This is an attachment to a federal contract providing guidance on data reporting procedures for the NAVFAC Maximo system.

The attachment establishes requirements for contractors to record and submit four categories of data through direct entry into NAVFAC Maximo: (1) Work Order Data, encompassing completed work orders including service orders, preventive maintenance, and IDIQ work; (2) Asset Data, detailing information necessary for identification and tracking of assets that have been repaired, replaced, or installed, with utilities assets requiring additional specification information; (3) Specification Information, providing detailed data specific to utilities assets; and (4) Condition Assessment Data, documenting condition ratings of all assets in support of the Infrastructure Condition Assessment Program (ICAP). Contractors must obtain authorized access to NAVFAC Maximo and directly enter data into applicable screens, with access limited to viewing, editing, and reporting only data related to their assigned work. Each contractor receives a specific work center code for all data entry and retrieval operations. The document references detailed field requirements contained in separate spreadsheets (J-0200000-XX) and system access procedures outlined in Annex 0200000. Unauthorized access attempts or attempts to access data unrelated to a contractor's work may result in removal of access privileges.

View the file

Other files

File Type Posted
1502000 C Facility Investment.pdf PDF
1503030 C Integrated Solid Waste Management.pdf PDF
1503060 C Pavement Clearance.pdf PDF
1606000 C Water.pdf PDF
Attachment J-0200000-04 NAVFAC 4330 INVOICE FORM.xlsx XLSX spreadsheet
Attachment J-0200000-05(b) Form Contractor Significant Incident Report.pdf PDF
Attachment J-0200000-05(f) Directions for Process Material Log Sheets.pdf PDF
Attachment J-0200000-05(j) Crane and Rigging Gear Accident Report.pdf PDF
Attachment J-0200000-15 ELINs Blank.xlsx XLSX spreadsheet
1501000 J Facility Management.pdf PDF
Attachment J-1501000-04 - NRL Site Map.pdf PDF
Attachment J-1502000-01 Definitions and Acronyms.pdf PDF
Attachment J-1502000-03 Sample of E_U_R Orders.pdf PDF
Attachment J-1502000-08 Boilers and UPVs.xlsx XLSX spreadsheet
Attachment J-1502000-12 Compressed Air.xlsx XLSX spreadsheet
Attachment J-1502000-19 Manual and Automated Doors.xlsx XLSX spreadsheet
Attachment J-1502000-21 Emergency Eye Wash and Emergency Showers.xlsx XLSX spreadsheet
Attachment J-1502000-24 Exhaust Hood and Duct Systems.xlsx XLSX spreadsheet
Attachment J-1502000-26 Boiler Water Testing and Treatment.xlsx XLSX spreadsheet
Attachment J-1502000-30 Miscellaneous Equipment.xlsx XLSX spreadsheet
Attachment J-1502000-32 Installation Facilities Monitoring.pdf PDF
1601000 J Utilities Management.pdf PDF
Attachment J-1601000-01 Points of Demarcation.pdf PDF
Attachment J-1601000-04 (b)- NRL Update Utility Drawings - Domestic Water.pdf PDF
Attachment J-1601000-04 (d) NRL 13.8KV SINGLE LINE REV-11.pdf PDF
Attachment J-1601000-08 Utility Asset Tagging Guidance.pdf PDF
Attachment J-1601000-12 Water Assets.xlsx XLSX spreadsheet
1604000 J Wastewater.pdf PDF
0100000 C General Information.pdf PDF
1602000 C Electrical.pdf PDF
1604000 C Wastewater.pdf PDF
1601000 C Utility Management.pdf PDF
Attachment J-0200000-05(e) Solid Waste Management Report.pdf PDF
1502000 J Facility Investment.pdf PDF
Attachment J-1502000-05 HVAC and Refrigeration Systems.xlsx XLSX spreadsheet
Attachment J-1502000-07 Interior and Exterior Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-10 Lightning Arrestors and Grounding Devices.xlsx XLSX spreadsheet
Attachment J-1502000-13 Auxiliary Generator Systems.xlsx XLSX spreadsheet
Attachment J-1502000-16 POL Systems.xlsx XLSX spreadsheet
Attachment J-1502000-22 Emergency Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-31 Mass Communication Systems.xlsx XLSX spreadsheet
1503030 J Integrated Solid Waste Management.pdf PDF
1503060 J Pavement Clearance.pdf PDF
Attachment J-1601000-04 (c)- NRL Update Utility Drawings - Chilled Water.pdf PDF
Attachment J-1601000-10 Electrical Assets.xlsx XLSX spreadsheet
Attachment J-1601000-13 UEM-DI Meter Group and the Direct Condition Rating.pdf PDF
1501000 C Facility Management.pdf PDF
0200000 J Management and Administration.pdf PDF
Attachment J-0200000-02 Wage Determination.pdf PDF
Attachment J-0200000-05(c) SECNAV Form 5512-1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-0200000-11 NAVFAC Maximo Data Reporting

PURPOSE AND OVERVIEW:

The purpose of this attachment is to provide guidance on how data is to be recorded and provided by the Contractor in reporting Service Provider, Asset, Specification, and Characteristic Meter Reading Information for NAVFAC MAXIMO. This document outlines the methods that must be utilized by the Contractor and associated NAVFAC business process and procedures for how data is to be submitted.

GENERAL TYPES OF DATA:

Work Order Data:

Work order data includes all necessary information for the documentation of all completed work orders, including, but not limited to, service orders, preventive maintenance (as performed under the PM program or as part of IMP), and work issued as IDIQ. Specific NAVFAC MAXIMO fields required for work order data are listed on the Service Provider Information spreadsheet provided in J-0200000-XX.

Asset Data:

Asset data includes the specific details necessary for proper identification and tracking of assets. Asset data must be updated for all completed work orders where an asset is repaired, replaced, installed, or otherwise affected.

Specific NAVFAC MAXIMO fields required for asset data are listed on the Asset Information spreadsheet provided in J-0200000-XX. Utilities assets require the additional data listed on the Specification Information spreadsheet provided in J-0200000-XX. When replacing existing assets, the Contractor shall change the status of the current asset which will remove it from the maintenance plan and add the new asset.

Condition Assessment Data:

Condition assessment data includes all necessary information for the accurate condition rating of all assets in support of the Infrastructure Condition Assessment Program (ICAP). Specific NAVFAC MAXIMO fields required for condition assessment data are listed on the Characteristic Meter Reading Information spreadsheet provided in J-0200000-XX.

METHODS FOR DATA SUBMISSION:

The Contractor shall provide work order, asset, specification, and condition assessment data via Direct Entry.

Direct Data Entry:

The Contractor shall obtain authorized access as specified in Section C and directly enter data into NAVFAC MAXIMO. Detailed guidance on NAVFAC MAXIMO System Access Procedures is provided in Annex 0200000 Management and Administration, Spec Item 2.6.6.1 System Access. All reference value verification is provided by NAVFAC MAXIMO.

All Contractors personnel who obtain authorized access will be granted entry only within the applicable NAVFAC MAXIMO screens necessary to enter work order, asset, specification and condition assessment data. Contractors are only authorized to view, edit, report or otherwise access data related to their work. Any unauthorized attempt to do otherwise may be grounds for removal of access privileges. Contractors will be assigned a specific work center code for their work and shall utilize this code for all such data entry and retrieval.

File details come from the government source that posted it. Updated .