Attachment J-1501000-06 Asset Tagging Guidance.pdf

PDF 156 KB Posted

Attached to
NAVAL RESEARCH LABORATORY (NRL) FACILITY SUPPORT SERVICES (FSS)
Solicitation number
N4008027R1001
Issued by

About this file

This is an Asset Tagging Guidance document that establishes requirements for installing and maintaining 2D barcode asset tags on equipment within the Naval Research Laboratory's Inventory Management Program.

The contractor is required to install synthetic, durable asset tags with 2D barcodes on all equipment maintained as part of the inventory program. Tags must be made of polypropylene with thermal transfer printable labels featuring a matte finish, 2.4 mil thickness, and permanent all-temperature adhesive. The tags must measure 2.43 inches by 3 inches to be compatible with Zebra Technology International P4T Mobile Thermal Transfer Printers using ink ribbon or similar equipment. Installation of tags shall be phased in as inventory is completed, and whenever equipment is replaced or new equipment is installed, the contractor must attach new tags and provide updated equipment information within the NAVFAC Maximo system. All equipment tags must match the asset numbers recorded in NAVFAC Maximo. The tags must be synthetic, durable, resistant to caustics and acids, abrasion-resistant, water-resistant, heat-resistant, and weather-resistant to ensure long-term durability in the Naval Research Laboratory environment.

View the file

Other files

File Type Posted
Pre-Solicitation Notice - NRL FSS.pdf PDF
0200000 C Management and Administration.pdf PDF
Attachment J-0200000-05(a) DBIDS Standard Operating Procedures.pdf PDF
Attachment J-0200000-05(g) Contractor Hazardous Material Inventory Log.pdf PDF
Attachment J-0200000-05(h) VOP-HAP Tracking.pdf PDF
Attachment J-0200000-14 Contractor Hazardous Material Inventory Log.pdf PDF
Attachment J-1502000-09 Cathodic Protection Systems.xlsx XLSX spreadsheet
Attachment J-1502000-20 Overhead Doors.xlsx XLSX spreadsheet
Attachment J-1502000-25 HVAC Water Testing and Treatment Services.xlsx XLSX spreadsheet
Attachment J-1601000-04 (a)- NRL Utility Drawings - Elec and Comm.pdf PDF
Attachment J-1601000-09 Specification Attributes.xlsx XLSX spreadsheet
1602000 J Electrical.pdf PDF
Attachment J-1606000-04 Chilled Water Assets.xlsx XLSX spreadsheet
0100000 C General Information.pdf PDF
1602000 C Electrical.pdf PDF
1604000 C Wastewater.pdf PDF
1601000 C Utility Management.pdf PDF
Attachment J-0200000-05(e) Solid Waste Management Report.pdf PDF
1502000 J Facility Investment.pdf PDF
Attachment J-1502000-05 HVAC and Refrigeration Systems.xlsx XLSX spreadsheet
Attachment J-1502000-07 Interior and Exterior Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-10 Lightning Arrestors and Grounding Devices.xlsx XLSX spreadsheet
Attachment J-1502000-13 Auxiliary Generator Systems.xlsx XLSX spreadsheet
Attachment J-1502000-16 POL Systems.xlsx XLSX spreadsheet
Attachment J-1502000-22 Emergency Lighting Systems.xlsx XLSX spreadsheet
Attachment J-1502000-31 Mass Communication Systems.xlsx XLSX spreadsheet
1503030 J Integrated Solid Waste Management.pdf PDF
1503060 J Pavement Clearance.pdf PDF
Attachment J-1601000-04 (c)- NRL Update Utility Drawings - Chilled Water.pdf PDF
Attachment J-1601000-10 Electrical Assets.xlsx XLSX spreadsheet
Attachment J-1601000-13 UEM-DI Meter Group and the Direct Condition Rating.pdf PDF
1501000 C Facility Management.pdf PDF
0200000 J Management and Administration.pdf PDF
Attachment J-0200000-02 Wage Determination.pdf PDF
Attachment J-0200000-05(c) SECNAV Form 5512-1.pdf PDF
Attachment J-0200000-05(d) Used Oil Disposal and Recycling Summary Report Form.pdf PDF
Attachment J-0200000-05(i) Crane Checklist.pdf PDF
Attachment J-0200000-05(k) Crane and Rigging Gear Near Miss Report.pdf PDF
Attachment J-0200000-07-08-09 MAXIMO INFORMATION.XLSX XLSX spreadsheet
Attachment J-0200000-10 Characteristic Meter Reading.pdf PDF
Attachment J-0200000-13 Installation Spill Plan.pdf PDF
Attachment J-1501000-03 Facility Listing- NOT COMPLETE.xlsx XLSX spreadsheet
Attachment J-1501000-07 Assets Requiring Condition Assessment.xlsx XLSX spreadsheet
Attachment J-1502000-02 Facility Listing.xlsx XLSX spreadsheet
Attachment J-1502000-06 Temperature Standards.pdf PDF
Attachment J-1502000-14 Building Control Systems.xlsx XLSX spreadsheet
Attachment J-1502000-15 Medium and Low Voltage Switchgear.xlsx XLSX spreadsheet
Attachment J-1502000-17 Backflow Prevention Devices.xlsx XLSX spreadsheet
Attachment J-1502000-18 Uninterupible Power Supply.xlsx XLSX spreadsheet
Attachment J-1502000-27 Building Drainage Systems.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .