Attachment B Price Schedule Breakdown (1 Page).pdf

PDF 135 KB Posted

Attached to
618-22-100 Renovate for Expanded Polytrauma Phase 1
Solicitation number
36C26323R0058_1
Issued by

About this file

This document contains a price schedule breakdown sheet and related federal contract opportunity notice for project 618-22-100 to renovate for expanded polytrauma care at the Minneapolis Veterans Affairs Health Care System. The price schedule breakdown sheet lists proposed pricing by construction division for general building construction, mechanical and electrical work, site improvements, and miscellaneous costs, along with proposed profit, overhead, and total pricing. The federal contract opportunity is a solicitation set aside for verified Service-Disabled Veteran-Owned Small Businesses for the renovation project, with a construction magnitude estimated between $10-20 million. The project scope includes general construction, electrical, plumbing and other trades to provide a complete renovation to expand and consolidate polytrauma care at the facility.

View the file

Other files

File Type Posted
36C26323R0058 0001.pdf PDF
See Attached document - Attachment 1 Questions and Answers Request 7.12.2023.doc DOC document
See Attached document - Attachment 5 618-22-100 Prebid Sign-in Roster.pdf PDF
See Attached document - Attachment 2 MPLS Expand Polytrauma Program - Pre Bid Walk Through.pdf PDF
See Attached document - Attachment 7 Polytrauma Structural Coordination.pdf PDF
See Attached document - Attachment 6 618-21-700.MPLS.POLYTRAUMA.PG104i.pdf PDF
See Attached document - Attachment 4 Polytrauma Addendum Summary.docx DOCX document
See Attached document - Attachment 3 Site Visit Agenda Poly Trauma Agenda June 26 2023.docx DOCX document
Attachment D.5 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Attachment C Specifications Polytrauma 1477 pages.pdf PDF
Attachment D.7-6_618-22-100_MPLS_PT_IFB_PLUMB_230404.pdf PDF
Attachment D.9 - 8_618-22-100_MPLS_PT_IFB_MECH_230404.pdf PDF
Attachment A - Final SOW-618-22-100 - REV4 4.18 (6 pages).pdf PDF
Attachment D.11 - 10_618-22-100_MPLS_PT_IFB_ELEC_230404.pdf PDF
Attachment I VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance (2 Pages).pdf PDF
Attachment F - VA6500 Appendix C and Appendix D.pdf PDF
Attachment H Questions Request Form (1 page).doc DOC document
Attachment K Combined Single Source Justifications_Redacted.pdf PDF
Attachment D.1 - 618-22-100_MPLS_PT_IFB_GENERAL_230404.pdf PDF
Attachment E - 618-22-100_MPLS_PT_TripleC-CA-SubmittalLOG.xlsx XLSX spreadsheet
Attachment D.2 - 2_618-22-100_MPLS_PT_IFB_ARCH_230404.pdf PDF
Attachment J Wage Determination MN20230117 05.19.2023.pdf PDF
Attachment D.3 - 3_618-22-100_MPLS_PT_IFB_INTERIORS_230404.pdf PDF
Attachment D.12 - 11_618-22-100_MPLS_PT_IFB_TELECOM_230404.pdf PDF
Attachment F - VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D (6 pages).pdf PDF
Attachment D.4 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404 (2).pdf PDF
Attachment D.1 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Attachment D.1 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404 (1).pdf PDF
Attachment D.6 -5_618-22-100_MPLS_PT_IFB_FIRE_230404.pdf PDF
Attachment G - Past Performance Questionnaire (3 Pages).docx DOCX document
36C26323R0058 1.pdf PDF
Attachment F - VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D.pdf PDF
Attachment D.10 - 9_618-22-100_MPLS_PT_IFB_MECH_230404.pdf PDF
Attachment D.8 - 7_618-22-100_MPLS_PT_IFB_PLUMB_230404.pdf PDF
Attachment D.4 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Breakdown Sheet Project Title: Renovate for Expanded PolyTrauma Phase 1 Project Number:

Contractor:

618-22-100

Division # Division Title Base Project 1 General Requirements 2 Existing Conditions 3 Concrete 4 Masonry 5 Metals 6 Wood, Plastics and Composites 7 Thermal and Moisture Protection 8 Openings 9 Finishes 10 Specialties 11 Equipment 12 Furnishings 14 Conveying Equipment Subtotal General Building Construction $

21 Fire Suppression 22 Plumbing 23 Heating, Ventilating and Air Conditioning 25 Integrated Automation 26 Electrical 27 Communications 28 Electronic Safety and Security Subtotal Mechanical and Electrical $

31 Earthwork 32 Exterior Improvements 33 Utilities 34 Transportation Subtotal Site Improvements $

Miscellaneous (Contractor shall identify any costs included)

Subtotal All Divisions & Miscellaneous (if any) $ Profit Overhead Proposal Grand Total $

File details come from the government source that posted it. Updated .