Attachment D.12 - 11_618-22-100_MPLS_PT_IFB_TELECOM_230404.pdf

PDF 7 MB Posted

Attached to
618-22-100 Renovate for Expanded Polytrauma Phase 1
Solicitation number
36C26323R0058_1
Issued by

About this file

This solicitation is for a construction project to renovate space at the Minneapolis VA Health Care System to expand and consolidate polytrauma care. The project, numbered 618-22-100, has an estimated value between $10-20 million. The contractor shall provide all labor, materials, equipment and testing to complete general construction, electrical, plumbing and other trades. The NAICS code is 236220 and small businesses must have no more than $45 million in annual revenue to qualify. The solicitation is set aside for service-disabled veteran-owned small businesses, which must be verified in VetCert to be considered. The contractor shall include all applicable taxes in pricing. Responses are due by the date specified in the solicitation issued by the Department of Veterans Affairs Veterans Health Administration VISN 23.

View the file

Other files

File Type Posted
36C26323R0058 0001.pdf PDF
See Attached document - Attachment 1 Questions and Answers Request 7.12.2023.doc DOC document
See Attached document - Attachment 5 618-22-100 Prebid Sign-in Roster.pdf PDF
See Attached document - Attachment 2 MPLS Expand Polytrauma Program - Pre Bid Walk Through.pdf PDF
See Attached document - Attachment 7 Polytrauma Structural Coordination.pdf PDF
See Attached document - Attachment 6 618-21-700.MPLS.POLYTRAUMA.PG104i.pdf PDF
See Attached document - Attachment 4 Polytrauma Addendum Summary.docx DOCX document
See Attached document - Attachment 3 Site Visit Agenda Poly Trauma Agenda June 26 2023.docx DOCX document
Attachment D.5 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Attachment C Specifications Polytrauma 1477 pages.pdf PDF
Attachment D.7-6_618-22-100_MPLS_PT_IFB_PLUMB_230404.pdf PDF
Attachment D.9 - 8_618-22-100_MPLS_PT_IFB_MECH_230404.pdf PDF
Attachment A - Final SOW-618-22-100 - REV4 4.18 (6 pages).pdf PDF
Attachment D.11 - 10_618-22-100_MPLS_PT_IFB_ELEC_230404.pdf PDF
Attachment I VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance (2 Pages).pdf PDF
Attachment F - VA6500 Appendix C and Appendix D.pdf PDF
Attachment H Questions Request Form (1 page).doc DOC document
Attachment K Combined Single Source Justifications_Redacted.pdf PDF
Attachment D.1 - 618-22-100_MPLS_PT_IFB_GENERAL_230404.pdf PDF
Attachment E - 618-22-100_MPLS_PT_TripleC-CA-SubmittalLOG.xlsx XLSX spreadsheet
Attachment D.2 - 2_618-22-100_MPLS_PT_IFB_ARCH_230404.pdf PDF
Attachment J Wage Determination MN20230117 05.19.2023.pdf PDF
Attachment D.3 - 3_618-22-100_MPLS_PT_IFB_INTERIORS_230404.pdf PDF
Attachment B Price Schedule Breakdown (1 Page).pdf PDF
Attachment F - VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D (6 pages).pdf PDF
Attachment D.4 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404 (2).pdf PDF
Attachment D.1 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Attachment D.1 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404 (1).pdf PDF
Attachment D.6 -5_618-22-100_MPLS_PT_IFB_FIRE_230404.pdf PDF
Attachment G - Past Performance Questionnaire (3 Pages).docx DOCX document
36C26323R0058 1.pdf PDF
Attachment F - VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D.pdf PDF
Attachment D.10 - 9_618-22-100_MPLS_PT_IFB_MECH_230404.pdf PDF
Attachment D.8 - 7_618-22-100_MPLS_PT_IFB_PLUMB_230404.pdf PDF
Attachment D.4 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE: NOT ALL ABBREVIATIONS AND

SYMBOLS APPLY TO THIS PROJECT.

ELECTRICAL ABBREVIATIONS

CR

MD

MD

DC

ES

RX

SECURITY DOOR CONTACT. PROVIDE AND INSTALL 4S BACK BOX ABOVE DOOR WITH A 1" EMT

CONDUIT STUBBED INTO NEAREST ACCESSIBLE CEILING SPACE. PROVIDE ALL CONDUIT,

CONDUIT SUPPORT, CONNECTORS, COUPLINGS, PLASTIC BUSHINGS, PULL STRINGS, OUTLET

BOX AND MUD RING.

WALL MOUNTED SINGLE SENSOR CAMERA. PROVIDE AND INSTALL 4S BACK BOX W/ A 1" EMT

CONDUIT STUBBED INTO NEAREST ACCESSIBLE CEILING SPACE (U.O.N). PROVIDE ALL CONDUIT, CONDUIT SUPPORT, CONNECTORS, COUPLINGS, PLASTIC BUSHINGS, PULL STRINGS, OUTLET BOX

AND MUD RING. EACH CAMERA TO HAVE ONE(1) CATEGORY 6A CABLE PROVIDED BY SECURITY

CONTRACTOR. PROVIDE WITH MANUFACTURER'S WALL MOUNTING ACCESSORIES.

CARD READER OUTLET. PROVIDE AND INSTALL 4S BACK BOX AT SWITCH HEIGHT WITH A 1" EMT

CONDUIT CONNECTED TO THE DOOR CONTACT OUTLET BOX. PROVIDE ALL CONDUIT, CONDUIT

SUPPORT, CONNECTORS, COUPLINGS, PLASTIC BUSHINGS, PULL STRINGS, OUTLET BOX AND MUD

RING.

DATA/VOICE OUTLET - FLOORBOX. PROVIDE AND INSTALL (4) CAT 6A CMP CABLES/JACKS

TERMINATED IN FLOOR BOX. PROVIDE AND INSTALL (2) 1-1/4" CONDUIT STUBBED TO NEAREST FURRED WALL , ROUTE CONDUIT TO ACCESSIBLE LOCATION ABOVE FINISHED CEILING. PROVIDE BUSHINGS AND PULLSTRING, U.O.N. USE EXISTING CONDUIT RISERS IN-WALL AND EXTEND ALL

CABLES TO NEW CABLE TRAY AND ROUTE TO TR INDICATED. SEE T-700 SERIES SHEETS FOR

NUMBER OF CABLES REQUIRED AT EACH WAO.

DATA/VOICE OUTLET - WALL MOUNTED. PROVIDE AND INSTALL (4) CAT 6A CMP CABLES / JACKS TERMINATED IN 6-PORT FACEPLATE AT 18" AFF. PROVIDE AND INSTALL 5S JBOX WITH SINGLE GANG MUDRING AND 1-1/4" CONDUIT STUBBED TO ACCESSIBLE CEILING LOCATION. PROVIDE BUSHINGS AND PULLSTRING, U.O.N. (SLASH INDICATES MOUNTING ABOVE FINISH COUNTER). USE EXISTING

CONDUIT RISERS IN-WALL AND EXTEND ALL CABLES TO NEW CABLE TRAY AND ROUTE TO TR

INDICATED. SEE T-700 SERIES SHEETS FOR NUMBER OF CABLES REQUIRED AT EACH WAO.

DATA/VOICE OUTLET - CEILING MOUNTED. PROVIDE AND INSTALL (2) CAT 6A CMP CABLES / JACKS

TERMINATED IN A 2-PORT FACEPLATE AT FINISHED CEILING. (NOTE: AT HARDLID CEILING

LOCATIONS PROVIDE AND INSTALL 5SJBOX WITH 1-1/4" CONDUIT STUBBED TO ACCESSIBLE CEILING LOCATION. PROVIDE BUSHINGS AND PULLSTRING, U.O.N.) SURFACE TYPE ("F" DENOTES FLUSH TYPE) USE EXISTING CONDUIT RISERS IN-WALL AND EXTEND ALL CABLES TO NEW CABLE TRAY AND ROUTE TO TR INDICATED. SEE T-700 SERIES SHEETS FOR NUMBER OF CABLES REQUIRED AT EACH

WAO.

REQUEST-TO-EXIT. ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL 1" EMT CONDUIT

CONNECTED TO THE DOOR POSITION SWITCH BOX. PROVIDE

ELECTRICAL CONTRACTOR SHALL PROVIDE ALL CONDUIT, CONDUIT SUPPORT, CONNECTORS,

COUPLINGS, PLASTIC BUSHINGS, PULL STRINGS, OUTLET BOX AND MUD RING.

REX DEVICES ARE TO BE INTEGRATED INTO THE ELECTRIFIED MORTISE LOCK AS DEFINED IN SPEC 08 71 00 SECURITY STANDARDS. REX MOTION SENSORS AND DEVICES ARE TO BE LIMITED FOR USE, EXCEPT WHEN THE SECURITY STANDARDS IN SPEC 08 71 00 CANNOT REALISTICALLY BE MET.

ELECTRIFIED DOOR HARDWARE. PROVIDE AND INSTALL 1" EMT CONDUIT CONNECTED TO THE

DOOR CONTACT OUTLET BOX.

CEILING MOUNTED SECURITY MOTION SENSOR. PROVIDE AND INSTALL 1-GANG BACK BOX AND (1) 1" CONDUIT STUBBED UP TO ACCESSIBLE CEILING SPACE. PROVIDE BUSHINGS AND PULLSTRING, U.O.N.

WALL MOUNTED SECURITY MOTION SENSOR. PROVIDE AND INSTALL 1-GANG BACK BOX AND (1) 1" CONDUIT STUBBED UP TO ACCESSIBLE CEILING SPACE. PROVIDE BUSHINGS AND PULLSTRING, U.O.N.

DATA/VOICE OUTLET - ABOVE CEILING.

A INTERCOMMUNICATION SYSTEM ( AI PHONE)

D D

FURNITURE/EQUIPMENT FEED DEDICATED JUNCTION BOX. PROVIDE AND INSTALL RACO 260 5S

JUNCTION BOX WITH (1) 1-1/4" CONDUIT TO ACCESSIBLE CEILING. EXTEND TO CABLE TRAY.

MOUNTING HEIGHT NOTES:

1. ALL ELEVATIONS ARE TO CENTER LINE OF DEVICE, UNLESS OTHERWISE NOTED.

2. REFER TO EQUIPMENT ELEVATION DRAWINGS FOR COORDINATION WITH

CASEWORK.

3. MOUNT MANUAL MOTOR STARTER ADJACENT TO OR ON UNIT.

4. REFER TO ARCHITECTURAL A0 SERIES FOR ADDITIONAL ELECTRICAL DEVICE

MOUNTING HEIGHTS AND DEVICE ALIGNMENT RULES.

WALL SWITCHES

RECEPTACLES

TELECOMMUNICATIONS OUTLETS

TELECOMMUNICATIONS OUTLETS - WALL PHONE

CLOCK OUTLETS

TV OUTLETS

PUSHBUTTONS

VOLUME CONTROLS

NURSE CALL STATIONS

NURSE CALL DOME LIGHTS

DIMMERS

ACCESS CONTROL DEVICES

VANITY LIGHT IN TOILET

INTERCOM

FIREMAN'S PHONE

FIRE ALARM - PULL STATIONS

FIRE ALARM DEVICES HORN/SPEAKERS/STROBES

(MOUNTING HEIGHT AT THE TOP OF THE FIRE ALARM DEVICE OR

6" BELOW CEILING WHICH IS LOWER)

4'-0" AFF

1'-6" AFF

1'-6" AFF

4'-0" AFF

7'-0" AFF

1'-6" AFF

4'-0" AFF

4'-0" AFF

4'-0" AFF

7'-6" AFF

4'-0" AFF

4'-0" AFF

6" ABOVE THE MIRROR, UON

4'-0" AFF

4'-0" AFF

4'-0" AFF

7'-2" AFF TO TOP

SECURITY SYSTEM SYMBOLS

TELECOMMUNICATION SYMBOLS

MOUNTING HEIGHTS

REFERENCE SYMBOLS

SECTION NUMBER

DETAIL NUMBER

DRAWING NUMBER WHERE DRAWN

DRAWING NUMBER WHERE DRAWN

E1-1.0

KEY NOTE

E1-1.0

DISCONNECT SWITCHES

MOTOR STARTERS

PANELBOARDS & CABINETS

INDIVIDUAL CIRCUIT BREAKERS

5'-6" AFF

5'-6" AFF

6'-0" AFF TO TOP

5'-6" AFF

WAP

WIRELESS ACCESS POINT OUTLET - CEILING MOUNTED. PROVIDE AND INSTALL (1) CAT 6A CMP CABLES / JACKS TERMINATED IN A SURFACE MOUNT BOX ABOVE FINISHED CEILING. (NOTE: AT HARDLID CEILING LOCATIONS, PROVIDE AND INSTALL 5S JBOX WITH 1-1/4" CONDUIT STUBBED TO ACCESSIBLE CEILING LOCATION. PROVIDE BUSHINGS AND PULLSTRING, U.O.N. TERMINATE CABLES ON JACKS IN 2-PORT FACE PLATE. PROVIDE 25FT. SLACK ON EVERY CABLE IF THE DISTANCE

ALLOWS. PROVIDE (1) CAT6A CMP PURPLE TO VA-IDF.

SPST

SWBD

SYM

STD

SW

SPEC(S)

SPDT

SPKR

SF

SEC

SINGLE POLE SINGLE THROW

SINGLE POLE DOUBLE THROW

SYMMETRICAL

SWITCHBOARD

STANDARD

SWITCH

SECONDARY

SQUARE FOOT

SPECIFICATION(S)

SPEAKER

PRI

RCLP

RM

SCH, SCHED

RP

REF

REC/RCPT

RSC

RLA

RF

R, RE

QTY

PWR

PT

PVC

PA

PH, ∅

PF

PNL

PE

PB

P

OPP

OHE/T

OH

OFOI

OFCI

NO., NUM, #

OC

NTS

AMERICAN WIRE GAUGE

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

AUTOMATIC TRANSFER SWITCH

AMPERE INTERRUPTING CAPACITY

ALTERNATING CURRENT

ABOVE FINISHED COUNTER

AWG

BDF

B/BUR

BUILDING DISTRIBUTION FRAME

BURIED

AUTO

AUX

ARCH

AT

ATS

ALT

AFG

AIC

AFC

AFF

AC

AF

AUXILIARY

ALTERNATE

ARCHITECT

AUTOMATIC

AMPERES TRIP

AMPERE FRAME (BREAKER RATING)

MTG

NC

NEMA

NO

NIC

NEC

N

MV

MH

MOCP

MTD

MLO

MIN

MISC

MECH

MCC

MFR

MCA

MCB

RIGID STEEL CONDUIT

RATED (RUNNING) LOAD AMPS

RECEPTACLE PANELBOARD

ROOM

SCHEDULE

RADIO FREQUENCY

RECEPTACLE

REFRIGERATOR

RELOCATE AS SHOWN

POTENTIAL TRANSFORMER

POLYVINYL CHLORIDE

REMOTE CONTROL LIGHTING PANEL

QUANTITY

POWER

PUBLIC ADDRESS

PANEL

PRIMARY

PULL BOX

POWER FACTOR

PHOTO ELECTRIC

PHASE

POLE

OPPOSITE

OWNER FURNISHED, CONTRACTOR INSTALLED

OWNER FURNISHED, OWNER INSTALLED

OVERHEAD ELECTRIC/TELEPHONE

OVERHEAD

ON CENTER

NOT TO SCALE

NUMBER

MOUNTING

NATIONAL ELECTRICAL CODE

MEDIUM VOLTAGE (OVER 600V LESS THAN

35KV)

NORMALLY CLOSED

NORMALLY OPEN

NOT IN CONTRACT

NEUTRAL

MINIMUM CIRCUIT AMPACITY

MAIN CIRCUIT BREAKER

MOTOR CONTROL CENTER

MAXIMUM OVERCURRENT PROTECTION

MOUNTED

MISCELLANEOUS

MAIN LUGS ONLY

MINIMUM

MANHOLE

MANUFACTURER

MECHANICAL

SWGR SWITCHGEAR

AIR HANDLING UNITAHU

MTS MANUAL TRANSFER SWITCH

PDP POWER DISTRIBUTION PANEL

AMPERESA OR AMP

OCPD OVERCURRENT PROTECTION DEVICE

A

M

B

N

O

P

Q

R

S

T

SPD SURGE PROTECTIVE DEVICE

OD OUTLET DESIGNATOR

LOW VOLTAGE (BELOW 50 VOLTS)

L-L

L-N

LTG

LV

LIGHTING

LINE TO LINE

LINE TO NEUTRAL

1000 CIRCULAR mils

KILOVOLTS (THOUSAND VOLTS)

KILOWATTS (THOUSAND WATTS)

LIGHTNING ARRESTOR

LOCAL AREA NETWORK

KILOVOLTS-AMPERES (THOUSAND VOLT-AMPS)

ISOLATED GROUND

KWH

LAN

LA

KW

KVA

Kcmil

KV

KILOWATT-HOURS

IR

KEY INTERLOCK

JUNCTION BOX

INCH/INCHES (")

INFRARED

GROUND FAULT INTERRUPTER

HAND-OFF-AUTOMATIC

HIGH PRESSURE SODIUM

HEATING VENTILATION AND AIR CONDITIONING

HERTZ

HVAC

HZ

HTR

HR

HT

HPS

HOA

HP

HEATER

HEIGHT

HORSEPOWER

HOUR

GFI

G, GND, GRD

GEN

FLUOR

FL, FLR

GROUND

GENERATOR

FOOT/FEET (')

FLUORESCENT

FLOOR

CMP

FIRE ALARM ANNUNCIATOR PANEL

EQUIPMENT GROUND

FAAP

FLA

FDR

FA

FULL LOAD AMPS

FEEDER

FIRE ALARM

FUSE

EG

CONTROL POWER TRANSFORMER

CURRENT TRANSFORMER

DBB

dB

DAS

DISPLAY BACKBOX

DISTRIBUTED ANTENNA SYSTEM

DECIBEL

CPT

CU

CT

COM, COMM

CKT

CLG

COPPER

COMMUNICATIONS

CIRCUIT

CEILING

COMMUNICATIONS PLENUM (CABLE JACKET

RATING)

CB CONDUIT BANK

COMMUNICATIONS RISER (CABLE JACKET RATING)

FIRE ALARM CONTROL PANELFACP

FIRE ALARM EXTENDER PANELFAEP

CCTV CLOSED CIRCUIT TELEVISION

CP CONSOLIDATION POINT

FLEX FLEXIBLE

HAND HOLEHH

LIGHTING CONTROL PANELLC, LCP

LIGHTING PANEL

L-G LINE TO GROUND

CMR

F

FT

IN

IG

JB, JBOX

K

LP

FOOT CANDLEFC

DMARC POINT OF DEMARCATION BETWEEN UTILITIES OR

BETWEEN UTILITIES AND OWNER PREMISE

EQUIPMENT

C

D

E

F

G

H

I

J

K

L

HORIZONTAL MOUNTINGH

COR CONTRACTING OFFICER'S REPRESENTATIVE

X

XFMR

WP

WHM

W/

W/O

W

VFD

VA

V

UPS

UL

UON

UG

UGS

UGT

UGP

TYP

TV

TP

TEL,TELE

TELECOM

TC

TRANSFORMER

REMOVE DEVICE

WATT HOUR METER

WEATHERPROOF

VOLTS

VARIABLE FREQUENCY DRIVE/

VARIABLE FREQUENCY MOTOR

CONTROLLER

WITHOUT

WITH

WATTS

VETERANS ADMINISTRATION

UNDERGROUND PRIMARY

UNDERGROUND SECONDARY

UNDERGROUND TELEPHONE

UNDERWRITER'S LABORATORY

UNLESS OTHERWISE NOTED

UNINTERRUPTIBLE POWER SUPPLY

UNDERGROUND

TELECOMMUNICATIONS

TYPICAL

TELEVISION

TAMPERPROOF

TIME CLOCK

TELEPHONE

TB TERMINAL BLOCK

TBB TELEPHONE BACKBOARD

U

V

W

X

Z

TPST TRIPLE POLE SINGLE THROW

FDS FORWARD DEPLOYED SERVICES

JOINT SECURITY ARCHITECTUREJSA

PIV PERSONAL IDENTITY VERIFICATION

GENERAL NOTES

1. ALL TELECOMMUNICATIONS WORK SHALL COMPLY WITH THE LATEST EDITION OF VA STANDARDS TELECOMMUNICATIONS INFRASTRUCTURE STANDARDS AND CURRENT MANUFACTURER AND BICSI INSTALLATION PRACTICES. THESE STANDARDS HAVE BEEN ESTABLISHED TO EXCEED ALL CURRENT CODE AND BICSI INSTALLATION PRACTICE. ANY ITEMS THAT RAISE QUESTION SHALL BE BROUGHT TO THE ATTENTION OF THE CONSTRUCTION MANAGER AND REPRESENTATIVE IN WRITING. IT IS ALWAYS A BEST PRACTICE TO PROVIDE THE AHJ WITH DETAIL ON ANY AND ALL CONSTRUCTION ITEMS THAT COULD BE QUESTIONED BY THE AHJ. THE PROJECT DOCUMENTATION PACKAGE STANDARDS ARE NOT TO BE INTERPRETED NOR CONSIDERED AS AUTHORIZATION TO DEVIATE FROM ANY CODE OR REGULATION. IT IS THE CONTRACTOR’S RESPONSIBILITY TO VALIDATE THAT THESE REQUIREMENTS WILL MEET THE EQUIPMENT MANUFACTURER’S REQUIREMENT TO

PROVIDE A MINIMUM 25-YEAR SCS FOR ALL LABOR AND MATERIALS WARRANTIES.

2. IN THE EVENT OF A CONFLICT OR INCONSISTENCY BETWEEN ITEMS INDICATED ON THE PLANS AND/OR SPECIFICATIONS OR WITH THE AHJ REQUIREMENTS, THE DOCUMENT WHICH PRESCRIBES AND ESTABLISHES THE COMPLETE JOB AS PER MANUFACTURER OR THE HIGHER STANDARD SHALL PREVAIL. ALL DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE CONSTRUCTION

MANAGER AND THE VA REPRESENTATIVE IN WRITING IMMEDIATELY UPON DISCOVERY.

3. OMISSIONS FROM THE DRAWINGS OR FROM THE SPECIFICATIONS OR THE MISDESCRIPTION OF DETAILS OF WORK WHICH ARE CLEAR AND NECESSARY TO CARRY OUT THE INTENT FOR THE DRAWINGS AND SPECIFICATIONS, OR WHICH ARE CUSTOMARILY PERFORMED SHALL NOT RELIEVE THE CONTRACTOR FROM PERFORMING SUCH OMITTED OR MISDESCRIBED DETAILS OF THE WORK.

THE CONTRACTOR SHALL NOTIFY THE CONSTRUCTION MANAGER AND VA REPRESENTATIVE UPON IDENTIFICATION OF SUCH OMISSIONS, MISDESCRIPTION, AND UNCLEAR DIRECTIONS IMMEDIATELY.

THE CONTRACTOR SHALL PERFORM ALL PROJECT TASKS AND ASSEMBLY BUILDS AS PER BICSI STANDARDS AND MANUFACTURER’S REQUIREMENTS ALONG WITH COORDINATING AND WORKING

WITH THE VA TO CORRECT SUCH DOCUMENTATION ERRORS.

4. THE CONTRACTOR SHALL CHECK ALL DRAWINGS FURNISHED IMMEDIATELY UPON THEIR RECEIPT AND PROMPTLY NOTIFY THE VA OF ANY DISCREPANCIES. THIS INCLUDES, BUT IS NOT LIMITED TO, DISCREPANCIES BETWEEN DRAWINGS AND SPECIFICATIONS, OR DRAWINGS AND MANUFACTURER INSTALLATION INSTRUCTIONS, OR DRAWINGS AND GOVERNING CODES AND BEST PRACTICES. THE CONTRACTOR SHALL BRING TO THE ATTENTION OF THE CONSTRUCTION MANAGER AND VA COR ANY DISCREPANCIES BETWEEN DRAWINGS AND HOW THE CONTRACTOR NORMALLY DELIVERS THE

SERVICES DESCRIBED IN THE DRAWINGS OR SPECIFICATIONS.

5. ALL MATERIALS AND EQUIPMENT FURNISHED AND INSTALLED SHALL BE NEW AND FREE FROM ANY KNOWN DEFECT. ALL EQUIPMENT SHALL BEAR THE UNDERWRITERS LABORATORIES LABEL (UL™) LISTING, CLASSIFIED, AND/OR PERFORMANCE VERIFIED MARK OR FROM A VA APPROVED ALTERNATIVE TESTING ORGANIZATION. ALL MATERIALS SHALL BE INSTALLED AND USED IN THE MANNER FOR WHICH THE MANUFACTURER INTENDS THEM FOR. THIS APPLIES FOR BOTH PIECE PARTS AND COMPLETE FUNCTIONING ASSEMBLIES.

6. CONTRACTOR IS REQUIRED TO RECEIVE WRITTEN APPROVAL FOR ALL RECOMMENDED AND REQUIRED WORK DEVIATIONS AND CLARIFICATIONS TO THE PLANS AND SPECIFICATIONS OF THIS

PROJECT BY THE VA AND ITS REPRESENTATIVES PRIOR TO ANY FIELD ACTIVITY.

7. ALL WORK MUST BE COMPLETED IN AS PER MANUFACTURERS INSTALLATION REQUIREMENTS AND BICSI INSTALLATION PRACTICES. THE VA DEMANDS THE UTMOST PROFESSIONALISM WHEN WORK IS BEING PERFORMED ON CAMPUS AND HOLDS ALL CONTRACTORS TO THAT LEVEL OF PROFESSIONALISM. THE WORK SITE SHALL BE KEPT CLEAN AND FREE FROM DEBRIS. IT IS EVERY CONTRACTOR

AND ALL THEIR REPRESENTATIVE’S RESPONSIBILITY TO GUARD AGAINST ANY DAMAGE TO VA PROPERTY AND THE IMMEDIATE REPAIR IF ANY DAMAGE IS CAUSED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUCTING A FINAL CLEANUP OF THE WORK SITE PRIOR TO FINAL SYSTEM ACCEPTANCE AS PART OF THE PUNCH-LIST PROCESS.

8. THE CONTRACTOR SHALL NOT BORE, NOTCH, OR IN ANY WAY CUT INTO ANY STRUCTURAL MEMBER WITHOUT WRITTEN APPROVAL FROM THE VA, ARCHITECT, AND STRUCTURAL ENGINEER. WITH PERMISSION FROM THE ABOVE AND PRIOR TO ALL CUTTING, DRILLING, NOTCHING, CORING, ETC. OF CONCRETE STRUCTURE AND FAÇADE, THESE SURFACES SHALL BE X-RAYED OR GROUND PENETRATING RADAR USED TO ACCURATELY LOCATE REBAR, POST-TENSION CABLES & RODS, CONDUITS, AND ANY OTHER EMBEDDED POTENTIAL OBSTRUCTIONS TO

ENSURE THAT NO DAMAGE IS CAUSED TO ANY STRUCTURAL REINFORCEMENTS.

9. FOR THE PURPOSE OF CLEARNESS AND LEGIBILITY, THE TELECOM DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC. THE SIZE AND LOCATION OF EQUIPMENT IS SHOWN TO SCALE WHEREVER POSSIBLE. THE CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS WITH INFORMATION INDICATED ON THE DRAWINGS AND DESCRIBED IN THE SPECIFICATION SECTIONS WHERE TELECOM WORK

INTERFACES WITH OTHER TRADES.

10. THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS WHEN WORKING IN AREAS WITH EXISTING CEILINGS AND SHALL BE RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING TILES WITHOUT DAMAGING OR SOILING THE CEILING TILES. CHIPPED, DAMAGED, CRACKED, OR BROKEN TILES ARE THE CONTRACTOR’S RESPONSIBILITY TO REPLACE WITH LIKE TILES.

11. ALL FOOTAGES IDENTIFIED ON DRAWINGS OR SCALED OFF OF DRAWINGS ARE TO BE CONSIDERED ESTIMATES AND ARE RECOMMENDED TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO

ORDERING OF MATERIAL

12. ALL CABLE TRAYS, LADDER (TYPE) RACKING, CONDUIT, EQUIPMENT RACKS, PROTECTION PANELS, AND CABLE SHEATHS SHALL BE BONDED TO AN APPROVED TELECOMMUNICATIONS BONDING

ASSEMBLY.

13. ACCORDING TO TIA STANDARDS AND BICSI METHODOLOGIES, PULL-BOXES LOCATED WITHIN A STRUCTURE ARE TO BE PLACED AT 100’ INCREMENTS AND PROPERLY SPACED WITHIN RUNS OF MORE THAN 150’. PULL-BOXES ARE TO BE PLACED IN CONDUIT RUNS THAT EXCEED A MAXIMUM OF 180-DEGREES IN CHANGES OF DIRECTION. TELECOMMUNICATIONS PULL-BOXES ARE TO BE SIZED AT A MINIMUM OF TWELVE (12) TIMES THE DIAMETER OF THE LARGEST CONDUIT. PULL-BOXES SHOULD NOT BE USED FOR CHANGES OF DIRECTION. THESE STANDARDS ARE TO BE ADHERED TO WHERE EVER PRACTICAL AND ANY DEVIATION TO THESE STANDARDS REQUIRES A SHOP-DRAWING, IF DISCOVERED DURING THE SUBMITTAL PHASE, TO REMEDIATE THE ISSUE OR BY AN RFI DURING THE CONSTRUCTION INSTALLATION PHASE. THE VA MAY ELECT TO INCREASE THE CONDUIT SIZE OR QUANTITY OF CONDUITS TO MITIGATE THE ISSUE FOR THE EXCESS LENGTH, ADDITIONAL QUANTITY OF CHANGES OF DIRECTION, AND/OR THE REDUCED SIZE OF PULL-BOXES WITHIN THE GIVEN PATHWAY. THE CONTRACTOR IS REQUIRED TO HAVE APPROVAL IN WRITING PRIOR TO ANY ROUGH-IN

WORK OR MATERIAL PROCUREMENT.

14. AS A STANDARD, ALL INTER-BUILDING PATHWAYS SHALL HAVE A MINIMUM OF 20% AVAILABLE CAPACITY AT THE SCHEDULED END OF THE PROJECT. SHOULD THIS PERCENTAGE NOT BE ACHIEVABLE, THIS ISSUE MUST BE BROUGHT TO THE ATTENTION OF THE CONSTRUCTION MANAGER AND THE VA REPRESENTATIVE.

15. WHERE PATHWAY CONSISTS OF MULTIPLE CONDUITS OR SLEEVES, A PATHWAY MUST BE FILLED TO CURRENT TIA AND BICSI INSTALLATION RECOGNIZED MAXIMUM FILL BEFORE UTILIZING THE NEXT

VACANT OR PARTIALLY FILLED PATHWAY.

16. OVERHEAD AND WALL MOUNTED LADDER (TYPE) RACKING INSTALLATION SHALL MATCH THE DRAWINGS AS CLOSELY AS POSSIBLE AND REQUIRES A SHOP DRAWING FOR EACH ROOM LOCATION.

THE PACKAGE IS TO INCLUDE A BILL OF MATERIALS WITH PART NUMBERS FROM RACKING MANUFACTURER FOR MOUNTING AND CONNECTION PIECE PARTS. PRIOR TO ANY ROUGH-IN WORK BEING

PERFORMED THESE SUBMITTALS MUST BE APPROVED BY THE VA REPRESENTATIVE.

17. ALL CABLING AND THEIR PATHWAYS PASSING THROUGH A RATED FIRE OR SMOKE BARRIER MUST BE PROPERLY SLEEVED AND FIRE STOPPED USING APPROVED (UL CLASSIFIED) FIRE STOP ASSEMBLIES. FIRESTOP ASSEMBLIES ARE TO BE INSTALLED PER THE MANUFACTURER’S INSTRUCTIONS FOR THE TYPE OF BARRIER, PATHWAY SIZE, AND QUANTITY OF CABLES THE FIRESTOP ASSEMBLY IS BEING INSTALLED FOR. CONTRACTOR IS REQUIRED TO MAINTAIN TRAINING RECORDS FOR ALL STAFF PERFORMING FIRESTOP ASSEMBLY INSTALLATION WORK.

18. CABLE PULLING – LINE/ROPE/TAPE SHALL BE PLACED IN ALL NEW CONDUITS. ALL CONDUITS SHALL ALSO BE CAPPED AND/OR PROPERLY FIRE STOPPED IN A MANNER APPROVED BY THE VA AND THE

AHJ.

19. EACH OSP CABLE SHALL BE EQUIPPED WITH A PERMANENT LABEL INDICATING CABLE TYPE, PAIR OR OPTICAL STRAND COUNTS, DISTANT END COMMONLY USED BUILDING NAME/NUMBER AND CABLE LENGTH. BOTH ENDS OF EACH CABLE SHALL BE LABELED CLEARLY SO THAT THEY CAN BE EASILY MATCHED TO EACH OTHER.

20. ALL CABLE SPLICES SHALL BE CONTAINED WITHIN AN APPROVED SPLICE CASE DESIGNED FOR THE LOCATION AND PURPOSE. THE SUBMITTAL FOR THE ENCLOSURE SHALL IDENTIFY WEATHER THE ENCLOSURE IS RE-ENTERABLE. AS PART OF THE SUBMITTAL, A LISTING OF ANY AND ALL ADDITIONAL PARTS ARE REQUIRED TO RESTORE THE INTEGRITY OF THE ENCLOSURE SHOULD THE SPLICE

CASE BE REQUIRED TO BE ENTERED OPERATIONALLY.

21. OPTICAL FIBER CABLE SHALL BE PLACED WITH A MINIMUM OF THREE (3) METER MAINTENANCE LOOP AT EACH END OF THE RUN, AT EACH SIDE OF A SEISMIC JOINT, IN EACH MAINTENANCE HOLE (MH), VAULT, ETC. THE MAINTENANCE LOOP SHALL BE SECURED IN SUCH A MANNER TO PROVIDE MECHANICAL PROTECTION OF THE CABLE. AS PART OF THE SUBMITTAL PHASE THE CONTRACTOR IS TO PROVIDE SINGLE-LINE SHOP DRAWINGS OF THE LOCATIONS OF ALL MAINTENANCE LOOPS AND TO INCLUDE ANY RECOMMENDED LOOPS TO BE ADDED IN PULL-BOXES FOR EACH INDIVIDUAL

PATHWAY RUNS.

22. ALL OPTICAL FIBER CABLE SHALL BE TESTED USING ANSI/TIA STANDARDS AND BICSI INSTALLATION APPROVED TESTING PLATFORM. THIS TEST MUST BE PERFORMED BI-DIRECTIONALLY ON ALL STRANDS AND ALL RECORDS ARE TO BE OPENED AND VIEWED IN A STANDARD PLATFORM THAT DOES NOT CAUSE THE VA TO PURCHASE OR LICENSE FOR SUCH VIEWING. THE VA, AT ITS DISCRETION MAY REQUIRE TO SEE THE TESTER’S CALIBRATION RECORD AND WILL NOTIFY THE CONTRACTOR OF THIS REQUEST PRIOR TO OR POST TESTING OPERATION. ALL BI-DIRECTIONAL

TESTING SHALL BE PERFORMED TO THE FOLLOWING STANDARDS:

A. ANSI/TIA - 568.3-D

B. ANSI/TIA - 526.7

C. ANSI/TIA - 455

23. OPTICAL FIBER CABLE SPLICING SHALL UTILIZE FUSION SPLICING TECHNIQUES AND REQUIRE A SHOP DRAWING DURING THE SUBMITTAL PHASE OF THE PROJECT PRIOR TO ANY ROUGH-IN. ANY AND ALL CABLE SPICING REQUIRES A WRITTEN APPROVAL BY THE VA BEFORE ANY MATERIAL PURCHASING OR ROUGH-IN.

24. CONTRACTOR TO COORDINATE WAO AND SUPPORTING CONDUIT AND CABLE TRAY WITH THE ELECTRICAL CONTRACTOR WHERE THE ELECTRICAL CONTRACTOR IS A DIFFERENT ORGANIZATION

THAN LOW-VOLTAGE CABLING/CONDUIT CONTRACTOR FOR PROPER PLACEMENT.

25. ALL STATION CABLES SHALL BE NEATLY DRESSED AND SECURED EVERY FIVE FEET AT A MINIMUM.

26. ALL VA-IT STATION CABLES SHALL BE TERMINATED ON THE SAME FLOOR AS THE FLOOR SERVING BDF/IDF UNLESS OTHERWISE NOTED IN THESE DRAWINGS.

27. ALL STATION CABLING IS TO BE MECHANICALLY PROTECTED IN PLACE UNLESS OTHERWISE IDENTIFIED IN THESE DRAWINGS, BY A CONTRACT CHANGE RECORD, OR BY A RFI RESPONSE FROM THE

VA REPRESENTATIVE IN WRITING DIRECTING SURFACE-MOUNT EXPOSED AS THE CABLE INSTALLATION MEANS.

28. ALL NEW STATION CABLES SHALL BE TESTED AND DOCUMENTED USING RECOGNIZED MANUFACTURER INSTALLATION REQUIREMENTS AND BICSI INSTALLATION PRACTICES. UTP (CATEGORY) CABLE

TESTING RESULTS SHALL BE ONE TEST RECORD FOR EACH CABLE AND THE RECORD MUST INCLUDE THE VA APPROVED CABLE IDENTIFICATION STANDARD NAMING/NUMBERING SCHEME. OPTICAL FIBER TESTING SHALL FOLLOW ALL VA AND MANUFACTURER INSTALLATION PRACTICES. COAX TESTING SHALL FOLLOW BOTH VA AND SCTE CABLE TESTING PRACTICES.

29. THE VA REQUIRES A ONE (1) METER SLACK LOOP FOR ALL WAO SUPPORTED BY OPEN CEILING CABLE DISTRIBUTION. THE SLACK LOOP MUST BE SUPPORTED ABOVE THE WAO IN NEAT AND REPEATABLE FASHION THAT MEETS BOTH BICSI INSTALLATION AND MANUFACTURER PRACTICES.

30. ALL STATION OUTLETS, WAO, AND TERMINATION POINTS INCLUDING EXISTING WAO UTILIZED UNDER THIS PROJECT SCOPE SHALL BE PROPERLY LABELED AND IDENTIFIED USING THE STANDARD VA INTERNAL DISTRIBUTION NAMING/NUMBERING SCHEME. ALL LABELS ARE TO BE MACHINE GENERATED AND AN EXCEL TYPE MATRIX CREATED DEFINING LOCATION OF BOTH ENDS OF EACH LABELED CABLE. AS-BUILT CLOSEOUT PACKAGE MUST INCLUDE THESE STATION AND TERMINATION POINTS IDENTIFIED ON FLOOR PLANS FOR EACH LEVEL/FLOOR IN ADDITION TO THE STATION CABLING MATRIX. THE SAME CABLE IDENTIFICATION IS ALSO REQUIRED TO BE INCLUDED ON EACH CABLE TESTED RECORD BOTH HARD AND SOFT-COPY RECORD.

31. STANDARD WORKSTATION OUTLET (AKA WORK AREA OUTLETS OR WAO) SHALL CONSIST OF A 5S X 2-7/8” DEEP METAL BOX, FED WITH A MINIMUM 1-1/4” CONDUIT. BACK BOX TO BE FITTED WITH

SINGLE-GANG FINISH RING FOR 6-PORT FACEPLATE.

32. STANDARD WAO FACEPLATE SHALL CONSIST OF A SINGLE-GANG PLATE, 6-POSTION, WHITE IN COLOR, AND UNIVERSAL MULTI-PURPOSE PORTS TO SUPPORT THE FOLLOWING TERMINATIONS: UTP, SCTP, COAX, OPTICAL FIBER, USB, VARIOUS A/V CONNECTORS, ETC. ALL UNUSED PORTS SHALL BE FITTED WITH BLANK INSERTS.

33. STANDARD WORKSTATION CONSISTS OF A MINIMUM OF FOUR (4) CATEGORY 6A, CMP, GRAY, BLUE, AND WHITE CABLES.

34. INCLUDED AS PART OF THE CABLING AS-BUILT DOCUMENTATION PACKAGE, IT IS THE CONTRACTOR’S RESPONSIBILITY TO PROVIDE TO THE VA THE STRUCTURED CABLING SOLUTION

MANUFACTURER’S 25-YEAR WARRANTY CERTIFICATE FOR THE PROJECT.

35. THE WAO UTP 8-CONDUCTOR JACKS ARE DESCRIBED WITHIN THIS DOCUMENT SET AS RJ-45 JACKS/INSERTS. THE DESIGNERS ARE AWARE THAT ABBREVIATION RJ-45 IS A FCC –REGISTERED JACK

WITH 8-CONDUCTORS AND DESCRIPTION IN THIS DOCUMENT SET IS FOR A UTP CATEGORY CABLE RATED JACK/INSERT AND NOT FOR FCC INTERFACE JACKS.

36. ALL NEW CABLING SHALL CONFORM TO THE SCS INCLUDING BEING INSTALLED BY A CERTIFIED INSTALLER AND SIGNED OFF BY A MANUFACTURER REPRESENTATIVE.

37. NOT ALL SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET ARE USED IN THE DRAWING SET CURRENTLY, BUT ARE THERE, SHOULD THE SCOPE GROW TO INCLUDE SUCH WORK.

38. THE CONTRACTOR SHALL PROVIDE WIRE GUARDS FOR ALL EXPOSED AUDIO, VISUAL, AND NETWORK DEVICES LOCATED IN AREAS THAT CAN BE SUBJECT TO VANDALISM SUCH AS WAITING ROOMS, RESTROOMS, LOCKER AND SHOWER ROOMS, MULTI-PURPOSE/DINING, CHECK-IN AREAS/LABS, & ASSEMBLY ROOMS, AND ALL HALLWAYS AND CORRIDORS ASSOCIATED WITH THESE SPACES

39. ALL CONDUITS CROSSING BUILDING SEISMIC SEPARATIONS OR EXPANSION JOINTS SHALL BE PROVIDED WITH APPROVED CONNECTORS. REFER TO ARCHITECTURAL PLANS FOR ALL EXPANSION

JOINT LOCATIONS.

40. COORDINATE INSTALLATION OF LIGHTING FIXTURES WITH CABLE TRAY AND EQUIPMENT IN BDF, IDF, AND ALL A/V ROOMS/SPACES TO MAINTAIN REQUIRED LIGHTING LEVELS WITH ALL EQUIPMENT IN

PLACE.

41. FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS OR SHOP DRAWINGS ON THE APPROVED DRAWINGS, THE INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE ELECTRICAL

ENGINEER AND THE FIELD REPRESENTATIVE FOR THE VA.

42. VA, MANUFACTURER, BICSI INSTALLATION PRACTICES FOR PROJECT SUBMITTALS AND SHOP DRAWINGS ARE IDENTIFIED IN SPECIFICATIONS SECTIONS LISTED IN DIVISION 26, 27, AND 28, OF THE

PROJECT CONTRACT DOCUMENTATION SET.

43. J-HOOK ROUTING IS AN "IN-THE-FIELD" INSTALLATION CHOICE AND SHALL BE REQUIRED TO BE DOCUMENTED ON ALL AS-BUILT PACKAGES. SLEEVES REQUIRED TO COMPLETE THESE J-HOOK

ROUTINGS SHALL BE CONSIDERED AND INCLUDED IN THE J-HOOK ROUTE EQUIPMENT PACKAGE FROM THE CONTRACTOR AS CPCI PATHWAY EQUIPMENT. J-HOOK SLEEVES THROUGH RATED AND NON-RATED ASSEMBLIES SHALL NOT BE A REQUIREMENT OF THIS DRAWING PACKAGE AS THEY ARE FIELD DEFINED LOCATIONS AND QUANTITIES.

44. CONTRACTOR SHALL SUBMIT COORDINATION DRAWINGS SHOWING ALL PROPOSED CABLE ROUTING, CABLE TRAY LOCATIONS AND SIZING, J-HOOK LOCATIONS, PENETRATIONS, DEVICE LOCATIONS, EQUIPMENT LOCATIONS, WAO LOCATIONS, ETC. PRIOR TO BEGINNING WORK. THESE DRAWINGS SHALL BE COORDINATED WITH NEW AND EXISTING SYSTEMS TO MAINTAIN ALL REQUIRED CLEARANCES AND ACCESS FOR NEW AND EXISTING EQUIPMENT. COORDINATION DRAWINGS MUST BE REVIEWED AND APPROVED BY VA/AE PRIOR TO BEGINNING INSTALLATION WORK.

45. CONTRACTOR SHALL SUBMIT PROPOSED NEW RACK ELEVATIONS FOR EACH TELECOMMUNICATIONS ROOM/RACK PRIOR TO BEGINNING WORK. TERMINATION LOCATIONS AND RACK

CONFIGURATIONS SHALL BE APPROVED PRIOR TO BEGINNING WORK.

46. CONTRACTOR SHALL SUBMIT WEEKLY CABLE TESTING/TERMINATION REPORTS FOR VA/AE REVIEW AS AREAS ARE COMPLETED TO ENSURE CABLE PERFORMANCE MEETS BICSI AND CONTRACT

REQUIREMENTS.

47. INFECTION CONTROL PROTOCOL SHALL BE MAINTAINED AT ALL TIMES, INCLUDING NEGATIVE AIR HEPA FILTERED CONTAINMENTS. MOBILE HEPA CARTS SHALL BE USED FOR CABLE PULLING ACTIVITIES AS REQUIRED BY THE SPECIFICATIONS. COORDINATE ALL ACTIVITY WITH THE VA. SEE SPECIFICATION SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION.

STANDARD OUTLET INFORMATION

X ROOM NUMBER - OUTLET DESIGNATOR

W WALL PHONE JACK @ +42" AFF (ADA)

H WALL PHONE JACK @ +84" AFF (ADA)

WP WEATHERPROOF

AV AUDIO VIDEO CABLES (SPECIFIC USE,

INSTALLED POINT TO POINT)

# NUMBER (IDENTIFICATION) OR COUNT

(#) NUMBER IS QUANTITY

A/E ARCHITECT/ENGINEER

AH AMPERE HOUR

AUTHORITY HAVING JURISDICTIONAHJ

ASSISTIVE LISTENING SYSTEMALS

ACCESS POINTAP

ALUMINUM, STEEL, POLYETHYLENEASP

AMERICAN SOCIETY FOR TESTING AND MATERIALSASTM

AUDIOVISUAL CONTRACTORAVC

BMS

BLDG

BUILDING

BUILDING

BS-IDF

BRKR, BKR

BUILDING SERVICES INTERMEDIATE DISTRIBUTION

FRAME

BREAKER

BTU BRITISH THERMAL UNIT

CATV COMMUNITY ANTENNA TELEVISION (CABLE

TELEVISION)

C CONDUIT

CONDUIT ONLY - WITH PULL WIREC.O.

CONSOLIDATION POINTCP

CAPTURED SCREW CONNECTORCSC

DISTRIBUTION PANEL

DOUBLE POLE SINGLE THROW

DOUBLE POLE DOUBLE THROWDPDT

DWG

DPST

DIST

DISC

DC

DP

DN

DRAWING

DISTRIBUTION

DIRECT CURRENT

DISCONNECT

DOWN

DIV DIVISION

ELECTRIC WATER COOLER

ELECTRIC WATER HEATER

ELECTRIC, ELECTRICAL

ELECTRIC METALLIC CONDUIT

ELECTRICAL CONTRACTOR

EWC

EWH

ELEC

EQ, EQUIP

EM, EMERG

EMT

ELEV

ENCL

E.C.

EQUIPMENT

ELEVATOR

EMERGENCY

ENCLOSURE

EXISTINGE, EX, EXIST

X EMPTY (OUTLET WITH NO CABLE,

FUTURE USE).

F FURNITURE SYSTEM JACK

C COAXIAL CABLE RG-11

M WALL MOUNTED MONITOR

T VOIP - TELEPHONE

TV TELEVISION OUTLET

WAP WIRELESS ACCESS POINT

NOTES

1. WORK AREA OUTLET CONDUIT HAS BEEN DESIGNED FOR CATEGORY 6A CMP CABLE DISTRIBUTION WITH 5S BACK-BOX AND

1-1/4" IN CONDUIT.

2. FILL FACTOR IS CALCULATED USING 0.275 IN O.D. FOR SUPERIOR ESSEX CAT6A CMP 77-246-YB AT A WEIGHT OF 23 LBS/KFT.

EACHEA

ENTRANCE FACILITYEF

EMI ELECTROMAGNETIC INTERFERENCE

EMS EMERGENCY MANAGEMENT SYSTEM

ENT ELECTRICAL NONMETALLIC TUBING

FLOOR BOXFB

FDC OPTICAL - FIBER DISTRIBUTION CENTER

FEXT FAR END CROSSTALK

FIN FINISH

FIXT FIXTURE

FOC FIBER OPTIC CABLE

FPS FRAMES PER SECOND

GA GAUGE

GC GENERAL CONTRACTOR

GALVANIZD RIGID CONDUITGRC

INTERCOM

IDF

INSIDE DIAMETER OR INSIDE DIMENSION

INTERMEDIATE DISTRIBUTION FRAME

ID

IC

ISP INTERNET SERVICE PROVIDER

M METER

MAC MEDIA ACCESS CONTROL

MDF MAIN DISTRIBUTION FRAME

MM MULTI-MODE

MOB MEDICAL OFFICE BUILDING

MTU MULTI TENNET UNIT

WS WORK STATION

WiFi

WIRELESS FIDELITY (LOCALIZED WIRELESS USER

ACCESS INTERNET/NETWORK)

WAO WORK AREA OUTLET / WORK STATION OUTLET

WBS WORK BREAKDOWN STRUCTURE

V-A VOLTS-AMPERES

ND NETWORK DEVICE

NE NETWORK ENCLOSURE

NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NEXT NEAR END CROSSTALK

OF OPTICAL FIBER

OSP OUTSIDE PLANT

OTDR OPTICAL TIME DOMAIN REFLECTOMETER

POE POWER OVER ETHERNET

PPF PIXELS PER FOOT

PR PAIR

PSU POWER SUPPLY UNIT

PTP POINT-TO-POINT

REQ'D REQUIRED

RM ROOM

RMC RIGID METAL CONDUIT

RMS RACK MOUNTED SPACE

RNC RIGID NONMETALLIC CONDUIT

RU RACK UNIT

SAC SECURITY AND ACCESS CONTROL

SCS STUCTURED CABLING SOLUTION

ScTP SCREENED TWISTED PAIR

SM SINGLE-MODE

SNR SIGNAL TO NOISE RATIO

SQ SQUARE

STP SHIELDED TWISTED PAIR

SYS SYSTEM

TCP/IP TRANSMISSION CONTROL PROTOCOL/

INTERNET PROTOCOL

TE TELECOMMUNICATION ENCLOSURE

TGB TELECOMMUNICATIONS GROUNDING BUSBAR

TMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBAR

TR TELECOMMUNICATIONS ROOM OR SPACE

UD UNDERGROUND DUCT

UTP UNSHIELDED TWISTED PAIR

DURESS ALARM

on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

Mat Perkins

(520) 481-8548

A

B D

EF

G

H

J

K

L

M

C

LINE INDICATES

PHASE 1 SCOPE AREA

B

IM

/6

-2

-1

E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e

/6 -2

-7

.M

P L S

.P O

L Y

T R

A U

M A

.G e n e ra l.

S h e e ts

.r v t

/3

/2

:4

:5

P

M 1 : 1

04/03/2023 K. Luke K.Hutchinson

618-22-100

1390 - T-001

TELECOMMUNICATION ABBREVIATIONS AND

SYMBOLS

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATE FOR EXPANDED

POLYTRAUMA PROGRAM

ISSUED FOR BIDDING

04/03/2023

WAP

SP

WAP

WAP

WAP

WAPWAP

WAP

SP

SP

D

D

D

D

D

D

D

D

D

D

D D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D

D D

T

N

Z

Z

WAP

SP

WAP

D

D

D

D

D

D

D

D

SP

WAP

SP

SP

Z

Z

Z Z

Z Z

WAP

Z

WAP

WAP

SP

SP

SP

WAP

SP

SP

WAP

WAP

W A

P

W A

P

SP

WAP

SP

WAP Z

WAP

SP

WAP

SP

WAP

D

D

D

D

D

D

D

D D

D D

D

D

D

D

D

S

N

T

N

Z ZZ

Z

WAP

D

D

D

SP

Z

WAP

WAP

SP

WAP

SP

SP

WAP

SP

WAP

SP

SP

WAP

WAP

WAP

SP

SP

SPSP

WAP

SP

Z Z

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

1TYP.

/F2 TD104 /F2 TD104

AREA NOT IN SCOPE OF WORK

ALL DATA DEVICES ARE EXISTING TO REMAIN

AREA NOT IN SCOPE OF WORK

ALL DATA DEVICES ARE EXISTING TO REMAIN

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

1 1

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

1 /F6 TD104/F6 TD104

TTUUVVWWXXYY

1144G-109B

4G-111

4G-112

4G-114

4S-6

4H-121

4H-122

4H-123

C4-116

4G-116 4G-115 4G-111C 4G-111B 4G-111A

4H-114

4H-115 4H-116 4H-117

4H-118

4H-120

E

C-6

M-8

4L-101

4L-140

C4-126

C4-115

C4-137

4L-102

4L-102A

4H-102

4H-103

4H-104

4H-105

4H-106

4H-107

4H-109 4H-110

4H-111

4H-113

4G-117

4H-101A

4H-101B

C4-110

C4-114

4H-112

4K-101

4H-108C4-138

4H-108A

TTUUVVWWXX

4K-142A

4K-142

4K-140

4K-140A

4K-138A

4K-138

4K-136

4K-136A

4K-134

4K-134A

4K-133A

4K-133

4K-132

4K-131A

4K-131

4K-129

4K-126

4K-127

4K-125 4K-123 4K-122 C4-132 4K-120 4K-121

4K-119

C4-133

4K-117

4K-109

4K-108

4K-106

4K-104

4K-103

4K-101

4H-108

4K-102

4K-107

4K-113

4K-112

4K-105

4K-102A

4K-124

4K-124A

4K-124B

4K-118

4K-128

4K-130

4K-130A

4K-121A

4K-115

4K-110

4K-111

C-7

C4-131

4K-114

4K-135

4K-137

4K-139

4K-141

4K-143

C4-135

C4-134

C4-138

C4-127

SW8

4H-108A

4K-116

WALL SYMBOL LEGEND

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

PROPOSED EXTERIOR WALL.

SEE WALL SECTIONS

1 HR FIRE AND SMOKE

BARRIER

2 HR FIRE AND SMOKE

BARRIER (SHAFT)

SMOKE BARRIER PARTITION

DEMOLISHED WALL,

FIXTURE OR FURNISHING

EXISTING WALL, FIXTURE

OR FURNISHING TO REMAIN

NOT IN CONTRACT - NO

WORK SCHEDULED

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

Mat Perkins

(520) 481-8548

A

B D

EF

G

H

J

K

L

M

C

GENERAL NOTES

KEYNOTES

LINE INDICATES

PHASE 1 SCOPE AREA

B

IM

/6

-2

-1

E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e

/6 -2

-7

.M

P L S

.P O

L Y

T R

A U

M A

.M E

P .B

.L

.r v t

/3

/2

:3

:0

P

M As indicated

04/03/2023 K. Luke K.Hutchinson

618-22-100

1390 - TD104

TELECOMMUNICATIONS DEMO PLANS-

FOURTH LEVEL - 4H&4K

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATE FOR EXPANDED

POLYTRAUMA PROGRAM - PHASE 1

ISSUED FOR BIDDING

SCALE: 1/8" = 1'-0"

F6

TELECOMMUNICATIONS DEMO PLAN -

FOURTH LEVEL - AREA 4K

SCALE: 1/8" = 1'-0"

F2

TELECOMMUNICATIONS DEMO PLAN -

FOURTH LEVEL - AREA 4H

A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,

FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.

B. PRIOR TO INSTALLATION OF CABLE TRAY, COORDINATE LOCATIONS WITH ALL

OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL

NEW CABLE, CABLE TRAY, AND J HOOKS SHALL BE INDEPENDENTLY

SUPPORTED & NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.

C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.

CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END

WARRANTEED SOLUTION FOR THE CABLING.

D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.

E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR

EXCEED CATEGORY 6A STANDARDS.

F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.

G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN

WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.

UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR

PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A

MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR

TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE

TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF

EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE

TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL

PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE

EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE

REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH

EXISTING CONDUIT CAPACITY.

H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO

PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE

OR JUNCTION BOX.

I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.

J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW

EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE

TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.

K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING

BACK TO THE RACK.

L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL

STANDARDS AND REQUIREMENTS. SEE DETAIL SHEETS FOR ADDITIONAL

INFORMATION.

M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL

TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE

DOCUMENTS. HANG ON THE WALL WITHIN THE TELECOM ROOM.

1. ALL EXISTING TELECOMMUNICATION OUTLETS AND CABLE AND WIRELESS

ACCESS POINTS TO BE REMOVED.

2. REMOVE ALL EXISTING NURSE CALL DEVICES. COORDINATE WITH NEW AND

EXISTING CONDITIONS.

3. (NOT USED)

4. EXISTING SPEAKER TO BE DEMOLISHED.

5. EXISTING 2-POST RACK TO BE DEMOLISHED. COORDINATE WITH COR PRIOR TO

COMMENCEMENT OF WORK.

6. EXISTING CABLING CONDUIT AND WIREWAYS ARE TO REMAIN AND BE CAREFULLY

PROTECTED IN PLACE UNTIL ALL EXISTING DEVICES ON THE EXISTING RACK ARE

TRANSFERRED TO THE NEW RACK. CONTRACTOR SHALL PROVIDE SHOP

DRAWINGS SHOWING THE PROPOSED NEW RACK ELEVATION AND PROVIDE A

PHASING PLAN FOR ALL EXISTING DEVICES TO REMAIN TO THE NEW RACKS.

7. EXISTING DURESS JACK TO BE DEMOLISHED.

8. EXISTING TELECOM EQUIPMENT, DEVICES, AND RACKS IN TELECOM ROOM TO

REMAIN IN PLACE.

9. EXISTING RACKS TO BE USED FOR NEW TELECOM CIRCUITS.

J

J J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J J

J

J

J

J

TTUUVVWWXXYY

TYP.

1"ø

"ø

/4

"ø

1 1/2"ø

/4

"ø

3/4"ø

/4

"ø

"ø

/2 "ø

/2 "ø

"ø

TYP.

TYP.

TYP.

TYP.

AREA NOT IN SCOPE OF WORK

AREA NOT IN SCOPE OF WORK

/F6 TD104i /F6 TD104i

TTUUVVWWXX

1"ø

1"ø

1"ø

1 1/2"ø

/2 "ø

1"ø

"ø

"ø

"ø

"ø

"ø

"ø

1"ø

2"ø

"ø

"ø

TYP.

TYP.

TYP.

TYP.

AREA NOT IN SCOPE OF WORK

POE

ACC

TYP.

/F2 TD104i /F2 TD104i

WALL SYMBOL LEGEND

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

PROPOSED EXTERIOR WALL.

SEE WALL SECTIONS

1 HR FIRE AND SMOKE

BARRIER

2 HR FIRE AND SMOKE

BARRIER (SHAFT)

SMOKE BARRIER PARTITION

DEMOLISHED WALL,

FIXTURE OR FURNISHING

EXISTING WALL, FIXTURE

OR FURNISHING TO REMAIN

NOT IN CONTRACT - NO

WORK SCHEDULED

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

Mat Perkins

(520) 481-8548

A

B D

EF

G

H

J

K

L

M

C

GENERAL NOTES

KEYNOTES

LINE INDICATES

PHASE 1 SCOPE AREA

B

IM

/6

-2

-1

E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e

/6 -2

-7

.M

P L S

.P O

L Y

T R

A U

M A

.M E

P .B

.L

.r v t

/3

/2

:3

:0

P

M As indicated

04/03/2023 K. Luke K.Hutchinson

618-22-100

1390 - TD104i

TELECOMMUNICATION DEMO PLANS -

FOURTH LEVEL INTERSTITIAL - AREA 4H&4K

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATE FOR EXPANDED

POLYTRAUMA PROGRAM - PHASE 1

ISSUED FOR BIDDING

SCALE: 1/8" = 1'-0"

F2

TELECOMMUNICATION DEMO PLAN -

FOURTH LEVEL INTERSTITIAL - AREA

H

SCALE: 1/8" = 1'-0"

F6

TELECOMMUNICATION DEMO PLAN -

FOURTH LEVEL INTERSTITIAL - AREA

K

1. EXISTING TELECOMMUNICATIONS RACEWAY, SEE T-603 FOR

ADDITIONAL INFORMATION.

2. DUCTBANK TELECOMMUNICATIONS RACEWAY DROP TO

TELECOM ROOM, SEE T-603 FOR ADDITIONAL INFORMATION.

3. WALLS SHOWN ON PLAN ARE FROM FOURTH LEVEL BELOW FOR

REFERENCE ONLY. SEE A-104 FOR ADDITIONAL INFORMATION.

4. EXISTING SECURITY CONDUIT TO REMAIN, PROTECT IN PLACE.

5. EXISTING SECURITY HEAD-END EQUIPMENT TO REMAIN,

PROTECT IN PLACE.

A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,

FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.

B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL

OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL

NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &

NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.

C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.

CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END

WARRANTEED SOLUTION FOR THE CABLING.

D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.

E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR

EXCEED CATEGORY 6A STANDARDS.

F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.

G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN

WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.

UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR

PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A

MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR

TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE

TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF

EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE

TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL

PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE

EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE

REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH

EXISTING CONDUIT CAPACITY.

H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO

PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE

OR JUNCTION BOX.

I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.

J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW

EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE

TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.

K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING

BACK TO THE RACK.

L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL

STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL

INFORMATION

M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL

TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE

DOCUMENTS. HANG ON THE WALL WITHIN THE TELECOM ROOM.

N. REFER TO R-900 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING

CONDITIONS.

NOTE: NOT ALL KEYNOTES ARE

USED ON EACH SHEET

C R

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

J J

J

J

J

J

D

D D

D

D

D

CR

E S

DC

RX

CR

E S

RX

DC

C R

D C

R X

ES

D

D

D

D

DD

D D D

D

J

J J

J

J

CR

J

J

J

J

J

J

J

D

D

D

D

CR

RX

DC

RX

DC

D

CR

E S

C R

ES

D C

R X

CRDC

RX

E S

E S

TTUUVVWWXX

SW8

4K-128

4K-123A

4K-123

4K-122

4K-120

4K-119

4K-119A

4K-120A

4K-122A

4K-150

4K-151

4K-116

4K-118

4K-117

4K-116D

4K-116A

4K-116C

4K-116B

C4-132

4K-115

4K-115A

4K-156

4K-114

4K-114A

4K-113A

4K-113

4K-112

4K-155

4K-112A

4K-110A

4K-110

4K-154

4K-108

4K-108A

4K-105A

4K-105

4K-103

4K-153

4K-103A

4H-113

4K-101

4K-152

C4-127C4-135

4K-149

4H-110

4H-111

4K-102

4K-127

4K-104

4K-106

4K-107

4K-109

4K-121

4K-126

4K-111

C4-131

C4-131-CAM

C4-135-CAM C4-127-CAM

TYP.

POE

ACC

TYP.

TYP.

TYP.

TYP.

TYP.

/F2 TY104 /F2 TY104

4K-127-CAM

4K-129-CAM

4K-125

4K-124B

4K-124A

C4-132-CAM

AREA NOT IN SCOPE OF WORK

TTUUVVWWXXYY

4H-100 C4-114

4H-104A

4H-101

4H-103

4H-105 4H-104

4H-102

C4-115

4H-115

4H-108A

4H-107A

4H-107

4H-114

C4-126

4H-108

C4-137

4H-109

4H-110

4H-111

4K-128

4K-101

4H-113

4K-103A

4K-103

C4-127

4K-127

4K-102

SW8

C4-115-CAM

C4-114-CAM-1

C4-137-CAM-1

4H-106

4H-122

4H-121

H

-1 -C

A M

-0

/F6 TY104 /F6 TY104

4H-106-CAM

4H-115-CAM

C4-137-CAM-2

C4-137-CAM-3

C4-114-CAM-2

4H-112

AREA NOT IN SCOPE OF WORK

AREA NOT IN SCOPE OF WORK

WALL SYMBOL LEGEND

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

PROPOSED EXTERIOR WALL.

SEE WALL SECTIONS

1 HR FIRE AND SMOKE

BARRIER

2 HR FIRE AND SMOKE

BARRIER (SHAFT)

SMOKE BARRIER PARTITION

DEMOLISHED WALL,

FIXTURE OR FURNISHING

EXISTING WALL, FIXTURE

OR FURNISHING TO REMAIN

NOT IN CONTRACT - NO

WORK SCHEDULED

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

DrawingNumber

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLAN

A/E:

TRIPLE C - The A/E Group

Mat Perkins

(520) 481-8548

A

B D

EF

G

H

J

K

L

M

C

GENERAL NOTES

KEYNOTES

LINE INDICATES

PHASE 1 SCOPE AREA

B

IM

/6

-2

-1

E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e

/6 -2

-7

.M

P L S

.P O

L Y

T R

A U

M A

.M E

P .B

.L

.r v t

/3

/2

:3

:1

P

M As indicated

04/03/2023 K. Luke N. Wicklund

618-22-100

1390 - TY104

SECURITY PLANS - FOURTH LEVEL - AREA

4H&4K

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATE FOR EXPANDED

POLYTRAUMA PROGRAM - PHASE 1

ISSUED FOR BIDDING

SCALE: 1/8" = 1'-0"

F6

SECURITY PLAN - FOURTH LEVEL -

AREA 4K

SCALE: 1/8" = 1'-0"

F2

SECURITY PLAN - FOURTH LEVEL -

AREA 4H

1. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12

COMPLIANT, CARD READER WITH PINPAD CARD, PIV READY.

2. PROVIDE DURESS ALARM AND NEW FACEPLATE, CABLE, AND

CONDUIT FOR DEDICATED DURESS OUTLET. COORDINATE

BUTTON LOCATION WITH OWNER.

3. PROVIDE NEW IP ADDRESSABLE NETWORK CAMERA, POE+, PTZ,

MOTION SENSOR, AUTO TRACKING, DOME MOUNT. BASIS OF

DESIGN AXIS BOD. INTEGRATE WITH EXISTING VIDEO

MANAGEMENT SYSTEM.

4. PROVIDE NEW IP ADDRESSABLE CEILING MOUNTED TELESITTER,

POE+. BASIS OF DESIGN AVASURE AVA-R-0203.

5. PROVIDE NEW CABLE CONNECTION TO NEW DURESS OUTLET

FROM EXISTING JUNCTION BOX.

6. EXISTING SECURITY CONDUIT IN THE ABOVE INTERSTITIAL LEVEL

TO REMAIN IN PLACE.

7. EXISTING ACCESS CONTROL DEVICES AND CARD READER TO

REMAIN PROTECTED IN PLACE.

8. EXISTING CAMERA TO REMAIN PROTECTED IN PLACE.

9. SECURITY CAMERA IS SET TO ONLY ACTIVATE WHEN DURESS

BUTTON IS PRESSED.

A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,

FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.

B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL

OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL

NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &

NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.

C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.

CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END

WARRANTEED SOLUTION FOR THE CABLING.

D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.

E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR

EXCEED CATEGORY 6A STANDARDS.

F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.

G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN

WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.

UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR

PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A

MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR

TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE

TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF

EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE

TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL

PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE

EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE

REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH

EXISTING CONDUIT CAPACITY.

H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO

PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE

OR JUNCTION BOX.

I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.

J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW

EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE

TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.

K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING

BACK TO THE RACK.

L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL

STANDARDS AND REQUIREMENTS, SEE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .