This document package includes a federal contract solicitation and related opportunity details. Project 618-22-100 Renovate for Expanded Polytrauma Phase 1 at the Minneapolis VAHCS seeks to renovate space to expand and consolidate Polytrauma care. Work includes general construction, electrical, plumbing and other trades. The solicitation is set aside for verified Service-Disabled Veteran-Owned Small Businesses. The construction magnitude is estimated between $10-20 million. All applicable taxes shall be included in pricing. The Department of Veterans Affairs Veterans Health Administration VISN 23 is the contracting agency.

View the file

Other files

File Type Posted
36C26323R0058 0001.pdf PDF
See Attached document - Attachment 1 Questions and Answers Request 7.12.2023.doc DOC document
See Attached document - Attachment 5 618-22-100 Prebid Sign-in Roster.pdf PDF
See Attached document - Attachment 2 MPLS Expand Polytrauma Program - Pre Bid Walk Through.pdf PDF
See Attached document - Attachment 7 Polytrauma Structural Coordination.pdf PDF
See Attached document - Attachment 4 Polytrauma Addendum Summary.docx DOCX document
See Attached document - Attachment 3 Site Visit Agenda Poly Trauma Agenda June 26 2023.docx DOCX document
Attachment D.5 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Attachment C Specifications Polytrauma 1477 pages.pdf PDF
Attachment D.7-6_618-22-100_MPLS_PT_IFB_PLUMB_230404.pdf PDF
Attachment D.9 - 8_618-22-100_MPLS_PT_IFB_MECH_230404.pdf PDF
Attachment A - Final SOW-618-22-100 - REV4 4.18 (6 pages).pdf PDF
Attachment D.11 - 10_618-22-100_MPLS_PT_IFB_ELEC_230404.pdf PDF
Attachment I VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance (2 Pages).pdf PDF
Attachment F - VA6500 Appendix C and Appendix D.pdf PDF
Attachment H Questions Request Form (1 page).doc DOC document
Attachment K Combined Single Source Justifications_Redacted.pdf PDF
Attachment D.1 - 618-22-100_MPLS_PT_IFB_GENERAL_230404.pdf PDF
Attachment E - 618-22-100_MPLS_PT_TripleC-CA-SubmittalLOG.xlsx XLSX spreadsheet
Attachment D.2 - 2_618-22-100_MPLS_PT_IFB_ARCH_230404.pdf PDF
Attachment J Wage Determination MN20230117 05.19.2023.pdf PDF
Attachment D.3 - 3_618-22-100_MPLS_PT_IFB_INTERIORS_230404.pdf PDF
Attachment D.12 - 11_618-22-100_MPLS_PT_IFB_TELECOM_230404.pdf PDF
Attachment B Price Schedule Breakdown (1 Page).pdf PDF
Attachment F - VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D (6 pages).pdf PDF
Attachment D.4 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404 (2).pdf PDF
Attachment D.1 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Attachment D.1 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404 (1).pdf PDF
Attachment D.6 -5_618-22-100_MPLS_PT_IFB_FIRE_230404.pdf PDF
Attachment G - Past Performance Questionnaire (3 Pages).docx DOCX document
36C26323R0058 1.pdf PDF
Attachment F - VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D.pdf PDF
Attachment D.10 - 9_618-22-100_MPLS_PT_IFB_MECH_230404.pdf PDF
Attachment D.8 - 7_618-22-100_MPLS_PT_IFB_PLUMB_230404.pdf PDF
Attachment D.4 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TTUUVVWWXX

1/2" MA

1/2" O

3/4" MV

1/2" MA

1/2" O

3/4" MV

1/2" O

3/4" MV

1/2" MA

1/2" MA

1/2" O

3/4" MV

3/4" MV

1/2" MA

1/2" O

1/2" MA

1/2" O

3/4" MV

3/4" MV

1/2" O

1/2" MA

1/2" MA

1/2" O

3/4" MV

3/4" MV

1/2" O

1/2" MA

3/4" MV

1/2" MA

1/2" O

3/4" MV

1/2" O

1/2" MA

3/4" MA

1/2" O

3/4" MV

3/4" MA

1/2" O

3/4" MV

3/4" MA

1/2" O

3/4" MV

3/4" MA MA

1/2" O

3/4" MV

3/4" MA

1/2" O

3/4" MV

3/4" MA

1/2" O O

3/4" MV

3/4" MA

1/2" O

3/4" MV

3/4" MV

1/2" O

3/4" MA

1/2" O

3/4" MV

1/2" O

3/4" MV

MECHANICAL

4K-124

2" MV

3/4" O

1 1/4" MA

TYP.

1/2" MA

1/2" O

3/4" MV

4J-101

SW7

SW8

4K-116B

4K-118

4K-117

4K-116C

4K-116D

4K-116A4K-116

4K-128

4K-109

4K-126

4K-121

4H-110

4H-113

4K-123

4K-122

4K-120

4K-119A

4K-120A

4K-122A

4K-123A

4K-106

4K-104

4K-102

4H-111

4K-111

C4-135

C4-127

4K-101

4K-127

4K-119

4K-107

4K-103

4K-105

4K-108

4K-110

4K-112

4K-105A

4K-108A

4K-110A

4K-112A

4K-113

4K-114

4K-113A

4K-114A

4K-115

C4-131

K

-1 A

4K-103A

4K-151

4K-155

4K-156

4K-154

4K-153

4K-150

4K-149

C4-132

4K-152

4K-124A

4K-124B

4K-125

/F2 PG104i /F2 PG104i

3/4" MV

1/2" O

1" MA

AAP-2

TTUUVVWWXXYY

1144G-109B

4G-111

4G-112

4G-114

4S-6

4G-116 4G-115 4G-111C 4G-111B 4G-111A

E 4L-101

4L-140

4L-102

4L-102A

4J-101

4J-1024J-103

4J-102B 4J-103B

4J-102A4J-103A

C4-142

C4-141

C4-139

4H-110

4H-113

4H-114

4H-115

C4-115

4H-106

4H-111

4H-107

4H-105

4H-102

4H-101

4H-104

4H-104A

4H-107A

4H-109

4H-103

C4-137

C4-114

C4-126

4K-101

4K-127

4H-108A

4H-108

4K-103A

4K-149

SW8

4H-100

4K-152

4H-121

4H-122

4H-123

4H-112

3S-6

3J-139A

C3-84

3J-140A

3H-110

/F6 PG104i /F6 PG104i

AAP-1

WALL SYMBOL LEGEND

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

PROPOSED EXTERIOR WALL.

SEE WALL SECTIONS

1 HR FIRE AND SMOKE

BARRIER

2 HR FIRE AND SMOKE

BARRIER (SHAFT)

SMOKE BARRIER PARTITION

DEMOLISHED WALL,

FIXTURE OR FURNISHING

EXISTING WALL, FIXTURE

OR FURNISHING TO REMAIN

NOT IN CONTRACT - NO

WORK SCHEDULED

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

Mat Perkins

(520) 481-8548

A

B D

EF

G

H

J

K

L

M

C

GENERAL NOTES

LINE INDICATES

PHASE 1 SCOPE AREA

B

IM

/6

-2

-1

E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e

/6 -2

-7

.M

P L S

.P O

L Y

T R

A U

M A

.M E

P .B

.L

.r v t

/1

/2

:1 :4

P

M As indicated

04/03/2023 K. Luke N.Harper

618-22-100

1390 - PG104i

MED GAS PLUMBING PLANS - FOURTH

LEVEL INTERSTITIAL

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATE FOR EXPANDED

POLYTRAUMA PROGRAM - PHASE 1

ISSUED FOR BIDDING

A. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED

WITH THE COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO

OCCUR 2 DAYS PRIOR TO INTERRUPTION.

B. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION

DATES WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED

TO THE COR. THIS SUBMITTAL MUST BE ACCEPTED BY THE COR PRIOR TO

THE START OF WORK.

C. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

D. MEDICAL GAS SYSTEM INSTALLERS MUST BE ASSE 6010 CERTIFIED; TESTING

PERSONNEL MUST BE ASSE 6020 CERTIFIED AND INSPECTORS AND

VERIFIERS MUST BE ASSE 6030 CERTIFIED.

E. BEFORE JOINING NEW MEDICAL GAS PIPE LINE TO EXISTING, CHECK NEW

PIPE LINE FOR PARTICULATE OR OTHER FORMS OF CONTAMINATION. NEW

PIPING SHALL BE CLEANED, TESTED AND PURGED IN ACCORDANCE WITH

NFPA 99.

F. USE SHAPE ALLOY MEMORY COUPLINGS WHEN MAKING CONNECTIONS TO

EXISTING MEDICAL GAS SYSTEMS.

G. NO "HOT TAPS" OR SIMILAR TYPE OF VALVES ARE ALLOWED IN MEDICAL GAS

SYSTEMS.

H. PRIOR TO PUTTING THE SYSTEM INTO SERVICE, TESTING SHALL BE

CONDUCTED BY A PARTY TECHNICALLY COMPETENT AND EXPERIENCED IN

THE FIELD OF MEDICAL GAS AND VACUUM PIPELINE TESTING AND MEETING THE

REQUIREMENTS OF ASSE 6030. TESTING SHALL BE PERFORMED BY A

THIRD-PARTY OTHER THAN THE INSTALLING CONTRACTOR.

I. PIPING PLANS ARE PREPARED BASED ON THE AVAILABLE INFORMATION AND

SHALL NOT BE SCALED FOR EXACT FIELD LOCATIONS, FIELD CONDITIONS,

AND NON-INTERFERENCE WITH OTHER UTILITIES AND TRADES.

CONTRACTOR SHALL PROVIDE COORDINATION DRAWINGS TO SUIT THE

FIELD CONDITIONS.

J. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 22 05 11 COMMON

WORK RESULTS FOR PLUMBING. CONSTRUCTION WORK SHALL NOT START

ON ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY

THE VA.

K. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF

ALL SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE,

INCORRECT AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS

"REVISE AND RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE

EQUIPMENT SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF

COMPLETE ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS,

SHALL BE SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE

ALLOWANCES ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE

SIZE DEVIATIONS DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL

HIGHLIGHT THE DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL.

CONTRACTOR SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION

THAT ACCESS POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED

EQUIPMENT CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING.

SAFETY PROTOCOLS FOR SUBJECT STATION SHALL BE REFLECTED ON

EQUIPMENT CLEARANCES. PLATFORMS AND INTERFACE AREAS (FILTER,

GAUGES, MONITORS, VALVES, ETC.) SHALL HAVE PROPER CLEARANCE AS

DEFINED BY THE MANUFACTURER, VA SAFETY PERSONNEL AND SERVICE

PERSONNEL. ACCESS POINTS OF USE SHALL BE CLEARLY IDENTIFIED ON THE

DRAWINGS.

KEYNOTES

1. CONNECT TO EXISTING VACUUM, MEDICAL AIR AND OXYGEN RISER PIPING.

2. 3/4" VACUUM, 1/2" MEDICAL AIR AND OXYGEN DOWN TO MEDICAL GAS INLET AND

OUTLETS. OUTLETS SHALL BE PER VA STATION STANDARDS AND

SPECIFICATION SECTIONS 22 62 00, 22 63 00 AND 22 05 11. MATCH EXISTING

OULET PLATE AND CONNECTION STANDARDS. COORDINATE WITH HEADWALL.

3. PROVIDE NEW MEDICAL GAS PIPING IN THIS AREA.

4. ADD NEW AREA ALARM PANEL BELOW AT NURSES STATION. PROVIDE NEW

PRESSURE TRANSDUCERS AND CONNECT TO NEW AREA ALARM PANEL.

5. CONTRACTOR TO PROVIDE NEW ZONE VALVE ASSEMBLY.

SCALE: 1/8" = 1'-0"

F6

MED GAS PLAN - FOURTH LEVEL

INTERSTITIAL - AREA K

SCALE: 1/8" = 1'-0"

F2

MED GAS PLAN - FOURTH LEVEL

INTERSTITIAL - AREA H

1 Addendum 1 07/11/23

Sheets
PG104i - MED GAS PLUMBING PLANS - FOURTH LEVEL INTERSTITIAL

File details come from the government source that posted it. Updated .