See Attached document - Attachment 6 618-21-700.MPLS.POLYTRAUMA.PG104i.pdf
PDF 682 KB Posted
- Solicitation number
- 36C26323R0058_1
About this file
This document package includes a federal contract solicitation and related opportunity details. Project 618-22-100 Renovate for Expanded Polytrauma Phase 1 at the Minneapolis VAHCS seeks to renovate space to expand and consolidate Polytrauma care. Work includes general construction, electrical, plumbing and other trades. The solicitation is set aside for verified Service-Disabled Veteran-Owned Small Businesses. The construction magnitude is estimated between $10-20 million. All applicable taxes shall be included in pricing. The Department of Veterans Affairs Veterans Health Administration VISN 23 is the contracting agency.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TTUUVVWWXX
1/2" MA
1/2" O
3/4" MV
1/2" MA
1/2" O
3/4" MV
1/2" O
3/4" MV
1/2" MA
1/2" MA
1/2" O
3/4" MV
3/4" MV
1/2" MA
1/2" O
1/2" MA
1/2" O
3/4" MV
3/4" MV
1/2" O
1/2" MA
1/2" MA
1/2" O
3/4" MV
3/4" MV
1/2" O
1/2" MA
3/4" MV
1/2" MA
1/2" O
3/4" MV
1/2" O
1/2" MA
3/4" MA
1/2" O
3/4" MV
3/4" MA
1/2" O
3/4" MV
3/4" MA
1/2" O
3/4" MV
3/4" MA MA
1/2" O
3/4" MV
3/4" MA
1/2" O
3/4" MV
3/4" MA
1/2" O O
3/4" MV
3/4" MA
1/2" O
3/4" MV
3/4" MV
1/2" O
3/4" MA
1/2" O
3/4" MV
1/2" O
3/4" MV
MECHANICAL
4K-124
2" MV
3/4" O
1 1/4" MA
TYP.
1/2" MA
1/2" O
3/4" MV
4J-101
SW7
SW8
4K-116B
4K-118
4K-117
4K-116C
4K-116D
4K-116A4K-116
4K-128
4K-109
4K-126
4K-121
4H-110
4H-113
4K-123
4K-122
4K-120
4K-119A
4K-120A
4K-122A
4K-123A
4K-106
4K-104
4K-102
4H-111
4K-111
C4-135
C4-127
4K-101
4K-127
4K-119
4K-107
4K-103
4K-105
4K-108
4K-110
4K-112
4K-105A
4K-108A
4K-110A
4K-112A
4K-113
4K-114
4K-113A
4K-114A
4K-115
C4-131
K
-1 A
4K-103A
4K-151
4K-155
4K-156
4K-154
4K-153
4K-150
4K-149
C4-132
4K-152
4K-124A
4K-124B
4K-125
/F2 PG104i /F2 PG104i
3/4" MV
1/2" O
1" MA
AAP-2
TTUUVVWWXXYY
1144G-109B
4G-111
4G-112
4G-114
4S-6
4G-116 4G-115 4G-111C 4G-111B 4G-111A
E 4L-101
4L-140
4L-102
4L-102A
4J-101
4J-1024J-103
4J-102B 4J-103B
4J-102A4J-103A
C4-142
C4-141
C4-139
4H-110
4H-113
4H-114
4H-115
C4-115
4H-106
4H-111
4H-107
4H-105
4H-102
4H-101
4H-104
4H-104A
4H-107A
4H-109
4H-103
C4-137
C4-114
C4-126
4K-101
4K-127
4H-108A
4H-108
4K-103A
4K-149
SW8
4H-100
4K-152
4H-121
4H-122
4H-123
4H-112
3S-6
3J-139A
C3-84
3J-140A
3H-110
/F6 PG104i /F6 PG104i
AAP-1
WALL SYMBOL LEGEND
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
PROPOSED EXTERIOR WALL.
SEE WALL SECTIONS
1 HR FIRE AND SMOKE
BARRIER
2 HR FIRE AND SMOKE
BARRIER (SHAFT)
SMOKE BARRIER PARTITION
DEMOLISHED WALL,
FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE
OR FURNISHING TO REMAIN
NOT IN CONTRACT - NO
WORK SCHEDULED
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.M E
P .B
.L
.r v t
/1
/2
:1 :4
P
M As indicated
04/03/2023 K. Luke N.Harper
618-22-100
1390 - PG104i
MED GAS PLUMBING PLANS - FOURTH
LEVEL INTERSTITIAL
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM - PHASE 1
ISSUED FOR BIDDING
A. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED
WITH THE COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO
OCCUR 2 DAYS PRIOR TO INTERRUPTION.
B. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION
DATES WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED
TO THE COR. THIS SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO
THE START OF WORK.
C. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
D. MEDICAL GAS SYSTEM INSTALLERS MUST BE ASSE 6010 CERTIFIED; TESTING
PERSONNEL MUST BE ASSE 6020 CERTIFIED AND INSPECTORS AND
VERIFIERS MUST BE ASSE 6030 CERTIFIED.
E. BEFORE JOINING NEW MEDICAL GAS PIPE LINE TO EXISTING, CHECK NEW
PIPE LINE FOR PARTICULATE OR OTHER FORMS OF CONTAMINATION. NEW
PIPING SHALL BE CLEANED, TESTED AND PURGED IN ACCORDANCE WITH
NFPA 99.
F. USE SHAPE ALLOY MEMORY COUPLINGS WHEN MAKING CONNECTIONS TO
EXISTING MEDICAL GAS SYSTEMS.
G. NO "HOT TAPS" OR SIMILAR TYPE OF VALVES ARE ALLOWED IN MEDICAL GAS
SYSTEMS.
H. PRIOR TO PUTTING THE SYSTEM INTO SERVICE, TESTING SHALL BE
CONDUCTED BY A PARTY TECHNICALLY COMPETENT AND EXPERIENCED IN
THE FIELD OF MEDICAL GAS AND VACUUM PIPELINE TESTING AND MEETING THE
REQUIREMENTS OF ASSE 6030. TESTING SHALL BE PERFORMED BY A
THIRD-PARTY OTHER THAN THE INSTALLING CONTRACTOR.
I. PIPING PLANS ARE PREPARED BASED ON THE AVAILABLE INFORMATION AND
SHALL NOT BE SCALED FOR EXACT FIELD LOCATIONS, FIELD CONDITIONS,
AND NON-INTERFERENCE WITH OTHER UTILITIES AND TRADES.
CONTRACTOR SHALL PROVIDE COORDINATION DRAWINGS TO SUIT THE
FIELD CONDITIONS.
J. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 22 05 11 COMMON
WORK RESULTS FOR PLUMBING. CONSTRUCTION WORK SHALL NOT START
ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY
THE VA.
K. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF
ALL SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE,
INCORRECT AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS
"REVISE AND RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE
EQUIPMENT SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF
COMPLETE ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS,
SHALL BE SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE
ALLOWANCES ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE
SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL
HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL.
CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION
THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED
EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.
SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE REFLECTED ON
EQUIPMENT CLEARANCES. PLATFORMS AND INTERFACE AREAS (FILTER,
GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE PROPER CLEARANCE AS
DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE
PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE
DRAWINGS.
KEYNOTES
1. CONNECT TO EXISTING VACUUM, MEDICAL AIR AND OXYGEN RISER PIPING.
2. 3/4" VACUUM, 1/2" MEDICAL AIR AND OXYGEN DOWN TO MEDICAL GAS INLET AND
OUTLETS. OUTLETS SHALL BE PER VA STATION STANDARDS AND
SPECIFICATION SECTIONS 22 62 00, 22 63 00 AND 22 05 11. MATCH EXISTING
OULET PLATE AND CONNECTION STANDARDS. COORDINATE WITH HEADWALL.
3. PROVIDE NEW MEDICAL GAS PIPING IN THIS AREA.
4. ADD NEW AREA ALARM PANEL BELOW AT NURSES STATION. PROVIDE NEW
PRESSURE TRANSDUCERS AND CONNECT TO NEW AREA ALARM PANEL.
5. CONTRACTOR TO PROVIDE NEW ZONE VALVE ASSEMBLY.
SCALE: 1/8" = 1'-0"
F6
MED GAS PLAN - FOURTH LEVEL
INTERSTITIAL - AREA K
SCALE: 1/8" = 1'-0"
F2
MED GAS PLAN - FOURTH LEVEL
INTERSTITIAL - AREA H
1 Addendum 1 07/11/23
| Sheets |
| PG104i - MED GAS PLUMBING PLANS - FOURTH LEVEL INTERSTITIAL |
File details come from the government source that posted it. Updated .