Attachment D.3 - 3_618-22-100_MPLS_PT_IFB_INTERIORS_230404.pdf
PDF 7 MB Posted
- Solicitation number
- 36C26323R0058_1
About this file
This solicitation is for project 618-22-100 to renovate and expand polytrauma care facilities at the Minneapolis VA Health Care System in Phase 1. Work includes general construction, electrical, plumbing and other trades as required. The project magnitude is estimated between $10-20 million. The solicitation is set aside for service-disabled veteran-owned small businesses, which must be verified in VetCert to be considered. The NAICS code is 236220 and small business size standard is $45 million. All applicable taxes shall be included in pricing.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. LETTERFORMS SHALL BE HELVETICA, PER VA ADMINISTRATION STANDARDS. UPPER AND LOWER CASE SHALL BE USED ON ALL DIRECTIONAL TRAFFIC AND PEDESTRIAN SIGNS, UNLESS NOTED. HELVETICA CONDENSED MEDIUM FOR ALL OVERHEAD SIGNS.
PROPOSED AND REFURBISHED SITE SIGNAGE SHALL MATCH EXISTING SIGN PROGRAM, INCLUDING FONT, GRAPHICS, CONSTRUCTION, DETAILING, MATERIALS AND COLORS.
2. SIGN CONTRACTOR SHALL REVIEW SIGN LOCATIONS PRIOR TO INSTALLATION WITH ENGINEER TO COORDINATE WITH LIGHTING
SYSTEM, SIGN AND LIGHT LOCATIONS PER SPECIFICATIONS.
3. SIGNS SHALL BE MOUNTED LEVEL AND PLUMB, UNLESS NOTED.
4. WHERE TWO (2) SIGNS ARE MOUNTED BACK-TO-BACK, SMALLEST L DIMENSION SHALL INCREASE TO MATCH LARGEST L DIMENSION.
5. MAXIMUM BOLT INSERT EMBEDMENT LENGTH 1-1/4" INTO CONCRETE STRUCTURE, UNLESS NOTED.
6. DO NOT SCALE DRAWINGS.
7. REFLECTIVE GRAPHICS AND COPY COLORS ARE 3M. ALL NON-REFLECTIVE COLORS ARE PANTONE OR EQUAL TO SHERWIN WILLIAMS.
8. SEE DEPARTMENT OF VETERANS AFFAIRS SIGNAGE DESIGN GUIDE, PG-18-12 FOR ADDITIONAL INFORMATION INCLUDING SIGN TYPE, SIZE, COLORS AND MOUNTING DETAILS NOTED IN SCHEDULE.
9. HANG SIGN FROM OUTSIDE FACE OF BEAM.
10. HEIGHT OF SIGNS AS INDICATED IS TO BOTTOM OF THE SIGN.
11. COORDINATE BLIND AND NON-AMBULATORY PEDESTRIAN SIGNAGE AND TACTILE SURFACING REQUIREMENTS WITH CAMPUS
STANDARDS AND PG-18-12.
12. DIRECTIONAL SIGNAGE: ARROW DIRECTION AND PLACEMENT IS DEPENDENT ON FINAL SIGN LOCATIONS. ALL SIGN ARROW
ORIENTATION IS TO BE COORDINATED WITH ARCHITECT AND OWNER PRIOR TO FABRICATION.
13. VA LOGO: CONTRACTOR SHALL OBTAIN DIGITAL FILE OF CURRENT VA LOGO FROM VA STAFF PRIOR TO FABRICATION OF ANY SIGNS
INCORPORATING THE VA LOGO.
14. ANY EXISTING SIGNS NOT SHOWN ON PLAN ARE "EXISTING TO REMAIN". IN THE CASE WHEN AN EXISTING SIGN IS IN CONFLICT WITH
FINAL PROJECT BUILDINGS OR SITE ELEMENTS, CONTRACTOR SHALL SALVAGE SIGNAGE FOR OWNER. IN THE CASE WHEN CONSTRUCTION ACTIVITIES CONFLICT WITH AN EXISTING SIGN LOCATION, THE SIGN SHALL BE REMOVED, PUT INTO STORAGE, REFURBISHED AND PLACED BACK IN ITS ORIGINAL LOCATION PRIOR TO COMPLETION OF THE PROJECT. INCLUDE THIS SCOPE OF WORK
WITHIN THE BID PRICE.
15. FOR EXISTING SIGNS THAT ARE SCHEDULED WITH PROPOSED MESSAGES, REMOVE THE ENTIRE EXISTING MESSAGE, THOROUGHLY CLEAN THE PANEL AND INSTALL THE NEW MESSAGE. IF SHADOWING OF ANY KIND REMAINS AFTER PANEL IS CLEANED, THEN PANEL
MUST BE REMOVED AND REFINISHED PRIOR TO NEW MESSAGE INSTALLATION.
16. FOR EXISTING SIGNS THAT HAVE NO PROPOSED MESSAGE IN THE SCHEDULE, THE EXISTING MESSAGE SHALL REMAIN UNCHANGED, U.N.O.
17. MESSAGES INDICATED IN SCHEDULE WITH UNDERLINED TEXT REPRESENT LINES SEPARATING TEXT.
18. DESIGN INTENT IS THAT TEXT IS ORIENTED AS INDICATED IN PROPOSED MESSAGE COLUMN OF THE SIGN SCHEDULE. ORIENTATION OF
MESSAGE SHALL BE CONSISTENT WITH EXISTING SITE SIGNS. FINAL LAYOUT COORDINATION TO BE PERFORMED WITH ARCHITECT
DURING THE SHOP DRAWING PROCESS.
19. DESIGN INTENT IS THAT SIZE OF LETTERING AND GRAPHICS ARE TO MATCH THAT OF THE MESSAGE BEING REPLACED.
20. ALL SIGNS REQUIRING PANEL REFURBISHMENT SHALL ALSO HAVE "VA" LOGO REPLACED.
21. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL SIGNS FOR THIS PROJECT. QUANTITIES INDICATED IN SCHEDULES DO NOT REFLECT
TOTAL QUANTITIES IN PROJECT. REFERENCE ALL DRAWINGS AND SPECIFICATIONS TO UNDERSTAND ENTIRE SIGNAGE SCOPE.
22. TEXT SIZE ON SIGNAGE TO BE MODIFIED TO ACCOMMODATE VERBIAGE FITTING WITHIN SIGN LIMITS.
23. MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN ARE ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES AND PATTERNS
AS THE BASIS OF THE DESIGN. PRODUCTS OF AUTHORIZED EQUAL MANUFACTURER'S EQUIVALENT TO COLORS, FINISHES, TEXTURES AND PATTERNS OF MANUFACTURERS LISTED THAT MEET REQUIREMENTS OF DRAWINGS AND TECHNICAL SPECIFICATIONS IN EVERY RESPECT MAY BE ACCEPTABLE WITH SUBMITTAL OF A COMPLETED SUBSTITUTION REQUEST CONTAINING ALL PRODUCT DATA, TESTING AND ACTUAL SAMPLES AND UPON APPROVAL IN WRITING BY CONTRACTING OFFICER.
SIGNAGE GENERAL NOTES
VA INTERIOR
DESIGNER TO
REVIEW AND
APPROVE ALL SIGN
NOTATIONS PRIOR
TO INSTALLATION.
INTERIOR SIGNAGE
TO BE PROCURED &
INSTALLED BY THE
CONTRACTOR.
SIGN SYMBOL LEGEND
PRIMARY SIGN
SECONDARY SIGN
SAFETY SIGN
RESTROOM - ALL
DIRECTIONAL SIGN
UTILITY SIGN
REFERENCES
VA SIGNAGE DESIGN MANUAL
SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE
SPECIFICATIONS
https://www.cfm.va.gov/til/spclRqmts.asp#SIGN
9"
W A
L L
G
C
/2
9 1/2"
A
D
C
F
B
9"
9"
/2
9 1/2"
E
D
A
C
B
5"
/4
A
C
B
G
DV205 Struck Kelp
/4
1'-0 1/4"
A
B
E
D
/4
1'-0 1/4"
A
B
E
D
2'-10"
A on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
Drawing Number
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
E F
G
H
J
K
L
M
C
LINE INDICATES
PHASE 1 SCOPE AREA
STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL
VERIFY ACTUAL CONDITIONS ON-SITE.
410 Grand Ave, Suite 201C Laramie, WY 82070
As indicated
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-1
.A
R C
H .B
.L
.P o ly tr a m a .r v t
/4
/2
:0
:4
P
M
04/03/2023 M.PERKINS K.MACAULAY
618-22-100
1390 - AW001
ARCHITECTURAL SIGNAGE ABBREVIATIONS,
SYMBOLS, GENERAL NOTES AND SCHEDULE
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAMISSUED FOR BIDDING
3" = 1'-0" C8
IN-01.02 - FIRE EXTINGUISHER
3" = 1'-0" D8
IN-09.03 - RESTROOM SIGN
3" = 1'-0" E8
IN-13 - PERPENDICULAR FLAG MOUNT
3" = 1'-0"
E6
IN-04.03 - PRIMARY ROOM IDENTIFICATION
3" = 1'-0" D6
IN-03.01 - ROOM NUMBER IDENTIFICATION
BUILDING SIGNAGE SCHEDULE
VERSION
TYPE COUNT DESCRIPTION DETAIL LOCATION REFERENCE
ADA
BRAILLE TEXT COLOR BACKGROUND COLOR
DIMENSIONS
Comments
SIGN_
HEIGHT
SIGN_
WIDTH
MOUNTING
HEIGHT
IN-01.02 5 FIRE EQUIPMENT IDENTIFICATION SIGN C8/AW001 CORRIDORS REFER TO PAGE 8-5-5 OF INTERIOR
SIGNS DESIGN
GUIDE DATED 12/2012
YES REFERENCE EXISTING
CAMPUS STANDARDS
REFERENCE EXISTING
CAMPUS STANDARDS
9" 9" 5' - 0"
IN-03.01 12 ROOM NUMBER IDENTIFICATION D6/AW001 PATIENT
BATHROOMS
REFER TO PAGE 9-4-2 OF INTERIOR
SIGNS DESIGN GUIDE DATED 12/2012
YES REFERENCE EXISTING
CAMPUS STANDARDS
REFERENCE EXISTING
CAMPUS STANDARDS
3 1/4" 5" 5' - 0"
IN-04.03 57 PRIMARY ROOM IDENTIFICATION WITH INSERT E6/AW001 PUBLIC SPACES REFER TO PAGE 9-5-7 OF INTERIOR
SIGNS DESIGN GUIDE DATED 12/2012
REFERENCE EXISTING
CAMPUS STANDARDS
REFERENCE EXISTING
CAMPUS STANDARDS
10 1/2" 9 1/2" 5' - 0"
IN-09.03 4 RESTROOM SIGN D8/AW001 UNISEX
RESTROOMS
REFER TO PAGE 9-4-3 OF INTERIOR
SIGNS DESIGN GUIDE DATED 12/2012
YES REFERENCE EXISTING
CAMPUS STANDARDS
REFERENCE EXISTING
CAMPUS STANDARDS
11 1/2" 9 1/2" 5' - 0"
IN-13 12 PERPENDICULAR (FLAG) MOUNT ROOM IDENTIFICATION E8 /AW001 PUBLIC SPACES REFER TO PAGE 9-4-2 OF INTERIOR
SIGNS DESIGN GUIDE DATED 12/2012
NO REFERENCE EXISTING
CAMPUS STANDARDS
REFERENCE EXISTING
CAMPUS STANDARDS
9" 9" 7' - 0"
IN-14.06 1 WALL DIRECTIONAL SIGN WITH INSERT E4/AW001 WARD ENTRY REFER TO PAGE 9-4-4 OF INTERIOR
SIGNS DESIGN
GUIDE DATED 12/2012
NO REFERENCE EXISTING
CAMPUS STANDARDS
REFERENCE EXISTING
CAMPUS STANDARDS
1' - 10 1/4"
1' - 0 1/4"
5' - 0"
IN-53.57 3 CEILING MOUNTED DIRECTIONAL SIGN D2/AW001 CORRIDORS REFER TO PAGE 9-4-6 OF INTERIOR
SIGNS DESIGN
GUIDE DATED 12/2012
NO REFERENCE EXISTING
CAMPUS STANDARDS
REFERENCE EXISTING
CAMPUS STANDARDS
7" 2' - 10" 8' - 0"
Grand total: 94
3" = 1'-0" E4
IN-14.06 WALL DIRECTIONAL (DIGITAL PRINT INSERT)
3" = 1'-0"
E2
IN-01.01 EMERGENCY EXIT PLAN
3" = 1'-0" D2
IN-53.57 CEILING MOUNTED DIRECTIONAL
/03
/20
1. LETTERFORMS SHALL BE HELVETICA, PER VA ADMINISTRATION STANDARDS. UPPER AND LOWER CASE SHALL BE USED ON ALL DIRECTIONAL TRAFFIC AND PEDESTRIAN SIGNS, UNLESS NOTED. HELVETICA CONDENSED MEDIUM FOR ALL OVERHEAD SIGNS.
PROPOSED AND REFURBISHED SITE SIGNAGE SHALL MATCH EXISTING SIGN PROGRAM, INCLUDING FONT, GRAPHICS, CONSTRUCTION, DETAILING, MATERIALS AND COLORS.
2. SIGN CONTRACTOR SHALL REVIEW SIGN LOCATIONS PRIOR TO INSTALLATION WITH ENGINEER TO COORDINATE WITH LIGHTING
SYSTEM, SIGN AND LIGHT LOCATIONS PER SPECIFICATIONS.
3. SIGNS SHALL BE MOUNTED LEVEL AND PLUMB, UNLESS NOTED.
4. WHERE TWO (2) SIGNS ARE MOUNTED BACK-TO-BACK, SMALLEST L DIMENSION SHALL INCREASE TO MATCH LARGEST L DIMENSION.
5. MAXIMUM BOLT INSERT EMBEDMENT LENGTH 1-1/4" INTO CONCRETE STRUCTURE, UNLESS NOTED.
6. DO NOT SCALE DRAWINGS.
7. REFLECTIVE GRAPHICS AND COPY COLORS ARE 3M. ALL NON-REFLECTIVE COLORS ARE PANTONE OR EQUAL TO SHERWIN WILLIAMS.
8. SEE DEPARTMENT OF VETERANS AFFAIRS SIGNAGE DESIGN GUIDE, PG-18-12 FOR ADDITIONAL INFORMATION INCLUDING SIGN TYPE, SIZE, COLORS AND MOUNTING DETAILS NOTED IN SCHEDULE.
9. HANG SIGN FROM OUTSIDE FACE OF BEAM.
10. HEIGHT OF SIGNS AS INDICATED IS TO BOTTOM OF THE SIGN.
11. COORDINATE BLIND AND NON-AMBULATORY PEDESTRIAN SIGNAGE AND TACTILE SURFACING REQUIREMENTS WITH CAMPUS
STANDARDS AND PG-18-12.
12. DIRECTIONAL SIGNAGE: ARROW DIRECTION AND PLACEMENT IS DEPENDENT ON FINAL SIGN LOCATIONS. ALL SIGN ARROW
ORIENTATION IS TO BE COORDINATED WITH ARCHITECT AND OWNER PRIOR TO FABRICATION.
13. VA LOGO: CONTRACTOR SHALL OBTAIN DIGITAL FILE OF CURRENT VA LOGO FROM VA STAFF PRIOR TO FABRICATION OF ANY SIGNS
INCORPORATING THE VA LOGO.
14. ANY EXISTING SIGNS NOT SHOWN ON PLAN ARE "EXISTING TO REMAIN". IN THE CASE WHEN AN EXISTING SIGN IS IN CONFLICT WITH
FINAL PROJECT BUILDINGS OR SITE ELEMENTS, CONTRACTOR SHALL SALVAGE SIGNAGE FOR OWNER. IN THE CASE WHEN CONSTRUCTION ACTIVITIES CONFLICT WITH AN EXISTING SIGN LOCATION, THE SIGN SHALL BE REMOVED, PUT INTO STORAGE, REFURBISHED AND PLACED BACK IN ITS ORIGINAL LOCATION PRIOR TO COMPLETION OF THE PROJECT. INCLUDE THIS SCOPE OF WORK
WITHIN THE BID PRICE.
15. FOR EXISTING SIGNS THAT ARE SCHEDULED WITH PROPOSED MESSAGES, REMOVE THE ENTIRE EXISTING MESSAGE, THOROUGHLY CLEAN THE PANEL AND INSTALL THE NEW MESSAGE. IF SHADOWING OF ANY KIND REMAINS AFTER PANEL IS CLEANED, THEN PANEL
MUST BE REMOVED AND REFINISHED PRIOR TO NEW MESSAGE INSTALLATION.
16. FOR EXISTING SIGNS THAT HAVE NO PROPOSED MESSAGE IN THE SCHEDULE, THE EXISTING MESSAGE SHALL REMAIN UNCHANGED, U.N.O.
17. MESSAGES INDICATED IN SCHEDULE WITH UNDERLINED TEXT REPRESENT LINES SEPARATING TEXT.
18. DESIGN INTENT IS THAT TEXT IS ORIENTED AS INDICATED IN PROPOSED MESSAGE COLUMN OF THE SIGN SCHEDULE. ORIENTATION OF
MESSAGE SHALL BE CONSISTENT WITH EXISTING SITE SIGNS. FINAL LAYOUT COORDINATION TO BE PERFORMED WITH ARCHITECT
DURING THE SHOP DRAWING PROCESS.
19. DESIGN INTENT IS THAT SIZE OF LETTERING AND GRAPHICS ARE TO MATCH THAT OF THE MESSAGE BEING REPLACED.
20. ALL SIGNS REQUIRING PANEL REFURBISHMENT SHALL ALSO HAVE "VA" LOGO REPLACED.
21. CONTRACTOR IS RESPONSIBLE TO PROVIDE ALL SIGNS FOR THIS PROJECT. QUANTITIES INDICATED IN SCHEDULES DO NOT REFLECT
TOTAL QUANTITIES IN PROJECT. REFERENCE ALL DRAWINGS AND SPECIFICATIONS TO UNDERSTAND ENTIRE SIGNAGE SCOPE.
