Attachment D.3 - 3_618-22-100_MPLS_PT_IFB_INTERIORS_230404.pdf

PDF 7 MB Posted

Attached to
618-22-100 Renovate for Expanded Polytrauma Phase 1
Solicitation number
36C26323R0058_1
Issued by

About this file

This solicitation is for project 618-22-100 to renovate and expand polytrauma care facilities at the Minneapolis VA Health Care System in Phase 1. Work includes general construction, electrical, plumbing and other trades as required. The project magnitude is estimated between $10-20 million. The solicitation is set aside for service-disabled veteran-owned small businesses, which must be verified in VetCert to be considered. The NAICS code is 236220 and small business size standard is $45 million. All applicable taxes shall be included in pricing.

View the file

Other files

File Type Posted
36C26323R0058 0001.pdf PDF
See Attached document - Attachment 1 Questions and Answers Request 7.12.2023.doc DOC document
See Attached document - Attachment 5 618-22-100 Prebid Sign-in Roster.pdf PDF
See Attached document - Attachment 2 MPLS Expand Polytrauma Program - Pre Bid Walk Through.pdf PDF
See Attached document - Attachment 7 Polytrauma Structural Coordination.pdf PDF
See Attached document - Attachment 6 618-21-700.MPLS.POLYTRAUMA.PG104i.pdf PDF
See Attached document - Attachment 4 Polytrauma Addendum Summary.docx DOCX document
See Attached document - Attachment 3 Site Visit Agenda Poly Trauma Agenda June 26 2023.docx DOCX document
Attachment D.5 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Attachment C Specifications Polytrauma 1477 pages.pdf PDF
Attachment D.7-6_618-22-100_MPLS_PT_IFB_PLUMB_230404.pdf PDF
Attachment D.9 - 8_618-22-100_MPLS_PT_IFB_MECH_230404.pdf PDF
Attachment A - Final SOW-618-22-100 - REV4 4.18 (6 pages).pdf PDF
Attachment D.11 - 10_618-22-100_MPLS_PT_IFB_ELEC_230404.pdf PDF
Attachment I VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance (2 Pages).pdf PDF
Attachment F - VA6500 Appendix C and Appendix D.pdf PDF
Attachment H Questions Request Form (1 page).doc DOC document
Attachment K Combined Single Source Justifications_Redacted.pdf PDF
Attachment D.1 - 618-22-100_MPLS_PT_IFB_GENERAL_230404.pdf PDF
Attachment E - 618-22-100_MPLS_PT_TripleC-CA-SubmittalLOG.xlsx XLSX spreadsheet
Attachment D.2 - 2_618-22-100_MPLS_PT_IFB_ARCH_230404.pdf PDF
Attachment J Wage Determination MN20230117 05.19.2023.pdf PDF
Attachment D.12 - 11_618-22-100_MPLS_PT_IFB_TELECOM_230404.pdf PDF
Attachment B Price Schedule Breakdown (1 Page).pdf PDF
Attachment F - VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D (6 pages).pdf PDF
Attachment D.4 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404 (2).pdf PDF
Attachment D.1 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Attachment D.1 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404 (1).pdf PDF
Attachment D.6 -5_618-22-100_MPLS_PT_IFB_FIRE_230404.pdf PDF
Attachment G - Past Performance Questionnaire (3 Pages).docx DOCX document
36C26323R0058 1.pdf PDF
Attachment F - VA6500 Appendix C 1-2-3a-6a-7a-7d-9 and Appendix D.pdf PDF
Attachment D.10 - 9_618-22-100_MPLS_PT_IFB_MECH_230404.pdf PDF
Attachment D.8 - 7_618-22-100_MPLS_PT_IFB_PLUMB_230404.pdf PDF
Attachment D.4 - 4_618-22-100_MPLS_PT_IFB_EQUIP_230404.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. LETTERFORMS SHALL BE HELVETICA, PER VA ADMINISTRATION STANDARDS. UPPER AND LOWER CASE SHALL BE USED ON ALL DIRECTIONAL TRAFFIC AND PEDESTRIAN SIGNS, UNLESS NOTED. HELVETICA CONDENSED MEDIUM FOR ALL OVERHEAD SIGNS.

PROPOSED AND REFURBISHED SITE SIGNAGE SHALL MATCH EXISTING SIGN PROGRAM, INCLUDING FONT, GRAPHICS, CONSTRUCTION, DETAILING, MATERIALS AND COLORS.

2. SIGN CONTRACTOR SHALL REVIEW SIGN LOCATIONS PRIOR TO INSTALLATION WITH ENGINEER TO COORDINATE WITH LIGHTING

SYSTEM, SIGN AND LIGHT LOCATIONS PER SPECIFICATIONS.

3. SIGNS SHALL BE MOUNTED LEVEL AND PLUMB, UNLESS NOTED.

4. WHERE TWO (2) SIGNS ARE MOUNTED BACK-TO-BACK, SMALLEST L DIMENSION SHALL INCREASE TO MATCH LARGEST L DIMENSION.

5. MAXIMUM BOLT INSERT EMBEDMENT LENGTH 1-1/4" INTO CONCRETE STRUCTURE, UNLESS NOTED.

6. DO NOT SCALE DRAWINGS.

7. REFLECTIVE GRAPHICS AND COPY COLORS ARE 3M. ALL NON-REFLECTIVE COLORS ARE PANTONE OR EQUAL TO SHERWIN WILLIAMS.

8. SEE DEPARTMENT OF VETERANS AFFAIRS SIGNAGE DESIGN GUIDE, PG-18-12 FOR ADDITIONAL INFORMATION INCLUDING SIGN TYPE, SIZE, COLORS AND MOUNTING DETAILS NOTED IN SCHEDULE.

9. HANG SIGN FROM OUTSIDE FACE OF BEAM.

10. HEIGHT OF SIGNS AS INDICATED IS TO BOTTOM OF THE SIGN.

11. COORDINATE BLIND AND NON-AMBULATORY PEDESTRIAN SIGNAGE AND TACTILE SURFACING REQUIREMENTS WITH CAMPUS

STANDARDS AND PG-18-12.

12. DIRECTIONAL SIGNAGE: ARROW DIRECTION AND PLACEMENT IS DEPENDENT ON FINAL SIGN LOCATIONS. ALL SIGN ARROW

ORIENTATION IS TO BE COORDINATED WITH ARCHITECT AND OWNER PRIOR TO FABRICATION.

13. VA LOGO: CONTRACTOR SHALL OBTAIN DIGITAL FILE OF CURRENT VA LOGO FROM VA STAFF PRIOR TO FABRICATION OF ANY SIGNS

INCORPORATING THE VA LOGO.

14. ANY EXISTING SIGNS NOT SHOWN ON PLAN ARE "EXISTING TO REMAIN". IN THE CASE WHEN AN EXISTING SIGN IS IN CONFLICT WITH

FINAL PROJECT BUILDINGS OR SITE ELEMENTS, CONTRACTOR SHALL SALVAGE SIGNAGE FOR OWNER. IN THE CASE WHEN CONSTRUCTION ACTIVITIES CONFLICT WITH AN EXISTING SIGN LOCATION, THE SIGN SHALL BE REMOVED, PUT INTO STORAGE, REFURBISHED AND PLACED BACK IN ITS ORIGINAL LOCATION PRIOR TO COMPLETION OF THE PROJECT. INCLUDE THIS SCOPE OF WORK

WITHIN THE BID PRICE.

15. FOR EXISTING SIGNS THAT ARE SCHEDULED WITH PROPOSED MESSAGES, REMOVE THE ENTIRE EXISTING MESSAGE, THOROUGHLY CLEAN THE PANEL AND INSTALL THE NEW MESSAGE. IF SHADOWING OF ANY KIND REMAINS AFTER PANEL IS CLEANED, THEN PANEL

MUST BE REMOVED AND REFINISHED PRIOR TO NEW MESSAGE INSTALLATION.

16. FOR EXISTING SIGNS THAT HAVE NO PROPOSED MESSAGE IN THE SCHEDULE, THE EXISTING MESSAGE SHALL REMAIN UNCHANGED, U.N.O.

17. MESSAGES INDICATED IN SCHEDULE WITH UNDERLINED TEXT REPRESENT LINES SEPARATING TEXT.

18. DESIGN INTENT IS THAT TEXT IS ORIENTED AS INDICATED IN PROPOSED MESSAGE COLUMN OF THE SIGN SCHEDULE. ORIENTATION OF

MESSAGE SHALL BE CONSISTENT WITH EXISTING SITE SIGNS. FINAL LAYOUT COORDINATION TO BE PERFORMED WITH ARCHITECT

DURING THE SHOP DRAWING PROCESS.

19. DESIGN INTENT IS THAT SIZE OF LETTERING AND GRAPHICS ARE TO MATCH THAT OF THE MESSAGE BEING REPLACED.

20. ALL SIGNS REQUIRING PANEL REFURBISHMENT SHALL ALSO HAVE "VA" LOGO REPLACED.

21. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL SIGNS FOR THIS PROJECT. QUANTITIES INDICATED IN SCHEDULES DO NOT REFLECT

TOTAL QUANTITIES IN PROJECT. REFERENCE ALL DRAWINGS AND SPECIFICATIONS TO UNDERSTAND ENTIRE SIGNAGE SCOPE.

