Attachment B Price Schedule Breakdown (1 Page).pdf
PDF 135 KB Posted
- Solicitation number
- 36C26323R0058_1
About this file
This document contains a price schedule breakdown sheet and related federal contract opportunity notice for project 618-22-100 to renovate for expanded polytrauma care at the Minneapolis Veterans Affairs Health Care System. The price schedule breakdown sheet lists proposed pricing by construction division for general building construction, mechanical and electrical work, site improvements, and miscellaneous costs, along with proposed profit, overhead, and total pricing. The federal contract opportunity is a solicitation set aside for verified Service-Disabled Veteran-Owned Small Businesses for the renovation project, with a construction magnitude estimated between $10-20 million. The project scope includes general construction, electrical, plumbing and other trades to provide a complete renovation to expand and consolidate polytrauma care at the facility.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Breakdown Sheet Project Title: Renovate for Expanded PolyTrauma Phase 1 Project Number:
Contractor:
618-22-100
Division # Division Title Base Project 1 General Requirements 2 Existing Conditions 3 Concrete 4 Masonry 5 Metals 6 Wood, Plastics and Composites 7 Thermal and Moisture Protection 8 Openings 9 Finishes 10 Specialties 11 Equipment 12 Furnishings 14 Conveying Equipment Subtotal General Building Construction $
21 Fire Suppression 22 Plumbing 23 Heating, Ventilating and Air Conditioning 25 Integrated Automation 26 Electrical 27 Communications 28 Electronic Safety and Security Subtotal Mechanical and Electrical $
31 Earthwork 32 Exterior Improvements 33 Utilities 34 Transportation Subtotal Site Improvements $
Miscellaneous (Contractor shall identify any costs included)
Subtotal All Divisions & Miscellaneous (if any) $ Profit Overhead Proposal Grand Total $
File details come from the government source that posted it. Updated .