1503060 C Pavement Clearance.pdf
PDF 129 KB Posted
- Solicitation number
- N4008027R1001
About this file
This is a Performance Work Statement for Pavement Clearance services at the Naval Research Laboratory, Washington DC 20375. The contractor must provide all labor, management, supervision, tools, materials, and equipment required to perform pavement sweeping and snow removal operations.
The recurring work requires the contractor to provide pavement sweeping services to maintain cleared, safe, and passable paved surfaces in accordance with Service Level Standards defined by Commander, Navy Installations Command (CNIC). The contractor must develop and submit a pavement sweeping services plan, sweep roads and other paved surfaces per a specified schedule and frequency provided in attachment J-1503060-04, and coordinate with the Contracting Officer to reschedule services if severe weather makes scheduled sweeping impracticable. Equipment used must have rubber-type tires; tracks are not acceptable. The Government will provide a pavement clearance equipment staging area in the parking lot on the south side of Building 54 for the contractor's use. Non-recurring work, including snow removal, may be ordered through DoD FedMall or task order with specific locations, types of work, and number of contractor working days specified in each ELIN. Personnel must possess required qualifications, technical knowledge, experience, and skills, with specific certification and training requirements addressed in Spec Item 3. Performance standards for non-recurring work will be the same as those specified for recurring work where applicable.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1503060 – Pavement Clearance Table of Contents
Spec Item Title
1 General Information
1.1 Concept of Operations
2 Management And Administration
2.1 Definitions and Acronyms
2.2 Personnel
2.2.1 Certification, Training, and Licensing
2.3 Special Requirements
2.3.1 Equipment Restrictions
2.3.2 Work Identification
3 Recurring Work
3.1 Pavement Sweeping Services
3.1.1 Roads and Other Paved Surfaces
4 Non-Recurring Work
1503060 - Pavement Clearance Spec Item
Title Description
1 General Information
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Pavement Clearance at the Naval Research Laboratory, Washington DC 20375.
1.1 Concept of
Operations
The intent of 1503060 Pavement Clearance is to specify the requirements related to pavement sweeping and snow removal operations. Snow removal requirements will be performed under the Non-recurring portion of the contract.
Spec Item Title Description 2 Management And
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-1503060-01.
2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required to efficiently provide pavement sweeping and snow removal services.
2.2.1 Certification, Training, and Licensing
Specific certification and training requirements are addressed in the appropriate Spec Item 3.
2.3 Special Requirements
2.3.1 Safety The Contractor shall comply with safety requirements for pavement clearance operations.
2.3.2 Equipment
Restrictions Equipment used shall have rubber type tires, tracks are not acceptable.
2.3.4 Work Identification The Contractor shall identify and recommend Non-Recurring work as appropriate to the KO.
Item
Title Performance Objective
Related Information Performance Standard
3 Recurring Work
Contractor shall provide pavement clearance to achieve a cleared appearance and safe use of paved surfaces.
Service Level Standards are defined.
by Commander, Navy Installations Command (CNIC) for Navy Shore Commands. Service Level Standards for pavement clearance are specified as shown in J- 1503050-02.
Paved surfaces are clear, safe, and passable in accordance with the specified Service Level Standards.
3.1 Pavement
Sweeping Services
The Contractor shall sweep paved surfaces to ensure paved surfaces are clear.
The Contractor shall provide pavement sweeping to remove abrasives and other debris, improve the appearance of paved areas, improve the safety of paved areas, reduce maintenance costs by keeping the drainage systems clean and, reduce pollutants entering the storm drain system.
The Contractor shall develop and submit a pavement sweeping services plan per Section F.
The Government will make available a pavement clearance equipment staging area located in the parking lot on the south side of Building 54 for the Contractor’s use as required.
The Contractor shall sweep roads and other paved surfaces per the schedule and frequency specified in the pavement sweeping schedule provided in J-1503060-03.
Paved surfaces are swept per the schedule and in accordance with specified Service Level Standards.
3.1.1 Roads and
Other Paved Surfaces
The Contractor shall sweep roads and other paved surfaces to ensure they are clear.
The Contractor shall sweep roads and other paved surfaces per the schedule and frequency specified in the pavement sweeping schedule provided in J-1503060-04.
If the severity of weather makes it impracticable to sweep during the scheduled times, the Contractor shall coordinate with the KO to reschedule services.
Roads and other paved surfaces are clear in accordance with specified Service Level Standards.
1503060 – Pavement Clearance
Item
Title Performance Objective Related Information Performance Standard
4 Non- Recurring Work
NON-RECURRING work may be ordered utilizing DoD FedMall in accordance with Section H or on a task order in accordance with the
PROCEDURES FOR
ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The number of Contractor working days will be specified in each ELIN.
Refer to NON-RECURRING ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for NON- RECURRING work will be the same as those in Spec Item 3 where applicable.
File details come from the government source that posted it. Updated .