22. TEXT SIZE ON SIGNAGE TO BE MODIFIED TO ACCOMMODATE VERBIAGE FITTING WITHIN SIGN LIMITS.

23. MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN ARE ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES AND PATTERNS

AS THE BASIS OF THE DESIGN. PRODUCTS OF AUTHORIZED EQUAL MANUFACTURER'S EQUIVALENT TO COLORS, FINISHES, TEXTURES AND PATTERNS OF MANUFACTURERS LISTED THAT MEET REQUIREMENTS OF DRAWINGS AND TECHNICAL SPECIFICATIONS IN EVERY RESPECT MAY BE ACCEPTABLE WITH SUBMITTAL OF A COMPLETED SUBSTITUTION REQUEST CONTAINING ALL PRODUCT DATA, TESTING AND ACTUAL SAMPLES AND UPON APPROVAL IN WRITING BY CONTRACTING OFFICER.

SIGNAGE GENERAL NOTES

VA INTERIOR

DESIGNER TO

REVIEW AND

APPROVE ALL SIGN

NOTATIONS PRIOR

TO INSTALLATION.

INTERIOR SIGNAGE

TO BE PROCURED &

INSTALLED BY THE

CONTRACTOR.

SIGN SYMBOL LEGEND

PRIMARY SIGN

SECONDARY SIGN

SAFETY SIGN

RESTROOM - ALL

DIRECTIONAL SIGN

UTILITY SIGN

REFERENCES

VA SIGNAGE DESIGN MANUAL

SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE

SPECIFICATIONS

https://www.cfm.va.gov/til/spclRqmts.asp#SIGN

9"

W A

L L

G

C

/2

9 1/2"

A

D

C

F

B

9"

9"

/2

9 1/2"

E

D

A

C

B

5"

/4

A

C

B

G

DV205 Struck Kelp

/4

1'-0 1/4"

A

B

E

D

/4

1'-0 1/4"

A

B

E

D

2'-10"

A on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

Drawing Number

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLANA/E:

TRIPLE C - The A/E Group

Mat Perkins

(520) 481-8548

A

B D

E F

G

H

J

K

L

M

C

LINE INDICATES

PHASE 1 SCOPE AREA

STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL

VERIFY ACTUAL CONDITIONS ON-SITE.

410 Grand Ave, Suite 201C Laramie, WY 82070

As indicated

B

IM

/6

-2

-1

E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e

/6 -2

-1

.A

R C

H .B

.L

.P o ly tr a m a .r v t

/4

/2

:0

:4

P

M

04/03/2023 M.PERKINS K.MACAULAY

618-22-100

1390 - AW001

ARCHITECTURAL SIGNAGE ABBREVIATIONS,

SYMBOLS, GENERAL NOTES AND SCHEDULE

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATE FOR EXPANDED

POLYTRAUMA PROGRAMISSUED FOR BIDDING

3" = 1'-0" C8

IN-01.02 - FIRE EXTINGUISHER

3" = 1'-0" D8

IN-09.03 - RESTROOM SIGN

3" = 1'-0" E8

IN-13 - PERPENDICULAR FLAG MOUNT

3" = 1'-0"

E6

IN-04.03 - PRIMARY ROOM IDENTIFICATION

3" = 1'-0" D6

IN-03.01 - ROOM NUMBER IDENTIFICATION

BUILDING SIGNAGE SCHEDULE

VERSION

TYPE COUNT DESCRIPTION DETAIL LOCATION REFERENCE

ADA

BRAILLE TEXT COLOR BACKGROUND COLOR

DIMENSIONS

Comments

SIGN_

HEIGHT

SIGN_

WIDTH

MOUNTING

HEIGHT

IN-01.02 5 FIRE EQUIPMENT IDENTIFICATION SIGN C8/AW001 CORRIDORS REFER TO PAGE 8-5-5 OF INTERIOR

SIGNS DESIGN

GUIDE DATED 12/2012

YES REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 0"

IN-03.01 12 ROOM NUMBER IDENTIFICATION D6/AW001 PATIENT

BATHROOMS

REFER TO PAGE 9-4-2 OF INTERIOR

SIGNS DESIGN GUIDE DATED 12/2012

YES REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

3 1/4" 5" 5' - 0"

IN-04.03 57 PRIMARY ROOM IDENTIFICATION WITH INSERT E6/AW001 PUBLIC SPACES REFER TO PAGE 9-5-7 OF INTERIOR

SIGNS DESIGN GUIDE DATED 12/2012

REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

10 1/2" 9 1/2" 5' - 0"

IN-09.03 4 RESTROOM SIGN D8/AW001 UNISEX

RESTROOMS

REFER TO PAGE 9-4-3 OF INTERIOR

SIGNS DESIGN GUIDE DATED 12/2012

YES REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

11 1/2" 9 1/2" 5' - 0"

IN-13 12 PERPENDICULAR (FLAG) MOUNT ROOM IDENTIFICATION E8 /AW001 PUBLIC SPACES REFER TO PAGE 9-4-2 OF INTERIOR

SIGNS DESIGN GUIDE DATED 12/2012

NO REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 7' - 0"

IN-14.06 1 WALL DIRECTIONAL SIGN WITH INSERT E4/AW001 WARD ENTRY REFER TO PAGE 9-4-4 OF INTERIOR

SIGNS DESIGN

GUIDE DATED 12/2012

NO REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

1' - 10 1/4"

1' - 0 1/4"

5' - 0"

IN-53.57 3 CEILING MOUNTED DIRECTIONAL SIGN D2/AW001 CORRIDORS REFER TO PAGE 9-4-6 OF INTERIOR

SIGNS DESIGN

GUIDE DATED 12/2012

NO REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

7" 2' - 10" 8' - 0"

Grand total: 94

3" = 1'-0" E4

IN-14.06 WALL DIRECTIONAL (DIGITAL PRINT INSERT)

3" = 1'-0"

E2

IN-01.01 EMERGENCY EXIT PLAN

3" = 1'-0" D2

IN-53.57 CEILING MOUNTED DIRECTIONAL

/03

/20

1. LETTERFORMS SHALL BE HELVETICA, PER VA ADMINISTRATION STANDARDS. UPPER AND LOWER CASE SHALL BE USED ON ALL DIRECTIONAL TRAFFIC AND PEDESTRIAN SIGNS, UNLESS NOTED. HELVETICA CONDENSED MEDIUM FOR ALL OVERHEAD SIGNS.

PROPOSED AND REFURBISHED SITE SIGNAGE SHALL MATCH EXISTING SIGN PROGRAM, INCLUDING FONT, GRAPHICS, CONSTRUCTION, DETAILING, MATERIALS AND COLORS.

2. SIGN CONTRACTOR SHALL REVIEW SIGN LOCATIONS PRIOR TO INSTALLATION WITH ENGINEER TO COORDINATE WITH LIGHTING

SYSTEM, SIGN AND LIGHT LOCATIONS PER SPECIFICATIONS.

3. SIGNS SHALL BE MOUNTED LEVEL AND PLUMB, UNLESS NOTED.

4. WHERE TWO (2) SIGNS ARE MOUNTED BACK-TO-BACK, SMALLEST L DIMENSION SHALL INCREASE TO MATCH LARGEST L DIMENSION.

5. MAXIMUM BOLT INSERT EMBEDMENT LENGTH 1-1/4" INTO CONCRETE STRUCTURE, UNLESS NOTED.

6. DO NOT SCALE DRAWINGS.

7. REFLECTIVE GRAPHICS AND COPY COLORS ARE 3M. ALL NON-REFLECTIVE COLORS ARE PANTONE OR EQUAL TO SHERWIN WILLIAMS.

8. SEE DEPARTMENT OF VETERANS AFFAIRS SIGNAGE DESIGN GUIDE, PG-18-12 FOR ADDITIONAL INFORMATION INCLUDING SIGN TYPE, SIZE, COLORS AND MOUNTING DETAILS NOTED IN SCHEDULE.

9. HANG SIGN FROM OUTSIDE FACE OF BEAM.

10. HEIGHT OF SIGNS AS INDICATED IS TO BOTTOM OF THE SIGN.

11. COORDINATE BLIND AND NON-AMBULATORY PEDESTRIAN SIGNAGE AND TACTILE SURFACING REQUIREMENTS WITH CAMPUS

STANDARDS AND PG-18-12.

12. DIRECTIONAL SIGNAGE: ARROW DIRECTION AND PLACEMENT IS DEPENDENT ON FINAL SIGN LOCATIONS. ALL SIGN ARROW

ORIENTATION IS TO BE COORDINATED WITH ARCHITECT AND OWNER PRIOR TO FABRICATION.

13. VA LOGO: CONTRACTOR SHALL OBTAIN DIGITAL FILE OF CURRENT VA LOGO FROM VA STAFF PRIOR TO FABRICATION OF ANY SIGNS

INCORPORATING THE VA LOGO.

14. ANY EXISTING SIGNS NOT SHOWN ON PLAN ARE "EXISTING TO REMAIN". IN THE CASE WHEN AN EXISTING SIGN IS IN CONFLICT WITH

FINAL PROJECT BUILDINGS OR SITE ELEMENTS, CONTRACTOR SHALL SALVAGE SIGNAGE FOR OWNER. IN THE CASE WHEN CONSTRUCTION ACTIVITIES CONFLICT WITH AN EXISTING SIGN LOCATION, THE SIGN SHALL BE REMOVED, PUT INTO STORAGE, REFURBISHED AND PLACED BACK IN ITS ORIGINAL LOCATION PRIOR TO COMPLETION OF THE PROJECT. INCLUDE THIS SCOPE OF WORK

WITHIN THE BID PRICE.

15. FOR EXISTING SIGNS THAT ARE SCHEDULED WITH PROPOSED MESSAGES, REMOVE THE ENTIRE EXISTING MESSAGE, THOROUGHLY CLEAN THE PANEL AND INSTALL THE NEW MESSAGE. IF SHADOWING OF ANY KIND REMAINS AFTER PANEL IS CLEANED, THEN PANEL

MUST BE REMOVED AND REFINISHED PRIOR TO NEW MESSAGE INSTALLATION.

16. FOR EXISTING SIGNS THAT HAVE NO PROPOSED MESSAGE IN THE SCHEDULE, THE EXISTING MESSAGE SHALL REMAIN UNCHANGED, U.N.O.

17. MESSAGES INDICATED IN SCHEDULE WITH UNDERLINED TEXT REPRESENT LINES SEPARATING TEXT.

18. DESIGN INTENT IS THAT TEXT IS ORIENTED AS INDICATED IN PROPOSED MESSAGE COLUMN OF THE SIGN SCHEDULE. ORIENTATION OF

MESSAGE SHALL BE CONSISTENT WITH EXISTING SITE SIGNS. FINAL LAYOUT COORDINATION TO BE PERFORMED WITH ARCHITECT

DURING THE SHOP DRAWING PROCESS.

19. DESIGN INTENT IS THAT SIZE OF LETTERING AND GRAPHICS ARE TO MATCH THAT OF THE MESSAGE BEING REPLACED.

20. ALL SIGNS REQUIRING PANEL REFURBISHMENT SHALL ALSO HAVE "VA" LOGO REPLACED.

21. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL SIGNS FOR THIS PROJECT. QUANTITIES INDICATED IN SCHEDULES DO NOT REFLECT

TOTAL QUANTITIES IN PROJECT. REFERENCE ALL DRAWINGS AND SPECIFICATIONS TO UNDERSTAND ENTIRE SIGNAGE SCOPE.

22. TEXT SIZE ON SIGNAGE TO BE MODIFIED TO ACCOMMODATE VERBIAGE FITTING WITHIN SIGN LIMITS.

23. MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN ARE ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES AND PATTERNS

AS THE BASIS OF THE DESIGN. PRODUCTS OF AUTHORIZED EQUAL MANUFACTURER'S EQUIVALENT TO COLORS, FINISHES, TEXTURES AND PATTERNS OF MANUFACTURERS LISTED THAT MEET REQUIREMENTS OF DRAWINGS AND TECHNICAL SPECIFICATIONS IN EVERY RESPECT MAY BE ACCEPTABLE WITH SUBMITTAL OF A COMPLETED SUBSTITUTION REQUEST CONTAINING ALL PRODUCT DATA, TESTING AND ACTUAL SAMPLES AND UPON APPROVAL IN WRITING BY CONTRACTING OFFICER.

SIGNAGE GENERAL NOTES

VA INTERIOR

DESIGNER TO

REVIEW AND

APPROVE ALL SIGN

NOTATIONS PRIOR

TO INSTALLATION.

INTERIOR SIGNAGE

TO BE PROCURED &

INSTALLED BY THE

CONTRACTOR.

SIGN SYMBOL LEGEND

PRIMARY SIGN

SECONDARY SIGN

SAFETY SIGN

RESTROOM - ALL

DIRECTIONAL SIGN

UTILITY SIGN

REFERENCES

VA SIGNAGE DESIGN MANUAL

SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE

SPECIFICATIONS

https://www.cfm.va.gov/til/spclRqmts.asp#SIGN

TTUUVVWWXXYY

88 SF

TLT

4K-103A

254 SF

BREAK RM

4H-113

128 SF

ANM + 1

4K-101

1127 SF

CORR.

C4-137

192 SF

TR

4H-114

642 SF

ELEV. LOBBY

4H-115

270 SF

ELEVATORS

E

66 SF

TLT

4H-102

65 SF

TLT

4H-101

110 SF

STAFF CORR.

4H-103

305 SF

W LOCKERS

4H-104

288 SF

M LOCKERS

4H-105

594 SF

DINING ACUTE

4H-108

113 SF

STOR.

4H-108A

699 SF

ENTRY CORR.

C4-114

241 SF

FAMILY ROOM

4H-109

131 SF

NOURISH.

4H-110

215 SF

FAMILY CONF.

4H-111

154 SF

TEAM RM

4K-102

121 SF

REC STOR

4K-127

77 SF

NURSING MOTHERS

RM

4H-104A

139 SF

MED RM

4H-107A

401 SF

CENTRAL NURSE

STATION

4H-107

150 SF

NURSE MNGR

4H-106

849 SF

VACANT (FINISH

PHASE 2)

4H-100

85 SF

CARTS

C4-126

19 SF

CARTS

4K-149

K102

H

K101

K103

K

3A

H

K127

H110

K128

8 SF

HAND WASH

4K-152

H114

H107-A

H106H

8A

H108

H101

H

H102

H

4A

H104 H105

J127-B

450 SF

BARIATRIC / SURGE

PATIENT ROOM

4K-103

IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-04.03IN-04.03

IN-04.03

IN-04.03IN-04.03

IN-04.03

IN-09.03IN-09.03

IN-04.03

IN-04.03

IN-04.03

H

64 SF

HAC

4H-112

IN-01.02

119 SF

OFFICE

4H-123

876 SF

ELEV. LOBBY

C4-115

H

5- A

H115-B

H

H121

H

2- A

IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-04.03

169 SF

STAIRWELL 8

SW8

IN-04.03

IN-01.02

FEC

FEC

FEC

IN-53.57

IN-53.57

IN-14.06

IN-04.03

MATCHLINE

SEE: F7/AW104

TTUUVVWWXX

310 SF

STORAGE

4K-116B

246 SF

THERAPIST OFFICE

4K-116C

2084 SF

THERAPY GYM

4K-116

143 SF

PRIVATE OT

4K-116A

168 SF

PRIVATE PT

4K-116D

72 SF

TLT

4K-115A

73 SF

TLT

4K-113A

73 SF

TLT

4K-114A

73 SF

TLT

4K-112A

74 SF

TLT

4K-110A

75 SF

TLT

4K-108A

71 SF

TLT

4K-105A

88 SF

TLT

4K-103A

254 SF

BREAK RM

4H-113

128 SF

ANM + 1

4K-101

241 SF

FAMILY ROOM

4H-109

594 SF

CORR.

C4-135

131 SF

NOURISH.

4H-110

215 SF

FAMILY CONF.

4H-111

703 SF

CORR.

C4-127

154 SF

TEAM RM

4K-102

121 SF

REC STOR

4K-127

76 SF

TLT

4K-123A

114 SF

SW +1

4K-104

68 SF

LSB

4K-106

88 SF

LINEN

4K-109

254 SF

STOR.

4K-121

98 SF

LAUNDRY

4K-126

59 SF

STAFF TLT

4K-107

71 SF

TLT

4K-120A

71 SF

TLT

4K-122A

306 SF

PATIENT ROOM

4K-119

71 SF

TLT

4K-119A

163 SF

NURSE STN

4K-111

104 SF

SOILED UTILITY

4K-118

89 SF

CLEAN

4K-117

741 SF

CORR.

C4-131

329 SF

PATIENT ROOM

4K-110

341 SF

PATIENT ROOM

4K-108

307 SF

PATIENT ROOM

4K-120

328 SF

PATIENT ROOM

4K-122

318 SF

PATIENT ROOM

4K-123

483 SF

REC THERAPY

4K-128

20 SF

NURSE

4K-150

20 SF

NURSE

4K-151

19 SF

NURSE

4K-155

19 SF

NURSE

4K-154

19 SF

NURSE

4K-153

19 SF

CARTS

4K-149

20 SF

NURSE

4K-156

K102

H

K101

K103

K

3A

H

K105

K

5A

K

8A

K108

K110

K

0A K

2A

K112

K113

K

3A K

4A

K114

K

6A

K116D

K

6-

AK

K

6C

K116-B

K115

K115A

252 SF

CORR.

C4-132

K104

K106

K107

K109

K111-A

K126

K127

H110

K128

K

3A

K123

K122

K

2A K

0A

K120

K119

K

9A

8 SF

HAND WASH

4K-152

307 SF

PATIENT ROOM

4K-112

314 SF

PATIENT ROOM

4K-113

316 SF

PATIENT ROOM

4K-114

388 SF

PATIENT ROOM

4K-115

352 SF

PATIENT ROOM

4K-105

450 SF

BARIATRIC / SURGE

PATIENT ROOM

4K-103

IN-03.01

IN-04.03

IN-13

IN-04.03

IN-03.01

IN-04.03

IN-13

IN-03.01

IN-04.03

IN-13

IN-03.01

IN-04.03

IN-13

IN-03.01

IN-04.03

IN-13

IN-03.01

IN-04.03

IN-13

IN-03.01

IN-04.03

IN-13

IN-03.01

IN-04.03

IN-13

IN-03.01

IN-04.03

IN-13

IN-03.01

IN-04.03

IN-13

IN-04.03

IN-13 IN-03.01

IN-04.03

IN-13 IN-03.01

IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-04.03IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-04.03

IN-09.03

IN-09.03

H

64 SF

HAC

4H-112

IN-01.02

IN-04.03

IN-04.03

IN-01.02

IN-04.03

IN-04.03

K121

K111-B

169 SF

STAIRWELL 8

SW8

57 SF

MED SUPPLY

4K-125

IN-04.03

FEC

FEC

IN-01.02

IN-53.57

FEC

IN-04.03

IN-04.03

MATCHLINE

SEE: F1/AW104

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

Drawing Number

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLANA/E:

TRIPLE C - The A/E Group

Mat Perkins

(520) 481-8548

A

B D

E F

G

H

J

K

L

M

C

LINE INDICATES

PHASE 1 SCOPE AREA

STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL

VERIFY ACTUAL CONDITIONS ON-SITE.

410 Grand Ave, Suite 201C Laramie, WY 82070

As indicated

B

IM

/6

-2

-1

E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e

/6 -2

-1

.A

R C

H .B

.L

.P o ly tr a m a .r v t

/4

/2

:1

:1

P

M

04/03/2023 M.PERKINS K.MACAULAY

618-22-100

1390 - AW104

ARCHITECTURALSIGNAGE PLAN - FOURTH

FLOOR 4H/4K

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATE FOR EXPANDED

POLYTRAUMA PROGRAMISSUED FOR BIDDING

1/8" = 1'-0" F1

ARCHITECTURAL SIGNAGE PLAN - FOURTH FLOOR 4H

1/8" = 1'-0"

F7

ARCHITECTURAL SIGNAGE PLAN - FOURTH FLOOR 4K

/03

WALL PROTECTION & MILLWORK

IN PRO*

RIVER ROCK

RUBBER WALL BASE

JOHNSONITE*

WELSH CASTLE

CG-1

HR-1

RWC-1

RB-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL

SAMPLE FOR TRUEST COLOR DEPICTION

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL

SAMPLE FOR TRUEST COLOR DEPICTION

PAINT

SHERWIN WILILAMS*

FIELD

ACCESSIBLE BEIGE 7036

EGGSHELL

*BASIS OF DESIGN

P-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL

SAMPLE FOR TRUEST COLOR DEPICTION

FLOORING

MINNEAPOLIS

P-3

P-4 P-5

P-2

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL

SAMPLE FOR TRUEST COLOR DEPICTION

LVT-1 LVT-2

MANNINGTON*

COLOR ANCHOR COLLECTION

STRIDE - COTTONTAIL C138

12"X24"

ARMSTRONG*

STYLE: ULTIMA

BEVELED TEGULAR

SIZE: 24"X24"

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL

SAMPLE FOR TRUEST COLOR DEPICTION

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL

SAMPLE FOR TRUEST COLOR DEPICTION

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

MRP KM

Project Number

Board Number

Office of Construction and

Facilities Management

RENOVATE FOR EXPANDED

POLYTRAUMA

618-22-100

Triple C A& E Group 121 Washington Ave.

Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com

1 Veterans Dr, Minneapolis, MN 55417

CORIAN*

CAMEO WHITE

S-1

WILSONART*

BRAZILWOOD

PL-1

TILE

P-6

** UNIQUE COLOR FORMULAS**

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

MRP KM

Project Number

Board Number

Office of Construction and

Facilities Management

RENOVATE FOR EXPANDED

POLYTRAUMA

618-22-100

Triple C A& E Group 121 Washington Ave.

Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com

1 Veterans Dr, Minneapolis, MN 55417

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

MRP KM

Project Number

Board Number

Office of Construction and

Facilities Management

RENOVATE FOR EXPANDED

POLYTRAUMA

618-22-100

Triple C A& E Group 121 Washington Ave.

Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com

1 Veterans Dr, Minneapolis, MN 55417

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

MRP KM

Project Number

Board Number

Office of Construction and

Facilities Management

RENOVATE FOR EXPANDED

POLYTRAUMA

618-22-100

Triple C A& E Group 121 Washington Ave.

Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com

1 Veterans Dr, Minneapolis, MN 55417

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

MRP KM

Project Number

Board Number

Office of Construction and

Facilities Management

RENOVATE FOR EXPANDED

POLYTRAUMA

618-22-100

Triple C A& E Group 121 Washington Ave.

Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com

1 Veterans Dr, Minneapolis, MN 55417

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

MRP KM

Project Number

Board Number

Office of Construction and

Facilities Management

RENOVATE FOR EXPANDED

POLYTRAUMA

618-22-100

Triple C A& E Group 121 Washington Ave.

Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com

1 Veterans Dr, Minneapolis, MN 55417

1 of 6 2 of 6

CEILINGS & WINDOWS

PT-1

CROSSVILLE*

BLUESTONE

PENNSYLVANIA BLUE

12X24

PT-2

CROSSVILLE*

PORTUGAL VENHO

VERDE- TEXTURED

12X24

TILE

PT-3

CROSSVILLE*

BLUESTONE

PENNSYLVANIA BLUE

2" X 2" MOSAIC

PT-4

VIRGINIA TILE

URBAN LIVING

RAW PEARL

2"X2" MOSAIC

PT-5

DALTILE*

KEYSTONES

URBAN PUTTY SPECKLED

2" X 2" MOSAIC

SHERWIN WILILAMS*

CEILING

GREEK VILLA 7551

FLAT

SHERWIN WILILAMS*

DOOR & WINDOW TRIM

BACKDROP 7025

DIRECT TO METAL

SHERWIN WILILAMS*

ACCENT

STEELY GREY 7664

EGGSHELL

SHERWIN WILILAMS*

ACCENT

UNUSUAL GREY 7059

EGGSHELL

SHERWIN WILILAMS*

ACCENT

ANTLER VELVET

EGGSHELL

MINNEAPOLIS MINNEAPOLIS

MINNEAPOLIS MINNEAPOLIS MINNEAPOLIS

AT-1

ARMSTRONG*

STYLE: FISSURED

SQUARE LAY IN

SIZE: 24"X48"

AT-2

ARMSTRONG*

STYLE: CLEAN ROOM VL

SQUARE LAY IN

SIZE: 24"X48"

AT-3

ARMSTRONG *

STYLE: WOODWORKS TEGULAR

ON 9/16" SUPRAFINE HD

SUSPENSION GRID (BLACK GRID)

WOOD FINISH: NATURAL

VARIATIONS MAPLE (NMP)

AT-4

RSF-1

MANNINGTON*

WELLSPRING

SHADE B303

WSF-1

MANNINGTON*

BIOSPEC MD

BEDROCK 15369

RWC-2 (COLOR)

(PATTERN)

FORMS+SURFACES*

BONDED METAL PANELS

PATTERN: DASH

BONDED ALUMINUM DARK

*BASIS OF DESIGN *BASIS OF DESIGN *BASIS OF DESIGN

*BASIS OF DESIGN

*BASIS OF DESIGN

DALTILE*

WALL SEMI-GLOSS & MATTE

ARTIC WHITE 0790

4 1/4" X 4 1/4" GLAZED

PT-6

MECHO SHADE*

THERMOVEIL

1724 TAUPE

RWS-1&2

BLACK OUT

0705 CHAMPAGNE

VALENCE:

COLONIAL WHITE

MANNINGTON*

COLOR ANCHOR COLLECTION

STRIDE - TRUFFLE C167

12"X24"

LVT-3

MANNINGTON*

COLOR ANCHOR COLLECTION

GROOVE - STONE WASH C152

12"X24"

RF-1

TARKETT*

INERTIA SPORTS

RUBBER TILE

MICROTONE HAMMERED

LUNAR EXPLORER

LVT-4

MANNINGTON*

SELECT WOODS

CHATHAM OAK

COTTAGE

5" X 48"

RWC-3

INPRO CORP

PALLADIUM BEADBOARD

RIVER ROCK

SKYFACTORY

LUMINOUS CEILING PANELS

LVT-5

MANNINGTON*

COLOR ANCHOR COLLECTION

GROOVE - GREEN TEA

12"X24"

RWS-1

RWS-2

CORIAN*

ASH CONCRETE

S-2 S-3

CORIAN*

NEUTRAL CONCRETE

RF-2

TARKETT*

INERTIA SPORTS

RUBBER TILE

MICROTONE HAMMERED

BEST SELLER

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

Drawing Number

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLANA/E:

TRIPLE C - The A/E Group

Mat Perkins

(520) 481-8548

A

B D

E F

G

H

J

K

L

M

C

LINE INDICATES

PHASE 1 SCOPE AREA

STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL

VERIFY ACTUAL CONDITIONS ON-SITE.

410 Grand Ave, Suite 201C Laramie, WY 82070

12" = 1'-0"

B

IM

/6

-2

-1

E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e

/6 -2

-1

.A

R C

H .B

.L

.P o ly tr a m a .r v t

/4

/2

:1

:1

P

M

04/03/2023 M.PERKINS K.MACAULAY

618-22-100

1390 - IN001

INTERIOR GENERAL NOTES, SYMBOLS,

ABBREVIATIONS & FINISH BOARDS

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATE FOR EXPANDED

POLYTRAUMA PROGRAMISSUED FOR BIDDING

INTERIOR FINISH NOTES

ADO Automatic Door Operator AF Access Flooring AT Acoustical Ceiling (Tile) AT (SP) (SP) Acoustical Ceiling (with Sprayed Plastic Finish)

BIM Building Information Model

C Concrete CBB Concrete Backer Board CC Cubicle Curtain and Track CG Corner Guard CHR Chair Rail CMU Concrete Masonry Units (Unit Masonry) CP Carpet (without Cushion Broadloom) CPT Carpet Tile CT Ceramic Tile

EFTR Existing Finish to Remain EPY Epoxy Flooring EX Existing EXP Exposed

GL Glass (Glazing) GWB Gypsum Wallboard Systems

HW Hardware Set (Finish or Builder’s Hardware)

LN Linoleum LVT Luxury Vinyl Tile

MAT Carpet Mat (Walk-Off Mat)

NO Number

PC Precast (Architectural Precast Concrete Pavers) P Paint (Exterior and Interior; Transparent, Semi-Transparent, and Opaque Finishes) PL Plastic Laminate PRB Profile Base PT Porcelain Tile (Floor and Base)

QT Quarry Tile

RAF Resilient Athletic Flooring RB Resilient Base (Rubber or vinyl with factory formed inside and outside corners) RES* Resinous Flooring RES-W* Resinous/Epoxy Wall/Ceiling RF Rubber Flooring RRF Raised Rubber Flooring RSF Resilient Sheet Flooring (Chemically Welded Seams) RWC Rigid Vinyl Wall Covering (Wall Protection - Roll or Sheet) RWS Window Roller Shades

S Solid Surface SC High Build Glazed Coating (Special Coating) SD Static Dissipative SP Special Faced SS Stainless Steel ST Stone (Cast) SVT Solid Vinyl Floor Tile

TC Toilet Compartments TER Terrazzo, Poured TR Tile Trim TT Terrazzo Tile (Plastic Matrix)

VT Vinyl Tile (High Content Vinyl) VWC Vinyl Wall Covering

WD Wood WFT Wall Finish Type WSF Welded Seam Sheet Flooring (Heat Welded with Rod)

ABBREVIATIONS

GENERAL FINISH NOTES:

1. REFER TO SPECIFICATIONS FOR ADDITIONAL MATERIAL AND INSTALLATION

REQUIREMENTS.

2. REFER TO SHEET IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.

3. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY,

REFER TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND

PHASING.

4. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR

CONSISTENCY.

SUBSTITUTION NOTES:

1. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR

SUBSTITUTION WILL REQUIRE APPROVAL BY THE COR.

TRANSITION NOTES:

1. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS.

2. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT

DOORWAYS, TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN

DOOR PANEL IS IN THE CLOSED POSITION.

SIGNAGE NOTES:

1. REFER TO AW SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO

SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND

SYSTEMS/EQUIPMENT LABELING REQUIREMENTS.

CASEWORK NOTES:

1. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS

SPECIFIED FOR THAT SPACE UNO.

2. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.

PAINTING NOTES:

1. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

2. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS

OR INSTALLER FINISHED ITEMS.

3. COORDINATE APPLICATIONS OF PAINTS AND ADHESIVES WITH COR.

PROVIDE SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO

ENSURE ODORS DO NOT TRANSMIT TO ADJACENT SPACES.

MISCELLANEOUS NOTES:

1. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.

2. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE

DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD

VERIFICATION AT THE TIME OF THE BIDDING BY THE CONTRACTOR.

3. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.

CODE NOTES:

1. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH

IBC TABLE 803.13

INSTALLATION NOTES:

1. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.

2. REFER TO FINISH PLANS FOR DIRECTION GRAIN OF FLOORING.

/03

PATTERN OR GRAIN DIRECTION CHANGE

MATERIAL FLOOR CHANGE

DIRECTION OF FINISH

CORNER GUARD LOCATION

CG

GRAIN

FINISH MATERIAL

ROOM FINISH TAG

INTERIOR FINISH SYMBOLS

Base Finish Floor Finish

Wall Finishes

North

South

West East

P-#

TTUUVVWWXXYY

MATCHLINE

SEE: F1/A-104 MATCHLINE

SEE: F1/A-104

88 SF

TLT

4K-103A

254 SF

BREAK RM

4H-113

128 SF

ANM + 1

4K-101

1127 SF

CORR.

C4-137

192 SF

TR

4H-114

270 SF

ELEVATORS

E

66 SF

TLT

4H-102

65 SF

TLT

4H-101

110 SF

STAFF CORR.

4H-103

305 SF

W LOCKERS

4H-104

288 SF

M LOCKERS

4H-105

594 SF

DINING ACUTE

4H-108

113 SF

STOR.

4H-108A

699 SF

ENTRY CORR.

C4-114

241 SF

FAMILY ROOM

4H-109

131 SF

NOURISH.

4H-110

215 SF

FAMILY CONF.

4H-111

703 SF

CORR.

C4-127

77 SF

NURSING MOTHERS

RM

4H-104A

139 SF

MED RM

4H-107A

401 SF

CENTRAL NURSE

STATION

4H-107

150 SF

NURSE MNGR

4H-106

849 SF

VACANT (FINISH

PHASE 2)

4H-100

85 SF

CARTS

C4-126

19 SF

CARTS

4K-149

K102

H

K101

K

3A

H

8 SF

HAND WASH

4K-152

H114

H107-A

H106

H

8A

H108

H101

H

H102

H

4A

H104 H105

J127-B

RB-1

LVT-1

RB-1

LVT-4

RB-1

LVT-2

RB-1

LVT-1

RB-1

LVT-4

RB-1

LVT-2

RB-1

LVT-1,2,3,4

RB-1

RF-1

PT-2

PT-3

PT-2

PT-3

RB-1

LVT-2

RB-1

LVT-1

RB-1

LVT-1,2,3,4

RB-1

LVT-2

RB-1

LVT-2

RB-1

LVT-1,3

RB-1

LVT-2

FINISHES ETR THIS ROOM

E4

IN501

PT-2

PT-3,4

2' -0

2' -0

"1 '-8

E4

IN501

RB-1

LVT-2

642 SF

ELEV. LOBBY

4H-115

RB-1

LVT-1,2,3,4

RB-1

LVT-1,2,3,4

876 SF

ELEV. LOBBY

C4-115

876 SF

ELEV. LOBBY

C4-115

1'-9 5/8"

H

7A

H

7- B

1' -6

64 SF

HAC

4H-112 WSF-1

WSF-1

A8

IN501

RB-1

LVT-4

PT-2

PT-3

PT-2

PT-3

FINISHES ETR THIS ROOM

WFT-9 WRAPS

COLUMN ALL

SIDES

ETR FINISHES

NEW FINISHES

RB-1

LVT-2

121 SF

REC STOR

4K-127

E6

IN501

E6

IN501

RB-1

LVT-1

119 SF

OFFICE

4H-123

RB-1

LVT-2

75 SF

TELECOM ROOM

4H-122

169 SF

STAIRWELL 8

SW8

2' -0

2'-8"

4'-0" 2'-0"

2' -0

4'

-6

2' -2

2'-0" 7'-9" 10'-0" 2'-0" 2'-0" 2'-0" 4'-0"

2' -0

1' -4

'-7

1' -4

4'

-9

3' -0

2'

-0

2' -0

5'

-7

/4

2'-0" 2'-0" 3'-11"

GRAIN

GRAIN

G R

A

IN

G R

A

IN

G R

A

IN

GRAIN

G R

A

IN

GRAIN GRAIN

GRAIN

G R

A

IN

G R

A

IN

GRAIN

GRAIN

G R

A

IN

GRAIN

GRAIN

GRAIN

GRAIN

G R

A

IN

GRAIN

G R

A

IN

G R

A

IN

GRAINGRAIN

GRAIN

GRAIN

G R

A

IN

GRAIN

GRAIN

GRAIN

GRAIN

GRAIN

GRAIN

G R

A

IN

G R

A

IN

G R

AIN

GRAIN

G R

A

IN

G R

A

IN

GRAIN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

F1

IN502

E6

IN501

E6

IN501

E6

IN501

E4

IN501

E4

IN501

E4

IN501

E4

IN501

E4

IN501

E4

IN501

E4

IN501

F5

IN502

F5

IN502

D6

IN502

D6

IN502

D6

IN502

D6

IN502

TTUUVVWWXX

310 SF

STORAGE

4K-116B

246 SF

THERAPIST OFFICE

4K-116C

2084 SF

THERAPY GYM

4K-116

143 SF

PRIVATE OT

4K-116A

168 SF

PRIVATE PT

4K-116D

72 SF

TLT

4K-115A

73 SF

TLT

4K-113A

73 SF

TLT

4K-114A

73 SF

TLT

4K-112A

74 SF

TLT

4K-110A

75 SF

TLT

4K-108A

71 SF

TLT

4K-105A

88 SF

TLT

4K-103A

254 SF

BREAK RM

4H-113

128 SF

ANM + 1

4K-101

241 SF

FAMILY ROOM

4H-109

594 SF

CORR.

C4-135

131 SF

NOURISH.

4H-110

215 SF

FAMILY CONF.

4H-111

703 SF

CORR.

C4-127

154 SF

TEAM RM

4K-102

121 SF

REC STOR

4K-127

76 SF

TLT

4K-123A

114 SF

SW +1

4K-104

68 SF

LSB

4K-106

88 SF

LINEN

4K-109

254 SF

STOR.

4K-121

98 SF

LAUNDRY

4K-126

59 SF

STAFF TLT

4K-107

71 SF

TLT

4K-120A

71 SF

TLT

4K-122A

306 SF

PATIENT ROOM

4K-119

71 SF

TLT

4K-119A

163 SF

NURSE STN

4K-111

104 SF

SOILED UTILITY

4K-118

89 SF

CLEAN

4K-117

741 SF

CORR.

C4-131

307 SF

PATIENT ROOM

4K-120

328 SF

PATIENT ROOM

4K-122

318 SF

PATIENT ROOM

4K-123

483 SF

REC THERAPY

4K-128

20 SF

NURSE

4K-150

20 SF

NURSE

4K-151

19 SF

NURSE

4K-155

19 SF

NURSE

4K-154

19 SF

NURSE

4K-153

19 SF

CARTS

4K-149

20 SF

NURSE

4K-156

K102

H

K101

K103

K

3A

H

K105

K

5A K

8A

K108

K110

K

0A K

2A

K112

K113

K

3A K

4A

K114

K

6A

K116D

K

6-

AK

K

6C

K116-B

K115

K115A

252 SF

CORR.

C4-132

K104

K106

K107

K109

K111-A

K126

K127

K128

K

3A

K123

K122

K

2A K

0A

K120

K119

K

9A

8 SF

HAND WASH

4K-152

MATCHLINE

SEE: F1/IN104

MATCHLINE

SEE: F1/IN104

RB-1

RF-1,2

RB-1

RF-1

RB-1

RF-1

RB-1

LVT-2RB-1

LVT-2

RB-1

LVT-1,4,5

RB-1

RSF-1

RB-1

LVT-1

WSF-1

WSF-1

RB-1

LVT-2

PT-2

PT-3

RB-1

LVT-2 RB-1

LVT-1

RB-1

LVT-1

RB-1

LVT-1

RB-1

LVT-1, 2, 3

RB-1

LVT-1

RB-1

LVT-4

RB-1

LVT-2

RB-1

LVT-1

RB-1

LVT-4

RB-1

LVT-2

388 SF

PATIENT ROOM

4K-115

316 SF

PATIENT ROOM

4K-114

314 SF

PATIENT ROOM

4K-113

307 SF

PATIENT ROOM

4K-112

329 SF

PATIENT ROOM

4K-110

341 SF

PATIENT ROOM

4K-108

352 SF

PATIENT ROOM

4K-105

450 SF

BARIATRIC / SURGE

PATIENT ROOM

4K-103

PT-2

PT-3

PT-2

PT-3

RB-1

LVT-1

RB-1

LVT-1

RB-1

LVT-1

1907 SF

MECHANICAL

4K-124 37 SF

TELECOM ROOM

4K-124A

319 SF

ELECTRICAL ROOM

4K-124B

RB-1

RSF-1

RB-1

RSF-1

RB-1

RSF-1

RB-1

RSF-1

RB-1

RSF-1

RB-1

RSF-1

RB-1

RSF-1

RB-1

RSF-1

K

6B

F6

IN502

A8

IN501

A8

IN501

F6

IN502

F6

IN502

A8

IN501

A8

IN501

A8

IN501

A8

IN501

A8

IN501

A8

IN501

RB-1

RSF-1

F6

IN502

F6

IN502

F6

IN502

F6

IN502

F6

IN502

E4

IN501

PT-2

PT-3,4

PT-2

PT-3,4

PT-2

PT-3,4

PT-2

PT-3,4

PT-2

PT-3,4

PT-2

PT-3,4

PT-2

PT-3,4

PT-2

PT-3,4

E4

IN501

2' -0

E4

IN501

E4

IN501

K111-B E4

IN501

K121

E4

IN501

E4

IN501

2' -0

"1 '-8

2'-0" 9'-1" 2'-0" 7'-3"

RB-1

LVT-1

K

E4

IN501

F6

IN502

F6

IN502

F6

IN502

F6

IN502

E4

IN501

E6

IN501

E6

IN501

E4

IN501

E6

IN501

A8

IN501

A8

IN501

A8

IN501

A8

IN501

RB-1

RSF-1

RB-1

RSF-1

RB-1

LVT-2

64 SF

HAC

4H-112 WSF-1

WSF-1

9' -0

3'

-0

121 SF

REC STOR

4K-127

A-406

C6

57 SF

MED SUPPLY

4K-125 RB-1

LVT-2

169 SF

STAIRWELL 8

SW8

163 SF

STAIRWELL 7

SW7

6"

1'-5"

1' -5

1'-5"

5°

135°

1' -5

2' -0

2'-8"

IN104

B4

GRAIN GRAIN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

GRAIN

GRAIN

GRAIN

GRAIN

GRAIN

GRAIN

GRAIN

GRAIN

GRAIN

GRAIN

GRAIN

GRAIN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

GRAIN

G R

A

IN

G R

A

IN

G R

A

IN

GRAIN

GRAIN

G R

A

IN

G R

A

IN

G R

A

IN

GRAIN

G R

A

IN

GRAIN GRAIN

GRAIN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

G R

A

IN

GRAIN GRAIN

G R

A

IN

G R

A

IN

/2

/2

/2

1'-10 1/2"

3"

1'-10 1/2"

7'-9 3/4"

/2

/2

/4

16'-2 1/4"

C10

GI200

'-2

/8

24'-2 1/8" 8" 4' -6

6"

4' -6

6"

4' -6

6"

4' -6

6"

4' -6

6"

4' -6

6"

4' -6

6"

4' -6

6"

4' -6

ALIGN

8"

A-401

F1

F1

IN502

F1

IN502

F1

IN502

F5

IN502

F5

IN502

F5

IN502

LVT - 1

LVT - 2

FLOOR FINISH LEGEND

PT-4

RF-1

PT-3 RSF-1

WSF-1LVT - 3

LVT - 4

LVT-5 RF-2

5' -4

1'-6"

RSF-1

LVT-1

LVT-5

LVT-1

A8

IN501

GRAIN

G R

A

IN

G R

A

IN

MATERIAL TRANSITION

TO OCCUR IN THE

CENTERLINE OF DOOR

OPENING

on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

Drawing Number

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLANA/E:

TRIPLE C - The A/E Group

Mat Perkins

(520) 481-8548

A

B D

E F

G

H

J

K

L

M

C

LINE INDICATES

PHASE 1 SCOPE AREA

STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL

VERIFY ACTUAL CONDITIONS ON-SITE.

410 Grand Ave, Suite 201C Laramie, WY 82070

As indicated

B

IM

/6

-2

-1

E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e

/6 -2

-1

.A

R C

H .B

.L

.P o ly tr a m a .r v t

/4

/2

:1

:3

P

M

04/03/2023 M.PERKINS K.MACAULAY

618-22-100

1390 - IN104

INTERIOR FLOOR FINISH PLAN - FOURTH

FLOOR 4H/4K

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATE FOR EXPANDED

POLYTRAUMA PROGRAMISSUED FOR BIDDING

INTERIOR SHEET NOTES

A. REFER TO IN001 FOR INTERIOR FINISH GENERAL NOTES

B. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.

C. REFER TO IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.

D. REFER TO A-400 SERIES FOR CASEWORK FINISHES.

E. REFER TO IF SERIES FOR FURNITURE; FURNITURE IS SHOWN FOR REFERENCE

ONLY, ALL FURNITURE IS NIC.

F. REFER TO AW SERIES FOR ALL SIGNAGE.

G. REFER TO Q SERIES FOR EQUIPMENT INFORMATION.

H. PAINT ALL WALLS (P-1) UNO.

I. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL

BOARD CEILINGS (P-2) UNO.

J. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT

BOUNDARY (P-3) UNO.

K. PLANS HAVE BEEN SCREENED BACK FOR CLARITY, REFER TO ARCHITECTURE

SERIES FOR WALL CONSTRUCTION INFORMATION

FINISH ABBREVIATIONS

ABBREVIATION FINISH TYPE - REFER TO IN601 FOR ADDITIONAL FINISH INFORMATION

AT ACOUSTICAL CEILING TILE

CC CUBICLE CURTAIN TRACK

CG CORNER GUARD

CHR CHAIR RAIL

HR HAND RAIL

LVT LUXURY VINYL TILE

P PAINT

PL PLASTIC LAMINATE

PT PORCELAIN TILE

RB RESILIENT BASE

RF RESILIENT ATHLETIC FLOORING

RSF RESILIENT SHEET VINYL

RSW ROLLER SHADES

RWC RIGID WALL COVERING

S SOLID SURFACE

TR TRIM

WD WOOD DOOR FINISH

WFT WALL FINISH TYPE

WSF WELDED SEAM SHEET

KEYNOTES-

1/8" = 1'-0" F1

INTERIOR FINISH FLOOR PLAN - FOURTH FLOOR 4H

1/8" = 1'-0"

F7

INTERIOR FINISH FLOOR PLAN - FOURTH FLOOR 4K

FLOOR MATERIAL TAKEOFF

Mark Material: Area

LVT-1 6979 SF

LVT-2 2572 SF

LVT-3 495 SF

LVT-4 796 SF

LVT-5 96 SF

PT-3 1919 SF

PT-5 22 SF

RF-1 2951 SF

RF-2 303 SF

RSF-1 4095 SF

WSF-1 171 SF

20399 SF

1/2" = 1'-0" B4

TYPICAL PATIENT ROOM ENTRY

/03

TTUUVVWWXX

310 SF

STORAGE

4K-116B

246 SF

THERAPIST OFFICE

4K-116C

2084 SF

THERAPY GYM

4K-116

143 SF

PRIVATE OT

4K-116A

168 SF

PRIVATE PT

4K-116D

72 SF

TLT

4K-115A

73 SF

TLT

4K-113A

73 SF

TLT

4K-114A

73 SF

TLT

4K-112A

74 SF

TLT

4K-110A

75 SF

TLT

4K-108A

71 SF

TLT

4K-105A

88 SF

TLT

4K-103A

254 SF

BREAK RM

4H-113

128 SF

ANM + 1

4K-101

241 SF

FAMILY ROOM

4H-109

594 SF

CORR.

C4-135

131 SF

NOURISH.

4H-110

215 SF

FAMILY CONF.

4H-111

703 SF

CORR.

C4-127

154 SF

TEAM RM

4K-102

121 SF

REC STOR

4K-127

76 SF

TLT

4K-123A

114 SF

SW +1

4K-104

68 SF

LSB

4K-106

88 SF

LINEN

4K-109

254 SF

STOR.

4K-121

98 SF

LAUNDRY

4K-126

59 SF

STAFF TLT

4K-107

71 SF

TLT

4K-120A

71 SF

TLT

4K-122A

306 SF

PATIENT ROOM

4K-119

71 SF

TLT

4K-119A

163 SF

NURSE STN

4K-111

104 SF

SOILED UTILITY

4K-118

89 SF

CLEAN

4K-117

741 SF

CORR.

C4-131

307 SF

PATIENT ROOM

4K-120

328 SF

PATIENT ROOM

4K-122

318 SF

PATIENT ROOM

4K-123

483 SF

REC THERAPY

4K-128

20 SF

NURSE

4K-150

20 SF

NURSE

4K-151

19 SF

NURSE

4K-155

19 SF

NURSE

4K-154

19 SF

NURSE

4K-153

19 SF

CARTS

4K-149

20 SF

NURSE

4K-156

K102

H

K101

K103

K

3A

H

K105

K

5A K

8A

K108

K110

K

0A K

2A

K112

K113

K

3A K

4A

K114

K

6A

K116D

K

6-

AK

K

6C

K116-B

K115

K115A

252 SF

CORR.

C4-132

K104

K106

K107

K109

K111-A

K126

K127

H110

K128

K

3A

K123

K122

K

2A

K

0A

K120

K119

K

9A

8 SF

HAND WASH

4K-152

MATCHLINE

SEE: F1/IN104

MATCHLINE

SEE: F1/IN104

P-5, WFT-3,4

RB-1

P-1, 5 P-4

P-1

P-1

RB-1

P-5 P-1

P-1

P-1

RB-1

P-5 P-1

P-1

WFT-3

RB-1

WFT-3

WFT-3

WFT-3

P-1

RB-1

P-1 P-5

P-1

P-4

RB-1

P-1 P-1

P-1, 4

P-1

RB-1

P-1 P-1

P-1WFT-7

WSF-1

WFT-7

WFT-7

WFT-7

P-4

RB-1

P-1 N/A

P-1

WFT-1

PT-2

WFT-1

WFT-1

WFT-1

WFT-3

RB-1

WFT-3

WFT-3

WFT-3

P-1

RB-1

P-1 P-1

P-1

P-1

RB-1

P-1 P-1

P-4

P-1

RB-1

P-1 P-1

P-5

P-6

RB-1

P-1 P-1

P-1

P-1

RB-1

P-1 P-1

P-1

P-1

RB-1

P-1 P-5

P-1

P-1

RB-1

P-1 P-1

P-1

P-1

RB-1

P-4 P-1

P-1

WFT-9

RB-1

WFT-9

WFT-9

WFT-9

P-1

RB-1

P-1 P-5

P-1

329 SF

PATIENT ROOM

4K-110

341 SF

PATIENT ROOM

4K-108

WFT-1

PT-2

WFT-1

WFT-1

WFT-1

WFT-1

PT-2

WFT-1

WFT-1,8

WFT-1

WFT-6

RB-1

WFT-6

WFT-6

N/A

WFT-6

RB-1

WFT-5/6

WFT-6

N/A

WFT-6

RB-1

WFT-6

WFT-6

N/A

1907 SF

MECHANICAL

4K-124 37 SF

TELECOM ROOM

4K-124A

319 SF

ELECTRICAL ROOM

4K-124B

P-4

RB-1

P-1 P-1

P-1,4

P-1

RB-1

P-1 P-4

P-1,4

P-4

RB-1

P-1 P-1

P-1,4

P-1

RB-1

P-1 P-4

P-1,4

P-4

RB-1

P-1 P-1

P-1,4

P-1

RB-1

P-1,4 P-4

P-1

P-4

RB-1

P-1,4 P-1

P-1

P-1

RB-1

P-1,4 P-4

P-1

K

6B

P-1

RB-1

P-1 P-4

P-1,4

WFT-1,2

PT-2

WFT-1,2

WFT-1,2

WFT-1,8

WFT-1,2

PT-2

WFT-1,8

WFT-1,2

WFT-1,2

WFT-1,2

PT-2

WFT-1,8

WFT-1,2

WFT-1,2

WFT-1,2

PT-2

WFT-1,8

WFT-1,2

WFT-1,2

WFT-1,2

PT-2

WFT-1,8

WFT-1,2

WFT-1,2

WFT-1,2

PT-2

WFT-1,8

WFT-1,2

WFT-1,2

WFT-1,2

PT-2

WFT-1,8

WFT-1,2

WFT-1,2

WFT-1,8

PT-2

WFT-1,2

WFT-1,2

WFT-1,2

K111-B

K121

WFT-6

RB-1

NA

WFT-6

WFT-6

K

P-4

RB-1

P-1,4 P-1

P-1

P-4

RB-1

P-1,4 P-1

P-1

WFT-3

RB-1

WFT-3, 4

WFT-3

WFT-3

P-1

RB-1

P-1 P-1

P-1

WFT-8

W F

T -8

W F

T -8

W F

T -8

W F

T -8

W F

T -8

WFT-6

RB-1

WFT-6

WFT-6

NA

WFT-4

RB-1

WFT-4

WFT-4

N/A

W F

T -8

W F

T -8

W F

T -8

W F

T -8

WFT-1,2

PT-2

WFT-1,2

WFT-1,2

WFT-1,8

WFT-1,2

PT-2

WFT-1,2

WFT-1,2

WFT-1,8

WFT-1,2

PT-2

WFT-1,2

WFT-1,2

WFT-1,8

WFT-1,2

PT-2

WFT-1,2

WFT-1,2

WFT-1,8

W F

T -6

W F

T -5

W F

T -6

W F

T -5

W F

T -6

W F

T -6

W F

T -5

W F

T -6

W F

T -6

W F

T -5

W F

T -6

W F

T -5

W F

T -5

W F

T -5

WFT-5WFT-6WFT-5

W F

T -6

W F

T -6

WFT-3

W F

T -5

W F

T -5

W F

T -5

W F

T -6

W F

T -6

W F

T -5

W F

T -5

W F

T -6

W F

T -6

WFT-5 WFT-5

W F

T -6

W F

T -5

W F

T -5

W F

T -5

W F

T -5

W F

T -5

WFT-3

WFT-5

W F

T -5

W F

T -6

WFT-7

WSF-1

WFT-7

WFT-7

WFT-7

WFT-6

57 SF

MED SUPPLY

4K-125

57 SF

MED SUPPLY

4K-125

P-1

RB-1

P-1 P-1

P-1

WFT-4

A-405

C7

A-404

F6

A-403

C4

A-404

D7

A-404

E7

A-404

B7

A-403

C7

A-406

F7

A-406

C6

A-402

F7

64 SF

HAC

4H-112

4'-2" 008

W F

T -8

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

307 SF

PATIENT ROOM

4K-112

314 SF

PATIENT ROOM

4K-113

316 SF

PATIENT ROOM

4K-114

388 SF

PATIENT ROOM

4K-115

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

P-4

TTUUVVWWXXYY

MATCHLINE

SEE: F7/A-104

88 SF

TLT

4K-103A

254 SF

BREAK RM

4H-113

128 SF

ANM + 1

4K-101

1127 SF

CORR.

C4-137

192 SF

TR

4H-114

270 SF

ELEVATORS

E

66 SF

TLT

4H-102

65 SF

TLT

4H-101

110 SF

STAFF CORR.

4H-103

305 SF

W LOCKERS

4H-104

288 SF

M LOCKERS

4H-105

594 SF

DINING ACUTE

4H-108

113 SF

STOR.

4H-108A

699 SF

ENTRY CORR.

C4-114

241 SF

FAMILY ROOM

4H-109

131 SF

NOURISH.

4H-110

215 SF

FAMILY CONF.

4H-111

703 SF

CORR.

C4-127

77 SF

NURSING MOTHERS

RM

4H-104A

139 SF

MED RM

4H-107A

401 SF

CENTRAL NURSE

STATION

4H-107

150 SF

NURSE MNGR

4H-106

849 SF

VACANT (FINISH

PHASE 2)

4H-100

85 SF

CARTS

C4-126

19 SF

CARTS

4K-149

K102

H

K101

K

3A

H

H110

8 SF

HAND WASH

4K-152

H114

H107-A

H106

H

8A

H108

H101

H

H102

H

4A

H104 H105

J127-B

MATCHLINE

SEE: F1/IN104

P-1

RB-1

P-1 P-1

P-1

P-1

RB-1

P-1 P-5

P-1

P-1

RB-1

P-1 P-1

P-1

P-1

RB-1

P-4 P-1

P-1

WFT-9

RB-1

WFT-9

WFT-9

WFT-9

P-1

RB-1

P-1 P-5

P-1

WFT-5

RB-1

WFT-5

WFT-5

WFT-5

P-1

RB-1

P-1 P-1

P-1

WFT-1/2

PT-2

WFT-1

WFT-1/2

WFT-1/2

WFT-1

PT-2

WFT-1/2

WFT-1/2

WFT-1/2

P-4

RB-1

P-1,4 P-1

P-1

P-1

RB-1

P-1 P-1

P-1

P-4

RB-1

P-1 P-5

P-1

P-1

RB-1

P-1 P-1

P-1

P-1

RB-1

P-1 P-1

P-1

WFT-9

RB-1

WFT-9

WFT-9

WFT-9

P-4

RB-1

P-1 P-1

P-1

FINISHES ETR THIS ROOM

WFT-1,2

PT-2

WFT-1,2

WFT-1,2

WFT-1,8

WFT-3

RB-1

WFT-3, 4

WFT-3

WFT-3

642 SF

ELEV. LOBBY

4H-115

WFT-10

RB-1

WFT-10

WFT-10

WFT-10

876 SF

ELEV. LOBBY

C4-115

876 SF

ELEV. LOBBY

C4-115

H

7A

H

7- B

W F

T -8

WFT-4

RB-1

WFT-4

WFT-4

N/A

WFT-9 WRAPS

COLUMN ALL

SIDES

WFT-1

PT-2

WFT-1

WFT-1

WFT-1

WFT-1

PT-2

WFT-1

WFT-1

WFT-1P-1

RB-1

P-1 P-1

P-1

W F

T -5

WFT-5WFT-6WFT-5

W F

T -6

W F

T -6

WFT-3

W F

T -5

W F

T -5

W F

T -5

W F

T -5

WFT-5

WFT-5

WFT-5 WFT-5

WFT-5

WFT-3

RB-1

WFT-3

NA

WFT-3

W F

T -5

P-4

P-4

W F

T -6

ETR FINISHES

NEW FINISHES

WFT-7

WSF-1

WFT-7

WFT-7

WFT-7

WFT-6

WFT-10

RB-1

WFT-10

WFT-10

WFT-10

119 SF

OFFICE

4H-123

P-1

RB-1

P-1 P-1

P-1

WFT-2

W F

T -2

W F

T -2

W F

T -2

WFT-2

WFT-2

A-403

D7

A-403

F7

A-405

F7

A-404

F3

A-405

C7

A-403

C7

64 SF

HAC

4H-112

WFT-10

RB-1

WFT-10

WFT-10

WFT-10

4'-2"

3' -4

WFT-10

RB-1

WFT-10

WFT-10

WFT-10

WFT-10

RB-1

WFT-10

WFT-10

WFT-10

P-4

PATTERN OR GRAIN DIRECTION CHANGE

MATERIAL FLOOR CHANGE

DIRECTION OF FINISH

CORNER GUARD LOCATION

CG

GRAIN

FINISH MATERIAL

ROOM FINISH TAG

INTERIOR FINISH SYMBOLS

Base Finish Floor Finish

Wall Finishes

North

South

West East

P-# on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot

REVISIONS DATE

General Notes:

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

Approved: Division Chief

Issue Date Checked Drawn

Drawing Number

Building Number

Project NumberDrawing Title Project Title

Location Drawing Scale

Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs

Office of Construction and Facilities Management

FULLY SPRINKLERED

Phase

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

TRUE NORTH

PLAN NORTH

KEYPLANA/E:

TRIPLE C - The A/E Group

Mat Perkins

(520) 481-8548

A

B D

E F

G

H

J

K

L

M

C

LINE INDICATES

PHASE 1 SCOPE AREA

STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL

VERIFY ACTUAL CONDITIONS ON-SITE.

410 Grand Ave, Suite 201C Laramie, WY 82070

As indicated

B

IM

/6

-2

-1

E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e

/6 -2

-1

.A

R C

H .B

.L

.P o ly tr a m a .r v t

/4

/2

:1

:5

P

M

04/03/2023 M.PERKINS K.MACAULAY

618-22-100

1390 - IN124

INTERIOR WALL FINISH PLAN - FOURTH

FLOOR 4H/4K

1 Veterans Drive, Minneapolis, MN 55417

B70

RENOVATE FOR EXPANDED

POLYTRAUMA PROGRAMISSUED FOR BIDDING

1/8" = 1'-0" F7

INTERIOR WALL FINISH PLAN - FOURTH FLOOR 4K

1/8" = 1'-0"

F1

INTERIOR WALL FINISH PLAN - FOURTH FLOOR 4H

INTERIOR SHEET NOTES

A. REFER TO IN001 FOR INTERIOR FINISH GENERAL NOTES

B. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.

C. REFER TO IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.

D. REFER TO A-400 SERIES FOR CASEWORK FINISHES.

E. REFER TO IF SERIES FOR FURNITURE; FURNITURE IS SHOWN FOR REFERENCE

ONLY, ALL FURNITURE IS NIC.

F. REFER TO AW SERIES FOR ALL SIGNAGE.

G. REFER TO Q SERIES FOR EQUIPMENT INFORMATION.

H. PAINT ALL WALLS (P-1) UNO.

I. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL

BOARD CEILINGS (P-2) UNO.

J. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT

BOUNDARY (P-3) UNO.

K. PLANS HAVE BEEN SCREENED BACK FOR CLARITY, REFER TO ARCHITECTURE

SERIES FOR WALL CONSTRUCTION INFORMATION

FINISH ABBREVIATIONS

ABBREVIATION FINISH TYPE - REFER TO IN601 FOR ADDITIONAL FINISH INFORMATION

AT ACOUSTICAL CEILING TILE

CC CUBICLE CURTAIN TRACK

CG CORNER GUARD

CHR CHAIR RAIL

HR HAND RAIL

LVT LUXURY VINYL TILE

P PAINT

PL PLASTIC LAMINATE

PT PORCELAIN TILE

RB RESILIENT BASE

RF RESILIENT ATHLETIC FLOORING

RSF RESILIENT SHEET VINYL

RSW ROLLER SHADES

RWC RIGID WALL COVERING

S SOLID SURFACE

TR TRIM

WD WOOD DOOR FINISH

WFT WALL FINISH TYPE

WSF WELDED SEAM SHEET

KEYNOTES-

1 AT AREA OF EXISTING DOOR INFILL, PAINT NEW WALL TO MATCH ADJACENT

EXISTING WALL COLOR. INSTALL NEW RB-1 WALL BASE AT AREA OF NEW WALL

INFILL.

/03

RB-1

RWC-1

P-1

UON ON

FINISH

PLAN

SHEET WALL PROTECTION

MANUFACTURER'S

STANDARD

TRIM PIECES AT

ALL SEAMS AND

EDGES

TR-3

BATHROOM WALL TILE

TR-1

3' -2

4"

RB-1

S-1

SOLID SURFACE WALL PANEL

AT WALL MOUNTED LAVATORIES

P-1 , UNLESS NOTED

OTHERWISE

ON FINISH

PLAN

EQ EQ

2'-6"

4' -4

4' -0

PATIENT SHOWER

8' -0

TR-1

S-1

SCRIBE

TO

CEILING

SCRIBE

AND SEAL

INSIDE

SHOWER

CORNERS

RWC MOUNTED

>2" AFF

RB-1

CORRIDOR WALL

PROTECTION & HANDRAILS

RWC-2 BONDED

METAL PANELING

RWC-2 MOUNTED

ABOVE WALL BASE

P-1 , UNLESS NOTED

OTHERWISE ON

FINISH PLAN

HONED FINISH

AT ALL

OUTSIDE

EDGES

8' -0

PT-2

4' -4

R E

F E

R T

O R

C P

T O

P O

F H

R -1

3' -0

HR-1

HANDRAIL

RB-1

CORRIDOR WALL

PROTECTION - NO HANDRAIL

RWC-2 BONDED

METAL PANELING

RWC-2 MOUNTED

ABOVE WALL BASE

R E

F E

R T

O R

C P

2' -7

/2

WHERE NO HANDRAIL

PROVIDE TR-3

FINISHING TRIM

P-1

UNLESS

NOTED

OTHERWISE

ON FINISH

PLAN

TR-3

UTILITY WALL TILE

WSF-1

4' -0

S E

E R

C P

PT-6

P-1 , UNLESS NOTED

OTHERWISE ON

FINISH PLAN

WFT-1 WFT-2 WFT-3 WFT-4 WFT-5 WFT-6 WFT-7

CAULK AT SEAMS

WHERE PANELS

ABUT WITH COLOR

TO MATCH PANELS

CAULK AT SEAMS

WHERE PANELS

ABUT WITH COLOR

TO MATCH PANELS

P-4

BATHROOM WALL TILE @ SINK

TR-1

2' -1

0" S

E E

R C

P

PT-2

BEHIND

APRON

WFT-8

S-1

COUNTERTOP

PER

ELEVATION

BEADBOARD & CHAIR RAIL

WFT-9

RB-1

CHR-1

RWC-3

P-5

3' -0

E8

IN501

E9

IN501

C1

IN501

E1

IN501

C4

IN501

C4

IN501

A6

IN501

E8

IN501

C1

IN501

E9

IN502

TR-3

SINK

APRON

B9

A-552 F9

IN502

BACK OF HOUSE WALL

PROTECTION & HANDRAIL

WFT-10

RB-1

S E

E R

C P

HR-1

RWC-1

P-5

3' -0

C1

IN501

E9

IN502

DOOR FRAME BEYOND

WHERE OCCURS

LVT FLOORING

AS SCHEDULED

LOCATION OF FLOOR FINISH

CHANGE, SEAM OR ADAPTER;

TRANSITION SHALL OCCUR AT

CENTER LINE OF DOOR IN

THE CLOSED POSITION

DOOR AS SCHEDULED

WHERE OCCURS

LVT FLOORING

AS SCHEDULED

C CENTER LINE OF DOORL

S E

E S

T R

U C

T U

R A

L

EQ.EQ.

TOP OF SLAB

CERAMIC TILE

FLOORING AS

SCHEDULED

LOCATION OF FLOOR FINISH

CHANGE, SEAM OR ADAPTER;

TRANSITION SHALL OCCUR AT

CENTER LINE OF DOOR IN THE

CLOSED POSITION

DOOR AS SCHEDULED

TRANSITION STRIP (TR-2) OR

EQUAL, REFER TO IN601 FOR

INFORMATION

LVT FLOORING AS SCHEDULED

C CENTER LINE OF DOORL

S E

E S

T R

U C

T U

R A

L

TOP OF SLAB

THRESHOLD

MUST MEET ADA

REQUIREMENTS:

Changes in level between ¼" and ½" must have a beveled slope equaling 1:2.

PORCELAIN TILE AS SCHEDULED

TRANSITION STRIP (TR-1) OR

EQUAL, REFER TO IN601 FOR

INFORMATION

THIN SET PORCELAIN

FLOOR TILE AS

SCHEDULED

TOP OF SLAB

PARTITION AS SCHEDULED

SOLID SURFACE AS SCHEDULED

TRANSITION STRIP (TR-1) OR

EQUAL, REFER TO IN601 FOR

INFORMATION

THIN SET PORCELAIN

FLOOR TILE AS

SCHEDULED

TOP OF SLAB

PARTITION AS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .