This document summarizes a federal contract solicitation for renovation services. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 23 to renovate the expanded Polytrauma program - Phase 1 at the Minneapolis VAMC. The purpose is to expand and consolidate Polytrauma care by providing general construction, electrical, plumbing and other trades services. The contract is set aside for verified Service-Disabled Veteran-Owned Small Businesses only. The magnitude of construction is estimated between $10-20 million. The contractor shall provide all labor, materials, equipment and other services to complete the project as required.
The solicitation number is 36C26323R0058_1 and responses are due by the date listed on the solicitation page. Pricing must include all applicable taxes.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
AHU AIR HANDLING UNIT
BRAKE HORSEPOWER
BTU PER HOUR
BRITISH THERMAL UNIT
BOTTOM OF DUCT
BOTTOM OF PIPE
ACOUSTIC LINING
ABOVE FINISHED FLOOR
ACCESS DOOR
COMPRESSED AIR
DRAIN
ENTERING
EXHAUST
CONTINUATION
DIRECT EXPANSION
CUBIC FEET PER MINUTE
CONDENSATE DRAIN
AL
AFF
AD
BHP
BOD
BTU
BOP
CA
CFM
D
DX
ENT
EXH
CD
EMCS
CONT.
BTUH
FLEXIBLE
FLAT BOTTOM
FILTER GAUGE
FLOOR SINK
FLOOR DRAIN
FAN COIL UNIT
DEGREES FAHRENHEIT
FEET PER MINUTE
FEET
FLAT TOP
HOSE BIBB
INCHES
GALLONS PER MINUTE
GALLONS PER HOUR
FB
°F
FD
FCU
F.G.
FS
FPM
FT.
FT
GPM
GPH
HB
HD
IN
HEPA
FLEX
KILOWATT
MAIN AIR (CONTROLS)
KILOWATT HOUR
OPPOSED BLADE DAMPER
OUTSIDE AIR
NUMBER (QUANTITY)
NOT IN CONTRACT
NOT APPLICABLE
MOTOR CONTROL CENTER
QUANTITY
QUADRANT
REVOLUTIONS PER MINUTE
RELATIVE HUMIDITY
SMOKE CONTROL DAMPER
RETURN AIR
PRESSURE REDUCING VALVE
KW
KWH
MA
MCC
NO.
NIC
OBD
OA
NA
PRV
PSIG
QTY
Rh
RA
RPM
SCD
QUAD
ENERGY MANAGEMENT CONTROL SYSTEM
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HAND DAMPER (VOLUME DAMPER)
POUNDS PER SQUARE INCH GAGE
TYPICAL
VOLTS
SOUND TRAP
VARIABLE AIR VOLUME
TOP OF PIPE TRAPEZE
VENT THRU ROOF
VELOCITY
ST
SP
TYP.
VAC
VAV
V
TP
VTR
VEL
SDVV
TOPT
SINGLE DUCT VARIABLE VOLUME
STATIC PRESSURE (INCHES OF WATER)
TOTAL PRESSURE (INCHES OF WATER)
VOLTS, ALTERNATING CURRENT
ACU AIR CONDITIONING UNIT
CONTRACTING OFFICER'S REPRESENTATIVECOR
RS
RL REFRIGERATION LIQUID
REFRIGERATION SUCTION
CONDENSING UNITCU
INDOOR UNITIU
MECHANICAL SYMBOL LEGEND
NOTE: NOT ALL ABBREVIATIONS AND
SYMBOLS APPLY TO THIS PROJECT.
A. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN
FURRED CHASES OR SUSPENDED CEILINGS, UNLESS OTHERWISE NOTED.
B. PROVIDE ACCESS PANELS OR DOORS IN INACCESSIBLE CEILINGS AND/OR
CHASES FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, COILS, FANS,
CONTROLS, ETC. THEY SHALL BE FURNISHED UNDER DIVISION 23 AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATION. ACCESS DOOR RATING
SHALL MATCH CLASSIFICATION OF WALL AND CEILING FIRE RATING.
C. COORDINATE THE LOCATION OF ALL DIFFUSERS, GRILLES, REGISTERS, ACCESS
DOORS, ETC., WITH THE ARCHITECTURAL REFLECTED CEILING PLAN(S).
D. ALL ROUND RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL
SIZE AS THE SCHEDULED DIFFUSER NECK SIZE.
E. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR
INDICATED. ALL DUCT SIZES SHOWN ON DRAWINGS ARE NET INSIDE DIMENSIONS.
PROVIDE ONE INCH ACOUSTICAL LINING (TYPE D3 INSULATION) IN LOW VELOCITY
RECTANGULAR DUCTWORK FOR THE FIRST 10 DIAMETERS OF DUCTWORK
CONNECTED TO DEVICE, OR AS INDICATED ON DRAWINGS, WHICHEVER IS
GREATER. FOR THE REMAINDER OF THIS DUCTWORK PROVIDE AS INDICATED IN
THE INSULATION SPECIFICATIONS.
F. PROVIDE 1/2" MANUAL AIR VENTS AT ALL HIGH POINTS OF CLOSED SYSTEM PIPING
AND 1/2" MANUAL DRAIN VALVES WITH HOSE CONNECTION AT LOW POINTS AS
REQUIRED TO PROVIDE COMPLETE SYSTEM DRAINAGE. WHERE DRAIN VALVES
OCCUR ABOVE CEILING AREAS AND IN AREAS OUTSIDE MECHANICAL RANGE
PROVIDE HOSE CONNECTION ON VALVE.
G. REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF ALL FIRE
RATED AND/OR SMOKE RATED WALLS AND ASSEMBLIES. PROVIDE APPROVED
FIRE DAMPERS IN ALL REQUIRED PENETRATIONS FOR DUCTWORK, GRILLES,
REGISTERS AND DIFFUSERS. ALL PIPE AND DUCTWORK PENETRATIONS OF FIRE,
SMOKE AND FULL HEIGHT WALLS SHALL BE CAULKED AIRTIGHT TO THE ADJACENT
STRUCTURE BY MEANS OF U.L. APPROVED FIRE PROOF CAULKING MATERIAL.
H. CONTRACTOR SHALL COORDINATE ALL DUCTWORK, PIPING, PLUMBING AND
FIRE PROTECTION PIPING WITH STRUCTURAL AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
EQUIPMENT ACCESS AND SERVICEABILITY.
I. CONTRACTOR SHALL FURNISH ALL NECESSARY STRUCTURES, INSERTS,
SLEEVES, AND HANGING DEVICES FOR INSTALLATION OF MECHANICAL AND
PLUMBING EQUIPMENT, DUCTWORK AND PIPING, ETC. CONTRACTOR SHALL
COORDINATE WITH GENERAL CONTRACTOR AND ALL BUILDING TRADES TO AVOID
CONFLICTS AND TO MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.
J. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY
MISCELLANEOUS ANGLES, CHANNELS, UNISTRUT, ETC., AS MAY BE REQUIRED TO
ADEQUATELY SUPPORT THE MECHANICAL PIPING, DUCTWORK, AND EQUIPMENT
IN A MANNER APPROVED BY THE ARCHITECT, WHICH WILL NOT OVERLOAD THE
BUILDING STRUCTURAL SYSTEM.
K. CONTRACTOR SHALL PROVIDE RETURN AIR OR TRANSFER AIR OPENINGS IN
FULL HEIGHT WALLS SIZED AT 350 FPM (UNLESS OTHERWISE SPECIFICALLY
SHOWN ON THE DRAWINGS) TO CREATE AND/OR MAINTAIN A RETURN AIR PATH AS
REQUIRED. FIRE DAMPERS AND/OR SMOKE DAMPERS SHALL BE PROVIDED IN
SUCH OPENINGS WHERE REQUIRED BY NOTE "J".
L. SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, DUCT WALL
PENETRATIONS AND FITTING CONNECTIONS ON ALL DUCT SYSTEMS.
M. MECHANICAL ITEMS SUCH AS ROOF DRAINS, FLOOR DRAINS, PLUMBING FIXTURES,
ETC. SHOWN ON THE ARCHITECTURAL DRAWINGS BUT NOT SHOWN ON THE
MECHANICAL DRAWINGS SHALL BE INCLUDED IN THE PROJECT. THESE ITEMS
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR INCLUSION IN
ADDENDUM.
N. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTS AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES ARE
REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS DIFFER
FROM THE BASIS OF DESIGN CONTRACTOR SHALL HIGHLIGHT THE DIFFERENCES
FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR SHALL PROVIDE
INSTALLATION ROUTE AND VERIFICATION THAT ACCESS POINTS, PLACEMENT
ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT CLEARANCES ARE IDENTIFIED ON
THE ROUTE DRAWING. SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE
REFLECTED ON EQUIPMENT CLEARANCES. PLATFORMS AND INTERFACE AREAS
(FILTER, GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE PROPER CLEARANCE AS
DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE
PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE
DRAWINGS.
O. THIS PROJECT RECONFIGURATION OF EXISTING BUILDING MECHANICAL AND
PLUMBING SYSTEMS TO MAINTAIN EXISTING BUILDING UTILITY SERVICES. THIS
WORK INCLUDES: (1) RELOCATING AND REPLACING EXISTING DUCT, PIPE, AIR
TERMINALS, ETC.; (2) PROVIDING NEW STRUCTURAL SUPPORTS AND SEISMIC
BRACING FOR EXISTING MECHANICAL AND PLUMBING SYSTEMS WHERE
RECONFIGURATIONS ARE REQUIRED; (3) PROVIDING DRIP PANS WITH DRAIN
CONNECTIONS TO EXISTING FLOOR DRAINS BELOW ALL EXISTING WATER WATER
PIPES THAT ROUTE ADJACENT TO OR ABOVE ELECTRICAL AND COMMUNICATIONS
EQUIPMENT.
P. CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS PRIOR TO COMMENCING
WORK SHOWING ALL NEW AND EXISTING SYSTEMS IN THE AREA OF WORK AND
ALL PROVISIONS FOR COORDINATING ROUTING, ACCESS AND CLEARANCES.
SUBMITTALS WILL NOT BE ACCEPTED WITHOUT APPROVED COORDINATION
DRAWINGS.
A. THE DEMOLITION DRAWINGS REFLECT INFORMATION ON EXISTING BUILDING
SERVICES GATHERED BY SITE INSPECTION, DISCUSSIONS WITH MAINTENANCE
PERSONNEL AND PREVIOUS CONSTRUCTION DRAWINGS. THE EXACT LOCATION,
ARRANGEMENT, AND SIZES OF PIPE LINES AND DUCTWORK IN THE EXISTING
BUILDING MAY BE DIFFERENT FROM THAT SHOWN ON THESE DRAWINGS.
B. THE CONTRACTOR SHALL COORDINATE THE SHUTDOWN OF EXISTING BUILDING
SERVICES FOR REMOVAL WITH OWNER AUTHORIZED REPRESENTATIVE AND
SHALL CONFORM TO THEIR REQUIREMENTS.
C. DISRUPTION OF NORMAL FACILITY ACTIVITIES ARE TO BE KEPT TO AN ABSOLUTE
MINIMUM. DUST, DEBRIS, AND FUMES SHALL BE CONTROLLED SO AS NOT TO
AFFECT THE HEALTH AND SAFETY OF OCCUPIED AREAS WITHIN THE FACILITY
WHICH ARE OUTSIDE THE AREA OF WORK. COORDINATE WITH THE ARCHITECT
AND THE OWNER'S REPRESENTATIVE WITH REGARD TO ALL ACTIVITIES TO BE
CONDUCTED OUTSIDE OF THE SUITE REMODEL AREA WHICH MAY AFFECT THE
OPERATION OF THE FACILITY.
D. THE CONTRACTOR SHALL PROVIDE TEMPORARY VENTILATION (MAINTAIN WORK
ZONE AT NEGATIVE PRESSURE), FILTRATION, AIR PURIFIERS, DUST SCREENS,
ETC. FOR ALL WORK AREAS AFFECTED BY DEMOLITION FOR NEW INSTALLATION
TO MINIMIZE DUST AND FUMES.
E. THE CONTRACTOR SHALL PRESENT AN AREA BY AREA WORK PLAN WELL IN
ADVANCE TO THE ARCHITECT AND THE OWNER'S AUTHORIZED REPRESENTATIVE
FOR APPROVAL PRIOR TO BEGINNING WORK. THE WORK PLAN SHALL INCLUDE
AN OUTLINE OF ALL ACTIVITIES OF ALL SUBCONTRACTORS. THE CONTRACTOR
SHALL COORDINATE WITH THE OWNER'S AUTHORIZED REPRESENTATIVE TO
ESTABLISH ACCEPTABLE ROUTING AND ACCESS WITHIN THE FACILITY FOR
MATERIALS REQUIRED FOR THE NEW INSTALLATION.
F. SEE SPECIFICATION SECTION 230593, TESTING, ADJUSTING, & BALANCING OR
MECHANICAL SYSTEMS FOR ADDITIONAL DESCRIPTION AND REQUIREMENTS.
G. ALL TEST AND MEASUREMENT TRAVERSE LOCATIONS SHALL BE CLEARLY NOTED
ON FLOOR PLANS WHICH SHALL BE INCLUDED WITH THE TEST AND
MEASUREMENT DATA.
H. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL
TRADES INCLUDING MECHANICAL, PLUMBING, ELECTRICAL, FURNITURE, AND
ARCHITECTURAL. ANY DISCREPANCIES SHALL BE REPORTED IMMEDIATELY TO
THE ARCHITECT PRIOR TO START OF WORK.
I. ALL NEW TO EXISTING DUCT CONNECTIONS SHALL BE FIELD VERIFIED PRIOR TO
ORDERING AND FABRICATING NEW DUCTWORK OR DAMPERS
GENERAL DEMO NOTES
GENERAL NOTES
T
H
CO
SDSD
VERIFY WITH
ARCHITECTURAL
DRAWINGS
DUCT TRANSITION FROM RECTANGULAR TO ROUND
DUCT TRANSITION
SIDEWALL EXHAUST OR RETURN AIR GRILLE
OR REGISTER
SIDEWALL SUPPLY REGISTER
RETURN DUCT
SUPPLY DUCT
RISE IN DUCT
CEILING RETURN AIR REGISTER OR GRILLE
SMOKE DAMPER
ACOUSTICAL DUCT LINING
FLEXIBLE DUCT
FIRE DAMPER
MANUAL BALANCING DAMPER
12"Ø INDICATES A 12" ROUND DUCT
24x12Ø INDICATES A 24"x12" FLAT OVAL DUCT (WIDTH x DEPTH)
EXISTING DUCT TO BE REMOVED
ACCESS DOOR
24x12 INDICATES A 24"x12" RECTANGULAR DUCT (WIDTH x DEPTH)
POINT OF CONNECTION, NEW DUCT TO EXISTING DUCT
OR / POINT OF REMOVAL FROM EXISTING DUCT TO DEMO DUCT
PERFORATED FACE CEILING DIFFUSERS
DUCTWORK SYMBOLS
ROOM HUMIDISTAT/HUMIDITY TRANSMITTER LOCATION ONLY
SEE CONTROL DRAWINGS FOR TYPE
SEE CONTROL DRAWINGS FOR TYPE
ROOM THERMOSTAT/TEMP. TRANSMITTER LOCATION ONLY
DUCT MOUNTED STATIC PRESSURE PROBE
S.DPR
F.DPR
CEILING EXHAUST REGISTER
EXHAUST DUCT
2HR. SMOKE BARRIER
SMOKE BARRIER
2HR. FIRE BARRIER
1 HR. FIRE BARRIER
COMBINATION FIRE/SMOKE DAMPER
F/S DPR
FLEXIBLE CONNECTION
STANDARD LONG RADIUS ELBOW
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES
EXCEPT TRANSFER AIR SOUND ELBOW)
SHORT RADIUS ELBOW (PROVIDE ALL
SQUARE, RECTANGULAR, AND ROUND
ELBOWS WITH VANES EXCEPT TRANSFER AIR
SOUND ELBOW)
ROOM CARBON DIOXIDE TRANSMITTER LOCATION ONLY
SEE CONTROL DRAWINGS FOR TYPE
24"x12"
24"/12"
12"Ø
DUCT MOUNTED SMOKE DETECTOR
STAMPED FACE CEILING DIFFUSERS
S
M
M
CHECK VALVE
GATE VALVE
PLUG VALVE
GLOBE VALVE
PRESSURE REDUCING VALVE
3-WAY
MODULATING
CONTROL VALVE
2-WAY CONTROL VALVE
SAFETY VALVE OR
PRESSURE RELIEF
VALVE
SOLENOID VALVE
3/4" BALL VALVE WITH ADAPTER
TO 3/4" HOSE THREAD
DIAPHRAGM VALVE
BUTTERFLY VALVE
BALL VALVE
VALVE IN RISE
WATER FLOW MEASURING DEVICE
CIRCUIT SETTER
VALVE SYMBOLS
HWS
V
D
TWS
TWR
TWB
MPS
HPS
LPS
CHR
RS
RL
HWR
R
CHS CHILLED WATER SUPPLY
CHILLED WATER RETURN
REFRIGERATION
STEAM - MEDIUM PRESSURE SUPPLY
STEAM - LOW PRESSURE SUPPLY
STEAM - HIGH PRESSURE SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
DEMO
EXISTING
TOWER WATER BYPASS
TOWER WATER RETURN
TOWER WATER RETURN
REFRIGERATION LIQUID
REFRIGERATION SUCTION
MECHANICAL PIPING
DIRECTION OF FLOW
MAKE-UP WATER
VENT
DRAIN
GEOTHERMAL SUPPLY
GEOTHERMAL RETURN
MU
CONDENSATE DRAINCD
STEAM - MEDIUM PRESSURE RETURN
STEAM - LOW PRESSURE RETURN
STEAM - HIGH PRESSURE RETURNHPR
HPR
LPR
CONDENSER WATERCND
GWS
GWR
DIRECTION PITCHDOWN
PUMPED CONDENSATEPC
PIPING SYMBOLS
XX-##
M301
A1
SCALE
DETAIL
SCALE
SECTION
A1
A1
X#/X###
LETTERS REFER TO THE EQUIPMENT TYPE
EQUIPMENT SYMBOLS
NUMBERS REFER TO SPECIFIC EQUIPMENT
DRAWING NUMBER WHERE DETAILED
SECTION LOCATION
DRAWING NUMBER WHERE DETAILED
DETAIL LOCATION
SECTION LETTER LOCATION
SECTION SYMBOL
DETAIL SYMBOL
SECTION AND DETAIL TITLES
DETAIL NUMBER LOCATION
SYMBOL INDICATES EQUIPMENT IDENTIFIED
IN EQUIPMENT SCHEDULE
XX-#
CFM
SYMBOL INDICATES GRILLE OR DIFFUSER
IDENTIFIED IN EQUIPMENT SCHEDULE
##x##
SIDEWALL GRILLE DIMENSION WHERE
SHOWN ON PLANS
A
B
M
HS
P
PS PS
F
PS
TS
ELBOW - DOWN
ELBOW - UP
PIPE RISE-DROP
TEE - DROP FROM TEE
END CAP
FLEX CONNECTION
PIPE REDUCER - CONCENTRIC
PIPE STRAINER
UNION - SCREWED
ELBOW - DROP TO TEE
PIPE REDUCER - ECCENTRIC
AIR VENT - AUTOMATIC
AIR VENT - MANUAL
GAUGE - DIFFERENTIAL
GAUGE - PRESSURE
GAUGE - PRESSURE WITH COCK
GAUGE - TEMPERATURE
PIPE ANCHOR
PIPE EXPANSION JOINT
PIPE GUIDE
SENSOR - FLOW
SWITCH - FLOW
SWITCH HUMIDITY
SWITCH - PRESSURE
SWITCH - TEMPERATURE
TEMPERATURE - PRESSURE TEST FITTING
THERMOMETER
THERMOMETER WELL
BASKET STRAINER
STEAM TRAP INVERTED BUCKET
METER - TOTALIZING BTU
METER - TOTALIZING FLOW
FITTING SYMBOLS
EXHAUST AIREA
MEDIUM PRESSURE SUPPLY AIRMP
SUPPLY AIRSA
(DOWN & UP)
(DOWN & UP)
(DOWN & UP)
DOWN UP
DOWN UP
DOWN UP
EA EXHAUST AIR DUCT
RA RETURN AIR DUCT
SA
SUPPLY AIR DUCT,
LOW PRESSURE
MPS
SUPPLY AIR DUCT,
MEDIUM PRESSURE
POINT OF DISCONNECT
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.G e n e ra l.
S h e e ts
.r v t
/3
/2
:4
:2
P
M 1/4" = 1'-0"
04/03/2023 K. Luke N. Harper
618-22-100
1390 - M-001
MECHANICAL ABBREVIATIONS AND
SYMBOLS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM
ISSUED FOR BIDDING
04/03/2023
AREA NOT IN SCOPE OF WORK
ALL MECHANICAL DUCTING/DEVICES ARE EXISTING TO REMAIN
AREA NOT IN SCOPE OF WORK
ALL MECHANICAL DUCTING/DEVICES ARE EXISTING TO REMAIN
TYP.
TYP.
3/F6 MD104i /F6 M-104i
TYP.
TYP.
TYP.
1 TYP.
TYP.
TYP.
TYP.
TYP.
TTUUVVWWXX
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
70-AH4S-32
70-RF-27 70-EF-57
TYP.
L O
U V
E R
M-401
F1
/F1 MD104/F1 MD104
TYP.
TYP.
TYP.
TYP.
TYP.
TTUUVVWWXXYY
1144G-109B
4G-111
4G-112
4G-114
4S-6
4H-121
4H-122
4H-123
C4-116
4G-116 4G-115 4G-111C 4G-111B 4G-111A
4H-114
4H-115 4H-116 4H-117 4H-118
4H-120
E
C-6
M-8
4L-101
4L-140
C4-126
C4-115
C4-137
4L-102
4L-102A
4H-102
4H-103
4H-104
4H-105
4H-106
4H-107
4H-109 4H-110
4H-111
4H-113
4G-117
4H-101A
4H-101B
C4-110
C4-114
4H-112
4K-101
4H-108C4-138
4H-108A
STAIRWELL 8
SW8
TYP.
TYP.
TYP.
4K-102
4K-102A 4K-105
4K-125 4K-123
4K-122
4K-128
4K-127 4K-129
C4-135
C4-131
4K-113
4K-112
4K-140
4K-117
4K-119
4K-120
4K-143
4K-141
4K-139
4K-137
4K-135
4J-101
4K-138
4K-136
4K-136A
4K-134A
4K-134
4K-133A
4K-133
4K-132
4K-131A
4K-140A
4K-138A
4K-142A
4K-142
C4-135
SW8
C4-138
4K-114 4K-107
4K-111
4K-130
4K-130A
4K-116
4K-118
4K-121
C4-133
C4-132
C4-134
4K-126
4K-131
C4-127
4K-109
4K-108
4K-106
4K-104
4K-124 4K-124A
4K-124B
SW7
4K-103
4K-101
4H-108
4K-110
4K-115
UNIT HEATER TO REMAIN
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.M E
P .B
.L
.r v t
/3
/2
:2
:5
P
M 1/8" = 1'-0"
04/03/2023 K. LUKE M. RIFFLE
618-22-100
1390 - MD104
MECHANICAL DEMO PLAN - FOURTH LEVEL -
AREA 4H&4K
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM - PHASE 1
ISSUED FOR BIDDING
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 48” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. CONTRACTOR SHALL REFER TO COORDINATION DRAWING REQUIREMENTS PER
SECTION 23.05.11
1. EXISTING SUPPLY AIR GRILLE TO BE REMOVED.
2. EXISTING RETURN AIR GRILLE TO BE REMOVED.
3. EXISTING EXHAUST AIR GRILLE TO BE REMOVED.
4. EXISTING PNEUMATIC CONTROLS DEVICES SERVING EQUIPMENT INCLUDING
THERMOSTAT AND ASSOCIATED MATERIALS IN THEIR ENTIRETY SERVICING
TERMINAL UNITS PLACED WITH THIS PROJECT SHALL BE REMOVED AND
REPLACED WITH NEW DDC CONTROLS. REFER TO ARCHITECTURAL REFLECTED
CEILING DEMOLITION PLAN FOR EXTENT TO EXISTING PNEUMATIC TUBE SYSTEM
DEMOLITION.
5. EXISTING DDC CONTROLS ENCLOSURE TO BE REMOVED AND REPLACED WITH
NEW DDC CONTROLS.
6. PROVIDE TEMPORARY AHU SERVING EXISTING SUPPLY AIR MAINS DURING
REPLACEMENT OF THE EXISTING AHU. TEMPORARY UNIT SHALL BE SIZED PER
MECHANICAL EQUIPMENT SCHEDULES. PROVIDE FLEXIBLE DUCT WORK AND
ISOLATION DAMPERS DURING CHANGEOVER TO TEMPORARY UNIT. TEMPORARY
AHU SHALL BE FULLY COMMISSIONED PRIOR TO REMOVING EXISTING UNIT.
7. EF-57 TO BE RETAINED AND REBALANCED FOR ROOMS IT IS SERVING ON LEVEL
2 AND LEVEL 3.
8. REMOVE AND REPLACE EXISTING RETURN FAN.
9. REMOVE AND REPLACE EXISTING OUTSIDE AIR INTAKE DUCT BACK TO OUTSIDE
AIR INTAKE LOUVER IN THE THIRD-LEVEL MECHANICAL ROOM, BELOW.
SCALE: 1/8" = 1'-0"
F1
MECHANICAL DEMO - FOURTH LEVEL
- AREA 4H
SCALE: 1/8" = 1'-0"
F6
MECHANICAL DEMO - FOURTH LEVEL
- AREA 4K
SEE ENLARGED PLAN F1/M-400
FOR DUCT ROUTING AND KEYNOTES
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
TTUUVVWWXXYY
"ø
"ø
"ø
"ø
"ø
"ø
3S-6
3H-110
4G-109B
4G-111
4G-112
4G-114
4S-6
4G-116 4G-115 4G-111C 4G-111B 4G-111A
E 4L-101
4L-140
4L-102
4L-102A
4J-101
4J-1024J-103
4J-102B 4J-103B
4J-102A4J-103A
C4-142
C4-141
C4-139
4H-110
4H-113
4H-114
4H-115
C4-115
4H-106
4H-111
4H-107
4H-105
4H-102 4H-101
4H-104
4H-104A
4H-107A
4H-109
4H-103
C4-137
C4-114
C4-126
4K-101
4K-127
4H-108A
4H-108
4K-103A 4K-149
SW8
4H-100
4K-152
4H-121
4H-122
4H-123
4H-112
C4-137 C4-137
8"ø
8"ø
8"ø
8"ø
"ø6"ø
"ø
8"ø
12"ø
8"ø
8"ø
"ø
"ø
"ø
"ø
"ø
"ø 14"ø
"ø
"ø
6"ø
10"ø
6"ø
6"ø
6"ø
6"ø6 "ø
6"ø
6"ø 6"ø
"ø
"ø
"ø
12"ø
8"ø
6"ø
"ø
"ø
16"ø 18"ø
16"ø
12"ø
"ø
"ø
"ø
"ø
"ø
"ø
10"ø
10"ø
14"ø
"ø
"ø
"ø
"ø
"ø 8
"ø
12"ø
12"ø
"ø
"ø
12"ø 8"ø
8"ø
"ø
"ø
12"ø
6"ø
6"ø8"ø
22"x8"
16"x8"
"ø
12"ø
"ø
"ø
"ø
8"ø
"x
8"ø
6"ø
6"ø
"ø
10"ø
6"ø 6"ø
6"ø
8"ø
6"ø6"ø
/F6 MD104i /F6 MD104i
"x
E A
TTUUVVWWXX
4K-124
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
"ø
32"ø
"ø
20"ø
"ø
36"ø
16"ø
42"ø
"ø
70-AH4S-32
"ø
"ø
"ø
"ø
"ø
"ø
24"ø
70-RF-27
L O
U V
E R
70-EF-57 10
TYP.
TYP.
8"ø
8"ø
12"ø
"ø1 "ø
"ø
4J-101
4K-128
4H-110
4H-113
4K-102
4H-111
4H-109
C4-135
C4-127
4K-101
4K-127
4K-103
4K-103A 4K-149
SW8
4K-152
C -1
4K-116B
4K-118
4K-117
4K-116C
4K-116D
4K-116A 4K-116
4K-109
4K-126
4K-121
4K-123
4K-122
4K-120
4K-119A
4K-120A
4K-122A
4K-123A
4K-106
4K-104
4K-111
4K-119
4K-107
4K-105
4K-108
4K-110
4K-112
4K-105A
4K-108A
4K-110A
4K-112A
4K-113
4K-114
4K-113A
4K-114A
4K-115
C4-131
4K-115A
4K-151
4K-155
4K-156
4K-154
4K-153
4K-150
SW7
C4-132
4K-124A
4K-124B
4K-125
"x
"x
"x
"ø
"ø6 "ø
"ø
"x
"ø
"ø
12"ø
"ø
10"ø
"ø
"ø
8"ø
12"ø
12"ø
12"ø
19"x9"~
"ø
"ø 8"ø
6"ø 8"ø
6"ø
6"ø
6"ø
8"ø
"ø
6"ø
8"ø8"ø
8"ø
8"ø
"ø
"ø
8"ø
"ø
6"ø 8"ø
6"ø8 "ø
"ø 8"ø
8"ø
8"ø
6"ø
6"ø
"ø8 "ø
8"ø
"ø
12"ø
10"ø 8"ø
8"ø
8"ø
"ø
8"ø
6"ø
10"ø
12"ø
8"ø
8"ø
"ø6"ø
10"ø
"ø
6"ø
10"ø
"ø 11"x9"~
8"ø
"ø
8"ø
12"ø
"ø
10"ø
11"x9"~
6"ø
10"ø
6"ø 8"ø
8"ø10"ø
10"ø
8"ø
8"ø
12"ø12"ø8"ø
6"ø
"ø
6"ø
8"ø
6"ø
8"ø
6"ø 8"ø
10"ø 8"ø
"ø 8
"ø
8"ø10"ø
6"ø
8"ø
6"ø
"ø
10"ø
"ø
12"ø
6"ø
6"ø
"ø
6"ø
6"ø
6"ø
6"ø
10"ø
10"ø
6"ø
8"ø
"ø
"ø
6"ø
8"ø
"ø
11 12
11 12
/F1 MD104i /F1 MD104i on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.M E
P .B
.L
.r v t
/3
/2
:2
:1
P
M 1/8" = 1'-0"
04/03/2023 K. LUKE M. RIFFLE
618-22-100
1390 - MD104i
MECHANICAL DEMO PLANS - FOURTH LEVEL
INTERSTITIAL - AREA 4K
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM - PHASE 1
ISSUED FOR BIDDING
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. CONTRACTOR SHALL REFER TO COORDINATION DRAWING REQUIREMENTS PER
SECTION 23.05.11
1. REMOVE ALL EXISTING TERMINAL UNITS AND ASSOCIATED THERMOSTATS IN
AREA H & K.
2. RETAIN TRUNK/MAIN DUCT WORK IN INTERSTITIAL BACK TO AHU 70-AH4S-32,
RF-27, AND EF-57.
3. REMOVE EXISTING DUCTWORK AND EXISTING TERMINAL UNITS. TO BE
REPLACED WITH NEW DUCTWORK AND TERMINAL UNITS.
4. EXISTING PNEUMATIC CONTROLS DEVICES SERVING EQUIPMENT PLACED WITH
THIS PROJECT SHALL BE REMOVED AND REPLACED WITH NEW DDC CONTROLS.
REFER TO ARCHITECTURAL REFLECTED CEILING DEMOLITION PLAN FOR
EXTENT TO EXISTING PNEUMATIC TUBE SYSTEM DEMOLITION.
