1503060 C Pavement Clearance.pdf

PDF 129 KB Posted

Attached to
NAVAL RESEARCH LABORATORY (NRL) FACILITY SUPPORT SERVICES (FSS)
Solicitation number
N4008027R1001
Issued by

About this file

This is a Performance Work Statement for Pavement Clearance services at the Naval Research Laboratory, Washington DC 20375. The contractor must provide all labor, management, supervision, tools, materials, and equipment required to perform pavement sweeping and snow removal operations.

The recurring work requires the contractor to provide pavement sweeping services to maintain cleared, safe, and passable paved surfaces in accordance with Service Level Standards defined by Commander, Navy Installations Command (CNIC). The contractor must develop and submit a pavement sweeping services plan, sweep roads and other paved surfaces per a specified schedule and frequency provided in attachment J-1503060-04, and coordinate with the Contracting Officer to reschedule services if severe weather makes scheduled sweeping impracticable. Equipment used must have rubber-type tires; tracks are not acceptable. The Government will provide a pavement clearance equipment staging area in the parking lot on the south side of Building 54 for the contractor's use. Non-recurring work, including snow removal, may be ordered through DoD FedMall or task order with specific locations, types of work, and number of contractor working days specified in each ELIN. Personnel must possess required qualifications, technical knowledge, experience, and skills, with specific certification and training requirements addressed in Spec Item 3. Performance standards for non-recurring work will be the same as those specified for recurring work where applicable.

View the file

Other files

File Type Posted
0100000 C General Information.pdf PDF
1602000 C Electrical.pdf PDF
1604000 C Wastewater.pdf PDF
1601000 C Utility Management.pdf PDF
Attachment J-0200000-05(e) Solid Waste Management Report.pdf PDF
1502000 J Facility Investment.pdf PDF
Attachment J-1502000-05 HVAC and Refrigeration Systems.xlsx XLSX spreadsheet
Attachment J-1502000-07 Interior and Exterior Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-10 Lightning Arrestors and Grounding Devices.xlsx XLSX spreadsheet
Attachment J-1502000-13 Auxiliary Generator Systems.xlsx XLSX spreadsheet
Attachment J-1502000-16 POL Systems.xlsx XLSX spreadsheet
Attachment J-1502000-22 Emergency Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-31 Mass Communication Systems.xlsx XLSX spreadsheet
1503030 J Integrated Solid Waste Management.pdf PDF
1503060 J Pavement Clearance.pdf PDF
Attachment J-1601000-04 (c)- NRL Update Utility Drawings - Chilled Water.pdf PDF
Attachment J-1601000-10 Electrical Assets.xlsx XLSX spreadsheet
Attachment J-1601000-13 UEM-DI Meter Group and the Direct Condition Rating.pdf PDF
1502000 C Facility Investment.pdf PDF
1503030 C Integrated Solid Waste Management.pdf PDF
1606000 C Water.pdf PDF
Attachment J-0200000-04 NAVFAC 4330 INVOICE FORM.xlsx XLSX spreadsheet
Attachment J-0200000-05(b) Form Contractor Significant Incident Report.pdf PDF
Attachment J-0200000-05(f) Directions for Process Material Log Sheets.pdf PDF
Attachment J-0200000-05(j) Crane and Rigging Gear Accident Report.pdf PDF
Attachment J-0200000-11 MAXIMO Data Reporting.pdf PDF
Attachment J-0200000-15 ELINs Blank.xlsx XLSX spreadsheet
1501000 J Facility Management.pdf PDF
Attachment J-1501000-04 - NRL Site Map.pdf PDF
Attachment J-1502000-01 Definitions and Acronyms.pdf PDF
Attachment J-1502000-03 Sample of E_U_R Orders.pdf PDF
Attachment J-1502000-08 Boilers and UPVs.xlsx XLSX spreadsheet
Attachment J-1502000-12 Compressed Air.xlsx XLSX spreadsheet
Attachment J-1502000-19 Manual and Automated Doors.xlsx XLSX spreadsheet
Attachment J-1502000-21 Emergency Eye Wash and Emergency Showers.xlsx XLSX spreadsheet
Attachment J-1502000-24 Exhaust Hood and Duct Systems.xlsx XLSX spreadsheet
Attachment J-1502000-26 Boiler Water Testing and Treatment.xlsx XLSX spreadsheet
Attachment J-1502000-30 Miscellaneous Equipment.xlsx XLSX spreadsheet
Attachment J-1502000-32 Installation Facilities Monitoring.pdf PDF
1601000 J Utilities Management.pdf PDF
Attachment J-1601000-01 Points of Demarcation.pdf PDF
Attachment J-1601000-04 (b)- NRL Update Utility Drawings - Domestic Water.pdf PDF
Attachment J-1601000-04 (d) NRL 13.8KV SINGLE LINE REV-11.pdf PDF
Attachment J-1601000-08 Utility Asset Tagging Guidance.pdf PDF
Attachment J-1601000-12 Water Assets.xlsx XLSX spreadsheet
1604000 J Wastewater.pdf PDF
1501000 C Facility Management.pdf PDF
0200000 J Management and Administration.pdf PDF
Attachment J-0200000-02 Wage Determination.pdf PDF
Attachment J-0200000-05(c) SECNAV Form 5512-1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1503060 – Pavement Clearance Table of Contents

Spec Item Title

1 General Information

1.1 Concept of Operations

2 Management And Administration

2.1 Definitions and Acronyms

2.2 Personnel

2.2.1 Certification, Training, and Licensing

2.3 Special Requirements

2.3.1 Equipment Restrictions

2.3.2 Work Identification

3 Recurring Work

3.1 Pavement Sweeping Services

3.1.1 Roads and Other Paved Surfaces

4 Non-Recurring Work

1503060 - Pavement Clearance Spec Item

Title Description

1 General Information

The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Pavement Clearance at the Naval Research Laboratory, Washington DC 20375.

1.1 Concept of

Operations

The intent of 1503060 Pavement Clearance is to specify the requirements related to pavement sweeping and snow removal operations. Snow removal requirements will be performed under the Non-recurring portion of the contract.

Spec Item Title Description 2 Management And

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-1503060-01.

2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required to efficiently provide pavement sweeping and snow removal services.

2.2.1 Certification, Training, and Licensing

Specific certification and training requirements are addressed in the appropriate Spec Item 3.

2.3 Special Requirements

2.3.1 Safety The Contractor shall comply with safety requirements for pavement clearance operations.

2.3.2 Equipment

Restrictions Equipment used shall have rubber type tires, tracks are not acceptable.

2.3.4 Work Identification The Contractor shall identify and recommend Non-Recurring work as appropriate to the KO.

Item

Title Performance Objective

Related Information Performance Standard

3 Recurring Work

Contractor shall provide pavement clearance to achieve a cleared appearance and safe use of paved surfaces.

Service Level Standards are defined.

by Commander, Navy Installations Command (CNIC) for Navy Shore Commands. Service Level Standards for pavement clearance are specified as shown in J- 1503050-02.

Paved surfaces are clear, safe, and passable in accordance with the specified Service Level Standards.

3.1 Pavement

Sweeping Services

The Contractor shall sweep paved surfaces to ensure paved surfaces are clear.

The Contractor shall provide pavement sweeping to remove abrasives and other debris, improve the appearance of paved areas, improve the safety of paved areas, reduce maintenance costs by keeping the drainage systems clean and, reduce pollutants entering the storm drain system.

The Contractor shall develop and submit a pavement sweeping services plan per Section F.

The Government will make available a pavement clearance equipment staging area located in the parking lot on the south side of Building 54 for the Contractor’s use as required.

The Contractor shall sweep roads and other paved surfaces per the schedule and frequency specified in the pavement sweeping schedule provided in J-1503060-03.

Paved surfaces are swept per the schedule and in accordance with specified Service Level Standards.

3.1.1 Roads and

Other Paved Surfaces

The Contractor shall sweep roads and other paved surfaces to ensure they are clear.

The Contractor shall sweep roads and other paved surfaces per the schedule and frequency specified in the pavement sweeping schedule provided in J-1503060-04.

If the severity of weather makes it impracticable to sweep during the scheduled times, the Contractor shall coordinate with the KO to reschedule services.

Roads and other paved surfaces are clear in accordance with specified Service Level Standards.

1503060 – Pavement Clearance

Item

Title Performance Objective Related Information Performance Standard

4 Non- Recurring Work

NON-RECURRING work may be ordered utilizing DoD FedMall in accordance with Section H or on a task order in accordance with the

PROCEDURES FOR

ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The number of Contractor working days will be specified in each ELIN.

Refer to NON-RECURRING ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for NON- RECURRING work will be the same as those in Spec Item 3 where applicable.

File details come from the government source that posted it. Updated .