF
Attachment J-1501000-04 - NRL Site Map.pdf PDF
Attachment J-1502000-01 Definitions and Acronyms.pdf PDF
Attachment J-1502000-03 Sample of E_U_R Orders.pdf PDF
Attachment J-1502000-08 Boilers and UPVs.xlsx XLSX spreadsheet
Attachment J-1502000-12 Compressed Air.xlsx XLSX spreadsheet
Attachment J-1502000-19 Manual and Automated Doors.xlsx XLSX spreadsheet
Attachment J-1502000-21 Emergency Eye Wash and Emergency Showers.xlsx XLSX spreadsheet
Attachment J-1502000-24 Exhaust Hood and Duct Systems.xlsx XLSX spreadsheet
Attachment J-1502000-26 Boiler Water Testing and Treatment.xlsx XLSX spreadsheet
Attachment J-1502000-30 Miscellaneous Equipment.xlsx XLSX spreadsheet
Attachment J-1502000-32 Installation Facilities Monitoring.pdf PDF
1601000 J Utilities Management.pdf PDF
Attachment J-1601000-01 Points of Demarcation.pdf PDF
Attachment J-1601000-04 (b)- NRL Update Utility Drawings - Domestic Water.pdf PDF
Attachment J-1601000-04 (d) NRL 13.8KV SINGLE LINE REV-11.pdf PDF
Attachment J-1601000-08 Utility Asset Tagging Guidance.pdf PDF
Attachment J-1601000-12 Water Assets.xlsx XLSX spreadsheet
1604000 J Wastewater.pdf PDF
1501000 C Facility Management.pdf PDF
0200000 J Management and Administration.pdf PDF
Attachment J-0200000-02 Wage Determination.pdf PDF
Attachment J-0200000-05(c) SECNAV Form 5512-1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1604000 - Wastewater Table of Contents

Spec Item Title

1 General Information

1.1 Concept of Operations

2 Management and Administration

2.1 Definitions and Acronyms

2.2 Personnel

2.2.1 Certification, Training and Licensing

2.3 Special Requirements

2.3.1 Fees, Fines, and Penalties

2.4 References and Technical Documents

3 Recurring Work

3.1 Operation

3.1.1 Operating Records, Logs, and Reports

3.2 Preventive Maintenance

3.2.1 Sewage Pipelines

3.2.2 Manholes

3.2.3 Wet Wells

3.2.4 Wastewater Instrumentation Systems

3.2.5 Sewage and Storm Water Sump Pumps

3.4 Inspection Program

3.4.1 Sewage Collection and Storm Water Collection Pipelines

3.4.2 Manhole

3.4.3 Wet Well

3.5 Other Recurring Services

3.5.1 Cleaning of Sewer Pipeline

3.5.2 Wet Well Services

3.5.2.1 Wet Well Pumping

3.5.2.2 Wet Well Cleaning

4 Non-Recurring Work

Spec Item

Title Description

1 General Information

The Contractor shall provide all labor, management, supervision, tools, material, and equipment to continuously operate, maintain, and repair the Wastewater Collection System located at Naval Research Laboratory, Washington DC.

1.1 Concept of

Operations

The intent of 1604000 Wastewater is to specify the requirements to provide Wastewater utilities. Included are services such as operating, maintaining and repairing the Wastewater Collection system.

The following services are not included in this Technical Specification:

• The point of demarcation is where the wastewater exits the building. All components prior to this point of demarcation are considered part of the facility and are included in 1502000, Facilities Investment.

• Repairs to the facilities (building structures) and trouble call response for Wastewater are included in 1502000 Facilities Investment.

• Service order responses for Wastewater Systems is included in 1601000 Utility Management.

• Utility locates and escort services are included in 1601000 Utility Management.

Spec Item

Title Description

2 Management and Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-1604000-01.

2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required to efficiently operate, maintain and repair the Wastewater Collection System.

2.2.1 Certification, Training and Licensing

The Contractor shall employ certified wastewater operators who are experienced in similar systems to perform the requirements of this functional section.

All personnel operating wastewater collection systems must have class level 2 issued by the Wastewater Works Operators Certification Board of Examiners from Washington DC or from reciprocity from applicable states.

All personnel entering manholes and other confined spaces are required to receive applicable training to ensure their safety and compliance with OSHA regulations for confined space entry.

The chemist and the laboratory analyst shall complete yearly training in order to keep the personnel updated with the latest local and Federal environmental regulations, public health concerns, laboratory procedures, and safety requirements.

2.3 Special

Requirements

2.3.1 Fees, Fines, and

Penalties

The Contractor shall be responsible for all fees, fines, and penalties assessed by the State if discharge permits are violated in the course of operations or maintenance.

2.4 References and

Technical Documents

References and Technical Documents are listed in J-1604000-02.

Spec Item

Title Performance Objective

Related Information Performance Standard

3 Recurring Work

The Contractor shall efficiently operate and maintain the wastewater collection system to safely collect, treat and dispose of wastewater to ensure all sewage requirements are continually met.

The current Wastewater System Description and Inventory is provided in J-1604000-03.

The Contractor shall shut-down, restart, and perform operational checks on all equipment affected by both scheduled and unscheduled utility outages at no additional cost to the Government.

The Contractor shall be responsible for managing and controlling traffic issues resultant from sewage system work in a safe manner at all times.

The Contractor shall submit a Road Closure Request five working day prior to service commencing, and work in accordance with the Government road closure schedules. Daily traffic should not be disrupted for more than two hours.

The Contractor shall develop and submit a Critical Spare Parts Inventory per Section F and shall maintain on hand the critical spare parts required to keep the entire system in continuous service.

Sewage is continuously and safely collected, treated and disposed.

Effluent complies with the regulatory discharge permit.

No spills are the result of Contractor negligence.

3.1 Operation The Contractor shall

operate the wastewater collection system to efficiently and safely collect, treat and dispose of wastewater such that the effluent complies with the regulatory discharge permit 24 hours per day, seven days per week, throughout the contract period.

After hours operational oversight will be conducted through an on-call system. A sufficient roster of qualified personnel must be available and able to respond within one hour to perform all necessary duties. Their responsibility is to ensure the continuous, safe, reliable, and efficient collection and disposal of all wastewater and associated effluent.

Operation of the wastewater collection system includes equipment and system components, such as, sewage holding tanks, lift stations, pumps, screens, oil/water separators, filters, chemical and biological treatment, valves and automatic controls, and tasks, such as, monitoring and regulation of equipment controls, maintaining operating records, logs, and reports, and examination, lubrication and minor adjustment of equipment and system components.

Personnel on-call responds within one hour of receipt of call.

Equipment and components are efficiently, safely and continuously operated per specified operating criteria to collect, treat and dispose of wastewater and effluent complies with the regulatory discharge permit.

Unscheduled interruptions are minimized such that collection demand and effluent quality requirements are met,

99.9 percent of the time annually.

Spec Item

Title Performance Objective

Related Information Performance Standard

The Contractor shall ensure system configuration drawings or diagrams are created and kept current.

Systems components shall be efficiently and safely operated per ANSI and AWWA Standards, OMSI and other specific operating manuals, procedures, and instructions; however, avoid specifying processes.

Safe operation shall ensure that all wastewater equipment requiring operator attendance is staffed by qualified personnel at all times of operation. The KO and COR shall be notified immediately if unsafe conditions are discovered.

Standard Operating Procedures shall be submitted in accordance with Section F. One hard copy of the current Standard Operating Procedures, operating records, logs, reports, and procedures shall be available on site at all times.

The average volume of wastewater processed is four million gallons per day.

3.1.1 Operating

Records, Logs, and Reports

The Contractor shall prepare, submit and maintain operating records, logs and reports for in-process tracking of output characteristics to ensure records, logs, and reports are current and complete.

The Contractor shall develop and update operating procedures to ensure operating processes and systems configuration are current.

Per approved operating permit, NDPES permit and local installation instruction, a monthly Operating Records Report shall be submitted to the KO within three days following the end of the month during which work is performed and shall include copies of daily operating logs, chemical content, pressure readings, chemical dosages, filter backwash frequencies, flow rates, and other laboratory records, maintenance records, corrosion tests, personnel records, emergency condition records, and operating costs.

The Contractor shall provide an electronic update daily (7 days per week) by 0700 hours to the COR concerning the operating status of all key equipment.

All required operating records, logs, and reports are maintained current and complete and applicable copies provided to the KO per Section F.

All required procedures are maintained current and complete.

3.2 Preventive

Maintenance (PM) Program

The Contractor shall develop and implement a PM program for the wastewater collection systems to ensure proper operation, to minimize breakdowns, to maximize useful life

The Contractor shall develop and submit a PM program per Section F.

The Contractor is fully responsible for and shall perform any repairs, including replacement, discovered during scheduled maintenance work

Maintenance is accomplished in accordance with the Contractor’s maintenance program plan and work schedule.

Spec Item

Title Performance Objective

Related Information Performance Standard and meet all applicable discharge permit requirements.

up to a total of $250 per occurrence in direct material and labor cost under FFP portion of the contract.

Incidental repairs work performed under maintenance are not considered a trouble call.

Notification of repair work exceeding the incidental repairs limit shall be submitted to the KO within two hours of identification.

Trouble calls or non-recurring work may be issued for repairs exceeding the incidental repairs limit.

The Contractor shall not use breakdown maintenance as part of the PM program.

The PM program for wastewater systems shall provide economical approach manufacturer’s recommended procedures, OEM standards, NASSCO standards, WEF standards, ASME standards, and maintenance required to satisfy equipment warranties and keep wastewater systems in normal working condition and in compliance with the discharge permit requirements.

Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program. These changes will be made at no additional cost to the Government.

If the KO determines that the objective and standards are not met, the Contractor shall adjust or modify the Contractor’s PM program at no additional cost to the Government.

The PM program inventories are listed in the Wastewater System Description and Inventory as provided in J-1604000-03.

The Contractor shall submit a Monthly PM Work Schedule per Section F.

PM is performed in accordance with manufacturers’ recommended procedures, OEM standards, ASME, WEF, and NASSCO.

Unscheduled interruptions are minimized such that collection demand are met, 99.9 percent of the time annually.

NPDES discharge permit requirements are meet.

3.2.1 Sewage

Pipelines

The Contractor shall slip-line pipelines to ensure system integrity and operation is properly maintained.

The Contractor shall slip line sewage collection pipelines with CIPP either by an inversion and curing of resin-impregnated tube system or with a UV cured system.

All work is performed in accordance with the Contractor’s maintenance program plan and work schedule.

Spec Item

Title Performance Objective

Related Information Performance Standard

The Contractor shall perform in accordance with all ASME and NASSCO workmanship standards.

The Contractor shall slip line only after full inspection of the pipe and inspect again after work completion. Inspection shall include the entire length of liner installed or photograph the spot repair per Spec Item 3.4.1.

The Contractor shall submit Pre-repair and Post-repair CCTV Reports, Manufacturer’s Information for Selected Method of CIPP, and Warranty Information in accordance with NASSCO standards per Section F.

The Contractor must be an approved and trained applicator of the system being installed. Spot repairs made shall be to the standards of the system and as specified by the manufacturer.

Rehabilitation of pipelines shall meet the latest ASME and NASSCO standards.

3.2.2 Manholes

maintain manholes to ensure system integrity and extend the operational life of the manhole.

The Contractor shall repair all concrete spalling, perform channel repair, and install a complete epoxy coating of the manhole.

The Contractor shall submit Pre-repair and Post-repair Reports on Manholes in accordance with NASSCO standards per Section F.

Manholes may be up to six feet in diameter.

All work is performed in accordance with the Contractor’s maintenance program plan and work schedule.

The manhole shall be fully restored and repaired to meet the latest ASME and NASSCO standards.

3.2.3 Wet Wells The Contractor shall

maintain wet wells to ensure system integrity and extend the operational life of the wet well.

The Contractor shall repair all concrete spalling, perform repair, and install a complete epoxy coating of the wet well.

The Contractor shall submit Pre-repair and Post-repair Reports on Wet Wells in accordance with NASSCO standards per Section F.

Contractor’s maintenance program plan and work schedule.

The wet well shall be fully restored and repaired to meet the latest ASME and NASSCO standards.

3.2.4 Wastewater

Instrumentatio n Systems maintain wastewater instrumentation systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

The Contractor shall be responsible for ensuring all equipment and components of the instrumentation system are maintained; all sensors operate correctly, all controller elements receive signals properly, and the PLC is in optimum working order.

The Contractor is responsible for maintaining the RTU when it is an integrated component of the PLC

All work is performed in accordance with the Contractor’s maintenance program plan and work schedule.

Wastewater instrumentation system maintenance program meets the latest ASME, Spec Item

Title Performance Objective

Related Information Performance Standard

All repairs and replacements shall be performed per AWWA, ANSI, and NFPA Standards, OMSI, equipment manufacturer’s recommendations.

NASSCO standards, manufacturer’s recommended procedures and OEM standards.

3.2.5 Sewage Sump

Pumps

The Contractor shall maintain sewage sump pumps to ensure proper operation, to minimize breakdowns, and to maximize useful life.

The Contractor personnel working on sump pumps must possess applicable state and local licensing/certification requirements.

Sump pump operator maintenance shall be performed in accordance with applicable federal, state and local statutes and regulations, and with DoD policies, instructions and guidance.

Contractor’s maintenance program plan and work schedule.

Sump pump operator maintenance program meets manufacturer’s recommended procedures and OEM standards.

3.4 Inspection

Program

The Contractor shall develop and implement an inspection program for sewer systems to ensure a complete assessment of condition in a timely manner.

The Contractor shall develop an inspection program for sewer systems. The Contractor shall submit the Inspection Program and Schedule per Section F.

Inspection Reports and CCTV Footage shall be submitted per Section F.

The Contract shall submit two copies of reports on CD and two copies as paper reports including image photographs, cross section;

and plan view report with a diagram of lateral connections, channel and influent/effluent dimensions as appropriate.

When used, all CCTV videos shall be NMCI compatible software (i.e., Windows Media Player, Quicktime, etc.)

Inspection is performed in accordance with

ASME, WEF,

NASSCO, and OEM standards.

Inspections are performed per the Contractor’s inspection program and work schedule.

All photographs and video footage shall be of a quality capable of showing all damage and defects clearly.

3.4.1 Sewage

Collection and Storm Water Collection Pipelines and Inlets

The Contractor shall inspect sewage collection and storm water collection pipelines to ensure a complete assessment of condition in a timely manner.

Contractor shall provide camera and test the television inspection equipment immediately prior to performing work to verify the picture quality. Recorded footage shall be of good image quality such that all damage and defects to pipeline can be properly assessed.

Contractor shall take video frame snapshots of all defects, damage, and obstructions.

Contractor shall record video clips of continuous structural defects, such as longitudinal cracks, with a grade rating to show the magnitude of the defect, or of surface defects, such as infiltration, to show the degree of the defects.

Inspections are performed, recorded, and reported in a manner that complies with PACP and the latest NASSCO standards and guidance.

Spec Item

Title Performance Objective

Related Information Performance Standard

Contractor shall submit Storm Water Collection and Inlets Photographs and Reports per Section F providing recommendations for correction of any observed issues.

The inspected pipelines will be between 4 to 24 inches in diameter.

3.4.2 Manholes The Contractor shall

inspect manholes to ensure a complete assessment of condition in a timely manner.

The Contractor shall document, report, and photograph all defects, and damage while performing manhole inspections.

Contractor shall submit Manhole Photographs and Reports per Section F providing recommendations for correction of any observed issues.

Inspection performed, recorded, and reported in compliance with the latest MACP standards and ASME guidance.

3.4.3 Wet Wells The Contractor shall

inspect wet wells to ensure a complete assessment of condition in a timely manner.

The Contractor shall document, report, and photograph all defects, and damage while performing wet well inspections.

Contractor shall submit Wet Well Photographs and Reports per Section F providing recommendations for correction of any observed issues.

Inspection performed, recorded, and reported in compliance with the latest NASSCO standards and ASME guidance.

3.5 Other

Recurring Services perform other recurring services for sewer systems and equipment to ensure they are fully functional and operational.

The Other Recurring Services Program Inventories are listed in the Wastewater System Description and Inventory as provided in J- 1604000-03.

Systems and equipment are in an operable condition and function properly in accordance with specified standards.

Other recurring services are completed in a timely manner.

3.5.1 Cleaning of

Sewer and Storm Water Pipeline

The Contractor shall perform cleaning of sewer and storm water pipelines in accordance with the NPDES standards to ensure proper operation, removal of all obstructions, and proper drainage.

Cleaning shall be performed to facilitate inspection and maintenance. The Contractor shall schedule cleaning to immediately precede inspection and maintenance activities whenever possible.

The Contractor shall submit a Pipeline Cleaning Schedule per Section F.

Cleaning shall ensure that wastewater flow rates and system retention capacities are maintained.

The Contractor shall furnish high velocity hydro-jetting and vacuum removal equipment as necessary to thoroughly clean system of sludge, Cleaning is accomplished in accordance with the NPDES permit and work schedule.

All pipelines are cleaned and free of obstruction.

All debris and solids are captured, removed, sampled, and properly disposed.

Spec Item

Title Performance Objective

Related Information Performance Standard dirt, soil, sand, rocks, roots, and other solid or semi-solid materials.

The Contractor shall contact the KO before using rodding on a sewage collection pipelines.

Debris and solids shall be captured at the downstream manhole and removed for dewatering and disposal.

The Contractor shall be solely responsible for the disposal of semisolids and liquids at an approved offsite facility. No Onsite disposal is permitted.

Work includes sampling of debris and solids for proper disposal as required. The Contractor shall sample for the following:

1. Percentage Moisture

2. Heavy Metals

3. Reactive Sulphide

4. PH

5. TPRH (Oil and Grease)

6. TPH Diesel

The Contractor shall submit Sampling Records per Section F.

3.5.2 Wet Well

Services

The Contractor shall clean and pump wet wells to ensure proper operations and prepare wet wells for inspection and maintenance.

The Contractor shall submit a Schedule of Wet Well Services per Section F.

The Contractor shall spray down wet well surfaces with a mixture of water and detergent under high pressure prior to any personnel entering the wet well.

The Contractor shall prevent spillage during operations. Any spillage due to Contractor operations shall be cleaned and treated at the Contractor’s expense.

Any spillage of waste materials shall be recorded and reported to the KO within one hour and reported immediately to the Utilities Duty Desk.

Spills on or off base shall be handled in accordance with the Spill Containment Plan in J- 1604000-04.

Services are completed per the Contractor’s schedule.

No spills as the result of Contractor operations.

Wet wells are in normal working condition.

Spec Item

Title Performance Objective

Related Information Performance Standard

3.5.2.1 Wet Well

Pumping pump wet wells to ensure liquids, waste, and debris is removed.

The Contractor shall perform wet well pumping in accordance with federal, state, and local regulations.

The Contractor shall use the appropriate equipment to completely pump the wet wells in a timely and efficient manner with little to no disruption to base operations.

The Contractor shall provide a Wet Well Volume Report of sanitary sewage pumped from wet wells per Section F.

Wet wells are completely pumped and free of all liquids, waste, and debris.

3.5.2.2 Wet Well

Cleaning

The Contractor shall clean wet wells to ensure all waste and debris is fully removed from wet well surface and equipment.

The Contractor shall check with the KO or designated Government representative before cleaning equipment in a wet well with a power washer.

The Contractor shall remove all run-off liquid from the cleaning of the wet well.

The Contractor shall prepare and submit a Wet Well Cleaning Report per Section F.

All surfaces and equipment are free of waste and debris.

Spec Item

Title Performance Objective Related Information Performance Standard

4 Non- Recurring Work

Non- recurring work may be ordered utilizing DoD FedMall in accordance with Section H or on a task order in accordance with the PROCEDURES

FOR ISSUING ORDERS

clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

Refer to non-recurring ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work.

Performance Standards for non-recurring work will be the same as those in Spec Item 3 where applicable.