5. EXISTING DDC CONTROLS ENCLOSURE TO REMAIN, PROTECT IN PLACE.
6. EXISTING SUPPLY AIR MAIN DUCTWORK FROM 70-AH4S-32 SHALL BE RETAINED
AND REUSED TO SERVE RENOVATED SPACE.
7. PROVIDE TEMPORARY AHU SERVING EXISTING SUPPLY AIR MAINS DURING
REPLACEMENT OF THE EXISTING AHU. TEMPORARY UNIT SHALL BE SIZED PER
MECHANICAL EQUIPMENT SCHEDULES. PROVIDE FLEXIBLE DUCT WORK AND
ISOLATION DAMPERS DURING CHANGEOVER TO TEMPORARY UNIT. TEMPORARY
AHU SHALL BE FULLY COMMISSIONED PRIOR TO REMOVING EXISTING UNIT.
8. REMOVE AND REPLACE EXISTING EXHAUST FAN 70-EF-57.
9. REMOVE AND REPLACE EXISTING RETURN FAN 70-RF-27.
10. REMOVE AND REPLACE EXISTING FIRE DAMPERS. REPLACEMENT TO BE
SIMULTANEOUS WITH TEMPORARY AHU OPERATION.
11. DEMO EXHAUST RISER DOWN TO LEVEL FLOOR SLAB. DEMO EXISTING
HORIZONTAL FIRE DAMPER. FAN 70-EF-41 TO BE REBALANCED FOR REMAINING
ROOMS THAT IT WILL BE SERVING.
12. AT SLAB PENETRATION, CLEAN EXHAUST DUCT RISER REMAINING FROM JUST
BELOW LEVEL 4 AND DOWN INTO MECHANICAL ROOM BELOW.
13. REMOVE 70-AH4S-32 AND ALL ASSOCIATED COMPONENTS, POWER SUPPLIES,
AND CONTROLS.
14. REMOVE OUTSIDE AIR DUCT WORK FROM 70-AH4S-32 DOWN THROUGH SLAB TO
LEVEL 3 INTERSTITIAL SPACE. CONTINUE REMOVING OUTSIDE AIR DUCT TO
LEVEL 3 INTERSTITIAL LOUVER.
15. PROTECT IN PLACE 32X32 HOISTWAY VENTILATION DUCT THROUGH ROOF TO
70-GH-14. 2 HOUR ENCLOSURE.
SCALE: 1/8" = 1'-0"
F1
MECHANICAL DEMO - FOURTH LEVEL
INTERSTITIAL - AREA 4H
SCALE: 1/8" = 1'-0"
F6
MECHANICAL DEMO - FOURTH LEVEL
INTERSTITIAL - AREA 4K
4J-101
AREA NOT IN SCOPE OF WORK
AREA NOT IN SCOPE OF WORK
4G-111
4G-112
4G-114
SHAFT
4S-6
4G-116 4G-115 4G-111C 4G-111B 4G-111A
ELEVATORS
E 4L-101
4L-140
4L-102
4L-102A
4J-1024J-103
4J-102B 4J-103B
4J-102A4J-103A
C4-142
C4-141
C4-139
NOURISH.
4H-110
BREAK RM
4H-113
TR
4H-114
ELEV. LOBBY
4H-115
ELEV. LOBBY
C4-115
NURSE MNGR
4H-106
FAMILY CONF.
4H-111
CENTRAL NURSE STATION
4H-107
M LOCKERS
4H-105
TLT
4H-102
TLT
4H-101
W LOCKERS
4H-104
NURSING MOTHERS RM
4H-104A
MED RM
4H-107A
FAMILY ROOM
4H-109
STAFF CORR.
4H-103
CORR.
C4-137
ENTRY CORR.
C4-114
CARTS
C4-126
ANM + 1
4K-101
REC STOR
4K-127
STOR.
4H-108A
DINING ACUTE
4H-108
TLT
4K-103A
CARTS
4K-149
STAIRWELL 8
SW8
VACANT (FINISH PHASE 2)
4H-100
HAND WASH
4K-152
ELECTRICAL ROOM
4H-121
TELECOM ROOM
4H-122
TYP.
TYP.
TYP.
8"
275 CFM
E2-3
8"
275 CFM
S2-4
8"
390 CFM
S2-4
8"
240 CFM
S2-4
12"
275 CFM
S2-4
12"
675 CFM
S2-4
10"
725 CFM
E2-3
10"
525 CFM
S2-4
12"
675 CFM
S2-4
12"
675 CFM
S2-4
8"
260 CFM
S2-4
8"
310 CFM
S2-4
6"
170 CFM
S2-4
8"
205 CFM
S2-4
12"
405 CFM
S2-4
6"
240 CFM
S2-4
12"
555 CFM
R2-4
8"
280 CFM
R2-2
8"
390 CFM
R2-2
8"
525 CFM
R2-2
12"
700 CFM
R2-4
8"
310 CFM
R2-2
12"
810 CFM
R2-4
6"
170 CFM
R1-1
8"
275 CFM
R2-2
8"
155 CFM
E1-2
8"
110 CFM
E1-2 8"
110 CFM
E1-2
10"
430 CFM
E1-2
10"
430 CFM
E1-2
12"
380 CFM
S2-4
12"
380 CFM
S2-4
10"
740 CFM
S2-4 10"
740 CFM
S2-4
10"
740 CFM
S2-4
12"
700 CFM
S2-4 12"
700 CFM
S2-4
12"
700 CFM
S2-4
12"
585 CFM
S2-4
8"
880 CFM
S2-4
12"
585 CFM
S2-4
6"
880 CFM
R2-1
/F6 M-104/F6 M-104
6"
60 CFM
S1-1 6"
60 CFM
S1-1
12"
480 CFM
S2-4
12"
480 CFM
S2-4 8"
300 CFM
S2-4
HAC
4H-112
12"
380 CFM
S2-4
10"
740 CFM
S2-4
8"
210 CFM
R1-2
10"
690 CFM
E2-3
8"
115 CFM
E2-2
12"
750 CFM
R2-4
12"
750 CFM
R2-4
8"
270 CFM
R2-2
12"
700 CFM
R2-4
8"
260 CFM
R1-2
8"
330 CFM
R2-2
OFFICE
4H-123
12"
500 CFM
S2-4
8"
500 CFM
R2-2
12"
1500 CFM
R2-4
8"
205 CFM
S2-4
TTUUVVWWXX
4J-101
STORAGE
4K-116B
SOILED UTILITY
4K-118
CLEAN
4K-117
THERAPIST OFFICE
4K-116C
PRIVATE PT
4K-116D
PRIVATE OT
4K-116A
THERAPY GYM
4K-116
REC THERAPY
4K-128
LINEN
4K-109
LAUNDRY
4K-126
STOR.
4K-121
NOURISH.
4H-110
BREAK RM
4H-113
PATIENT ROOM
4K-123
PATIENT ROOM
4K-122
PATIENT ROOM
4K-120
TLT
4K-119A
TLT
4K-120A
TLT
4K-122A
TLT
4K-123A
LSB
4K-106
SW +1
4K-104
TEAM RM
4K-102
FAMILY CONF.
4H-111
NURSE STN
4K-111
CORR.
C4-127
ANM + 1
4K-101
REC STOR
4K-127
PATIENT ROOM
4K-119
STAFF TLT
4K-107
BARIATRIC / SURGE PATIENT ROOM
4K-103
PATIENT ROOM
4K-105
PATIENT ROOM
4K-108
PATIENT ROOM
4K-110
PATIENT ROOM
4K-112
TLT
4K-105A
TLT
4K-108A
TLT
4K-110A
TLT
4K-112A
PATIENT ROOM
4K-113
PATIENT ROOM
4K-114
TLT
4K-113A
TLT
4K-114A
PATIENT ROOM
4K-115
CORR.
C4-131
TLT
4K-115A
TLT
4K-103A
NURSE
4K-151
NURSE
4K-155
NURSE
4K-156
NURSE
4K-154
NURSE
4K-153
NURSE
4K-150
CARTS
4K-149
STAIRWELL 8
SW8
CORR.
C4-132
HAND WASH
4K-152
MECHANICAL
4K-124
TELECOM ROOM
4K-124A
ELECTRICAL ROOM
4K-124B
TYP.
TYP.
70-RF-27
M-401
C1
8"
345 CFM
R2-2
12"
500 CFM
S2-4
8"
350 CFM
R2-2
12"
550 CFM
S2-4
12"
525 CFM
S2-4
12"
525 CFM
S2-4
12"
525 CFM
S2-4
12"
525 CFM
S2-4
12"
525 CFM
S2-4
12"
550 CFM
S2-4
8"
310 CFM
S2-4
8"
350 CFM
S2-4
8"
395 CFM
R2-2
8"
385 CFM
R2-2
8"
370 CFM
R2-2
8"
365 CFM
R2-2
8"
365 CFM
R2-2
8"
365 CFM
R2-2
8"
365 CFM
R2-2
8"
365 CFM
R2-2
8"
395 CFM
R2-2
12"
600 CFM
S2-4
8"
415 CFM
R2-2
8"
180 CFM
E1-2
8"
100 CFM
E1-2
8"
75 CFM
E1-2
8"
275 CFM
E2-3
8"
390 CFM
S2-4
8"
280 CFM
S2-4
8"
240 CFM
S2-4
8"
200 CFM
S2-4
8"
500 CFM
S2-4
12"
275 CFM
S2-4 12"
675 CFM
S2-4
8"
235 CFM
S2-4
8"
180 CFM
S2-4
12"
325 CFM
S2-4
8"
240 CFM
R1-2
8"
180 CFM
E2-3
10"
700 CFM
S2-4
12"
860 CFM
S2-4
12"
480 CFM
S2-4 12"
555 CFM
R2-4
8"
250 CFM
R2-2
8"
240 CFM
R2-2
8"
280 CFM
R2-2
8"
390 CFM
R2-2
8"
285 CFM
R2-2
8"
250 CFM
R2-2
8"
250 CFM
R2-2
8"
130 CFM
R2-2
8"
310 CFM
R2-2
8"
350 CFM
R2-2
8"
750 CFM
R2-2
8"
860 CFM
R2-2
8"
275 CFM
R2-2
8"
130 CFM
E1-2
8"
125 CFM
E1-2
8"
130 CFM
E1-2
8"
130 CFM
E1-2
8"
130 CFM
E1-2
8"
130 CFM
E1-2
8"
125 CFM
E1-2
8"
125 CFM
E1-2
8"
135 CFM
E1-2
8"
125 CFM
E1-2
8"
155 CFM
E1-2
12"
610 CFM
S2-4
12"
610 CFM
S2-4
12"
610 CFM
S2-4
12"
610 CFM
S2-4
12"
610 CFM
S2-4
12"
610 CFM
S2-4
12"
600 CFM
S2-4
12"
600 CFM
S2-4
12"
625 CFM
S2-4
12"
625 CFM
S2-4
12"
900 CFM
S2-4
12"
450 CFM
S2-4
12"
450 CFM
S2-4
12"
450 CFM
S2-4
TYP.
/F1 M-104 /F1 M-104
12"
505 CFM
S2-4
12"
550 CFM
S2-4
8"
130 CFM
S2-4
TYP.
SEE
ENLARGED
PLAN FOR
DUCT IN
MECH
ROOM
4K-124
4K-125
12"
525 CFM
S2-4
TYP.
8"
50 CFM
S2-4
8"
125 CFM
E1-2
12"
740 CFM
R2-4
12"
740 CFM
R2-4 12"
740 CFM
R2-4
12"
740 CFM
R2-4
12"
740 CFM
R2-4
8"
130 CFM
S1-2
12"
555 CFM
R2-4
12"
480 CFM
S2-4
12"
1500 CFM
R2-4
12"
1500 CFM
R2-4
WALL SYMBOL LEGEND
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
PROPOSED EXTERIOR WALL.
SEE WALL SECTIONS
1 HR FIRE AND SMOKE
BARRIER
2 HR FIRE AND SMOKE
BARRIER (SHAFT)
SMOKE BARRIER PARTITION
DEMOLISHED WALL,
FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE
OR FURNISHING TO REMAIN
NOT IN CONTRACT - NO
WORK SCHEDULED
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.M E
P .B
.L
.r v t
/3
/2
:2
:4
P
M As indicated
04/03/2023 K. Luke M. RIFFLE
618-22-100
1390 - M-104
MECHANICAL PLANS - FOURTH LEVEL -
AREA 4H&4K
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM - PHASE 1
ISSUED FOR BIDDING
SCALE: 1/8" = 1'-0"
F1
MECHANICAL NEW - FOURTH LEVEL -
AREA 4H
SCALE: 1/8" = 1'-0"
F6
MECHANICAL NEW - FOURTH LEVEL -
AREA 4K
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. CONTRACTOR SHALL REFER TO COORDINATION DRAWING REQUIREMENTS PER
SECTION 23.05.11
1. PROVIDE NEW SUPPLY AIR GRILLE, COORDINATE WITH NEW AND EXISTING
CONDITIONS.
2. PROVIDE NEW RETURN AIR GRILLE, COORDINATE WITH NEW AND EXISTING
CONDITIONS.
3. PROVIDE NEW EXHAUST FAN, COORDINATE WITH NEW AND EXISTING
CONDITIONS.
4. RETAIN AND CLEAN TRUNK/MAIN DUCT WORK IN INTERSTITIAL BACK TO AHU 70-
AH4S-32, RF-27, AND EF-57.
5. PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING
AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH BUILDING
STANDARDS, COORDINATE FINAL LOCATION WITH COR. REFER TO SHEET M-501
FOR DETAILS AND M-803 FOR CONTROLS.
6. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS
SYSTEM HARDWARE AND SOFTWARE IN ACCORDANCE WITH SPECIFICATION
SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL NEW
MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL CENTER.
ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE EXISTING
NETWORK. CONTROL PANEL MUST BE LABELED WITH POWER SOURCE - WHICH
PANEL PROVIDES POWER FOR THE CONTROLS.
7. PROVIDE NEW OUTSIDE AIR DUCT, DAMPER, AND LOUVER. SIZED FOR 100%
OUTSIDE AIR.
8. PROVIDE NEW EXHAUST FAN WITH HEPA FILTER TO SERVE NEGATIVE
PRESSURE ROOMS. REPLACE DUCTWORK BACK TO POINT OF CONNECTION IN
THE FOURTH LEVEL MECHANICAL ROOM.
9. PROVIDE NEW AIR HANDLING UNIT WITH 100% OUTSIDE AIR EMERGENCY
PANDEMIC MODE OPERATION. SEE MECHANICAL SCHEDULES FOR AHU
SPECIFICATIONS. SHIPPING SPLITS SHALL BE SIZED TO FIT THROUGH EXISTING
KNOCKOUT LOUVER AT THE OUTSIDE AIR INTAKE.
10. PROVIDE NEW EXHAUST FAN WITH HEPA FILTER TO SERVE NEGATIVE
PRESSURE ROOMS. REPLACE DUCTWORK BACK TO POINT OF CONNECTION IN
THE FOURTH LEVEL MECHANICAL ROOM.
11. EXISTING SUPPLY AIR MAIN DUCTWORK FROM AHU SHALL BE RETAINED,
CLEANED, AND REUSED TO SERVE RENOVATED SPACE.
12. PROVIDE TEMPORARY AHU SERVING EXISTING SUPPLY AIR MAINS DURING
REPLACEMENT OF THE EXISTING AHU. TEMPORARY UNIT SHALL BE SIZED PER
MECHANICAL EQUIPMENT SCHEDULES. PROVIDE FLEXIBLE DUCT WORK AND
ISOLATION DAMPERS DURING CHANGEOVER TO TEMPORARY UNIT. TEMPORARY
AHU SHALL BE FULLY COMMISSIONED PRIOR TO REMOVING EXISTING UNIT.
13. FAN TO BE RETAINED AND REUSED.
14. DUCT CONTINUES INTO 4TH FLOOR INTERSTITIAL AREA H&K. SEE SHEET M-104i
15. NEW ULTRA LOW LEAKAGE DAMPER PER DMHVAC REQUIREMENTS.
16. PROVIDE NEW THERMOSTAT, COORDINATE WITH NEW AND EXISTING
CONDITIONS.
17. 4" 22 GAUGE ALUMINUM STEEL DRYER PIPE TO GO THROUGH CHASE TO 4TH
FLOOR INTERSTITIAL SPACE. REFER TO SHEET M-505 MECHANICAL DETAILS
FOR FURTHER GUIDANCE.
18. COORDINATE NEW CEILING ACCESS PANELS WITH PLACEMENT OF NEW AIR
DISTRIBUTION DEVICES.
AREA NOT IN SCOPE OF WORK
AREA NOT IN SCOPE OF WORK
A R
E A
N O
T I N
S C
O P
E O
F W
O R
K
/F6 M-104i/F6 M-104i
"ø
R A
"ø
E A
22"ø RA
14"ø EA
"ø
R A
10"ø SA
8"ø RA
8"ø SA
"ø
R A
"ø
E A
12"ø SA12"ø SA
12"ø SA
12"ø RA 16"ø RA
12"ø SA
"ø
S A
16"ø SA
8"ø RA
8"ø SA
12"ø SA
"ø
S A
12"ø SA
"ø
S A
"ø
R A
12"ø SA
"ø
E A
6"ø SA
10"ø SA 10"ø SA
8"ø SA
VAV.70.32.4H-100
VAV.70.32.4H-104
VAV.70.32.4H-101
VAV.70.32.C4-114
VAV.70.32.C4-137.1
VAV.70.32.4K-101
VAV.70.32.C4-137.2
VAV.70.32.4H-111
4G-109B
4G-111
4G-112
4G-114
SHAFT
4S-6
4G-116 4G-115 4G-111C 4G-111B 4G-111A
ELEVATORS
E 4L-101
4L-140
4L-102
4L-102A
4J-101
4J-1024J-103
4J-102B 4J-103B
4J-102A4J-103A
C4-142
C4-141
C4-139
NOURISH.
4H-110
BREAK RM
4H-113
TR
4H-114
ELEV. LOBBY
4H-115
ELEV. LOBBY
C4-115
NURSE MNGR
4H-106
FAMILY CONF.
4H-111
CENTRAL NURSE STATION
4H-107
M LOCKERS
4H-105
TLT
4H-102TLT
4H-101
W LOCKERS
4H-104
NURSING MOTHERS RM
4H-104A
MED RM
4H-107A
FAMILY ROOM
4H-109
STAFF CORR.
4H-103
CORR.
C4-137
ENTRY CORR.
C4-114
CARTS
C4-126
ANM + 1
4K-101
REC STOR
4K-127
STOR.
4H-108A
DINING ACUTE
4H-108
TLT
4K-103A
CARTS
4K-149
STAIRWELL 8
SW8
VACANT (FINISH PHASE 2)
4H-100
H A
N D
W A
S H
K
-1
E L
E C
T R
IC
A
L R
O O
M
H
-1
T E
L E
C O
M R
O O
M
H
-1
OFFICE
4H-123
HAC
4H-112
CORR.
C4-137A
3J-139A
C3-84
3J-140A
12"ø SA
"ø
S A
8" E2-2
VAV.70.32.4H-108
VAV.70.32.4H-115.1
VAV.70.32.4H-113
VAV.70.32.4H-109
VAV.70.32.C4-137.3
VAV.70.32.4H-114
VAV.70.32.4H-115.2
VAV.70.32.4H-106
VAV.70.32.4H-107A
6"ø RA
6"ø SA
8"ø EA
12"ø SA
10"ø SA
VAV.70.32.4H-110
VAV.70.32.4H-123
6"ø SA
10"ø EA
12"ø SA
12"ø SA 20"ø RA
8"ø RA
VAV.70.32.4H-121
"x
R A
"x
S A
10"ø RA
"x
S A
12"ø SA 8"ø SA
6"ø SA 6"ø RA
12"ø RA
6"ø EA
10"ø EA
12"ø EA
"ø
S A
"x
E A
"ø
R A12"ø SA
10"ø EA 8"ø EA
8"ø SA
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
VAV.70.32.C4-115
TTUUVVWWXX
12"ø SA
12"ø SA
12"ø SA
12"ø SA
12"ø SA
12"ø SA
12"ø SA
10"ø SA
12"ø SA
12"ø SA
12"ø SA
12"ø SA
12"ø SA
12"ø SA
12"ø SA
8"ø SA
8"ø RA
8"ø SA
12"ø SA
8"ø RA
8"ø RA
8"ø RA
8"ø RA
8"ø EA
8"ø RA
8"ø EA
8"ø RA
8"ø SA
8"ø RA
8"ø RA
8"ø EA
8"ø EA
8"ø RA
8"ø SA
VAV.70.32.4K-115
VAV.70.32.4K-114
VAV.70.32.4K-113
VAV.70.32.4K-112
VAV.70.32.4K-110
VAV.70.32.4K-108
VAV.70.32.4K-105
VAV.70.32.4K-103
VAV.70.32.4K-102
VAV.70.32.4K-104
VAV.70.32.4K-109
VAV.70.32.4K-116D
VAV.70.32.4K-116A
VAV.70.32.4K-119
VAV.70.32.4K-120
VAV.70.32.4K-122
VAV.70.32.4K-123
VAV.70.32.4K-128
VAV.70.32.4K-127
VAV.70.32.4H-111
VAV.70.32.4K-126
VAV.70.32.4K-121.1
VAV.70.32.4K-111
VAV.70.32.4K-101
VAV.70.32.4K-116B
VAV.70.32.4K-116C
VAV.70.32.4K-116.1
V A
V .7
.3
.4
K -1
.2
VAV.70.32.4K-116.3
L O
U V
E R
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
610"ø RA
8"ø EA
TYP.
VAV.70.32.C4-132
VAV.70.32.C4-131.2
VAV.70.32.C4-131.1
VAV.70.32.C4-127
"ø
E A
"ø
R A
"ø
S A
"ø
S A
12"ø SA
12"ø SA
12"ø SA
12"ø SA
"ø
S A
"ø
E A
"ø
R A
"ø
S A
24"ø SA
28"ø RA
16"ø EA
12"ø SA
8"ø RA
8"ø RA
8"ø RA
8"ø EA
8"ø RA
8"ø EA
"ø
E A
VAV.70.32.C4-131.3
"ø
E A
"ø
E A
"ø
E A
"ø
R A
"ø
E A
"ø
R A
"ø
S A
"ø
R A
VAV.70.32.C4-135.2
4J-101
STORAGE
4K-116B
SOILED UTILITY
4K-118
CLEAN
4K-117
THERAPIST OFFICE
4K-116C
PRIVATE PT
4K-116D
PRIVATE OT
4K-116A
THERAPY GYM
4K-116
REC THERAPY
4K-128
LINEN
4K-109
LAUNDRY
4K-126
STOR.
4K-121
NOURISH.
4H-110
BREAK RM
4H-113
PATIENT ROOM
4K-123
PATIENT ROOM
4K-122
PATIENT ROOM
4K-120
TLT
4K-119A
TLT
4K-120A
TLT
4K-122A
TLT
4K-123A
LSB
4K-106
SW +1
4K-104
TEAM RM
4K-102
F A
M
IL
Y C
O N
F
H
-1
FAMILY ROOM
4H-109
NURSE STN
4K-111
CORR.
C4-135
C O
R R
C -1
ANM + 1
4K-101
REC STOR
4K-127
PATIENT ROOM
4K-119
STAFF TLT
4K-107
BARIATRIC / SURGE PATIENT ROOM
4K-103
PATIENT ROOM
4K-105
PATIENT ROOM
4K-108
PATIENT ROOM
4K-110
PATIENT ROOM
4K-112
TLT
4K-105A
TLT
4K-108A
TLT
4K-110A
TLT
4K-112A
PATIENT ROOM
4K-113
PATIENT ROOM
4K-114
TLT
4K-113A
TLT
4K-114A
PATIENT ROOM
4K-115
CORR.
C4-131
TLT
4K-115A
TLT
4K-103A
N U
R S
E
K
-1
NURSE
4K-155
N U
R S
E
K
-1
N U
R S
E
K
-1
N U
R S
E
K
-1
NURSE
4K-150
CARTS
4K-149
STAIRWELL 7
SW7
STAIRWELL 8
SW8
CORR.
C4-132
H A
N D
W A
S H
K
-1
MECHANICAL
4K-124
T E
L E
C O
M R
O O
M
K
-1 A
ELECTRICAL ROOM
4K-124B
MED SUPPLY
4K-125
CHUTE
4K-118A
70-RF-27
VAV.70.32.C4-131
/F3 M-104i /F3 M-104i
36"ø RA
"ø
R A
8"ø SA
8"ø SA
12"ø SA
8"ø SA
12"ø RA
12"ø RA
12"ø RA 10"ø EA
12"ø SA
8"ø EA
8"ø EA
CORR.
C4-131
8"ø RA
8"ø EA
8"ø RA
VAV.70.32.4K-117
8"ø RA
TYP.
8"ø RA
8"ø RA
70-AH4S-32
WALL SYMBOL LEGEND
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
PROPOSED EXTERIOR WALL.
SEE WALL SECTIONS
1 HR FIRE AND SMOKE
BARRIER
2 HR FIRE AND SMOKE
BARRIER (SHAFT)
SMOKE BARRIER PARTITION
DEMOLISHED WALL,
FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE
OR FURNISHING TO REMAIN
NOT IN CONTRACT - NO
WORK SCHEDULED
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.M E
P .B
.L
.r v t
/3
/2
:2
:0
P
M As indicated
04/03/2023 K. Luke M. RIFFLE
618-22-100
1390 - M-104i
MECHANICAL PLANS - FOURTH LEVEL
INTERSTITIAL - AREA 4H&4K
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM - PHASE 1
ISSUED FOR BIDDING
A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING
WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL
PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
B. COORDINATE ALL DUCTWORK AND PIPE ROUTING AND ELEVATIONS WITH
OTHER TRADES IN ADVANCE OF INSTALLATION.
C. TEST AND BALANCE CONTRACTOR SHALL PROVIDE A PRE-
CONSTRUCTION TAB REPORT FOR THE EQUIPMENT AND ASSOCIATED
SYSTEMS SHOWN ON THE CONSTRUCTION DOCUMENTS AND UTILIZE
ALL AVAILABLE AS-BUILT DRAWINGS FROM THE OWNER. TEST AND
BALANCE CONTRACTOR SHALL VISIT SITE PRIOR TO CONSTRUCTION
AND VERIFY ALL EXISTING EQUIPMENT AND DEVICES, AND DEVELOP
THEIR TEST AND BALANCE FORMS INCLUDING DRAWINGS SHOWING
EQUIPMENT LOCATIONS, AIR DISTRIBUTION DEVICE LOCATIONS AND
TAG NUMBERS. IF THERE ARE LOCATIONS WHERE THE DRAWINGS DO
NOT REFLECT FIELD CONDITIONS, THE TEST AND BALANCE
CONTRACTOR SHALL INCLUDE THE AIRFLOW READINGS ON THE FORMS
AND LOCATE THE EQUIPMENT AND/OR AIR DEVICE ON THE DRAWINGS.
REFER TO SPECIFICATION SECTION 23 05 93 FOR MORE INFORMATION.
D. ALL DATA OBTAINED VIA TESTING AND MEASURING SHALL BE UTILIZED
TO ESTABLISH NEW HVAC SYSTEM PERFORMANCE AND BALANCE DATA
FOR THE RENOVATION. DATA SHALL BE FORWARDED TO THE PROJECT
ENGINEER FOR REVIEW AND COMMENT PRIOR TO COMMENCING THE
DEMOLITION AND/OR NEW WORK ASSOCIATED WITH THE FACILITY
RENOVATION.
E. THE CONTRACTOR SHALL PATCH, PAINT AND RETURN TO MATCH EXISTING
CONDITIONS FOR ANY FLOOR, WALL, OR CEILING THAT WAS DISTURBED TO
COMPLETE THIS PROJECT.
F. ALL NEW THERMOSTATS ARE TO BE MOUNTED AT A HEIGHT OF 54” ABOVE
FINISHED FLOOR. VERIFY FINAL THERMOSTAT LOCATIONS WITH VA.
G. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHTS AND
ELEVATIONS.
H. CONTRACTOR SHALL REFER TO COORDINATION DRAWING REQUIREMENTS PER
SECTION 23.05.11
1. PROVIDE NEW SUPPLY AIR GRILLE, COORDINATE WITH NEW AND EXISTING
CONDITIONS.
2. PROVIDE NEW RETURN AIR GRILLE, COORDINATE WITH NEW AND EXISTING
CONDITIONS.
3. PROVIDE NEW EXHAUST GRILLE, COORDINATE WITH NEW AND EXISTING
CONDITIONS.
4. PROVIDE NEW TRUNK/MAIN DUCT WORK IN INTERSTITIAL BACK TO AHU 70-
AH4S-32, RF-27, AND EF-57.
5. PROVIDE NEW DDC TERMINAL UNIT, CONNECT TO EXISTING BUILDING
AUTOMATION SYSTEM. PROVIDE NEW THERMOSTAT TO MATCH BUILDING
STANDARDS, COORDINATE FINAL LOCATION WITH COR. REFER TO SHEET M-501
FOR DETAILS AND M-803 FOR CONTROLS.
6. CONNECT NEW DUCTWORK TO NEW TERMINAL UNIT. PROVIDE TRANSITIONS AS
NECESSARY TO MAKE CONNECTION AND SEAL AIRTIGHT.
7. CONTRACTOR SHALL PROVIDE NEW MECHANICAL CONTROL SYSTEM
HARDWARE AND SOFTWARE AND INTEGRATE WITH EXISTING CONTROLS
SYSTEM HARDWARE AND SOFTWARE IN ACCORDANCE WITH SPECIFICATION
SECTION 23 09 23. COORDINATE WITH VA AND COMMISSION ALL NEW
MECHANICAL EQUIPMENT WITH THE EXISTING ENGINEERING CONTROL CENTER.
ALL TRENDS, POINTS, AND ALARMS SHALL BE ADDRESSABLE BY THE EXISTING
NETWORK.
8. PROVIDE NEW EXHAUST FAN WITH HEPA FILTER TO SERVE NEGATIVE
PRESSURE ROOMS. REPLACE DUCTWORK BACK TO POINT OF CONNECTION IN
THE FOURTH LEVEL MECHANICAL ROOM.
9. PROVIDE NEW AIR HANDLING UNIT WITH 100% OUTSIDE AIR EMERGENCY
PANDEMIC MODE OPERATION. SEE MECHANICAL SCHEDULES FOR AHU
SPECIFICATIONS. SHIPPING SPLITS SHALL BE SIZED TO FIT THROUGH EXISTING
KNOCKOUT LOUVER AT WEST SIDE OF 4K-124.
10. PROVIDE TEMPORARY AHU SERVING TEMPORARY SUPPLY AIR MAINS DURING
REPLACEMENT OF THE EXISTING AHU. TEMPORARY UNIT SHALL BE SIZED PER
MECHANICAL EQUIPMENT SCHEDULES. PROVIDE FLEXIBLE DUCT WORK AND
ISOLATION DAMPERS DURING CHANGEOVER TO TEMPORARY UNIT. TEMPORARY
AHU SHALL BE FULLY COMMISSIONED PRIOR TO REMOVING EXISTING UNIT.
11. PROVIDE MANUAL DAMPERS PER SHEET M-502/C6 TO DUCT BRANCHES
12. EXISTING 32X32 HOISTWAY VENTILATION DUCT THROUGH ROOF TO 70-GH-14. 2
HOUR ENCLOSURE.
SCALE: 1/8" = 1'-0"
F3
MECHANICAL PLAN - FOURTH LEVEL
INTERSTITIAL - AREA H
SCALE: 1/8"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .