See Attached document - Attachment 7 Polytrauma Structural Coordination.pdf

PDF 1 MB Posted

Attached to
618-22-100 Renovate for Expanded Polytrauma Phase 1
Solicitation number
36C26323R0058_1
Issued by

About this file

This document package includes construction plans and specifications for a federal contract opportunity. The construction plans detail renovations and upgrades to the fourth floor areas 4H and 4K at the Minneapolis Veterans Affairs Medical Center. Work includes general construction, electrical, and plumbing work. Additional details provided in the plans include fixture schedules, notes, and diagrams.

The related federal contract opportunity is a solicitation to provide construction services for Project 618-22-100 to renovate and expand the Polytrauma program at the Minneapolis VAMC. Estimated value is between $10-20 million. The purpose of the renovation is to expand and consolidate Polytrauma care. The contractor will be responsible for all supervision, labor, materials, tools and equipment to complete the construction as described. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses. The required completion date and response date are not specified. The Department of Veterans Affairs Veterans Health Administration VISN 23 is the issuing agency.

View the file

Other files

File Type Posted
36C26323R0058 0001.pdf PDF
See Attached document - Attachment 1 Questions and Answers Request 7.12.2023.doc DOC document
See Attached document - Attachment 5 618-22-100 Prebid Sign-in Roster.pdf PDF
See Attached document - Attachment 2 MPLS Expand Polytrauma Program - Pre Bid Walk Through.pdf PDF
See Attached document - Attachment 6 618-21-700.MPLS.POLYTRAUMA.PG104i.pdf PDF
See Attached document - Attachment 4 Polytrauma Addendum Summary.docx DOCX document
See Attached document - Attachment 3 Site Visit Agenda Poly Trauma Agenda June 26 2023.docx DOCX document
Attachment D.5 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Attachment C Specifications Polytrauma 1477 pages.pdf PDF
Attachment D.7-6_618-22-100_MPLS_PT_IFB_PLUMB_230404.pdf PDF
Attachment D.9 - 8_618-22-100_MPLS_PT_IFB_MECH_230404.pdf PDF
Attachment A - Final SOW-618-22-100 - REV4 4.18 (6 pages).pdf PDF
Attachment D.11 - 10_618-22-100_MPLS_PT_IFB_ELEC_230404.pdf PDF
Attachment I VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance (2 Pages).pdf PDF
Attachment F - VA6500 Appendix C and Appendix D.pdf PDF
Attachment H Questions Request Form (1 page).doc DOC document
Attachment K Combined Single Source Justifications_Redacted.pdf PDF
Attachment D.1 - 618-22-100_MPLS_PT_IFB_GENERAL_230404.pdf PDF
Attachment E - 618-22-100_MPLS_PT_TripleC-CA-SubmittalLOG.xlsx XLSX spreadsheet
Attachment D.2 - 2_618-22-100_MPLS_PT_IFB_ARCH_230404.pdf PDF
Attachment J Wage Determination MN20230117 05.19.2023.pdf PDF
Attachment D.3 - 3_618-22-100_MPLS_PT_IFB_INTERIORS_230404.pdf PDF
Attachment D.12 - 11_618-22-100_MPLS_PT_IFB_TELECOM_230404.pdf PDF
Attachment B Price Schedule Breakdown (1 Page).pdf PDF
Attachment F - VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D (6 pages).pdf PDF
Attachment D.4 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404 (2).pdf PDF
Attachment D.1 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Attachment D.1 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404 (1).pdf PDF
Attachment D.6 -5_618-22-100_MPLS_PT_IFB_FIRE_230404.pdf PDF
Attachment G - Past Performance Questionnaire (3 Pages).docx DOCX document
36C26323R0058 1.pdf PDF
Attachment F - VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D.pdf PDF
Attachment D.10 - 9_618-22-100_MPLS_PT_IFB_MECH_230404.pdf PDF
Attachment D.8 - 7_618-22-100_MPLS_PT_IFB_PLUMB_230404.pdf PDF
Attachment D.4 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TTUUVVWWXXYY

4J-101

AREA NOT IN SCOPE OF WORK

AREA NOT IN SCOPE OF WORK

4G-109B

4G-111

4G-112

4G-114

SHAFT

4S-6

4G-116 4G-115 4G-111C 4G-111B 4G-111A

ELEVATORS

E 4L-101

4L-140

4L-102

4L-102A

4J-1024J-103

4J-102B 4J-103B

4J-102A4J-103A

C4-142

C4-141

C4-139

NOURISH.

4H-110

BREAK RM

4H-113

TR

4H-114

ELEV. LOBBY

4H-115

ELEV. LOBBY

C4-115

NURSE MNGR

4H-106

FAMILY CONF.

4H-111

CENTRAL NURSE STATION

4H-107

M LOCKERS

4H-105

TLT

4H-102

TLT

4H-101

W LOCKERS

4H-104

NURSING MOTHERS RM

4H-104A

MED RM

4H-107A

FAMILY ROOM

4H-109

STAFF CORR.

4H-103

CORR.

C4-137

CORR.

C4-135

ENTRY CORR.

C4-114

CARTS

C4-126

ANM + 1

4K-101

REC STOR

4K-127

STOR.

4H-108A

DINING ACUTE

4H-108

TLT

4K-103A

CARTS

4K-149

STAIRWELL 8

SW8

VACANT (FINISH PHASE 2)

4H-100

HAND WASH

4K-152

ELECTRICAL ROOM

4H-121

TELECOM ROOM

4H-122

P-110

P-110

P-110

P-201

P-110 P-110

P-408 P-408

P-404

P-408

P-408

P-408 P-408

P-701

P-701

P-524

P-528

P-528

P-528

P-404

P-408

OFFICE

4H-123

P-608

4" V 4" W

P-502

/F6 P-104 /F6 P-104

FD-Z

FD-Z

FD-CFD-C

FD-C

FD-C

2" OFL

1/2" HWC

1" HW

2 1/2" CW

AAP-1

TTUUVVWWXX

STORAGE

4K-116B

SOILED UTILITY

4K-118

CLEAN

4K-117

THERAPIST OFFICE

4K-116C

PRIVATE PT

4K-116D

PRIVATE OT

4K-116A

THERAPY GYM

4K-116

REC THERAPY

4K-128

LINEN

4K-109

LAUNDRY

4K-126

STOR.

4K-121

NOURISH.

4H-110

BREAK RM

4H-113

PATIENT ROOM

4K-123

PATIENT ROOM

4K-122

PATIENT ROOM

4K-120

TLT

4K-119A

TLT

4K-120A

TLT

4K-122A

TLT

4K-123A

LSB

4K-106

SW +1

4K-104

TEAM RM

4K-102

FAMILY CONF.

4H-111

NURSE STN

4K-111

CORR.

C4-135

CORR.

C4-127

ANM + 1

4K-101

REC STOR

4K-127

PATIENT ROOM

4K-119

STAFF TLT

4K-107

BARIATRIC / SURGE PATIENT ROOM

4K-103

PATIENT ROOM

4K-105

PATIENT ROOM

4K-108

PATIENT ROOM

4K-110

PATIENT ROOM

4K-112

TLT

4K-105A

TLT

4K-108A

TLT

4K-110A

TLT

4K-112A

PATIENT ROOM

4K-113

PATIENT ROOM

4K-114

TLT

4K-113A

TLT

4K-114A

PATIENT ROOM

4K-115

CORR.

C4-131

TLT

4K-115A

TLT

4K-103A

NURSE

4K-151

NURSE

4K-155

NURSE

4K-154

NURSE

4K-153

NURSE

4K-150

CARTS

4K-149

STAIRWELL 8

SW8

CORR.

C4-132

HAND WASH

4K-152

TYP.

TYP.

TYP.

TYP.

P-110

P-110

P-110

P-110

P-110

P-110

P-110

P-110

P-110

P-110

P-110

P-404

P-404

P-404

P-404

P-404

P-404

P-404

P-404

P-404

P-404

P-418

P-418

P-418

P-418

P-418

P-418

P-418

P-418

P-418

P-418

P-418

P-418

P-110

P-110

P-505

P-408

P-404

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-C

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-C

FD-Z

FD-Z

FD-C

FD-C

FD-Z

P-114

P-404

TYP.

TYP.

8 9

TYP.

TYP.

TYP.

1 1/4" MA

10" SD

3/4" O

2" MV

6" V

WCO

FD-C

FD-C

FD-C

MECHANICAL

4K-124

TELECOM ROOM

4K-124A

ELECTRICAL ROOM

4K-124B

P-701

P-701

P-701

P-701

P-608 P-408

P-701

P-701

P-701

P-701

P-701

P-701

P-701

P-408

P-528

P-808

P-302

WCO

P-528

P-528

P-701

FD-Z

P-708

/F1 P-104 /F1 P-104

WCO

WCO

AAP-2

P-408

2 1/2" HW

3/4" HWR

6" W

WALL SYMBOL LEGEND

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

PROPOSED EXTERIOR WALL.

SEE WALL SECTIONS

1 HR FIRE AND SMOKE

BARRIER

2 HR FIRE AND SMOKE

BARRIER (SHAFT)

SMOKE BARRIER PARTITION

DEMOLISHED WALL,

FIXTURE OR FURNISHING

EXISTING WALL, FIXTURE

OR FURNISHING TO REMAIN

NOT IN CONTRACT - NO

WORK SCHEDULED

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

Mat Perkins

(520) 481-8548

A

B D

EF

G

H

J

K

L

M

C

GENERAL NOTES

KEYNOTES

LINE INDICATES

PHASE 1 SCOPE AREA

B

IM

/6

-2

-1

E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e

/6 -2

-7

.M

P L S

.P O

L Y

T R

A U

M A

.M E

P .B

.L

.r v t

/1

/2

:3

:5

A

M As indicated

04/03/2023 K. Luke N.Harper

618-22-100

1390 - P-104

PLUMBING PLANS - FOURTH LEVEL - AREA

4H&4K

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATE FOR EXPANDED

POLYTRAUMA PROGRAM - PHASE 1

ISSUED FOR BIDDING

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD

VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM

THOSE INDICATED. CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE

LOCATION AND CONDITION OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED

OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE

FOUND TO DIFFER SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.

B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED

WITH THE COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO

OCCUR 2 DAYS PRIOR TO INTERRUPTION.

C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES

WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE

COR PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY

THE COR PRIOR TO THE START OF WORK.

D. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 22 05 11 COMMON

WORK RESULTS FOR PLUMBING. CONSTRUCTION WORK SHALL NOT START ON

ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.

E. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA,

CEILING HEIGHTS, AND SQUARE FOOTAGE.

F. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND

OTHER TRADES PRIOR TO CONSTRUCTION.

G. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED

CHASES UNLESS NOTED OTHERWISE.

H. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT

PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND

SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

I. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL

VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED

UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL

SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF

WALL AND CEILING FIRE RATING.

J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

K. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

L. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE

RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.

PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS

SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.

APPROVED FIRE PROOF CAULKING MATERIAL.

M. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

N. CONTRACTOR SHALL REMOVE ALL DEAD LEGS BY REMOVING THE TEE AND

PROVIDING A COUPLING TO MAKE A CONTINUOUS RUN; OR PIPING SHALL BE

REMOVED BACK TO NEAREST FIXTURE OR TEE AND REPLACED WITH AN ELBOW

TO MAKE A CONTINUOUS RUN.\

O. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL

SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT

AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND

RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT

SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE

ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE

SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES

ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS

DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE

DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR

SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS

POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT

CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS

FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES.

PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES,

ETC.) SHALL HAVE PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER,

VA SAFETY PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE

SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.

1. PROVIDE NEW PLUMBING FIXTURE. SEE PLUMBING FIXTURE SCHEDULE ON

SHEET P-701 AND SPECIFICATION 22 40 00 FOR ADDITIONAL INFORMATION.

2. PROVIDE NEW LINEAR FLOOR DRAIN. SEE PLUMBING FIXTURE SCHEDULE ON

SHEET P-701 FOR ADDITIONAL INFORMATION.

3. PROVIDE NEW MOP SINK AND STUB OUT AS REQUIRED.

4. PROVIDE NEW AREA ALARM PANEL AND SENSORS SERVING THE NEW MEDICAL

VACUUM, MEDICAL AIR, AND OXYGEN PIPING.

5. PROVIDE NEW PLUMBING PIPING FOR EACH SYSTEM. CONNECT NEW MAINS

SERVING 4K TO EXISTING RISERS 3" DOMESTIC COLD WATER, 2" DOMESTIC HOT

WATER, 2 1/2" DOMESTIC HOT WATER RETURN 6" WASTE, AND 6" SANITARY

VENT.

6. PROVIDE NEW ISOLATION VALVES AT DOMESTIC WATER POINTS OF

CONNECTION.

7. PROVIDE NEW FULL-PORT BALL VALVES IN DOMESTIC WATER PIPING FOR

ISOLATION OF EACH ROOM.

8. NEW DOMESTIC WATER MONITORING SYSTEM CONTROL PANEL. REFER TO

DIAGRAM ON SHEET P-501.

9. ROUTE NEW 1/4" COPPER TUBING FROM CONTROL PANEL TO DOMESTIC WATER

PIPING UPSTREAM OF ANY VALVES OR BRANCH PIPING AND CONNECT

10. PROVIDE WATTS MIXING VALVES AT EACH SINK.

11. ADD INLINE DIGITAL THERMOMETER FOR EACH SHOWER FIXTURE. BASIS OF

DESIGN IS AMERICAN STANDARD.

SCALE: 1/8" = 1'-0"

F1

PLUMBING PLAN - FOURTH LEVEL -

AREA 4H

SCALE: 1/8" = 1'-0"

F6

PLUMBING PLAN - FOURTH LEVEL -

AREA 4K

Nick Highlight

Nick Highlight

Nick Highlight

Nick Highlight

Nick Highlight

Nick Highlight

Nick Highlight

Nick Highlight

Nick Highlight

Nick Rectangle

Nick Rectangle

Nick Rectangle

Nick Rectangle

Image

Nick Image

Nick Image

Nick Image

Nick Image

Nick Image

Sheets
P-104 - PLUMBING PLANS - FOURTH LEVEL - AREA 4H&4K

File details come from the government source that posted it. Updated .