1502000 J Facility Investment.pdf
PDF 254 KB Posted
- Solicitation number
- N4008027R1001
About this file
This is Section J of a federal contract specification document titled "Facility Investment" (1502000), containing 32 numbered attachments that establish technical requirements, standards, and inventories for comprehensive facilities maintenance and management operations.
The document defines facilities stewardship responsibilities across multiple building systems and equipment categories including HVAC and refrigeration systems, lighting systems, boilers and unfired pressure vessels, fire protection systems, compressed air systems, auxiliary generators, cathodic protection systems, lightning arresting and grounding systems, POL (petroleum, oils, lubricants) distribution systems, building control systems, and electrical switchgear. Temperature standards are specified for HVAC operations (ranging from 68-78°F depending on area type and season) and refrigeration systems (ranging from -5°F to 42°F depending on storage type). The contractor must develop and implement preventive maintenance programs for all systems, with responsibility for maintaining equipment in operational readiness. The document references numerous technical standards including NAVFAC manuals, UFC (Unified Facilities Criteria) guidelines, NFPA standards, ASME codes, and military specifications. Historical work order data indicates approximately 1,600 emergency orders, 1,700 urgent orders, and 2,808 routine orders annually. Extensive supplementary inventories are referenced as separate attachments covering equipment such as medium/low voltage switchgear, uninterruptible power supplies, grease traps, exhaust hoods, water testing services, drinking fountains, acid neutralization systems, doors, emergency lighting, and mass communication systems. The specification emphasizes systems-approach maintenance that encompasses all mechanically and electrically interlocked components, controls, and ancillary equipment as integrated units rather than individual items.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section J – 1502000 Facility Investment
Section J -1502000
Attachment Number Attachment Title
J-1502000-01 Definitions and Acronyms J-1502000-02 References and Technical Documents J-1502000-03 Facilities Description J-1502000-04 Sample of Historical Emergency, Urgent, and Routine Work Orders J-1502000-05 HVAC and Refrigeration Systems J-1502000-06 Temperature Standards for HVAC and Refrigeration Systems J-1502000-07 Interior and Exterior Lighting Systems J-1502000-08 Boilers and Unfired Pressure Vessels (UPVs) Systems J-1502000-09 Cathodic Protection Systems J-1502000-10 Lightning Arresting and Grounding Systems J-1502000-11 Fire Protection Systems J-1502000-12 Compressed Air Systems J-1502000-13 Auxiliary Generators J-1502000-14 Building Control Systems J-1502000-15 Medium and Low Voltage Switchgear J-1502000-16 POL System Facilities and Distribution Systems J-1502000-17 Backflow Prevention Devices J-1502000-18 Uninterruptible Power Supply J-1502000-19 Manual and Automated Doors J-1502000-20 Overhead Doors J-1502000-21 Emergency Eyewash and Shower Stations J-1502000-22 Emergency Lighting J-1502000-23 Grease Traps J-1502000-24 Exhaust Hoods and Ducts J-1502000-25 HVAC Water Testing and Treatment Services J-1502000-26 Boiler Water Testing and Treatment Services J-1502000-27 Building Drainage Systems J-1502000-28 Drinking Fountains and Water Coolers J-1502000-29 Acid Neutralization Systems J-1502000-30 Miscellaneous Equipment and Systems J-1502000-31 Mass Communication Systems J-1502000-32 Installation Facilities Monitoring
Attachment J-1502000-01 Definitions and Acronyms
Definition Description Crane, Category 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes
(YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.
Crane, Category 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.
Crane, Category 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.
Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.
Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
Equipment, Personal Property
Personal property equipment includes all equipment other than collateral equipment.
Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.
Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.
Facilities Maintenance Management
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
Integrated Maintenance Program (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Emergency, Urgent, and Routine Work Orders will not be issued for accomplishment of repairs on systems and equipment maintained under
IMP.
Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
Maintenance, Preventive
Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.
Management Information Systems- Maintenance
A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.
Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair.
The intent of repair is to have the equipment at normal working condition.
Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters.
Replacement is performed when the equipment has reached the end of its useful life;
when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
Weight Handling Equipment (WHE)
Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE.
Acronym Title ADR Automated Demand Response ANSI American National Standards Institute ASME American Society of Mechanical Engineers ASSE American Society of Safety Engineers ASTM American Society for Testing and Materials ATSPP Automated Transmission of Standby Power Programs BCS Building Control System BPVC Boiler and Pressure Vessel Code CEMS Centralized Elevator Monitoring System CFC Chlorofluorocarbon DDC Direct Digital Controls EMCS Energy Management and Controls System FAS Fire Alarm System FTE Full Time Employee HCFC Hydrochlorofluorocarbon HTHW High Temperature Hot Water HVAC Heating, Ventilation, and Air Conditioning
IAW In Accordance With LED Light Emitting Diode MBTU(H) One Million British Thermal Units per Hour MIL-HDBK Military Handbook MIL-STD Military Standard MLSC Master Load-Shed Controls MNS Mass Notifications System MO Maintenance and Operations Manuals MPI Master Painters Institute NBBI National Board of Boiler and Pressure Vessel Inspectors NAVMED Navy Medicine NFPA National Fire Protection Association OEM Original Equipment Manufacturer OWS Oil Water Separators PC Personal Control PCS Plant Control System POL Petroleum, Oils, Lubricants RPIE Real Property Inventory Equipment SCADA Supervisory Control And Data Acquisition SRM Sustainment, Restoration and Modernization TM Technical Manual UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specifications UPV Unfired Pressure Vessel VTE Vertical Transportation Equipment WHE Weight Handling Equipment
Attachment J-1502000-00-02
References and Technical Documents
Reference Title
40 CFR 60 Standards of Performance for New Stationary Sources (NSPS) 40 CFR 63 National Emission Standards for Hazardous Air Pollutants for Source Categories
40 CFR 89 Control Of Emissions From New And In-Use Nonroad Compression-Ignition Engines
ASME A17.1 Safety Code for Elevators and Escalators
ASME A17.2 Safety Code for Existing Elevators and Escalators ASME 18.1 Safety Standard for Platform Lifts & Stairway Chairlifts
COMAR
26.11.09.08(E)
Control of Fuel Burning Equipment and Stationary Internal Combustion - Control of Nitrogen Oxides Emissions from Major Stationary Sources
COMAR 26.11.09.05 Control of Fuel Burning Equipment and Stationary Internal Combustion - Visible Emissions
COMAR 26.11.03.06C General Emissions Standards, Prohibitions, and Restrictions - Particulate Matter
MIL-HDBK-274 Oxyacetylene and Nitrogen and Breathing Oxygen Facilities MIL-HDBK-419A Grounding, Bonding, and Shielding for Electronic Equipments and Facilities
MIL-STD-188-124B
Grounding, Bonding and Shielding for Common Long Haul/Tactical
Communication Systems Including Ground Based Communications- Electronics Facilities and Equipments
National Board of Boiler and Pressure Vessel Inspectors Code
NAVFACINST
11300.37 Energy and Utilities Policy Manual
NAVFAC MO-200 Facilities Engineering Electrical Exterior Facilities NAVFAC MO-206 Maintenance and Operation of Air Compressor Plants
NAVFAC MO-209 Maintenance of Steam, Hot Water and Compressed Air NAVFAC MO-912 Auxiliary Generators NAVFAC MO-322 Inspection of Shore Facilities, Volume I and II
NAVFAC P-307 Management of Weight Handling Equipment NAVFAC MO-230 Petroleum Fuel Facilities NAVFAC MO-102 Maintenance and Repair of Surface Areas NAVMED P-5010-4 Manual of Naval Preventive Medicine Swimming Pools and Bathing Places NAVSEA OP-5 Ammunition And Explosives Safety Ashore
NFPA 780 Standard for the Installation of Lightning Protection Systems NFPA 99 Health Care Facilities Code NFPA Standard 96 National Fire Protection Association, NAVSUP P-558 Fuel Management Ashore NAVSUPINST 4750.1 Automated Fuel Maintenance System OPNAVINST 5090.1 Environmental Readiness Program Manual
TM 5-693
Uninterruptible Power Supply System Selection, Installation, and Maintenance for Command, Control, Communications, Computer, Intelligence, Surveillance, and Reconnaissance (C4isr) Facilities
UFC 3-230-02 Operation and Maintenance: Water Supply Systems UFC 3-240-13FN Industrial Water Treatment Operation and Maintenance UFC 3-250-08FA Standard Practice for Sealing Joints and Cracks in Rigid and Flexible Pavements
UFC 3-270-01 Asphalt Maintenance and Repair of Surface Areas UFC 3-270-01 Asphalt Maintenance and Repair UFC 3-270-02 Asphalt Crack Repair
UFC 3-410-01 Design: Petroleum Fuel Facilities
UFC 3-430-07 Operations and Maintenance: Inspection and Certification of Boilers and Unfired Pressure Vessels
UFC 3-460-03 O&M: Maintenance of Petroleum Systems UFC 3-570-06 O&M: Cathodic Protection Systems
UFC 3-600-02 Operations and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems
UG-2029-ENV Cross-Connection Control and Backflow Prevention Program Implementation at Navy Shore Facilities
Attachment J-1502000-03 Facilities Description
Attached J-1502000-02 Facility Listing provided as a separate attachment.
Attachment J-1502000-04 Sample of Historical Emergency, Urgent, Routine Orders and Project Work Orders
Description Facilities Sub-Work Type Emergency 1,600
Urgent 1,700 Routine 2,808
Project Work Orders
Attachment J-1502000-05
HVAC and Refrigeration Systems
HVAC and Refrigeration Systems commence at and includes the utility isolation point of connection and terminate at the conditioned air point of delivery. The Contractor shall develop and implement an Preventive Maintenance (PM) Program for the HVAC and Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the HVAC and Refrigeration Systems such as: air handling units, blowers, boilers, chillers, compressors (including air compressors), condensers, controls, cooling towers, dehumidifiers, diffusers, driers, ducts, electrical disconnects, evaporators, fans, fan coil units, filters, fire dampers, fresh air dampers, heaters, heat exchangers, heat pumps, hoods, humidification systems, insulation, intakes, package units, piping, pumps, refrigeration boxes, registers, returns, strainers, ultraviolet lighting, valves, VAV boxes, variable frequency drives, water treatment systems, monitoring and control systems including the EMCS.
The Energy Management Control System (EMCS) is a centralized Building Automation System that provides monitoring and control of HVAC systems (e.g., Chillers, Air Handlers, Cooling Towers, Pumps, DX Split Systems, Outside Air Units, Variable Air Volume Boxes, Fan Terminal Units, etc.) in multiple facilities. The EMCS includes all equipment and components of the EMCS (e.g., Hardware, Software, Controllers, Field Devices, Graphics, monitoring and control system, etc.).
The EMCS is designed on an open standard BACnet Protocol. The EMCS uses Tridium's Niagara-AX Framework for the Direct Digital Controls (DDC) systems integration of the diverse systems that are utilized locally by different facilities. The EMCS Supervisor Workstation, located at Building 1966, uses a web-based building management system interface, EC-Net A/X Graphics Package. In general, all DDC control devices within the facilities that are linked via the base wide EMCS, communicate to a building level JACE (Java Application Control Engine) device, which in turn communicates to a centralized controller via fiber optic communication network and copper telephone network.
Attachment J-1502000-05 HVAC and Refrigeration Systems provided as a separate attachment (Provided as file name: J-1502000-05 HVAC and Refrigeration Systems).
Attachment J-1502000-06
Temperature Standards for HVAC and Refrigeration Systems
HVAC Systems Degrees Fahrenheit dry bulb
Area Cooling Season Heating Season Living & Admin. Areas (Inactive Employment) 73 68 Working Areas (Active Employment) 78 68 Storage Areas 78 40 Computer Areas 70 68 Training Areas 75 68
Refrigeration Systems Type Degrees Fahrenheit
Frozen Meat -5 to 0 Fresh Meat 30 to 34 Ice Storage 28 to 30 Dairy Products 32 to 34 Ice Cream 0 to -5 Beer 35 to 39 Fruits and Vegetables 36 to 42 Chill Room 35 to 39
Attachment J-1502000-07 Interior and Exterior Lighting Systems
Interior and Exterior Lighting Systems commence at, and includes the utility isolation point of connection. The Contractor shall develop and implement a Lighting Systems Preventive Maintenance (PM) Program to clean, re-lamp, and make all necessary repairs to the Interior and Exterior Lighting Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Lighting Systems, such as: replacement of defective bulbs, batteries, lamps, tubes, ballasts, fuses, starters, switches, diffusers, covers, reflectors, photocells, controls, etc.
Attachment J-1502000-07 Interior and Exterior Lighting Systems provided as a separate attachment (Provided as file name: J-1502000-07 Interior and Exterior Lighting Systems).
Attachment J-1502000-08 Boiler and UPV Systems
Boiler and UPV Systems commence at, and includes the utility isolation point of connection and terminate at the steam/hot water point of delivery. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Boiler and UPV Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Boiler and UPV Systems, such as: burners, heat exchangers, flash tanks, meters, pressure vessel, pumps, piping, valves, steam regulating valves, steam traps, distribution lines, insulation, chemical feed system, condensation return lines, condensate meters, monitoring and controls systems, etc.
Attachment J-1502000-08 Boiler and UPV Systems provided as a separate attachment (Provided as file name: J- 1502000-08 Boiler and UPV Systems).
Attachment J-1502000-09 Cathodic Protection Systems
Cathodic Protection Systems commence at, and includes the utility isolation point of connection and terminate at and includes the anode. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Cathodic Protection Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Cathodic Protection Systems, such as: anodes, cathodes, rectifiers, wiring, monitoring and controls systems, etc.
Attachment J-1502000-09 Cathodic Protection Systems provided as a separate attachment (Provided as file name:
J-1502000-09 Cathodic Protection Systems).
Attachment J-1502000-10
Lightning Arresting and Grounding Systems
Lightning Arresting and Grounding Systems commence at, and includes the utility isolation point of connection and terminate at foundation. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Lightning Arresting and Grounding Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Lightning Arresting and Grounding Systems, such as:
conductors, bonding, ground rods, air terminals, etc.
The Contractor shall develop and implement an Inspection, Testing and Certification program for the grounding points and all mechanically and electrically interlocked ancillary parts, equipment, and components of the grounding points, such as conductors, bonding, ground rods, air terminals, etc.
Grounding points are located at all designated parking, refueling, ordinance load out, arming and maintenance areas for aircraft on the flight line and hangar areas as listed below. Other areas will include flammable or explosive hazard sites, i.e. Paint booths, seat shops hazardous waste storage sites and all magazines and explosive storage sites and fuel tanks. The Contractor shall stencil the test date at grounding points.
Attachment J-1502000-10 Lightning Arresting and Grounding Systems provided as a separate attachment (Provided as file name: J-1502000-10 Lightning Arresting and Grounding Systems).
Attachment J-1502000-11
Fire Protection Systems
Protection Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Fire Protection Systems and all mechanically and electrically interlocked ancillary parts, equipment and components of the Fire Protection Systems; such as: AFFF Foam, air compressors, alarm devices, alarm valves, annunciators, antennas, backflow prevention devices, Dry Chemicals, batteries, connections, control panels, detectors, diesel engines, electric motors, fuses, gauges, initiating devices, meters, notification appliances, nozzles, piping, pumps, receivers, sensors, sprinkler heads, tanks, transmitters, voice communication devices, valves (including post indicator valves), Wet Chemicals, monitoring and controls systems, etc.
AFFF drainage trenches and automatic valves shall be maintained clear of obstruction.
Attachment J-1502000-11 Fire Protection Systems provided as a separate attachment (Provided as file name: J- 1502000-11 Fire Protection Systems).
Attachment J-1502000-12 Compressed Air Systems
Compressed Air Systems commence at and includes the utility isolation point of connection and terminate at the compressed air point of delivery. The Contractor shall develop and implement a PM program for the Compressed Air Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Compressed Air Systems, such as: compressors, regulators, unfired pressure vessels, air drying systems, distribution systems, air supply connectors, monitoring and control systems, electrical disconnects, etc.
Attachment J-1502000-12 Compressed Air Systems provided as a separate attachment (Provided as file name: J- 1502000-12 Compressed Air Systems).
Attachment J-1502000-13 Auxiliary Generator Systems
Auxiliary Generator Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Auxiliary Generator Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Auxiliary Generator Systems, such as:
batteries, fuel tanks, generator, inverters, rectifiers, regulators, prime mover, pumps, piping, transfer switches, switchgear, meters, monitoring and control systems, uninterruptible power supply, wiring, etc.
Attachment J-1502000-13 Auxiliary Generator Systems provided as a separate attachment (Provided as file name: J-1502000-13 Auxiliary Generator Systems).
Attachment J-1502000-14 Building Controls Systems
Systems approach emphasizes the interdependence and interactive nature of elements within and external to equipment systems. Systems include all major components and terminate at the point of delivery to include all mechanically and electrically interlocked ancillary parts, equipment, and components. Systems typically include items not normally included in an inventory listing, such as, controls, electrical disconnects, insulation, piping, valves, instrumentation systems, monitoring, control panels/systems, annunciators, initiating devices, detectors, sensors, meters, batteries, notification appliances, voice communication devices, antennas, alarm devices, connections, gauges, fuses etc.
Attachment J-1502000-14 Building Control Systems provided as a separate attachment (Provided as file name: J- 1502000-14 Building Control Systems).
Attachment J-1502000-15
Medium and Low Voltage Switchgear Inventory
See the Excel File J-1502000-15 Medium and Low Voltage Switchgear Inventory (Tab #11:1502000-15).xlsx attached separately.
Attachment J-1502000-16 POL System Facilities and Distribution System
POL System Facilities and Distribution System commence at and include the utility isolation point of connection.
The Contractor shall develop and implement a Preventive maintenance (PM) program for the POL System Facilities and Distribution System and all mechanically and electrically interlocked ancillary parts, equipment, and components of the POL System Facilities and Distribution System, such as: fuel tanks, pumps, piping, transfer switches, valves, monitoring and control systems, etc.
Attachment J-1502000-16 POL System Facilities and Distribution Systems provided as a separate attachment (Provided as file name: J-1502000-16 POL System Facilities and Distribution Systems).
Attachment J-1502000-17
Backflow Prevention Devices
Backflow Prevention Devices commence at, and includes the utility isolation point of connection. The Contractor shall develop and implement a Preventive Maintenance (PM) Program to maintain, inspect, test and certify, and make all necessary repairs to the Backflow Prevention Devices and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Backflow Prevention Devices, such as: bleeders, regulators, valves, etc.
Attachment J-1502000-17 Backflow Prevention Devices provided as a separate attachment (Provided as file name:
J-1502000-17 Backflow Prevention Devices).
Attachment J-1502000-18
Uninterrupted Power Systems (UPS)
Attachment J-1502000-18 Uninterrupted Power Systems Inventory attached separately.
Attachment J-1502000-19
Manual and Automatic Doors
Systems approach emphasizes the interdependence and interactive nature of elements within and external to equipment systems. Systems include all major components and terminate at the point of delivery to include all mechanically and electrically interlocked ancillary parts, equipment, and components. Systems typically include items not normally included in an inventory listing, such as, controls, electrical disconnects, insulation, control panels/systems, initiating devices, detectors, sensors, meters, batteries, door handles, locking devices, stops, hinges, connections, gauges, electric motors and fuses etc.
Attachment J-1502000-19 Manual and Automatic Doors attached separately.
Attachment J-1502000-20
Overhead Doors
Systems approach emphasizes the interdependence and interactive nature of elements within and external to equipment systems. Systems include all major components and terminate at the point of delivery to include all mechanically and electrically interlocked ancillary parts, equipment, and components. Systems typically include items not normally included in an inventory listing, such as, controls, drive chains, pulleys, gears, hinges, locking devices electrical disconnects, control panels/systems, initiating devices, detectors, sensors, batteries, notification appliances, alarm devices, connections, gauges, electric motors and engines (i.e. generators/pumps), fuses etc.
Attachment J-1502000-20 Overhead Doors attached separately.
Attachment J-1502000-21
Emergency Eyewash and Shower Stations
Attachment J-1502000-21 Emergency Eyewash and Shower Stations attached separately.
Attachment J-1502000-22
Emergency Lighting
Attachment J-1502000-22 Emergency Lighting attached separately.
Attachment J-1502000-23 Grease Trap Inventory
Attachment J-1502000-23 Grease Trap Inventory attached separately.
Attachment J-1502000-24
Exhaust Hoods and Ducts Inventory
Attachment J-1502000-24 Exhaust Hoods and Ducts Inventory attached separately.
Attachment J-1502000-25
HVAC Water Testing Treatment Services Inventory
Attachment J-1502000-25 HVAC Water Testing Treatment Services Inventory attached separately.
ATTACHMENT J-1502000-26
Boiler Water Testing Treatment Services Inventory
Attachment J-1502000-26 Boiler Water Testing Inventory attached separately.
Attachment J-1502000-28
Drinking Fountains and Water Coolers Inventory
Attachment J-1502000-28 Drinking Fountains and Water Coolers Inventory attached separately.
Attachment J-1502000-29
Acid Neutralization Inventory
Attachment J-1502000-29 Acid Neutralization Inventory attached separately.
Attachment J-1502000-30
Miscellaneous Equipment and Systems
Attachment J-1502000-30 Miscellaneous Equipment and Systems Inventory attached separately.
Attachment J-1502000-31
Mass Communication Systems
Attachment J-1502000-31 Mass Communications Inventory attached separately.
Attachment J-1502000-32
Installation Facilities Monitoring
Attachment J-1502000-32 Installation Facilities Monitoring attached separately.
Attachment J-1502000-25 Grease and Grit Trap Systems
The Contractor shall develop and implement a Grease and Grit Trap Systems maintenance, repair and cleaning program for the Grease and Grit Trap Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Grease and Grit Trap Systems, such as: tanks, piping, sumps, dispensers, leak detection systems, sensors, secondary containment systems, etc.
Attachment J-1502000-25 Grease and Grit Trap Systems provided as a separate attachment (Provided as file name: J-1502000-25 Grease and Grit Trap Systems).
Attachment J-1502000-26 Exhaust Hoods and Duct Systems
<<Note to Spec Writer: Insert Exhaust Hoods and Ducts description, e.g., . >> Attachment J-1502000-26 Exhaust Hood and Duct Systems provided as a separate attachment (Provided as file name: J-1502000-26 Exhaust Hood and Duct Systems).
| Attachment J-1502000-14 |
| Attachment J-1502000-14 Building Control Systems provided as a separate attachment (Provided as file name: J-1502000-14 Building Control Systems). |
| Attachment J-1502000-15 |
| See the Excel File J-1502000-15 Medium and Low Voltage Switchgear Inventory (Tab #11:1502000-15).xlsx attached separately. |
| Attachment J-1502000-18 |
| Attachment J-1502000-18 Uninterrupted Power Systems Inventory attached separately. |
| Attachment J-1502000-19 |
| Attachment J-1502000-19 Manual and Automatic Doors attached separately. |
| Attachment J-1502000-20 |
| Attachment J-1502000-20 Overhead Doors attached separately. |
| Attachment J-1502000-21 |
| Attachment J-1502000-21 Emergency Eyewash and Shower Stations attached separately. |
| Attachment J-1502000-22 |
| Attachment J-1502000-22 Emergency Lighting attached separately. |
| Attachment J-1502000-23 |
| Attachment J-1502000-23 Grease Trap Inventory attached separately. |
| Attachment J-1502000-24 |
| Attachment J-1502000-24 Exhaust Hoods and Ducts Inventory attached separately. |
| Attachment J-1502000-25 |
| Attachment J-1502000-25 HVAC Water Testing Treatment Services Inventory attached separately. |
| ATTACHMENT J-1502000-26 |
| Attachment J-1502000-26 Boiler Water Testing Inventory attached separately. |
| Attachment J-1502000-28 |
| Attachment J-1502000-28 Drinking Fountains and Water Coolers Inventory attached separately. |
| Attachment J-1502000-29 |
| Attachment J-1502000-29 Acid Neutralization Inventory attached separately. |
| Attachment J-1502000-30 |
| Attachment J-1502000-30 Miscellaneous Equipment and Systems Inventory attached separately. |
| Attachment J-1502000-31 |
| Attachment J-1502000-31 Mass Communications Inventory attached separately. |
| Attachment J-1502000-32 |
| Attachment J-1502000-32 Installation Facilities Monitoring attached separately. |
File details come from the government source that posted it. Updated .