22. TEXT SIZE ON SIGNAGE TO BE MODIFIED TO ACCOMMODATE VERBIAGE FITTING WITHIN SIGN LIMITS.
23. MANUFACTURER'S TRADE NAMES AND NUMBERS USED HEREIN ARE ONLY TO IDENTIFY COLORS, FINISHES, TEXTURES AND PATTERNS
AS THE BASIS OF THE DESIGN. PRODUCTS OF AUTHORIZED EQUAL MANUFACTURER'S EQUIVALENT TO COLORS, FINISHES, TEXTURES AND PATTERNS OF MANUFACTURERS LISTED THAT MEET REQUIREMENTS OF DRAWINGS AND TECHNICAL SPECIFICATIONS IN EVERY RESPECT MAY BE ACCEPTABLE WITH SUBMITTAL OF A COMPLETED SUBSTITUTION REQUEST CONTAINING ALL PRODUCT DATA, TESTING AND ACTUAL SAMPLES AND UPON APPROVAL IN WRITING BY CONTRACTING OFFICER.
SIGNAGE GENERAL NOTES
VA INTERIOR
DESIGNER TO
REVIEW AND
APPROVE ALL SIGN
NOTATIONS PRIOR
TO INSTALLATION.
INTERIOR SIGNAGE
TO BE PROCURED &
INSTALLED BY THE
CONTRACTOR.
SIGN SYMBOL LEGEND
PRIMARY SIGN
SECONDARY SIGN
SAFETY SIGN
RESTROOM - ALL
DIRECTIONAL SIGN
UTILITY SIGN
REFERENCES
VA SIGNAGE DESIGN MANUAL
SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE
SPECIFICATIONS
https://www.cfm.va.gov/til/spclRqmts.asp#SIGN
TTUUVVWWXXYY
88 SF
TLT
4K-103A
254 SF
BREAK RM
4H-113
128 SF
ANM + 1
4K-101
1127 SF
CORR.
C4-137
192 SF
TR
4H-114
642 SF
ELEV. LOBBY
4H-115
270 SF
ELEVATORS
E
66 SF
TLT
4H-102
65 SF
TLT
4H-101
110 SF
STAFF CORR.
4H-103
305 SF
W LOCKERS
4H-104
288 SF
M LOCKERS
4H-105
594 SF
DINING ACUTE
4H-108
113 SF
STOR.
4H-108A
699 SF
ENTRY CORR.
C4-114
241 SF
FAMILY ROOM
4H-109
131 SF
NOURISH.
4H-110
215 SF
FAMILY CONF.
4H-111
154 SF
TEAM RM
4K-102
121 SF
REC STOR
4K-127
77 SF
NURSING MOTHERS
RM
4H-104A
139 SF
MED RM
4H-107A
401 SF
CENTRAL NURSE
STATION
4H-107
150 SF
NURSE MNGR
4H-106
849 SF
VACANT (FINISH
PHASE 2)
4H-100
85 SF
CARTS
C4-126
19 SF
CARTS
4K-149
K102
H
K101
K103
K
3A
H
K127
H110
K128
8 SF
HAND WASH
4K-152
H114
H107-A
H106H
8A
H108
H101
H
H102
H
4A
H104 H105
J127-B
450 SF
BARIATRIC / SURGE
PATIENT ROOM
4K-103
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03IN-04.03
IN-04.03
IN-04.03IN-04.03
IN-04.03
IN-09.03IN-09.03
IN-04.03
IN-04.03
IN-04.03
H
64 SF
HAC
4H-112
IN-01.02
119 SF
OFFICE
4H-123
876 SF
ELEV. LOBBY
C4-115
H
5- A
H115-B
H
H121
H
2- A
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
169 SF
STAIRWELL 8
SW8
IN-04.03
IN-01.02
FEC
FEC
FEC
IN-53.57
IN-53.57
IN-14.06
IN-04.03
MATCHLINE
SEE: F7/AW104
TTUUVVWWXX
310 SF
STORAGE
4K-116B
246 SF
THERAPIST OFFICE
4K-116C
2084 SF
THERAPY GYM
4K-116
143 SF
PRIVATE OT
4K-116A
168 SF
PRIVATE PT
4K-116D
72 SF
TLT
4K-115A
73 SF
TLT
4K-113A
73 SF
TLT
4K-114A
73 SF
TLT
4K-112A
74 SF
TLT
4K-110A
75 SF
TLT
4K-108A
71 SF
TLT
4K-105A
88 SF
TLT
4K-103A
254 SF
BREAK RM
4H-113
128 SF
ANM + 1
4K-101
241 SF
FAMILY ROOM
4H-109
594 SF
CORR.
C4-135
131 SF
NOURISH.
4H-110
215 SF
FAMILY CONF.
4H-111
703 SF
CORR.
C4-127
154 SF
TEAM RM
4K-102
121 SF
REC STOR
4K-127
76 SF
TLT
4K-123A
114 SF
SW +1
4K-104
68 SF
LSB
4K-106
88 SF
LINEN
4K-109
254 SF
STOR.
4K-121
98 SF
LAUNDRY
4K-126
59 SF
STAFF TLT
4K-107
71 SF
TLT
4K-120A
71 SF
TLT
4K-122A
306 SF
PATIENT ROOM
4K-119
71 SF
TLT
4K-119A
163 SF
NURSE STN
4K-111
104 SF
SOILED UTILITY
4K-118
89 SF
CLEAN
4K-117
741 SF
CORR.
C4-131
329 SF
PATIENT ROOM
4K-110
341 SF
PATIENT ROOM
4K-108
307 SF
PATIENT ROOM
4K-120
328 SF
PATIENT ROOM
4K-122
318 SF
PATIENT ROOM
4K-123
483 SF
REC THERAPY
4K-128
20 SF
NURSE
4K-150
20 SF
NURSE
4K-151
19 SF
NURSE
4K-155
19 SF
NURSE
4K-154
19 SF
NURSE
4K-153
19 SF
CARTS
4K-149
20 SF
NURSE
4K-156
K102
H
K101
K103
K
3A
H
K105
K
5A
K
8A
K108
K110
K
0A K
2A
K112
K113
K
3A K
4A
K114
K
6A
K116D
K
6-
AK
K
6C
K116-B
K115
K115A
252 SF
CORR.
C4-132
K104
K106
K107
K109
K111-A
K126
K127
H110
K128
K
3A
K123
K122
K
2A K
0A
K120
K119
K
9A
8 SF
HAND WASH
4K-152
307 SF
PATIENT ROOM
4K-112
314 SF
PATIENT ROOM
4K-113
316 SF
PATIENT ROOM
4K-114
388 SF
PATIENT ROOM
4K-115
352 SF
PATIENT ROOM
4K-105
450 SF
BARIATRIC / SURGE
PATIENT ROOM
4K-103
IN-03.01
IN-04.03
IN-13
IN-04.03
IN-03.01
IN-04.03
IN-13
IN-03.01
IN-04.03
IN-13
IN-03.01
IN-04.03
IN-13
IN-03.01
IN-04.03
IN-13
IN-03.01
IN-04.03
IN-13
IN-03.01
IN-04.03
IN-13
IN-03.01
IN-04.03
IN-13
IN-03.01
IN-04.03
IN-13
IN-03.01
IN-04.03
IN-13
IN-04.03
IN-13 IN-03.01
IN-04.03
IN-13 IN-03.01
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-09.03
IN-09.03
H
64 SF
HAC
4H-112
IN-01.02
IN-04.03
IN-04.03
IN-01.02
IN-04.03
IN-04.03
K121
K111-B
169 SF
STAIRWELL 8
SW8
57 SF
MED SUPPLY
4K-125
IN-04.03
FEC
FEC
IN-01.02
IN-53.57
FEC
IN-04.03
IN-04.03
MATCHLINE
SEE: F1/AW104
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
Drawing Number
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
E F
G
H
J
K
L
M
C
LINE INDICATES
PHASE 1 SCOPE AREA
STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL
VERIFY ACTUAL CONDITIONS ON-SITE.
410 Grand Ave, Suite 201C Laramie, WY 82070
As indicated
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-1
.A
R C
H .B
.L
.P o ly tr a m a .r v t
/4
/2
:1
:1
P
M
04/03/2023 M.PERKINS K.MACAULAY
618-22-100
1390 - AW104
ARCHITECTURALSIGNAGE PLAN - FOURTH
FLOOR 4H/4K
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAMISSUED FOR BIDDING
1/8" = 1'-0" F1
ARCHITECTURAL SIGNAGE PLAN - FOURTH FLOOR 4H
1/8" = 1'-0"
F7
ARCHITECTURAL SIGNAGE PLAN - FOURTH FLOOR 4K
/03
WALL PROTECTION & MILLWORK
IN PRO*
RIVER ROCK
RUBBER WALL BASE
JOHNSONITE*
WELSH CASTLE
CG-1
HR-1
RWC-1
RB-1
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL
SAMPLE FOR TRUEST COLOR DEPICTION
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL
SAMPLE FOR TRUEST COLOR DEPICTION
PAINT
SHERWIN WILILAMS*
FIELD
ACCESSIBLE BEIGE 7036
EGGSHELL
*BASIS OF DESIGN
P-1
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL
SAMPLE FOR TRUEST COLOR DEPICTION
FLOORING
MINNEAPOLIS
P-3
P-4 P-5
P-2
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL
SAMPLE FOR TRUEST COLOR DEPICTION
LVT-1 LVT-2
MANNINGTON*
COLOR ANCHOR COLLECTION
STRIDE - COTTONTAIL C138
12"X24"
ARMSTRONG*
STYLE: ULTIMA
BEVELED TEGULAR
SIZE: 24"X24"
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL
SAMPLE FOR TRUEST COLOR DEPICTION
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER TO ACTUAL
SAMPLE FOR TRUEST COLOR DEPICTION
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
MRP KM
Project Number
Board Number
Office of Construction and
Facilities Management
RENOVATE FOR EXPANDED
POLYTRAUMA
618-22-100
Triple C A& E Group 121 Washington Ave.
Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com
1 Veterans Dr, Minneapolis, MN 55417
CORIAN*
CAMEO WHITE
S-1
WILSONART*
BRAZILWOOD
PL-1
TILE
P-6
** UNIQUE COLOR FORMULAS**
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
MRP KM
Project Number
Board Number
Office of Construction and
Facilities Management
RENOVATE FOR EXPANDED
POLYTRAUMA
618-22-100
Triple C A& E Group 121 Washington Ave.
Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com
1 Veterans Dr, Minneapolis, MN 55417
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
MRP KM
Project Number
Board Number
Office of Construction and
Facilities Management
RENOVATE FOR EXPANDED
POLYTRAUMA
618-22-100
Triple C A& E Group 121 Washington Ave.
Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com
1 Veterans Dr, Minneapolis, MN 55417
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
MRP KM
Project Number
Board Number
Office of Construction and
Facilities Management
RENOVATE FOR EXPANDED
POLYTRAUMA
618-22-100
Triple C A& E Group 121 Washington Ave.
Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com
1 Veterans Dr, Minneapolis, MN 55417
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
MRP KM
Project Number
Board Number
Office of Construction and
Facilities Management
RENOVATE FOR EXPANDED
POLYTRAUMA
618-22-100
Triple C A& E Group 121 Washington Ave.
Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com
1 Veterans Dr, Minneapolis, MN 55417
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
MRP KM
Project Number
Board Number
Office of Construction and
Facilities Management
RENOVATE FOR EXPANDED
POLYTRAUMA
618-22-100
Triple C A& E Group 121 Washington Ave.
Suite 400 Minneapolis, MN, 55401 www.triplecaeg.com
1 Veterans Dr, Minneapolis, MN 55417
1 of 6 2 of 6
CEILINGS & WINDOWS
PT-1
CROSSVILLE*
BLUESTONE
PENNSYLVANIA BLUE
12X24
PT-2
CROSSVILLE*
PORTUGAL VENHO
VERDE- TEXTURED
12X24
TILE
PT-3
CROSSVILLE*
BLUESTONE
PENNSYLVANIA BLUE
2" X 2" MOSAIC
PT-4
VIRGINIA TILE
URBAN LIVING
RAW PEARL
2"X2" MOSAIC
PT-5
DALTILE*
KEYSTONES
URBAN PUTTY SPECKLED
2" X 2" MOSAIC
SHERWIN WILILAMS*
CEILING
GREEK VILLA 7551
FLAT
SHERWIN WILILAMS*
DOOR & WINDOW TRIM
BACKDROP 7025
DIRECT TO METAL
SHERWIN WILILAMS*
ACCENT
STEELY GREY 7664
EGGSHELL
SHERWIN WILILAMS*
ACCENT
UNUSUAL GREY 7059
EGGSHELL
SHERWIN WILILAMS*
ACCENT
ANTLER VELVET
EGGSHELL
MINNEAPOLIS MINNEAPOLIS
MINNEAPOLIS MINNEAPOLIS MINNEAPOLIS
AT-1
ARMSTRONG*
STYLE: FISSURED
SQUARE LAY IN
SIZE: 24"X48"
AT-2
ARMSTRONG*
STYLE: CLEAN ROOM VL
SQUARE LAY IN
SIZE: 24"X48"
AT-3
ARMSTRONG *
STYLE: WOODWORKS TEGULAR
ON 9/16" SUPRAFINE HD
SUSPENSION GRID (BLACK GRID)
WOOD FINISH: NATURAL
VARIATIONS MAPLE (NMP)
AT-4
RSF-1
MANNINGTON*
WELLSPRING
SHADE B303
WSF-1
MANNINGTON*
BIOSPEC MD
BEDROCK 15369
RWC-2 (COLOR)
(PATTERN)
FORMS+SURFACES*
BONDED METAL PANELS
PATTERN: DASH
BONDED ALUMINUM DARK
*BASIS OF DESIGN *BASIS OF DESIGN *BASIS OF DESIGN
*BASIS OF DESIGN
*BASIS OF DESIGN
DALTILE*
WALL SEMI-GLOSS & MATTE
ARTIC WHITE 0790
4 1/4" X 4 1/4" GLAZED
PT-6
MECHO SHADE*
THERMOVEIL
1724 TAUPE
RWS-1&2
BLACK OUT
0705 CHAMPAGNE
VALENCE:
COLONIAL WHITE
MANNINGTON*
COLOR ANCHOR COLLECTION
STRIDE - TRUFFLE C167
12"X24"
LVT-3
MANNINGTON*
COLOR ANCHOR COLLECTION
GROOVE - STONE WASH C152
12"X24"
RF-1
TARKETT*
INERTIA SPORTS
RUBBER TILE
MICROTONE HAMMERED
LUNAR EXPLORER
LVT-4
MANNINGTON*
SELECT WOODS
CHATHAM OAK
COTTAGE
5" X 48"
RWC-3
INPRO CORP
PALLADIUM BEADBOARD
RIVER ROCK
SKYFACTORY
LUMINOUS CEILING PANELS
LVT-5
MANNINGTON*
COLOR ANCHOR COLLECTION
GROOVE - GREEN TEA
12"X24"
RWS-1
RWS-2
CORIAN*
ASH CONCRETE
S-2 S-3
CORIAN*
NEUTRAL CONCRETE
RF-2
TARKETT*
INERTIA SPORTS
RUBBER TILE
MICROTONE HAMMERED
BEST SELLER
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
Drawing Number
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
E F
G
H
J
K
L
M
C
LINE INDICATES
PHASE 1 SCOPE AREA
STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL
VERIFY ACTUAL CONDITIONS ON-SITE.
410 Grand Ave, Suite 201C Laramie, WY 82070
12" = 1'-0"
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-1
.A
R C
H .B
.L
.P o ly tr a m a .r v t
/4
/2
:1
:1
P
M
04/03/2023 M.PERKINS K.MACAULAY
618-22-100
1390 - IN001
INTERIOR GENERAL NOTES, SYMBOLS,
ABBREVIATIONS & FINISH BOARDS
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAMISSUED FOR BIDDING
INTERIOR FINISH NOTES
ADO Automatic Door Operator AF Access Flooring AT Acoustical Ceiling (Tile) AT (SP) (SP) Acoustical Ceiling (with Sprayed Plastic Finish)
BIM Building Information Model
C Concrete CBB Concrete Backer Board CC Cubicle Curtain and Track CG Corner Guard CHR Chair Rail CMU Concrete Masonry Units (Unit Masonry) CP Carpet (without Cushion Broadloom) CPT Carpet Tile CT Ceramic Tile
EFTR Existing Finish to Remain EPY Epoxy Flooring EX Existing EXP Exposed
GL Glass (Glazing) GWB Gypsum Wallboard Systems
HW Hardware Set (Finish or Builder’s Hardware)
LN Linoleum LVT Luxury Vinyl Tile
MAT Carpet Mat (Walk-Off Mat)
NO Number
PC Precast (Architectural Precast Concrete Pavers) P Paint (Exterior and Interior; Transparent, Semi-Transparent, and Opaque Finishes) PL Plastic Laminate PRB Profile Base PT Porcelain Tile (Floor and Base)
QT Quarry Tile
RAF Resilient Athletic Flooring RB Resilient Base (Rubber or vinyl with factory formed inside and outside corners) RES* Resinous Flooring RES-W* Resinous/Epoxy Wall/Ceiling RF Rubber Flooring RRF Raised Rubber Flooring RSF Resilient Sheet Flooring (Chemically Welded Seams) RWC Rigid Vinyl Wall Covering (Wall Protection - Roll or Sheet) RWS Window Roller Shades
S Solid Surface SC High Build Glazed Coating (Special Coating) SD Static Dissipative SP Special Faced SS Stainless Steel ST Stone (Cast) SVT Solid Vinyl Floor Tile
TC Toilet Compartments TER Terrazzo, Poured TR Tile Trim TT Terrazzo Tile (Plastic Matrix)
VT Vinyl Tile (High Content Vinyl) VWC Vinyl Wall Covering
WD Wood WFT Wall Finish Type WSF Welded Seam Sheet Flooring (Heat Welded with Rod)
ABBREVIATIONS
GENERAL FINISH NOTES:
1. REFER TO SPECIFICATIONS FOR ADDITIONAL MATERIAL AND INSTALLATION
REQUIREMENTS.
2. REFER TO SHEET IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.
3. INTERIOR FINISH PLANS ARE GRAPHICALLY SCREENED BACK FOR CLARITY,
REFER TO ARCHITECTURAL PLANS TO REFERENCE WALL TYPES AND
PHASING.
4. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN FOR
CONSISTENCY.
SUBSTITUTION NOTES:
1. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR
SUBSTITUTION WILL REQUIRE APPROVAL BY THE COR.
TRANSITION NOTES:
1. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS.
2. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT
DOORWAYS, TRANSITION MATERIALS AT CENTERLINE OF DOOR WHEN
DOOR PANEL IS IN THE CLOSED POSITION.
SIGNAGE NOTES:
1. REFER TO AW SERIES SHEETS FOR SIGNAGE INFORMATION, REFER TO
SPECIFICATIONS FOR ADDITIONAL SIGNAGE, IDENTIFICATION AND
SYSTEMS/EQUIPMENT LABELING REQUIREMENTS.
CASEWORK NOTES:
1. CASEWORK TOE KICKS TO RECEIVE THE SAME WALL BASE TYPE/COLOR AS
SPECIFIED FOR THAT SPACE UNO.
2. REFER TO INTERIOR ELEVATIONS FOR CASEWORK FINISHES.
PAINTING NOTES:
1. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.
2. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED ITEMS
OR INSTALLER FINISHED ITEMS.
3. COORDINATE APPLICATIONS OF PAINTS AND ADHESIVES WITH COR.
PROVIDE SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD TO
ENSURE ODORS DO NOT TRANSMIT TO ADJACENT SPACES.
MISCELLANEOUS NOTES:
1. PROVIDE BACKING FOR ALL MOUNTED EQUIPMENT.
2. QUANTITIES ARE PROVIDED FOR COST ESTIMATING PURPOSES DURING THE
DESIGN PHASE. ALL QUANTITIES TO BE VERIFIED THROUGH FIELD
VERIFICATION AT THE TIME OF THE BIDDING BY THE CONTRACTOR.
3. FURNITURE IS SHOWN FOR REFERENCE ONLY, ALL FURNITURE IS NIC.
CODE NOTES:
1. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE WITH
IBC TABLE 803.13
INSTALLATION NOTES:
1. ALL FLOOR TILE TO BE CENTERED IN ROOM UNO.
2. REFER TO FINISH PLANS FOR DIRECTION GRAIN OF FLOORING.
/03
PATTERN OR GRAIN DIRECTION CHANGE
MATERIAL FLOOR CHANGE
DIRECTION OF FINISH
CORNER GUARD LOCATION
CG
GRAIN
FINISH MATERIAL
ROOM FINISH TAG
INTERIOR FINISH SYMBOLS
Base Finish Floor Finish
Wall Finishes
North
South
West East
P-#
TTUUVVWWXXYY
MATCHLINE
SEE: F1/A-104 MATCHLINE
SEE: F1/A-104
88 SF
TLT
4K-103A
254 SF
BREAK RM
4H-113
128 SF
ANM + 1
4K-101
1127 SF
CORR.
C4-137
192 SF
TR
4H-114
270 SF
ELEVATORS
E
66 SF
TLT
4H-102
65 SF
TLT
4H-101
110 SF
STAFF CORR.
4H-103
305 SF
W LOCKERS
4H-104
288 SF
M LOCKERS
4H-105
594 SF
DINING ACUTE
4H-108
113 SF
STOR.
4H-108A
699 SF
ENTRY CORR.
C4-114
241 SF
FAMILY ROOM
4H-109
131 SF
NOURISH.
4H-110
215 SF
FAMILY CONF.
4H-111
703 SF
CORR.
C4-127
77 SF
NURSING MOTHERS
RM
4H-104A
139 SF
MED RM
4H-107A
401 SF
CENTRAL NURSE
STATION
4H-107
150 SF
NURSE MNGR
4H-106
849 SF
VACANT (FINISH
PHASE 2)
4H-100
85 SF
CARTS
C4-126
19 SF
CARTS
4K-149
K102
H
K101
K
3A
H
8 SF
HAND WASH
4K-152
H114
H107-A
H106
H
8A
H108
H101
H
H102
H
4A
H104 H105
J127-B
RB-1
LVT-1
RB-1
LVT-4
RB-1
LVT-2
RB-1
LVT-1
RB-1
LVT-4
RB-1
LVT-2
RB-1
LVT-1,2,3,4
RB-1
RF-1
PT-2
PT-3
PT-2
PT-3
RB-1
LVT-2
RB-1
LVT-1
RB-1
LVT-1,2,3,4
RB-1
LVT-2
RB-1
LVT-2
RB-1
LVT-1,3
RB-1
LVT-2
FINISHES ETR THIS ROOM
E4
IN501
PT-2
PT-3,4
2' -0
2' -0
"1 '-8
E4
IN501
RB-1
LVT-2
642 SF
ELEV. LOBBY
4H-115
RB-1
LVT-1,2,3,4
RB-1
LVT-1,2,3,4
876 SF
ELEV. LOBBY
C4-115
876 SF
ELEV. LOBBY
C4-115
1'-9 5/8"
H
7A
H
7- B
1' -6
64 SF
HAC
4H-112 WSF-1
WSF-1
A8
IN501
RB-1
LVT-4
PT-2
PT-3
PT-2
PT-3
FINISHES ETR THIS ROOM
WFT-9 WRAPS
COLUMN ALL
SIDES
ETR FINISHES
NEW FINISHES
RB-1
LVT-2
121 SF
REC STOR
4K-127
E6
IN501
E6
IN501
RB-1
LVT-1
119 SF
OFFICE
4H-123
RB-1
LVT-2
75 SF
TELECOM ROOM
4H-122
169 SF
STAIRWELL 8
SW8
2' -0
2'-8"
4'-0" 2'-0"
2' -0
4'
-6
2' -2
2'-0" 7'-9" 10'-0" 2'-0" 2'-0" 2'-0" 4'-0"
2' -0
1' -4
'-7
1' -4
4'
-9
3' -0
2'
-0
2' -0
5'
-7
/4
2'-0" 2'-0" 3'-11"
GRAIN
GRAIN
G R
A
IN
G R
A
IN
G R
A
IN
GRAIN
G R
A
IN
GRAIN GRAIN
GRAIN
G R
A
IN
G R
A
IN
GRAIN
GRAIN
G R
A
IN
GRAIN
GRAIN
GRAIN
GRAIN
G R
A
IN
GRAIN
G R
A
IN
G R
A
IN
GRAINGRAIN
GRAIN
GRAIN
G R
A
IN
GRAIN
GRAIN
GRAIN
GRAIN
GRAIN
GRAIN
G R
A
IN
G R
A
IN
G R
AIN
GRAIN
G R
A
IN
G R
A
IN
GRAIN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
F1
IN502
E6
IN501
E6
IN501
E6
IN501
E4
IN501
E4
IN501
E4
IN501
E4
IN501
E4
IN501
E4
IN501
E4
IN501
F5
IN502
F5
IN502
D6
IN502
D6
IN502
D6
IN502
D6
IN502
TTUUVVWWXX
310 SF
STORAGE
4K-116B
246 SF
THERAPIST OFFICE
4K-116C
2084 SF
THERAPY GYM
4K-116
143 SF
PRIVATE OT
4K-116A
168 SF
PRIVATE PT
4K-116D
72 SF
TLT
4K-115A
73 SF
TLT
4K-113A
73 SF
TLT
4K-114A
73 SF
TLT
4K-112A
74 SF
TLT
4K-110A
75 SF
TLT
4K-108A
71 SF
TLT
4K-105A
88 SF
TLT
4K-103A
254 SF
BREAK RM
4H-113
128 SF
ANM + 1
4K-101
241 SF
FAMILY ROOM
4H-109
594 SF
CORR.
C4-135
131 SF
NOURISH.
4H-110
215 SF
FAMILY CONF.
4H-111
703 SF
CORR.
C4-127
154 SF
TEAM RM
4K-102
121 SF
REC STOR
4K-127
76 SF
TLT
4K-123A
114 SF
SW +1
4K-104
68 SF
LSB
4K-106
88 SF
LINEN
4K-109
254 SF
STOR.
4K-121
98 SF
LAUNDRY
4K-126
59 SF
STAFF TLT
4K-107
71 SF
TLT
4K-120A
71 SF
TLT
4K-122A
306 SF
PATIENT ROOM
4K-119
71 SF
TLT
4K-119A
163 SF
NURSE STN
4K-111
104 SF
SOILED UTILITY
4K-118
89 SF
CLEAN
4K-117
741 SF
CORR.
C4-131
307 SF
PATIENT ROOM
4K-120
328 SF
PATIENT ROOM
4K-122
318 SF
PATIENT ROOM
4K-123
483 SF
REC THERAPY
4K-128
20 SF
NURSE
4K-150
20 SF
NURSE
4K-151
19 SF
NURSE
4K-155
19 SF
NURSE
4K-154
19 SF
NURSE
4K-153
19 SF
CARTS
4K-149
20 SF
NURSE
4K-156
K102
H
K101
K103
K
3A
H
K105
K
5A K
8A
K108
K110
K
0A K
2A
K112
K113
K
3A K
4A
K114
K
6A
K116D
K
6-
AK
K
6C
K116-B
K115
K115A
252 SF
CORR.
C4-132
K104
K106
K107
K109
K111-A
K126
K127
K128
K
3A
K123
K122
K
2A K
0A
K120
K119
K
9A
8 SF
HAND WASH
4K-152
MATCHLINE
SEE: F1/IN104
MATCHLINE
SEE: F1/IN104
RB-1
RF-1,2
RB-1
RF-1
RB-1
RF-1
RB-1
LVT-2RB-1
LVT-2
RB-1
LVT-1,4,5
RB-1
RSF-1
RB-1
LVT-1
WSF-1
WSF-1
RB-1
LVT-2
PT-2
PT-3
RB-1
LVT-2 RB-1
LVT-1
RB-1
LVT-1
RB-1
LVT-1
RB-1
LVT-1, 2, 3
RB-1
LVT-1
RB-1
LVT-4
RB-1
LVT-2
RB-1
LVT-1
RB-1
LVT-4
RB-1
LVT-2
388 SF
PATIENT ROOM
4K-115
316 SF
PATIENT ROOM
4K-114
314 SF
PATIENT ROOM
4K-113
307 SF
PATIENT ROOM
4K-112
329 SF
PATIENT ROOM
4K-110
341 SF
PATIENT ROOM
4K-108
352 SF
PATIENT ROOM
4K-105
450 SF
BARIATRIC / SURGE
PATIENT ROOM
4K-103
PT-2
PT-3
PT-2
PT-3
RB-1
LVT-1
RB-1
LVT-1
RB-1
LVT-1
1907 SF
MECHANICAL
4K-124 37 SF
TELECOM ROOM
4K-124A
319 SF
ELECTRICAL ROOM
4K-124B
RB-1
RSF-1
RB-1
RSF-1
RB-1
RSF-1
RB-1
RSF-1
RB-1
RSF-1
RB-1
RSF-1
RB-1
RSF-1
RB-1
RSF-1
K
6B
F6
IN502
A8
IN501
A8
IN501
F6
IN502
F6
IN502
A8
IN501
A8
IN501
A8
IN501
A8
IN501
A8
IN501
A8
IN501
RB-1
RSF-1
F6
IN502
F6
IN502
F6
IN502
F6
IN502
F6
IN502
E4
IN501
PT-2
PT-3,4
PT-2
PT-3,4
PT-2
PT-3,4
PT-2
PT-3,4
PT-2
PT-3,4
PT-2
PT-3,4
PT-2
PT-3,4
PT-2
PT-3,4
E4
IN501
2' -0
E4
IN501
E4
IN501
K111-B E4
IN501
K121
E4
IN501
E4
IN501
2' -0
"1 '-8
2'-0" 9'-1" 2'-0" 7'-3"
RB-1
LVT-1
K
E4
IN501
F6
IN502
F6
IN502
F6
IN502
F6
IN502
E4
IN501
E6
IN501
E6
IN501
E4
IN501
E6
IN501
A8
IN501
A8
IN501
A8
IN501
A8
IN501
RB-1
RSF-1
RB-1
RSF-1
RB-1
LVT-2
64 SF
HAC
4H-112 WSF-1
WSF-1
9' -0
3'
-0
121 SF
REC STOR
4K-127
A-406
C6
57 SF
MED SUPPLY
4K-125 RB-1
LVT-2
169 SF
STAIRWELL 8
SW8
163 SF
STAIRWELL 7
SW7
6"
1'-5"
1' -5
1'-5"
5°
135°
1' -5
2' -0
2'-8"
IN104
B4
GRAIN GRAIN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
GRAIN
GRAIN
GRAIN
GRAIN
GRAIN
GRAIN
GRAIN
GRAIN
GRAIN
GRAIN
GRAIN
GRAIN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
GRAIN
G R
A
IN
G R
A
IN
G R
A
IN
GRAIN
GRAIN
G R
A
IN
G R
A
IN
G R
A
IN
GRAIN
G R
A
IN
GRAIN GRAIN
GRAIN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
G R
A
IN
GRAIN GRAIN
G R
A
IN
G R
A
IN
/2
/2
/2
1'-10 1/2"
3"
1'-10 1/2"
7'-9 3/4"
/2
/2
/4
16'-2 1/4"
C10
GI200
'-2
/8
24'-2 1/8" 8" 4' -6
6"
4' -6
6"
4' -6
6"
4' -6
6"
4' -6
6"
4' -6
6"
4' -6
6"
4' -6
6"
4' -6
ALIGN
8"
A-401
F1
F1
IN502
F1
IN502
F1
IN502
F5
IN502
F5
IN502
F5
IN502
LVT - 1
LVT - 2
FLOOR FINISH LEGEND
PT-4
RF-1
PT-3 RSF-1
WSF-1LVT - 3
LVT - 4
LVT-5 RF-2
5' -4
1'-6"
RSF-1
LVT-1
LVT-5
LVT-1
A8
IN501
GRAIN
G R
A
IN
G R
A
IN
MATERIAL TRANSITION
TO OCCUR IN THE
CENTERLINE OF DOOR
OPENING
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
Drawing Number
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
E F
G
H
J
K
L
M
C
LINE INDICATES
PHASE 1 SCOPE AREA
STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL
VERIFY ACTUAL CONDITIONS ON-SITE.
410 Grand Ave, Suite 201C Laramie, WY 82070
As indicated
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-1
.A
R C
H .B
.L
.P o ly tr a m a .r v t
/4
/2
:1
:3
P
M
04/03/2023 M.PERKINS K.MACAULAY
618-22-100
1390 - IN104
INTERIOR FLOOR FINISH PLAN - FOURTH
FLOOR 4H/4K
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAMISSUED FOR BIDDING
INTERIOR SHEET NOTES
A. REFER TO IN001 FOR INTERIOR FINISH GENERAL NOTES
B. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.
C. REFER TO IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.
D. REFER TO A-400 SERIES FOR CASEWORK FINISHES.
E. REFER TO IF SERIES FOR FURNITURE; FURNITURE IS SHOWN FOR REFERENCE
ONLY, ALL FURNITURE IS NIC.
F. REFER TO AW SERIES FOR ALL SIGNAGE.
G. REFER TO Q SERIES FOR EQUIPMENT INFORMATION.
H. PAINT ALL WALLS (P-1) UNO.
I. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL
BOARD CEILINGS (P-2) UNO.
J. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT
BOUNDARY (P-3) UNO.
K. PLANS HAVE BEEN SCREENED BACK FOR CLARITY, REFER TO ARCHITECTURE
SERIES FOR WALL CONSTRUCTION INFORMATION
FINISH ABBREVIATIONS
ABBREVIATION FINISH TYPE - REFER TO IN601 FOR ADDITIONAL FINISH INFORMATION
AT ACOUSTICAL CEILING TILE
CC CUBICLE CURTAIN TRACK
CG CORNER GUARD
CHR CHAIR RAIL
HR HAND RAIL
LVT LUXURY VINYL TILE
P PAINT
PL PLASTIC LAMINATE
PT PORCELAIN TILE
RB RESILIENT BASE
RF RESILIENT ATHLETIC FLOORING
RSF RESILIENT SHEET VINYL
RSW ROLLER SHADES
RWC RIGID WALL COVERING
S SOLID SURFACE
TR TRIM
WD WOOD DOOR FINISH
WFT WALL FINISH TYPE
WSF WELDED SEAM SHEET
KEYNOTES-
1/8" = 1'-0" F1
INTERIOR FINISH FLOOR PLAN - FOURTH FLOOR 4H
1/8" = 1'-0"
F7
INTERIOR FINISH FLOOR PLAN - FOURTH FLOOR 4K
FLOOR MATERIAL TAKEOFF
Mark Material: Area
LVT-1 6979 SF
LVT-2 2572 SF
LVT-3 495 SF
LVT-4 796 SF
LVT-5 96 SF
PT-3 1919 SF
PT-5 22 SF
RF-1 2951 SF
RF-2 303 SF
RSF-1 4095 SF
WSF-1 171 SF
20399 SF
1/2" = 1'-0" B4
TYPICAL PATIENT ROOM ENTRY
/03
TTUUVVWWXX
310 SF
STORAGE
4K-116B
246 SF
THERAPIST OFFICE
4K-116C
2084 SF
THERAPY GYM
4K-116
143 SF
PRIVATE OT
4K-116A
168 SF
PRIVATE PT
4K-116D
72 SF
TLT
4K-115A
73 SF
TLT
4K-113A
73 SF
TLT
4K-114A
73 SF
TLT
4K-112A
74 SF
TLT
4K-110A
75 SF
TLT
4K-108A
71 SF
TLT
4K-105A
88 SF
TLT
4K-103A
254 SF
BREAK RM
4H-113
128 SF
ANM + 1
4K-101
241 SF
FAMILY ROOM
4H-109
594 SF
CORR.
C4-135
131 SF
NOURISH.
4H-110
215 SF
FAMILY CONF.
4H-111
703 SF
CORR.
C4-127
154 SF
TEAM RM
4K-102
121 SF
REC STOR
4K-127
76 SF
TLT
4K-123A
114 SF
SW +1
4K-104
68 SF
LSB
4K-106
88 SF
LINEN
4K-109
254 SF
STOR.
4K-121
98 SF
LAUNDRY
4K-126
59 SF
STAFF TLT
4K-107
71 SF
TLT
4K-120A
71 SF
TLT
4K-122A
306 SF
PATIENT ROOM
4K-119
71 SF
TLT
4K-119A
163 SF
NURSE STN
4K-111
104 SF
SOILED UTILITY
4K-118
89 SF
CLEAN
4K-117
741 SF
CORR.
C4-131
307 SF
PATIENT ROOM
4K-120
328 SF
PATIENT ROOM
4K-122
318 SF
PATIENT ROOM
4K-123
483 SF
REC THERAPY
4K-128
20 SF
NURSE
4K-150
20 SF
NURSE
4K-151
19 SF
NURSE
4K-155
19 SF
NURSE
4K-154
19 SF
NURSE
4K-153
19 SF
CARTS
4K-149
20 SF
NURSE
4K-156
K102
H
K101
K103
K
3A
H
K105
K
5A K
8A
K108
K110
K
0A K
2A
K112
K113
K
3A K
4A
K114
K
6A
K116D
K
6-
AK
K
6C
K116-B
K115
K115A
252 SF
CORR.
C4-132
K104
K106
K107
K109
K111-A
K126
K127
H110
K128
K
3A
K123
K122
K
2A
K
0A
K120
K119
K
9A
8 SF
HAND WASH
4K-152
MATCHLINE
SEE: F1/IN104
MATCHLINE
SEE: F1/IN104
P-5, WFT-3,4
RB-1
P-1, 5 P-4
P-1
P-1
RB-1
P-5 P-1
P-1
P-1
RB-1
P-5 P-1
P-1
WFT-3
RB-1
WFT-3
WFT-3
WFT-3
P-1
RB-1
P-1 P-5
P-1
P-4
RB-1
P-1 P-1
P-1, 4
P-1
RB-1
P-1 P-1
P-1WFT-7
WSF-1
WFT-7
WFT-7
WFT-7
P-4
RB-1
P-1 N/A
P-1
WFT-1
PT-2
WFT-1
WFT-1
WFT-1
WFT-3
RB-1
WFT-3
WFT-3
WFT-3
P-1
RB-1
P-1 P-1
P-1
P-1
RB-1
P-1 P-1
P-4
P-1
RB-1
P-1 P-1
P-5
P-6
RB-1
P-1 P-1
P-1
P-1
RB-1
P-1 P-1
P-1
P-1
RB-1
P-1 P-5
P-1
P-1
RB-1
P-1 P-1
P-1
P-1
RB-1
P-4 P-1
P-1
WFT-9
RB-1
WFT-9
WFT-9
WFT-9
P-1
RB-1
P-1 P-5
P-1
329 SF
PATIENT ROOM
4K-110
341 SF
PATIENT ROOM
4K-108
WFT-1
PT-2
WFT-1
WFT-1
WFT-1
WFT-1
PT-2
WFT-1
WFT-1,8
WFT-1
WFT-6
RB-1
WFT-6
WFT-6
N/A
WFT-6
RB-1
WFT-5/6
WFT-6
N/A
WFT-6
RB-1
WFT-6
WFT-6
N/A
1907 SF
MECHANICAL
4K-124 37 SF
TELECOM ROOM
4K-124A
319 SF
ELECTRICAL ROOM
4K-124B
P-4
RB-1
P-1 P-1
P-1,4
P-1
RB-1
P-1 P-4
P-1,4
P-4
RB-1
P-1 P-1
P-1,4
P-1
RB-1
P-1 P-4
P-1,4
P-4
RB-1
P-1 P-1
P-1,4
P-1
RB-1
P-1,4 P-4
P-1
P-4
RB-1
P-1,4 P-1
P-1
P-1
RB-1
P-1,4 P-4
P-1
K
6B
P-1
RB-1
P-1 P-4
P-1,4
WFT-1,2
PT-2
WFT-1,2
WFT-1,2
WFT-1,8
WFT-1,2
PT-2
WFT-1,8
WFT-1,2
WFT-1,2
WFT-1,2
PT-2
WFT-1,8
WFT-1,2
WFT-1,2
WFT-1,2
PT-2
WFT-1,8
WFT-1,2
WFT-1,2
WFT-1,2
PT-2
WFT-1,8
WFT-1,2
WFT-1,2
WFT-1,2
PT-2
WFT-1,8
WFT-1,2
WFT-1,2
WFT-1,2
PT-2
WFT-1,8
WFT-1,2
WFT-1,2
WFT-1,8
PT-2
WFT-1,2
WFT-1,2
WFT-1,2
K111-B
K121
WFT-6
RB-1
NA
WFT-6
WFT-6
K
P-4
RB-1
P-1,4 P-1
P-1
P-4
RB-1
P-1,4 P-1
P-1
WFT-3
RB-1
WFT-3, 4
WFT-3
WFT-3
P-1
RB-1
P-1 P-1
P-1
WFT-8
W F
T -8
W F
T -8
W F
T -8
W F
T -8
W F
T -8
WFT-6
RB-1
WFT-6
WFT-6
NA
WFT-4
RB-1
WFT-4
WFT-4
N/A
W F
T -8
W F
T -8
W F
T -8
W F
T -8
WFT-1,2
PT-2
WFT-1,2
WFT-1,2
WFT-1,8
WFT-1,2
PT-2
WFT-1,2
WFT-1,2
WFT-1,8
WFT-1,2
PT-2
WFT-1,2
WFT-1,2
WFT-1,8
WFT-1,2
PT-2
WFT-1,2
WFT-1,2
WFT-1,8
W F
T -6
W F
T -5
W F
T -6
W F
T -5
W F
T -6
W F
T -6
W F
T -5
W F
T -6
W F
T -6
W F
T -5
W F
T -6
W F
T -5
W F
T -5
W F
T -5
WFT-5WFT-6WFT-5
W F
T -6
W F
T -6
WFT-3
W F
T -5
W F
T -5
W F
T -5
W F
T -6
W F
T -6
W F
T -5
W F
T -5
W F
T -6
W F
T -6
WFT-5 WFT-5
W F
T -6
W F
T -5
W F
T -5
W F
T -5
W F
T -5
W F
T -5
WFT-3
WFT-5
W F
T -5
W F
T -6
WFT-7
WSF-1
WFT-7
WFT-7
WFT-7
WFT-6
57 SF
MED SUPPLY
4K-125
57 SF
MED SUPPLY
4K-125
P-1
RB-1
P-1 P-1
P-1
WFT-4
A-405
C7
A-404
F6
A-403
C4
A-404
D7
A-404
E7
A-404
B7
A-403
C7
A-406
F7
A-406
C6
A-402
F7
64 SF
HAC
4H-112
4'-2" 008
W F
T -8
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
307 SF
PATIENT ROOM
4K-112
314 SF
PATIENT ROOM
4K-113
316 SF
PATIENT ROOM
4K-114
388 SF
PATIENT ROOM
4K-115
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
P-4
TTUUVVWWXXYY
MATCHLINE
SEE: F7/A-104
88 SF
TLT
4K-103A
254 SF
BREAK RM
4H-113
128 SF
ANM + 1
4K-101
1127 SF
CORR.
C4-137
192 SF
TR
4H-114
270 SF
ELEVATORS
E
66 SF
TLT
4H-102
65 SF
TLT
4H-101
110 SF
STAFF CORR.
4H-103
305 SF
W LOCKERS
4H-104
288 SF
M LOCKERS
4H-105
594 SF
DINING ACUTE
4H-108
113 SF
STOR.
4H-108A
699 SF
ENTRY CORR.
C4-114
241 SF
FAMILY ROOM
4H-109
131 SF
NOURISH.
4H-110
215 SF
FAMILY CONF.
4H-111
703 SF
CORR.
C4-127
77 SF
NURSING MOTHERS
RM
4H-104A
139 SF
MED RM
4H-107A
401 SF
CENTRAL NURSE
STATION
4H-107
150 SF
NURSE MNGR
4H-106
849 SF
VACANT (FINISH
PHASE 2)
4H-100
85 SF
CARTS
C4-126
19 SF
CARTS
4K-149
K102
H
K101
K
3A
H
H110
8 SF
HAND WASH
4K-152
H114
H107-A
H106
H
8A
H108
H101
H
H102
H
4A
H104 H105
J127-B
MATCHLINE
SEE: F1/IN104
P-1
RB-1
P-1 P-1
P-1
P-1
RB-1
P-1 P-5
P-1
P-1
RB-1
P-1 P-1
P-1
P-1
RB-1
P-4 P-1
P-1
WFT-9
RB-1
WFT-9
WFT-9
WFT-9
P-1
RB-1
P-1 P-5
P-1
WFT-5
RB-1
WFT-5
WFT-5
WFT-5
P-1
RB-1
P-1 P-1
P-1
WFT-1/2
PT-2
WFT-1
WFT-1/2
WFT-1/2
WFT-1
PT-2
WFT-1/2
WFT-1/2
WFT-1/2
P-4
RB-1
P-1,4 P-1
P-1
P-1
RB-1
P-1 P-1
P-1
P-4
RB-1
P-1 P-5
P-1
P-1
RB-1
P-1 P-1
P-1
P-1
RB-1
P-1 P-1
P-1
WFT-9
RB-1
WFT-9
WFT-9
WFT-9
P-4
RB-1
P-1 P-1
P-1
FINISHES ETR THIS ROOM
WFT-1,2
PT-2
WFT-1,2
WFT-1,2
WFT-1,8
WFT-3
RB-1
WFT-3, 4
WFT-3
WFT-3
642 SF
ELEV. LOBBY
4H-115
WFT-10
RB-1
WFT-10
WFT-10
WFT-10
876 SF
ELEV. LOBBY
C4-115
876 SF
ELEV. LOBBY
C4-115
H
7A
H
7- B
W F
T -8
WFT-4
RB-1
WFT-4
WFT-4
N/A
WFT-9 WRAPS
COLUMN ALL
SIDES
WFT-1
PT-2
WFT-1
WFT-1
WFT-1
WFT-1
PT-2
WFT-1
WFT-1
WFT-1P-1
RB-1
P-1 P-1
P-1
W F
T -5
WFT-5WFT-6WFT-5
W F
T -6
W F
T -6
WFT-3
W F
T -5
W F
T -5
W F
T -5
W F
T -5
WFT-5
WFT-5
WFT-5 WFT-5
WFT-5
WFT-3
RB-1
WFT-3
NA
WFT-3
W F
T -5
P-4
P-4
W F
T -6
ETR FINISHES
NEW FINISHES
WFT-7
WSF-1
WFT-7
WFT-7
WFT-7
WFT-6
WFT-10
RB-1
WFT-10
WFT-10
WFT-10
119 SF
OFFICE
4H-123
P-1
RB-1
P-1 P-1
P-1
WFT-2
W F
T -2
W F
T -2
W F
T -2
WFT-2
WFT-2
A-403
D7
A-403
F7
A-405
F7
A-404
F3
A-405
C7
A-403
C7
64 SF
HAC
4H-112
WFT-10
RB-1
WFT-10
WFT-10
WFT-10
4'-2"
3' -4
WFT-10
RB-1
WFT-10
WFT-10
WFT-10
WFT-10
RB-1
WFT-10
WFT-10
WFT-10
P-4
PATTERN OR GRAIN DIRECTION CHANGE
MATERIAL FLOOR CHANGE
DIRECTION OF FINISH
CORNER GUARD LOCATION
CG
GRAIN
FINISH MATERIAL
ROOM FINISH TAG
INTERIOR FINISH SYMBOLS
Base Finish Floor Finish
Wall Finishes
North
South
West East
P-# on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
Drawing Number
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
E F
G
H
J
K
L
M
C
LINE INDICATES
PHASE 1 SCOPE AREA
STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL
VERIFY ACTUAL CONDITIONS ON-SITE.
410 Grand Ave, Suite 201C Laramie, WY 82070
As indicated
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-1
.A
R C
H .B
.L
.P o ly tr a m a .r v t
/4
/2
:1
:5
P
M
04/03/2023 M.PERKINS K.MACAULAY
618-22-100
1390 - IN124
INTERIOR WALL FINISH PLAN - FOURTH
FLOOR 4H/4K
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAMISSUED FOR BIDDING
1/8" = 1'-0" F7
INTERIOR WALL FINISH PLAN - FOURTH FLOOR 4K
1/8" = 1'-0"
F1
INTERIOR WALL FINISH PLAN - FOURTH FLOOR 4H
INTERIOR SHEET NOTES
A. REFER TO IN001 FOR INTERIOR FINISH GENERAL NOTES
B. REFER TO SPECIFICATIONS FOR MATERIAL AND INSTALLATION REQUIREMENTS.
C. REFER TO IN601 FOR FINISH LEGEND AND ROOM FINISH SCHEDULE.
D. REFER TO A-400 SERIES FOR CASEWORK FINISHES.
E. REFER TO IF SERIES FOR FURNITURE; FURNITURE IS SHOWN FOR REFERENCE
ONLY, ALL FURNITURE IS NIC.
F. REFER TO AW SERIES FOR ALL SIGNAGE.
G. REFER TO Q SERIES FOR EQUIPMENT INFORMATION.
H. PAINT ALL WALLS (P-1) UNO.
I. PAINT ALL EXPOSED SIDES OF INTERIOR CEILING SOFFITS AND GYPSUM WALL
BOARD CEILINGS (P-2) UNO.
J. PAINT ALL HOLLOW METAL DOORS AND HOLLOW METAL FRAMES IN CONTRACT
BOUNDARY (P-3) UNO.
K. PLANS HAVE BEEN SCREENED BACK FOR CLARITY, REFER TO ARCHITECTURE
SERIES FOR WALL CONSTRUCTION INFORMATION
FINISH ABBREVIATIONS
ABBREVIATION FINISH TYPE - REFER TO IN601 FOR ADDITIONAL FINISH INFORMATION
AT ACOUSTICAL CEILING TILE
CC CUBICLE CURTAIN TRACK
CG CORNER GUARD
CHR CHAIR RAIL
HR HAND RAIL
LVT LUXURY VINYL TILE
P PAINT
PL PLASTIC LAMINATE
PT PORCELAIN TILE
RB RESILIENT BASE
RF RESILIENT ATHLETIC FLOORING
RSF RESILIENT SHEET VINYL
RSW ROLLER SHADES
RWC RIGID WALL COVERING
S SOLID SURFACE
TR TRIM
WD WOOD DOOR FINISH
WFT WALL FINISH TYPE
WSF WELDED SEAM SHEET
KEYNOTES-
1 AT AREA OF EXISTING DOOR INFILL, PAINT NEW WALL TO MATCH ADJACENT
EXISTING WALL COLOR. INSTALL NEW RB-1 WALL BASE AT AREA OF NEW WALL
INFILL.
/03
RB-1
RWC-1
P-1
UON ON
FINISH
PLAN
SHEET WALL PROTECTION
MANUFACTURER'S
STANDARD
TRIM PIECES AT
ALL SEAMS AND
EDGES
TR-3
BATHROOM WALL TILE
TR-1
3' -2
4"
RB-1
S-1
SOLID SURFACE WALL PANEL
AT WALL MOUNTED LAVATORIES
P-1 , UNLESS NOTED
OTHERWISE
ON FINISH
PLAN
EQ EQ
2'-6"
4' -4
4' -0
PATIENT SHOWER
8' -0
TR-1
S-1
SCRIBE
TO
CEILING
SCRIBE
AND SEAL
INSIDE
SHOWER
CORNERS
RWC MOUNTED
>2" AFF
RB-1
CORRIDOR WALL
PROTECTION & HANDRAILS
RWC-2 BONDED
METAL PANELING
RWC-2 MOUNTED
ABOVE WALL BASE
P-1 , UNLESS NOTED
OTHERWISE ON
FINISH PLAN
HONED FINISH
AT ALL
OUTSIDE
EDGES
8' -0
PT-2
4' -4
R E
F E
R T
O R
C P
T O
P O
F H
R -1
3' -0
HR-1
HANDRAIL
RB-1
CORRIDOR WALL
PROTECTION - NO HANDRAIL
RWC-2 BONDED
METAL PANELING
RWC-2 MOUNTED
ABOVE WALL BASE
R E
F E
R T
O R
C P
2' -7
/2
WHERE NO HANDRAIL
PROVIDE TR-3
FINISHING TRIM
P-1
UNLESS
NOTED
OTHERWISE
ON FINISH
PLAN
TR-3
UTILITY WALL TILE
WSF-1
4' -0
S E
E R
C P
PT-6
P-1 , UNLESS NOTED
OTHERWISE ON
FINISH PLAN
WFT-1 WFT-2 WFT-3 WFT-4 WFT-5 WFT-6 WFT-7
CAULK AT SEAMS
WHERE PANELS
ABUT WITH COLOR
TO MATCH PANELS
CAULK AT SEAMS
WHERE PANELS
ABUT WITH COLOR
TO MATCH PANELS
P-4
BATHROOM WALL TILE @ SINK
TR-1
2' -1
0" S
E E
R C
P
PT-2
BEHIND
APRON
WFT-8
S-1
COUNTERTOP
PER
ELEVATION
BEADBOARD & CHAIR RAIL
WFT-9
RB-1
CHR-1
RWC-3
P-5
3' -0
E8
IN501
E9
IN501
C1
IN501
E1
IN501
C4
IN501
C4
IN501
A6
IN501
E8
IN501
C1
IN501
E9
IN502
TR-3
SINK
APRON
B9
A-552 F9
IN502
BACK OF HOUSE WALL
PROTECTION & HANDRAIL
WFT-10
RB-1
S E
E R
C P
HR-1
RWC-1
P-5
3' -0
C1
IN501
E9
IN502
DOOR FRAME BEYOND
WHERE OCCURS
LVT FLOORING
AS SCHEDULED
LOCATION OF FLOOR FINISH
CHANGE, SEAM OR ADAPTER;
TRANSITION SHALL OCCUR AT
CENTER LINE OF DOOR IN
THE CLOSED POSITION
DOOR AS SCHEDULED
WHERE OCCURS
LVT FLOORING
AS SCHEDULED
C CENTER LINE OF DOORL
S E
E S
T R
U C
T U
R A
L
EQ.EQ.
TOP OF SLAB
CERAMIC TILE
FLOORING AS
SCHEDULED
LOCATION OF FLOOR FINISH
CHANGE, SEAM OR ADAPTER;
TRANSITION SHALL OCCUR AT
CENTER LINE OF DOOR IN THE
CLOSED POSITION
DOOR AS SCHEDULED
TRANSITION STRIP (TR-2) OR
EQUAL, REFER TO IN601 FOR
INFORMATION
LVT FLOORING AS SCHEDULED
C CENTER LINE OF DOORL
S E
E S
T R
U C
T U
R A
L
TOP OF SLAB
THRESHOLD
MUST MEET ADA
REQUIREMENTS:
Changes in level between ¼" and ½" must have a beveled slope equaling 1:2.
PORCELAIN TILE AS SCHEDULED
TRANSITION STRIP (TR-1) OR
EQUAL, REFER TO IN601 FOR
INFORMATION
THIN SET PORCELAIN
FLOOR TILE AS
SCHEDULED
TOP OF SLAB
PARTITION AS SCHEDULED
SOLID SURFACE AS SCHEDULED
TRANSITION STRIP (TR-1) OR
EQUAL, REFER TO IN601 FOR
INFORMATION
THIN SET PORCELAIN
FLOOR TILE AS
SCHEDULED
TOP OF SLAB
PARTITION AS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .