Attachment D.1 - 618-22-100_MPLS_PT_IFB_GENERAL_230404.pdf
PDF 9 MB Posted
- Solicitation number
- 36C26323R0058_1
About this file
This federal solicitation is for project 618-22-100 to renovate and expand polytrauma care facilities at the Minneapolis VA Health Care System. The scope of work includes general construction, electrical, plumbing and other trades as required to complete the project. The estimated value of construction is between $10-20 million. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses, which must be verified in the VetBiz Vendor Information Pages database. The work includes renovating wards H and K on the fourth floor to expand patient rooms, therapy spaces and support areas. The contractor must provide all labor, materials, equipment and testing to deliver a finished project.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
Drawing Number
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
E F
G
H
J
K
L
M
C
LINE INDICATES
PHASE 1 SCOPE AREA
STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL
VERIFY ACTUAL CONDITIONS ON-SITE.
410 Grand Ave, Suite 201C Laramie, WY 82070
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-1
.A
R C
H .B
.L
.P o ly tr a m a .r v t
/4
/2
:1
:2
P
M
04/03/2023 M.PERKINS K.MACAULAY
618-22-100
1390 - GI000
COVER SHEET
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAMISSUED FOR BIDDING
ISSUED FOR BIDDING
04/03/2023
Contract No.
Solicit No.
618-22-100 RENOVATE FOR
EXPANDED POLYTRAUMA
PROGRAM - B70
VA Minneapolis Healthcare System
CONTRACTOR SCOPE OF WORK:
Contractor shall completely prepare project site for operations, including demolition and removal of existing site elements, and furnish labor and materials and perform work for the Minneapolis VA Medical Center Project 618-22-100, Renovate for Expanded Polytrauma Program Phase 1 as required by drawings and specifications.
Period of performance is projected to be five-hundred forty (540) calendar days.
The work will require the demolition of the interior of the existing 4H and 4K wards on the fourth floor of Building 70 as required by the drawings and specifications. The project entails the masterplanning for the renovation of wards 4H, 4J, 4K and 4L. Phase 1 includes the renovation of only wards 4H and 4K (with 4J and 4L to be constructed in separate, subsequent phases). The current 4H and 4K occupants will be relocating to other spaces within the hospital prior to the commencement of construction activities. The newly renovated 4H ward will consist of a large, centralized nursing station, med room, office spaces, staff locker and break spaces and an existing EHRM technology room. The newly renovated 4K ward will house the acute polytrauma patient rooms (11 private patient rooms with attached bathrooms and 1 bariatric room with capacity to surge to a dual occupancy room with attached bathroom) a satellite nurses's station, storage and support spaces, staff offices and work rooms, a large therapy gym and treatment spaces. This Phase 1 renovation also includes the replacement of the AHUs serving 4H and 4K.
Electrical, Telecommunications, and Security Work: Work includes all labor, material, equipment and supervision to perform new electrical, communications and security systems to the renovated spaces renovated as detailed by the construction drawings and specifications.
Provide access control for all the required doors, coordinate with the door hardware schedule for additional requirements. Provide new cameras, associated devices and equipment.
Mechanical, Plumbing and Fire Protection Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical, Plumbing and Fire Protection construction work on this project including provide materials and construction equipment as detailed by the construction drawings and specifications. All new mechanical systems shall be addressable and controllable via the existing Engineering Control Center (ECC) and HVAC Shop. The ECC system shall monitor space conditions and unit status and shall alarm the Facility Operations staff as detailed by the mechanical control drawings and specifications.
In addition to providing new mechanical systems to serve the renovated spaces, this project also requires reconfiguration of the existing building HVAC systems (duct, diffusers, grilles, bracing and supports) to maintain existing heating and cooling systems. Contractor is required to Test and Balance (TAB) new and existing HVAC systems per 23 05 93. This work requires preconstruction TAB readings to establish baseline performance for all existing HVAC systems to remain serving the Medical Bed space and adjacent clinical office space & corridor. Existing systems shall be rebalanced to preconstruction readings.
Contractor shall reconfigure fire protection piping and provide additional sprinkler heads to the existing building automatic sprinkler system as required. New Fire Protection systems shall be provided, and existing systems modified per the construction drawings and specifications.
Contractor shall reconfigure plumbing and medical gas piping and provide new piping, fixtures, valves, fittings, and devices as required by the construction drawings and specifications.
CO: Dean W. Flanders, USAF (Ret), MPA Branch Chief, Construction Team 1 Department of Veterans Affairs Network 23 Contracting Office (NCO 23) 316 Robert Street North, Room 406 Saint Paul, MN 55101
M-F 0630-1500 CST
320-469-6583 (W) Dean.Flanders@va.gov
COR: Nathan Estrem, P.E.
Projects Section Chief Facilities Engineering Minneapolis VAMC Mobile Phone: 612-946-4254 External Direct Dial: 612-467-5523 Internal Dial: 315523
VA LOCATION MAP - NOT TO SCALE
VA VICINITY MAP - NOT TO SCALE
All new and existing systems within the Scope of Work shall be commissioned (or recommissioned) for per Specification 01 91 00.
Inspections: Comprehensive 3rd party inspections, testing and written reports for all Divisions are required and paid by the General Contractor. Contractor shall employ third party inspection consultants to perform all inspections required by this contract.
Contractor shall appoint a third-party individual, company, or firm to act as the Commissioning Agent. The Commissioning Agent is the designated person, company, or entity that plans, schedules, and coordinates the commissioning team to implement the commissioning process.
Identify complete bids associated with the CLINs (Contract Line Item Number) as follows:
CLIN 01: All work associated with the 4H and 4K Ward Renovation. 18 month Period of Performance.
CLIN 02: All work associated with Alternate 1. Alternate 1 removes 30 days from the Period of Performance.
CLIN 03: All work associated with Alternate 2. Alternate 2 removes 30 days from the Period of Performance.
CLIN 04: All work associated with Alternate 3. Alternate 3 removes 60 days from the Period of Performance.
The expected construction period duration for each building includes all pre-construction activity and post-construction testing, third-party inspections and commissioning. Contractor shall submit a comprehensive schedule of work in compliance with 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS DESIGN/BID/BUILD). Contractor to perform Commissioning of all new systems and existing systems impacted by the project according to requirements in sections:
01 91 00 – GENERAL COMMISSIONING REQUIREMENTS; 21 08 00 – COMMISSIONING OF FIRE SUPPRESSION SYSTEMS, 22 08 00 – COMMISSIONING OF PLUMBING SYSTEMS, 23 08 00 – COMMISSIONING OF HVAC SYSTEMS; 26 08 00 – COMMISSIONING OF ELECTRICAL SYSTEMS; 27 08 00 – COMMISSIONING OF COMMUNICATIONS SYSTEMS, 28 08 00 – COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS and 33 08 00 –COMMISSIONING OF SITE UTILITY SYSTEMS. A detailed commissioning plan is required to ensure that all devices are calibrated, programmed, and all graphic displays are accurate and approved by applicable VA staff.
Accessibility: The design shall be constructed to ensure access to the handicapped and disabled. All facilities which are open to the public, to limited segments of the public, visited by the public in the conduct of normal business, or those which hire or have the capacity to hire civilian personnel, shall be designed and constructed to be accessible to the handicapped. Design and construction must comply with HYPERLINK https://www.access-board.gov/aba/ Architectural Barriers Act Accessibility Standard (ABAAS) for Federal Facilities and HYPERLINK https://www.cfm.va.gov/til/etc/dsBarrFree.pdf PG-18-13 VA Barrier Free Design Standard, whichever is most stringent.
Infection Control: The construction shall clearly define and meet “Infection Control Barrier” criteria. The construction shall be in accordance with the AIA Guidelines or Design and Construction of Hospital and Health Care Facilities and address; the impact of demolition, renovation including walls and ceiling, electrical, mechanical, equipment and equipment support installation, and new construction.
HIPAA: The design shall accommodate compliance with current HIPAA requirements.
TRIPLE C TEAM:
MAT PERKINS, PM
mat.perkins@triplecaeg.com
HEATHER GARDINER, DEPT. PM
heather.gardiner@triplecaeg.com
KATE MACAULAY, SENIOR INTERIOR DESIGNER
kate.macaulay@triplecaeg.com
SHANNON POLLARD MADEN, PROJECT ARCHITECT
caleb.lowery@triplecaeg.com
KEVIN LUKE, MECHANICAL ENGINEER
kevin.luke@triplecaeg.com
- DRAWING INDEX -
SHEET
NUMBER SHEET NAME
INCLUDED
IN 35% SD
INCLUDED
IN 65% DD
INCLUDED
IN 95%CD
INCLUDED
IN 100%
M-801 MECHANICAL CONTROL SYMBOL LEGEND AND
ABBREVIATIONS
Yes Yes Yes Yes
M-802 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes
M-803 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes
M-804 MECHANICAL CONTROL DIAGRAMS Yes Yes Yes Yes
M-805 MECHANICAL POINTS SCHEDULE Yes Yes Yes Yes
M-901 MECHANICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
M-902 MECHANICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
M-903 MECHANICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
ELECTRICAL
E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
EDL104 ELECTRICAL DEMO LIGHTING RCP - FOURTH LEVEL -
AREA 4H&4K
Yes Yes Yes Yes
EDP104 ELECTRICAL DEMO POWER PLANS- FOURTH LEVEL -
4H&4K
Yes Yes Yes Yes
EDP104i ELECTRICAL DEMO POWER PLAN - FOURTH LEVEL
INTERSTITIAL - AREA 4H & 4K
Yes Yes Yes Yes
EL104 ELECTRICAL LIGHTING RCP - FOURTH LEVEL - AREA
4H&4K
Yes Yes Yes Yes
EP103 ELECTRICAL POWER PLANS - THIRD LEVEL - AREA 3K Yes Yes Yes Yes
EP104 ELECTRICAL POWER PLANS - FOURTH LEVEL - AREA
4H&4K
Yes Yes Yes Yes
EP104i ELECTRICAL POWER PLANS - FOURTH LEVEL - AREA
4H&4K INTERSTITIAL
Yes Yes Yes Yes
EP400 ELECTRICAL ENLARGED PLANS Yes Yes Yes Yes
E-501 ELECTRICAL DETAILS Yes Yes Yes Yes
E-601 ELECTRICAL ONE-LINE DIAGRAM DEMO - FOURTH LEVEL -
AREA 4H&4K
Yes Yes Yes Yes
E-602 ELECTRICAL ONE-LINE DIAGRAMS NEW - FOURTH LEVEL -
AREA 4H&4K
Yes Yes Yes Yes
E-603 ELECTRICAL DIAGRAMS Yes Yes Yes Yes
E-701 ELECTRICAL PANEL SCHEDULES - EXISTING Yes Yes Yes Yes
E-702 ELECTRICAL PANEL SCHEDULES - EXISTING Yes Yes Yes Yes
E-703 ELECTRICAL PANEL SCHEDULES - NEW Yes Yes Yes Yes
E-704 ELECTRICAL PANEL SCHEDULES - NEW Yes Yes Yes Yes
E-705 ELECTRICAL PANEL SCHEDULES - NEW Yes Yes Yes Yes
E-901 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
E-902 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
E-903 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
E-904 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
E-905 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
E-906 ELECTRICAL CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
TELECOMMUNICATION
T-001 TELECOMMUNICATION ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
TD104 TELECOMMUNICATIONS DEMO PLANS- FOURTH LEVEL -
4H&4K
Yes Yes Yes Yes
TD104i TELECOMMUNICATION DEMO PLANS - FOURTH LEVEL
INTERSTITIAL - AREA 4H&4K
Yes Yes Yes Yes
TY104 SECURITY PLANS - FOURTH LEVEL - AREA 4H&4K Yes Yes Yes Yes
T-104 TELELCOMMUNICATIONS PLANS - FOURTH LEVEL - AREA
4H&4K
Yes Yes Yes Yes
T-104i TELECOMMUNICATION PLANS - FOURTH LEVEL
INTERSTITIAL - AREA 4H&4K
Yes Yes Yes Yes
T-400 TELECOMMUNICATIONS ENLARGED PLANS Yes Yes Yes Yes
T-501 TELECOMMUNICATION DETAILS Yes Yes Yes Yes
T-601 TELECOMMUNICATIONS RISER DIAGRAMS Yes Yes Yes Yes
T-901 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
T-902 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
T-903 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
T-904 TELECOMMUNICATION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
Grand total: 139
- DRAWING INDEX -
SHEET
NUMBER SHEET NAME
INCLUDED
IN 35% SD
INCLUDED
IN 65% DD
INCLUDED
IN 95%CD
INCLUDED
IN 100%
GENERAL
GI000 COVER SHEET Yes Yes Yes Yes
GI050 GENERAL NOTES Yes Yes Yes Yes
GI100 ARCHITECTURAL 4TH FLOOR EXISTING CONDITIONS PLAN No No Yes Yes
GI104 LIFE SAFETY PLAN - LEVEL 4 - PHASE 1 Yes Yes Yes Yes
GI200 ARCHITECTURAL SITE PLAN - 4K Yes
GI204 PHASING PLAN - LEVEL 4 - PHASE 1 Yes Yes Yes
GI304 ICRA, INTERIM LIFE SAFETY & PHASING PLAN - LEVEL 4 -
PHASE 1
No Yes Yes Yes
GI314 ICRA, INTERIM LIFE SAFETY & PHASING PLAN - LEVEL 4 -
PHASE 1
Yes Yes Yes
ARCHITECTURAL
A-001 SYMBOLS & GENERAL NOTES Yes Yes Yes Yes
A-002 ARCHITECTURAL ROOM PROGRAM PLAN - OVERALL
MASTERPLAN
Yes Yes Yes Yes
A-003 ARCHITECTURAL ROOM PROGRAM PLAN - PHASE 1
RENOVATION
Yes Yes Yes Yes
AD104 ARCHITECTURAL DEMOLITION PLAN - LEVEL 4 - 4H/4K Yes Yes Yes Yes
AD124 ARCHITECTURAL DEMOLITION RCP- LEVEL 4 - 4H/4K Yes Yes Yes Yes
A-104 ARCHITECTURAL FLOOR PLAN - LEVEL 4 - 4H/4K NEW Yes Yes Yes Yes
A-124 ARCHITECTURAL DIMENSIONING PLAN - FOURTH FLOOR
4H/4K
No Yes Yes Yes
AC104 ARCHITECTURAL REFLECTED CEILING PLAN - LEVEL 4 -
4H/4K
Yes Yes Yes Yes
AC124 ARCHITECTURAL ENLARGED CEILING PLANS Yes
A-401 ARCHITECTURAL ENLARGED VIEWS - TYPICAL PATIENT
ROOM
Yes Yes Yes Yes
A-402 ARCHITECTURAL ENLARGED VIEWS - BARIATRIC PATIENT
ROOM
No Yes Yes Yes
A-403 ARCHITECTURAL ENLARGED VIEWS No Yes Yes Yes
A-404 ARCHITECTURAL ENLARGED VIEWS No Yes Yes Yes
A-405 ARCHITECTURAL ENLARGED VIEWS Yes Yes Yes
A-406 ARCHITECTURAL ENLARGED VIEWS Yes Yes
A-410 TYPICAL PATIENT CASEWORK DETAILS Yes Yes Yes
A-512 ARCHITECTURAL DETAILS No Yes Yes Yes
A-551 ARCHITECTURAL CEILING DETAILS No Yes Yes Yes
A-552 ARCHITECTURAL CASEWORK DETAILS No Yes Yes Yes
A-601 DOOR & WINDOW SCHEDULES Yes Yes Yes
A-610 SLIDING DOOR DETAILS Yes Yes Yes
A-720 STANDARD PARTITION TYPES Yes Yes Yes
A-721 PARTITION FRAMING DETAILS Yes Yes Yes
A-730 TYPICAL MOUNTING HEIGHTS Yes Yes Yes Yes
ARCHITECTURAL SIGNAGE
AW001 ARCHITECTURAL SIGNAGE ABBREVIATIONS, SYMBOLS,
GENERAL NOTES AND SCHEDULE
Yes Yes Yes Yes
AW104 ARCHITECTURALSIGNAGE PLAN - FOURTH FLOOR 4H/4K Yes Yes Yes Yes
INTERIORS
IN001 INTERIOR GENERAL NOTES, SYMBOLS, ABBREVIATIONS &
FINISH BOARDS
Yes Yes Yes Yes
IN104 INTERIOR FLOOR FINISH PLAN - FOURTH FLOOR 4H/4K Yes Yes Yes Yes
IN124 INTERIOR WALL FINISH PLAN - FOURTH FLOOR 4H/4K Yes Yes Yes
IN501 DETAILS - INTERIOR FINISH Yes Yes Yes
IN601 INTERIOR FINISH LEGEND AND ROOM FINISH SCHEDULE Yes Yes Yes Yes
IN901 INTERIOR 3D CONCEPT IMAGES Yes Yes Yes Yes
EQUIPMENT
Q-104 INTERIOR EQUIPMENT & FURNITURE PLAN - OVERALL Yes Yes Yes
Q-401 INTERIOR EQUIPMENT & FURNITURE PLAN - ENLARGED
VIEW
Yes Yes Yes
Q-402 INTERIOR EQUIPMENT & FURNITURE PLAN - ENLARGED
VIEW
Yes Yes Yes
Q-601 EQUIPMENT SCHEDULE Yes Yes Yes
FIRE PROTECTION
FX001 FIRE PROTECTION ABBREVIATIONS, SYMBOLS, AND
DETAILS
Yes Yes Yes Yes
FXD104 FIRE PROTECTION DEMO PLANS - FOURTH LEVEL - AREA
4H&4K
Yes Yes Yes Yes
FXD104i FIRE PROTECTION DEMO PLANS - FOURTH LEVEL
INTERSTITIAL - AREA 4H&K
No No Yes Yes
FX104 FIRE PROTECTION PLANS - FOURTH LEVEL - AREA 4H&4K Yes Yes Yes Yes
FX501 FIRE PROTECTION DETAILS AND SCHEDULES Yes Yes Yes Yes
FX502 FIRE PROTECTION DETAILS AND SCHEDULES Yes Yes Yes Yes
FX901 FIRE PROTECTION CUTSHEETS & BASIS OF DESIGN Yes Yes Yes Yes
PLUMBING
P-001 PLUMBING LEGEND Yes Yes Yes Yes
PD103i PLUMBING PLANS - THIRD LEVEL INTERSTITIAL 3H&3K -
DEMO
No Yes Yes Yes
PD104 PLUMBING DEMO PLANS - FOURTH LEVEL - AREA 4H&4K Yes Yes Yes Yes
PD104i PLUMBING PLANS - FOURTH LEVEL INTERSTITIAL 4H&4K -
DEMO
No No Yes Yes
PGD104i PLUMBING MED GAS PLANS - FOURTH LEVEL
INTERSTITIAL - DEMO
No No Yes Yes
P-103i SANITARY PLANS - THIRD LEVEL INTERSTITIAL - AREA 3H&3K
No Yes Yes Yes
P-104 PLUMBING PLANS - FOURTH LEVEL - AREA 4H&4K Yes Yes Yes Yes
P-104i PLUMBING PLANS - FOURTH LEVEL INTERSTITIAL - NEW
VENT PIPING PLAN
No Yes Yes Yes
PP104i PLUMBING PLANS - FOURTH LEVEL INTERSTITIAL - NEW
DOMESTIC WATER PIPING PLAN
No No Yes Yes
PG104i MED GAS PLUMBING PLANS - FOURTH LEVEL
INTERSTITIAL
No Yes Yes Yes
P-501 PLUMBING DETAILS Yes Yes Yes Yes
P-601 PLUMBING ISOMETRIC PLAN - NORTH Yes
P-602 PLUMBING ISOMETRIC PLAN - SOUTH Yes
P-700 PLUMBING SCHEDULES No No No Yes
P-701 PLUMBING SCHEDULES Yes Yes Yes Yes
P-901 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes
P-902 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes
P-903 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes
P-904 PLUMBING EQUIPMENT CUTSHEETS / BASIS OF DESIGN Yes Yes Yes Yes
MECHANICAL
M-001 MECHANICAL ABBREVIATIONS AND SYMBOLS Yes Yes Yes Yes
MD104 MECHANICAL DEMO PLAN - FOURTH LEVEL - AREA 4H&4K Yes Yes Yes Yes
MD104i MECHANICAL DEMO PLANS - FOURTH LEVEL
INTERSTITIAL - AREA 4K
Yes Yes Yes Yes
M-104 MECHANICAL PLANS - FOURTH LEVEL - AREA 4H&4K Yes Yes Yes Yes
M-104i MECHANICAL PLANS - FOURTH LEVEL INTERSTITIAL -
AREA 4H&4K
Yes Yes Yes Yes
MPD103i MECHANICAL PIPING DEMOVPLAN - THIRD LEVEL
INTERSTITIAL - AREA 3K
Yes Yes Yes Yes
MPD104 MECHANICAL PIPING DEMO PLAN - FOURTH LEVEL - AREA
4H&4K
Yes Yes Yes Yes
MPD104i MECHANICAL PIPING DEMO PLAN - FOURTH LEVEL
INTERSTITIAL - AREA 4H&4K
Yes Yes Yes Yes
MP103i MECHANICAL PIPING PLAN - THIRD LEVEL INTERSTITIAL -
AREA 4H&4K
Yes Yes Yes Yes
MP104 MECHANICAL PIPING PLAN - FOURTH FLOOR - AREA
4H&4K
Yes Yes Yes Yes
MP104i MECHANICAL PIPING PLAN - FOURTH FLOOR
INTERSTITIAL - AREA 4H&4K
Yes Yes Yes Yes
M-400 ENLARGED MECHANICAL PLANS Yes
M-401 ENLARGED MECHANICAL PLANS Yes Yes Yes Yes
M-402 ENLARGED MECHANICAL PLANS Yes Yes Yes Yes
M-403 ENLARGED MECHANICAL PLANS No No Yes Yes
M-404 ENLARGED MECHANICAL PLANS Yes
M-501 MECHANICAL DETAILS Yes Yes Yes Yes
M-502 MECHANICAL DETAILS Yes Yes Yes Yes
M-503 MECHANICAL DETAILS Yes Yes Yes Yes
M-504 MECHANICAL DETAILS Yes Yes Yes Yes
M-505 MECHANICAL DETAILS Yes Yes Yes Yes
M-700 MECHANICAL SCHEDULES Yes Yes Yes Yes
M-701 MECHANICAL SCHEDULES Yes Yes Yes Yes
M-702 MECHANICAL SCHEDULES Yes Yes Yes Yes
MINNEAPOLIS
VA MEDICAL
CENTER
/03
/20 on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
Drawing Number
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
E F
G
H
J
K
L
M
C
LINE INDICATES
PHASE 1 SCOPE AREA
STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL
VERIFY ACTUAL CONDITIONS ON-SITE.
410 Grand Ave, Suite 201C Laramie, WY 82070
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-1
.A
R C
H .B
.L
.P o ly tr a m a .r v t
/4
/2
:1
:2
P
M
04/03/2023 M.PERKINS K.MACAULAY
618-22-100
1390 - GI050
GENERAL NOTES
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAMISSUED FOR BIDDING
1. STANDARDS: GENERAL PAINTING SPECIFICATIONS FOR
THIS PROJECT ARE DEFINED BY THE PROJECT MANUAL
AND ARE BASED ON THE MPI ARCHITECTURAL PAINTING
SPECIFICATION MANUAL FOR NEW WORK AND THE MPI
MAINTENANCE REPAINTING MANUAL FOR RENOVATION OR
REPAINTING WORK.
2. PAINTING WORK: INCLUDES TAPING, SURFACE
PREPARATION, CLEANING, DE-RUSTING, PRIMING, FIELD
PAINTING AND FINISHING AS REQUIRED BY STANDARD
PRACTICE, MANUFACTURER OR SPECIFICATION. REQUIRED
COATS OF PAINT OR STAIN ARE IN ADDITION TO SHOP
PRIMING, SURFACE TREATMENT AND FINISHING. THE WORK
ALSO INCLUDES PAINTING CLEANUP AND REMOVAL OF
OVERSPRAY, DRIPS AND SPLATTERS. THE SPECIFICATIONS
MAY REQUIRE OTHER TYPES OF PAINTING, INCLUDING, BUT
NOT LIMITED TO, FIELD APPLIED SPECIAL COATINGS AND
FACTORY PRIMING.
3. PROJECT PAINTING SCOPE: EXCEPT AS NOTED
OTHERWISE, CONTRACTOR IS TO FIELD PAINT INTERIOR
AND EXTERIOR EXPOSED ITEMS AND BUILDING SURFACES,
WHETHER OR NOT PREVIOUSLY PAINTED, AND ALL NEW
ITEMS AND SURFACES. THIS INCLUDES, BUT IS NOT LIMITED
TO, FACTORY-PRIMED ITEMS, GALVANIZED SHEET METAL
AND EXPOSED PIPING AND FITTINGS (INCLUDING IRON AND
PVC). EXTERIOR EXPOSED MASONRY AND CONCRETE
SHALL BE SEALED, UNLESS NOTED OTHERWISE OR NOT
RECOMMENDED BY MANUFACTURER. PAINTING SCOPE
ITEMS MAY BE FOUND IN FINISH SCHEDULES, DRAWINGS,
SPECIFICATIONS AND PAINTING GENERAL NOTES. THESE
SOURCES ARE COMPLEMENTARY, NOT MUTUALLY
EXCLUSIVE.
4. MECHANICAL AND ELECTRICAL PAINTING: INCLUDES FIELD
PAINTING OF INTERIOR AND EXTERIOR EXPOSED PIPES,
DUCTS, HANGERS, EXPOSED STEEL AND IRON WORK AND
PRIMED METAL SURFACES OF EQUIPMENT IN EXPOSED
AREAS INSTALLED UNDER MECHANICAL AND ELECTRICAL
WORK, EXCEPT AS OTHERWISE INDICATED. PAINTING OF
ELECTRICAL AND MECHANICAL WORK IN ELECTRICAL AND
MECHANICAL ROOMS IS NOT REQUIRED UNLESS NOTED
OTHERWISE IN THE PROJECT MANUAL. COLOR-CODING OF
PIPING FOR MECHANICAL AND PLUMBING WORK IS
COVERED IN THE MECHANICAL OR PLUMBING
SPECIFICATIONS.
5. APPLICATION: EACH COAT OF PAINT SHALL TERMINATE AT
AN EDGE, CORNER, CHANGE OF MATERIALS OR CHANGE
OF PAINT COLOR. COMPLETED PAINTING SHALL NOT
IMPEDE THE INTENDED OPERATION OF ANY ITEM, SUCH AS
WINDOWS, DRAWERS, HINGES, DOORS, ETC.
6. TOUCH-UP: SURFACES REQUIRING TOUCH-UP SHALL BE
REPAIRED AS REQUIRED. PAINT TEXTURE, GLOSS AND
COLOR SHALL MATCH EXISTING. IF TOTAL TOUCH-UP AREA
ON ONE SURFACE IS LARGER THAN 1 SQUARE FOOT, OF IF
TEXTURE, GLOSS AND COLOR CANNOT BE MATCHED, THE
ENTIRE SURFACE SHALL BE REPAINTED TO ENCLOSING
EDGES OR CORNERS.
7. DO NOT PAINT: UNLESS OTHERWISE INDICATED, DO NOT
PAINT ITEMS THAT ARE SPECIFIED FACTORY-FINISHED OR
INSTALLER-FINISHED. ALSO, UNLESS OTHERWISE
INDICATED, DO NOT PAINT SUCH ITEMS AS ACOUSTIC
MATERIALS, HARDWARE, PRE-FINISHED FIXTURES AND
EQUIPMENT, PRE-FINISHED MECHANICAL AND ELECTRICAL
EQUIPMENT, SWITCH AND OUTLET PLATES, THERMOSTATS,
LIGHTING FIXTURES, SWITCHGEAR, MOTORS,
DISTRIBUTION PANELS AND INTERIOR AND EXTERIOR
SIGNAGE. IF THERE IS A QUESTION WHETHER OR NOT TO
PAINT AN ITEM OR SURFACE, FOLLOW PROCEDURES
LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION
(RFI).
8. EXPOSED FINISH METAL SURFACES: UNLESS OTHERWISE
INDICATED, DO NOT PAINT METAL SURFACES OF ANODIZED
ALUMINUM, STAINLESS STEEL, NICKEL, CHROMIUM PLATE,
COPPER, BRASS, BRONZE AND SIMILAR FINISHED
MATERIALS.
9. CONCEALED SURFACES: UNLESS OTHERWISE INDICATED,
DO NOT PAINT SURFACES SUCH AS WALLS AND CEILINGS
IN CONCEALED AND GENERALLY INACCESSIBLE AREAS,
INCLUDING FURRED AREAS, UTILITY TUNNELS, PIPE
SPACES, CHASES AND DUCT SHAFTS. WATERPROOF SEAL
CONCRETE IN PIPE SPACE.
10. OPERATING PARTS AND SENSING DEVICES: UNLESS
OTHERWISE INDICATED, DO NOT PAINT MOVING PARTS OF
OPERATING UNITS SUCH AS VALVES, DAMPER
OPERATORS, LINKAGES, MOTOR AND FAN SHAFTS, LIGHT
SENSING OR EMITTING DEVICES THAT MIGHT NOT
FUNCTION PROPERLY IF PAINTED.
11. CODE-REQUIRED LABELS: DO NOT PAINT OVER CODE-
REQUIRED LABELS.
12. ALL FLOORS ARE TO BE CLEANED AND SEALED AT
COMPLETION OF WORK. NO EPOXY PAINT.
13. ALL INTERIOR SURFACES, WALLS, FRAMES, ETC.,
REQUIRED TO HAVE NEW FINISHES APPLIED, SHALL HAVE
ALL EXISTING AND CONTRACTOR CAUSED HOLES, CRACKS,
AND OTHER IMPERFECTIONS FILLED WITH APPROVED
PATCHING MATERIAL. PATCH TO BE FINISHED FLUSH WITH
ADJACENT SURFACE, WITH TEXTURE TO MATCH TEXTURE
OF ADJACENT SURFACE. SEE SPECIFICATIONS FOR
PATCHING REQUIREMENTS.
14. PAINT EXPOSED TOP EDGE OF ALL TERRAZZO FLOOR BASE
TO MATCH WALL PAINT. CLEAN TERRAZZO FACE OF ANY
OLD PAINT.
15. PAINT EXISTING MECHANICAL HEATING UNIT COVER AND
ACCESSORIES, INCLUDING ALL SUPPORT BRACKETS.
PAINT THE HEATING WATER PIPING THAT IS EXPOSED TO
VIEW BELOW THE UNIT. PAINT ALL WALL SURFACES THAT
ARE VISIBLE BEHIND HEATING UNIT WHEN COVER IS IN
PLACE.
16. THE CONTRACTOR SHALL FIELD VERIFY EXISTING PAINT
MATERIALS AND FINISHES. APPLY THE APPROPRIATE
SEPARATION COAT (PRIMER/BONDING COAT) BETWEEN ALL
NON-COMPATIBLE COATINGS (I.E. WHERE NEW WATER-
BORNE ACRYLIC IS TO BE INSTALLED OVER EXISTING OIL
BASE PAINT).
GENERAL PAINTING NOTES:
1. THE PRIMARY OBJECT OF APPLYING SEALANT IS TO
FACILITATE WEATHER TIGHTNESS AT THE EXTERIOR
BUILDING ENVELOPE AND WATER TIGHTNESS AT INTERIOR
WET\DAMP LOCATIONS. PROPER PRIMING MUST BE USED
WITH SEALANTS.
2. THE PRIMARY OBJECT OF APPLYING CAULKING IS TO
ENHANCE APPEARANCE AND FINISH AT INTERIOR
APPLICATIONS AND IN SOME SITUATIONS TO REDUCE
AIRFLOW, SUCH AS AT DUCTS, INTERIOR SIDES OF THE
EXTERIOR ENVELOPE AND AT FIREWALL/SMOKE BARRIER
PENETRATIONS (FIRE CAULKING) AND TO DECREASE
SOUND TRANSMISSION THROUGH WALLS AND CEILINGS.
OTHER USES MAY BE NOTED IN THE SPECIFICATIONS
AND/OR ON THE DRAWINGS. IF THERE ARE QUESTIONS
ABOUT WHERE OR WHAT TYPE OF SEALANT OR CAULKING
SHOULD BE USED, FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
3. SPECIFIED SEALANT (AND BACKER RODS, AS REQUIRED)
SHALL BE USED AT HORIZONTAL AND VERTICAL CONCRETE
JOINTS AND AS NOTED.
4. SPECIFIED SEALANT AND BACKER RODS, OR EXPANSION
JOINT MATERIAL, AS REQUIRED, SHALL BE USED AT
MASONRY AND CONCRETE CONTROL JOINTS.
5. APPLY SEALANT TAPE OR TWO CONTINUOUS BEADS OF
SEALANT BETWEEN PERIMETER SOLE PLATES AND
FOUNDATIONS, SLABS AND FLOOR DECKS. SET EXTERIOR
THRESHOLDS IN SEALANT UNLESS NOTED OTHERWISE.
6. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND BOTH SIDES OF DOOR FRAMES.
7. SPECIFIED SEALANT OR CAULK SHALL BE USED ALL
AROUND INTERIOR WALL MOUNTED EQUIPMENT FRAMES
AND EXPOSED SUPPORTS.
8. SPECIFIED SEALANT OR CAULK SHALL BE USED AT JOINTS
BETWEEN DIFFERENT WALL MATERIALS (TILE TO BRICK,
CMU TO GYPSUM BOARD, WOOD TO STONE, METAL PANEL
TO P-LAM, ETC).
9. USE SPECIFIED CAULK OR SEALANT AT WALL MATERIAL
GAPS OF 1/16TH INCH OR MORE.
10. SEAL ALL AROUND ATTACHMENTS TO, AND PENETRATIONS
THROUGH, FLOORS AND WALLS.
11. USE SPECIFIED SEALANT AROUND WALL, FLOOR AND
CEILING PIPE PENETRATIONS. WHERE ESCUTCHEONS ARE
SPECIFIED OR PROVIDED, SET THE ESCUTCHEONS IN A
BED OF SEALANT.
12. USE SPECIFIED CAULK OR SEALANT AROUND
PENETRATIONS IN EXTERIOR WALLS AND SOFFITS, SUCH
AS AT HOSE BIBS, FD CONNECTIONS, ELECTRIC SERVICE
ENTRIES, GAS PIPE ENTRIES, ELECTRIC OUTLETS,
LIGHTING, VENTS, ETC.
GENERAL SEALANT / CAULKING
NOTES:
1. THESE GENERAL NOTES APPLY TO ALL DRAWINGS.
2. COMPLY WITH ALL APPLICABLE CODES, RULES, AND
REGULATIONS. ALL WORK SHALL BE INSPECTED AND
APPROVED BY COR PRIOR TO FINAL ACCEPTANCE.
3. ALL EXISTING CONDITIONS AND DIMENSIONS SHALL BE
VERIFIED BY THE CONTRACTOR(S) PRIOR TO FABRICATION
AND CONSTRUCTION. IF INCONSISTENCIES,
CONTRADICTIONS OR OMISSIONS ARE DISCOVERED
FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI).
4. GENERAL CONTRACTOR SHALL COORDINATE ALL
MECHANICAL AND ELECTRICAL DUCT SIZES AND
LOCATIONS.
5. ALL EXITS TO BE OPERABLE FROM THE INSIDE WITHOUT
THE USE OF A KEY OR SPECIAL KNOWLEDGE. DELAYED
EGRESS HARDWARE TO BE USED AT EGRESS DOORS IN
ORDER TO MITIGATE RISK FOR WANDERING PATIENTS.
6. WALL OUTLETS, SWITCHES,THERMOSTATS, ETC. TO BE
INSTALLED LEVEL WITH EACH OTHER AND PLUMB.
7. THE WORK INDICATED IN THE NOTES DESCRIBES THE
GENERAL SCOPE OF WORK ONLY AND IS NOT INTENDED
TO BE INCLUSIVE OF ALL WORK REQUIRED TO COMPLETE
FULL SCOPE OF WORK.
8. DO NOT MEASURE DRAWINGS. ALL DIMENSIONS SHALL BE
FIELD VERIFIED. IF DIMENSIONAL INFORMATION IS
REQUIRED & NOT FOUND, FOLLOW PROCEDURES LISTED IN
SECTION 01 26 13 REQUESTS FOR INFORMATION (RFI).
9. FIELD VERIFICATION: BEFORE BIDDING AND DURING
CONSTRUCTION, CONTRACTOR SHALL VERIFY THAT
ACTUAL CONDITIONS ARE THOSE REFLECTED BY THE
CONTRACT DOCUMENTS. REPORT DISCREPANCIES TO
ARCHITECT AND COR PRIOR TO BIDDING OR PERFORMING
WORK RELATED TO ANY DISCREPANCIES. SEE
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
10. MOST EXPENSIVE BID: IF THERE ARE SCHEDULES,
SYSTEMS, SUBCONTRACT, OR MATERIAL CONFLICTS NOT
BROUGHT TO THE ARCHITECT'S AND COR'S ATTENTION
PRIOR TO BIDDING, THE CONTRACTOR WILL BE DEEMED TO
HAVE ELECTED THE MORE COSTLY TIME, METHOD,
SYSTEM, PRODUCT, SUBCONTRACT AND/OR MATERIAL.
11. NIC: CONSTRUCTION OF WORK INDICATED ON DRAWINGS
AS "NIC" IS NOT IN THE CONTRACT. HOWEVER, THE
CONTRACTOR SHALL COORDINATE ITS WORK, WITH WORK
INDICATED AS NIC.
12. SITE COORDINATION: COORDINATE ALL SITE OPERATIONS
WITH COR, INCLUDING STAGING AREAS, MATERIAL
STORAGE, ACCESS TO WORK, TIMING OF WORK, NOISY
OPERATIONS, INTERRUPTION OF UTILITIES. SEE
SPECIFICATIONS.
13. TRADE COORDINATION: CONTRACTOR SHALL COORDINATE
THE PLACEMENT OF EACH TRADE'S WORK SO THAT THERE
ARE NO CONFLICTS AND NO SYSTEM'S OPERATION OR
FUNCTION IMPAIRED. IT IS ESPECIALLY IMPORTANT TO
COORDINATE PENETRATIONS THROUGH FOUNDATIONS,
FLOORS, WALLS AND CEILING SPACES. SEE
SPECIFICATIONS.
14. PROVIDE GALVANIC SEPARATION MATERIAL, BETWEEN
DISSIMILAR METALS. SEE SPECIFICATIONS.
15. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY
SHALL BE FIRE TREATED. SEE SPECIFICATIONS. ALL
SURFACE ATTACHED METAL SHALL BE SEPARATED FROM
CONCRETE OR MASONRY BY NON-METALLIC MATERIAL
SUCH AS #30 FELT, "PEEL AND STICK" OR OTHER MATERIAL
AS APPROVED BY ARCHITECT AND COR. ALL WOOD IN
PROJECT SHALL BE FIRE TREATED.
16. EXTERIOR / INTERIOR ELEVATIONS DO NOT SHOW ALL
EQUIPMENT, FIXTURES, DEVICES, MECHANICAL, PLUMBING
OR ELECTRICAL ITEMS. SEE ARCHITECTURAL, INTERIOR,
MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL
ELEVATION COORDINATION.
17. ANY CUTTING/WELDING WILL REQUIRE DAILY HOT WORK
PERMITS TO BE COORDINATED WITH COR. SUBMIT
CERTIFICATIONS AS REQUIRED BY THE SPECIFICATIONS.
18. FIRE PROTECTION FOR CONSTRUCTION AREA SHALL BE
MAINTAINED AT ALL TIMES IN ACCORDANCE TO NFPA 13.
GENERAL NOTES: GENERAL FIRE & LIFE SAFETY
NOTES:
FIRE ALARM
1. DESIGN SHALL BE AN APPROVED FIRE ALARM SYSTEM IN
ACCORDANCE WITH CLASS B WIRING SCHEMES FOR THE
ALARM SYSTEM AND CLASS X WIRING STYLE FOR
COMMUNICATION BETWEEN BUILDING FIRE ALARM
CONTROL UNITS.
2. SUBMIT PER SECTION 01 33 23 SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES; AND SECTION 28 31 00 FIRE
DETECTION AND ALARM FOR APPROVAL PRIOR TO THE
INSTALLATION.
3. THE MINNEAPOLIS VAMC HAS A FULL SERVICE
MAINTENANCE CONTRACT FOR MAINTENANCE AND
TESTING OF THE FIRE ALARM SYSTEM. IN ACCORDANCE
WITH THIS CONTRACT THE FIRE ALARM MAINTENANCE
CONTRACTOR (CURRENTLY FIRE SENTRY) MUST CERTIFY
ALL PROGRAMMING DONE TO THE FIRE ALARM SYSTEM.
UNDER THIS CONTRACT, THE CONSTRUCTION
CONTRACTOR MUST EITHER HIRE THE CURRENT FIRE
ALARM MAINTENANCE CONTRACTOR TO PERFORM ALL
FIRE ALARM PROGRAMMING WORK OR IF THE
PROGRAMMING IS COMPLETED BY ANOTHER FIRE ALARM
CONTRACTOR, THE CONSTRUCTION CONTRACTOR MUST
HIRE THE CURRENT FIRE ALARM MAINTENANCE
CONTRACTOR TO FULLY INSPECT, TEST, AND CERTIFY
THE PROGRAMMING WORK DONE BY ANOTHER
CONTRACTOR.
4. WHENEVER FIRE ALARM WORK TAKES PLACE IN AN AREA
THAT IS BEING REMODELED, AT THE CONCLUSION OF THE
WORK, THE FIRE ALARM CONTRACTOR IS TO TEST ALL
FIRE ALARM DEVICES WITHIN THE AREA OF THE REMODEL
AREA WHETHER OR NOT THEY WERE MODIFIED AS PART
OF THE PROJECT.
FIRE EXTINGUISHERS
1. TEMPORARY- CONTRACTOR SHALL PROVIDE JOB SITE
WITH TEMPORARY PORTABLE FIRE EXTINGUISHERS AND
SHALL MAINTAIN THEM DURING THE COURSE OF
CONSTRUCTION. EACH EXTINGUISHER SHALL BE 10 lb.
CAPACITY, CAPABLE OF EXTINGUISHING CLASS A, B & C
FIRES. ALL EXTINGUISHERS SHALL BE U.L. LABELED AND
SHALL BE DRY CHEMICAL TYPE.
2. CONTRACTOR SHALL MAINTAIN AND INSPECT
EXTINGUISHERS AT LEAST MONTHLY, AND IN
ACCORDANCE WITH MANUFACTURER
RECOMMENDATIONS. INSPECTION TAGS SHALL BE UP TO
DATE AND CLEARLY DISPLAYED.
EXIT & EMERGENCY LIGHTING
1. EXIT SIGNS SHALL CLEARLY INDICATE DIRECTION LEADING
TO EXTERIOR WITH MINIMUM 6" HIGH LETTERS AT
REQUIRED EXITS, EXIT DISCHARGE AND AT ALL CORRIDOR
INTERSECTIONS AND CHANGES OF DIRECTION. EXIT WAY;
CORRIDORS AND STAIRS SHALL BE ILLUMINATED BY A
SUITABLE EMERGENCY LIGHTING SYSTEM TO OPERATE
WHEN NORMAL POWER IS INTERRUPTED. EMERGENCY
LIGHTING SHALL PROVIDE A MINIMUM OF 5 FOOT CANDLE
POWER AT FLOOR LEVEL. EXIT DOOR SHALL SWING IN THE
DIRECTION OF EXIT OVER A LANDING NOT MORE THAN 1/2"
BELOW THE THRESHOLD.
2. EXIT AND EMERGENCY LIGHTING SHALL CONFORM WITH
THE LOCAL AND CURRENT NEC GUIDELINES.
FIRE SPRINKLER SYSTEM
1. EXISTING FIRE SPRIKLER MAIN PIPES AND BRANCH LINES
TO BE RETAINED AND REUSED. CONTRACTOR TO VERIFY
THE EXACT SIZE AND LOCATION IN FIELD.
2. ALL NEW SPRINKLER HEADS, HANGERS AND RESTRAINTS
TO BE INSTALLED IN ACCORDANCE WITH 2019 NFPA 13.
3. ALL NEW PIPING FOR SPRINKLER HEADS SHALL BE HARD
PIPED, NO FLEXIBLE CONNECTIONS ARE PERMISSIBLE.
4. WHENEVER EXISTING FIRE SPRINKLER PIPING IS
REMOVED, THE FIRE SPRINKLER CONTRACTOR IS TO
ANALYZE THE PIPING FOR OBSTRUCTIONS AND PROVIDE
WRITTEN OBSTRUCTION DOCUMENTATION IN
ACCORDANCE WITH NFPA REQUIREMENTS TO THE VA.
FIRE STOPPING
1. FIRE STOPPING IS REQUIRED. SEE SECTION 07 84 00 FIRE
STOPPING.
GENERAL
1. ANY DECORATIONS USED SHALL BE NON-COMBUSTIBLE
OR FLAME-PROOFED IN AN APPROVED MANNER.
2. INSULATION APPLIED TO EXTERIOR SURFACE OF DUCTS
LOCATED IN BUILDINGS SHALL HAVE A FLAME SPREAD OF
NOT MORE THAN 25 AND SMOKE-DEVELOPED RATING OF
NOT MORE THAN 50 WHEN TESTED AS A COMPOSITE
INSTALLATION, INCLUDING INSULATION, FACING
MATERIALS, TAPES AND ADHESIVES NORMALLY APPLIED.
3. ALL INSULATION MATERIALS INSTALLED WITHIN FLOOR-
CEILING ASSEMBLIES, ROOF CEILING ASSEMBLIES, WALLS
SHALL HAVE A FLAME-SPREAD RATING NOT TO EXCEED 25
AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED
IN ACCORDANCE WITH ASTM E 84.
4. HAND-ACTIVATED, DOOR-OPENING HARDWARE SHALL BE
CENTERED BETWEEN 30" AND 44" ABOVE THE FLOOR.
LATCHING AND LOCKING DOORS THAT ARE HAND-
ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL
BE OPERABLE WITH A SINGLE EFFORT BY LEVER-TYPE
HARDWARE, PANIC BARS, PUSH-PULL PASSAGE WITHOUT
REQUIRING THE ABILITY TO GRASP THE OPENING
HARDWARE. LOCKED EXIT DOORS SHALL OPERATE AS
ABOVE IN EGRESS DIRECTION. DOOR CLOSERS (EXCEPT
FIRE DOORS) SHALL HAVE SWEEP PERIOD SO THAT FROM
AN OPEN POSITION OF 70 DEGREES, THE DOOR WILL TAKE
AT LEAST 3 SECONDS TO MOVE TO A POINT 3" FROM THE
LATCH, MEASURED FROM THE LEADING EDGE OF THE
DOOR.
5. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT
EXCEED:
A. INTERIOR DOORS - 5 lbs.
B. EXTERIOR DOORS - 8.5 lbs.
C. FIRE DOORS - 15 lbs.
6. ALL FLOOR, WALL, AND CEILING PENETRATIONS FOR
PIPING, DUCTS, CONDUIT, ETC. SHALL BE SEALED WITH A
UL APPROVED METHOD AND MATERIAL.
FIRE & SMOKE DAMPERS
1. EXISTING FIRE & SMOKE DAMPERS ARE TO BE RETAINED
AND REUSED.
2. THE BUILDING IS EQUIPPED WITH A FIRE ALARM SYSTEM.
THE BUILDING IS EQUIPPED WITH A FIRE SPRINKLER AND
FIRE ALARM SYSTEM.
1. ALTHOUGH SIGNIFICANT EFFORTS HAVE BEEN MADE TO
COORDINATE DIMENSIONS, THERE MAY BE DISCREPANCIES
AND/OR OMISSIONS. IF ENCOUNTERED, CONTACT THE
ARCHITECT AND COR FOR ADDITIONAL INFORMATION. IF
DIMENSIONAL INFORMATION IS REQUIRED & NOT FOUND,
FOLLOW PROCEDURES LISTED IN SECTION 01 26 13
REQUESTS FOR INFORMATION (RFI). IF DISCREPANCIES
ARE DISCOVERED AFTER THE BIDFOLLOW PROCEDURES
LISTED IN SECTION 01 26 13 REQUESTS FOR INFORMATION
(RFI) PRIOR TO CONSTRUCTION OF THE AFFECTED AREA.
2. ACTUAL CONSTRUCTION CONDITIONS AND/OR MATERIAL
AND EQUIPMENT SIZES MAY NOT BE THOSE ANTICIPATED
BY THE DESIGNERS. THROUGH FIELD INVESTIGATION AND
SHOP DRAWINGS CONTRACTOR SHALL VERIFY
DIMENSIONS AND RECOMMEND DIMENSIONAL
MODIFICATIONS AS REQUIRED.
3. ARCHITECTURAL DIMENSIONS MAY BE FOUND ON FLOOR
PLANS, EXPANDED PLANS, REFLECTED CEILING PLANS,
SECTIONS, DETAILS, DOOR SCHEDULES, INTERIOR
ELEVATIONS AND EXTERIOR ELEVATIONS.
4. ADDITIONAL DIMENSIONS MAY BE SHOWN ON
STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS.
MECHANICAL AND ELECTRICAL EQUIPMENT SCHEDULES
MAY ALSO CONTAIN DIMENSIONAL INFORMATION RELATED
TO EQUIPMENT SIZES AND CLEARANCES.
5. DESIGNATIONS ARE NOTED AS NOMINAL, NOT ACTUAL (2 X
4 STUD); DIMENSIONS ARE SHOWN AS ACTUAL, NOT
NOMINAL (1 1/2" X 3 1/2" STUD). DIMENSIONS ARE NOT
ROUNDED, BUT UN-ROUNDED DIMENSIONS SHOULD NOT
BE VIEWED AS MAXIMUM CONSTRUCTION TOLERANCE.
(FOR INSTANCE, MASONRY OPENING DIMENSIONS MAY BE
SHOWN IN THE 16THS OF AN INCH, BUT STANDARD
MASONRY CONSTRUCTION TOLERANCES MAY BE +/- 1/4").
6. FLOOR PLAN DIMENSIONS
A. THE LOWEST FLOOR OVERALL BUILDING
DIMENSIONS ARE FROM THE OUTSIDE FACE OF THE
FOUNDATION WALL TO THE OPPOSITE OUTSIDE
FACE OF THE FOUNDATION WALL (OR, FROM
OUTSIDE GRIDLINE TO OUTSIDE GRIDLINE) AS
SHOWN.
B. DIMENSIONS FOR NON-LOAD BEARING WALLS ARE
TO ONE FACE OF THE STUDS, BOTH FACES OF
MASONRY WALLS, OR BOTH FACES OF CONCRETE
WALLS, ETC, UNLESS NOTED OTHERWISE.
C. WALL DIMENSIONS ARE ACTUAL, NOT NOMINAL
(UNLESS NOTED AS "NOM").
D. DOOR OPENING DIMENSIONS IN FRAME
CONSTRUCTION (WOOD OR STEEL STUDS) ARE
TYPICALLY SHOWN AT THEIR CENTERLINES.
HOWEVER, WHEN THE EDGE OF THE DOOR IS
IMPORTANT, OR MAKES THE PLACEMENT CLEARER,
THE DIMENSION MAY BE TO THE ACTUAL FRAME
EDGE.
E. DOOR DIMENSIONS IN LOAD-BEARING MASONRY
AND CONCRETE WALLS ARE TO "ROUGH"
OPENINGS (FACES OF MASONRY OR CONCRETE).
TYPICAL DOOR ROUGH OPENING DIMENSIONS ARE
THE FRAME WIDTH PLUS 1/2" (1/4" CLEARANCE
EACH SIDE) AND PLUS 1/2" TOTAL FOR THE
HEAD/SILL DIMENSIONS.
F. "TYPICAL" DOOR FRAME CLEARANCE DIMENSIONS
TO ADJACENT WALLS: BETWEEN FRAME FACES
AND FACES OF STUDS, OR FACES OF MASONRY OR
CONCRETE, AT NEARBY PERPENDICULAR WALLS
ARE TYPICALLY 4", DEPENDING ON HARDWARE
CLEARANCES AND FRAME REQUIREMENTS (2.5"-
DOOR HANDLE PLUS 1" -WALL STOP PLUS 1/2" GB=
4.0")
G. SOME DIMENSIONS REQUIRED TO BE CLEAR, SUCH
AS AT REQUIRED EXIT WAYS, APPLIANCE COVES OR
PREFABRICATED STAIR ENCLOSURES, ARE NOTED
"CLR" OR "CLEAR" AND ARE SHOWN TO THE FACES
OF FINISHES.
H. DIMENSIONS DESIGNATED WITH "MIN" INDICATE
THE MINIMUM CLEARANCE OR SEPARATION
REQUIRED.
1. VERTICAL DIMENSIONS
A. UNLESS NOTED OTHERWISE, THE FIRST FLOOR
REFERENCE ELEVATION IS 100'-0". THIS IS
REFERENCED TO A GROUND ELEVATION ABOVE
MEAN SEA LEVEL (MSL), AS SHOWN IN CIVIL OR
STRUCTURAL DRAWINGS. ELEVATIONS BELOW 0'-0"
ARE "-" (PREFIXED WITH A MINUS SIGN).
B. BUILDING, FLOOR AND ROOF HEIGHTS SHOWN ON
ARCHITECTURAL DRAWINGS ARE TO TOP OF
DECKING OR SHEATING, BUT DO NOT INCLUDE
FINISHES OR ROOFING MATERIAL.
C. WALL OPENINGS: DOOR AND LOUVER HEIGHTS ARE
TO FINISH HEIGHTS (UNLESS THEY ARE IN LOAD-
BEARING MASONRY OR CONCRETE WALLS, WHERE
THEY ARE TO ROUGH OPENINGS). HEIGHT
REFERENCES SHOULD BE TO THE NEXT LOWER
FINISH FLOOR ELEVATION
D. LIGHTING HEIGHTS ON WALLS ARE TO
CENTERLINES OF THE ELECTRICAL BOXES, UNO.
EQUIPMENT, VENT, PLUMBING AND FIXTURE
ELEVATIONS ARE TO CENTERLINES OF THE WALL
PENETRATIONS, UNO.
E. SOME VERTICAL DIMENSIONS ARE SHOWN ON
PLANS FOR DEPRESSIONS, RIDGES, CURBS, AND
ELEVATION CHANGES. A PLAN ELEVATION CHANGE
SYMBOL LOOKS LIKE A STEP OR VERTICAL "Z" AND
INDICATES THE + OR - ELEVATION CHANGE IN
INCHES FROM THE FINISHED FLOOR ELEVATION
(FFE) NEXT TO IT.
GENERAL DIMENSIONING
NOTES:
1. HALF-TONED OR LIGHT LINES INDICATE EXISTING
CONSTRUCTION TO REMAIN. DASHED BOLD LINES INDICATE
EXTENT OF DEMOLITION.
2. TEMPORARY BRACING OR SHORING MAY BE NECESSARY,
AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
3. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES
TO MEET APPROVAL OF CODE AGENCIES. COORDINATE
DEMOLITION WORK WITH ALL DISCIPLINES. CONTRACTOR
SHALL DISPOSE OF ALL ITEMS PER SPECIFICATIONS. THE
COR RESERVES THE RIGHT TO SELECT SPECIFIC ITEMS
FOR SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING
THE PRE-CONSTRUCTION WALK THROUGH.
4. CONTRACTOR SHALL PATCH AND REPAIR ALL OPENINGS,
VOIDS OR PENETRATIONS LEFT BY THE INSTALLATION OR
CONSTRUCTION OF EQUIPMENT, PIPING, DUCTS, ETC. TO
MAINTAIN THE INTEGRITY OF THE WALL, FLOOR, AND/OR
ROOF ASSEMBLY.
5. THE ACCESSIBLE PARKING AREA AND PUBLIC RIGHT-OF-
WAY OF THE PROJECT SITE MAY BE IMPACTED BY
CONSTRUCTION ACTIVITIES. TEMPORARY BARRICADES
PERTAINING TO THE CONTRACTOR'S ACTIVITIES SHALL BE
INSTALLED TO PREVENT POSSIBLE INJURY IN AND AROUND
DEMOLITION AND CONSTRUCTION AREAS IN ACCORDANCE
WITH THE LATEST OSHA REQUIREMENTS. COORDINATE
CONTRACTOR STAGING AREA AND PUBLIC ACCESS WITH
COR PRIOR TO CONSTRUCTION. PROTECT SIGNAGE WITHIN
PROJECT AREA.
6. SEE SPECIFICATIONS FOR CUTTING AND PATCHING AND
DEMOLITION FOR RELATED DEMOLITION WORK.
7. SEE DRAWINGS FOR ADDITIONAL PROJECT RELATED
UTILITY & DEMOLITION WORK AND PROJECT PHASING
NOTES. COORDINATE UTILITY SYSTEM SHUTDOWNS WITH
COR PER SPECIFICATIONS. DEVIATION FROM PROPER
NOTIFICATION OF SHUTDOWNS WILL NOT BE AUTHORIZED.
GENERAL DEMOLITION AND
PHASING NOTES:
/03
EXT'G WARD J TO
REMAIN THIS PHASE
EXT'G WARD L TO
REMAIN THIS PHASE
RENOVATIONS LIMITED
TO WARDS H & K THIS
PHASE
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
Drawing Number
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLANA/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
E F
G
H
J
K
L
M
C
LINE INDICATES
PHASE 1 SCOPE AREA
STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE USED. CONTRACTOR SHALL
VERIFY ACTUAL CONDITIONS ON-SITE.
410 Grand Ave, Suite 201C Laramie, WY 82070
1" = 30'-0"
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-1
.A
R C
H .B
.L
.P o ly tr a m a .r v t
/4
/2
:1
:4
P
M
04/03/2023 M.PERKINS K.MACAULAY
618-22-100
1390 - GI100
ARCHITECTURAL 4TH FLOOR EXISTING
CONDITIONS PLAN
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAMISSUED FOR BIDDING
1" = 30'-0" F4
ARCHITECTURAL 4TH FLOOR EXISTING CONDITIONS PLAN
/03
BUILDING CODE:
MIXED BUILDING OCCUPANCY TYPE:
The entire existing building 1 is comprised of:
Primary: Healthcare (NFPA 101, Chapter 19) Secondary:Ambulatory Health Care (not adjacent to project area) (NFPA 101, Chapter 21) This project is modifing wards F,J,G, and H on Level 4, all currently Healthcare occupancy.
The renovation area is reviewed under New Health Care Occupancy. (NFPA 1010, Chapter 18)
PROJECT AREA:
AREA IN SCOPE (PHASE 1): 21,893 GSF
FUTURE PHASE 2 (AREA J): 11,835 GSF
FUTURE PHASE 3 (AREA L): 12,979 GSF
CHANGE TO BUILDING SF: NO CHANGE
OCCUPANT LOAD:
EXISTING OCCUPANT LOAD: 183
PROPOSED OCCUPANT LOAD: 159
120 GSF PER OCCUPANT - Healthcare Sleeping Department (7.3.1.2)
CONSTRUCTION TYPE:
CONSTRUCTION: Type 1 (332) per NFPA 220, Chapter 4
FIRE RATED REQUIREMENTS FOR BUILDING ELEMENTS:
PRIMARY STRUCTURAL FRAME: 3 HOURS
BEARING WALLS (EXT & INT): 3 HOURS
FLOOR CONSTRUCTION: 2 HOURS
ROOF CONSTRUCTION: 1.5 HOURS
NON BEARING WALLS: 0 HOURS
OTHER REQUIRED RATINGS & SEPARATIONS:
VERTICAL SHAFTS: 2 HOURS
EXIT STAIRS: 2 HOURS
SOILED UTILITY: 1 HOUR
HAZARDOUS STORAGE: 1 HOUR
MEANS OF EGRESS:
MAXIMUM PATH OF TRAVEL (TABLE A.7.6): 200'
(160'-11" ACTUAL)
MAXIMUM COMMON PATH (18.2.5.2): 100' (56'-0" ACTUAL)
DEAD-END CORRIDORS (18.2.5.3): 30'
MINIMUM CORRIDOR WIDTH (18.2.3.4): 96 INCHES
OTHER EGRESS WIDTH REQUIRED: 0.2 INCHES PER
OCCUPANT
APPLICABLE BUILDING CODES:
• 2021 NFPA 101 LIFE SAFETY CODE
• 2022 NFPA 13 SPRINKLER SYSTEMS CODE
• 2022 NFPA 241 STANDARD FOR SAFEGUARDING
CONSTRUCTION, ALTERATION, AND DEMOLITION
OPERATIONS
• 2018 INTERNATIONAL BUILDING CODE (IBC)
• 2018 INTERNATIONAL MECHANICAL CODE (IPC)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION
(OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2020 NATIONAL ELECTRICAL CODE (NEC)
• 2018 INTERNATIONAL PLUMBING CODE (IPC)
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT,
BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE, AMERICAN CONCRETE INSTITUTE AND
COMMENTARY (ACI 318)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION
STANDARDS FOR NEW FEDERAL, COMMERCIAL AND
MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS
433, 434, AND 435
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND
SUSTAINABLE BUILDINGS: MEMORANDUM OF
UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION
MANAGEMENT
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY
SIGNS STATED IN THE GENERAL REQUIREMENTS
SECTION 01 00 00 AND 01 35 26 OF THE VA MASTER
CONSTRUCTION SPECIFICATIONS.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY -
ASHRAE STANDARD 62.1-2016: MEDICAL SPACES -
ASHRAE 170-2013, NON-MEDICAL SPACES - ASHRAE
62.1-2016
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS -
ASHRAE STANDARD 15-2013
• VA FIRE PROTECTION DESIGN GUIDE, 8TH EDITION (2021)
LIFE SAFETY SYMBOLS
PATH OF EXIT ACCESS TRAVEL
PATH LENGTH
FIRE EXTINGUISHER CABINET (FEC)
REQUIRED DOOR CLEARANCES
FEC
PATH TO POINT OF COMMON TRAVEL
PATH LENGTH###' - ##"
BOLD LINE REPRESENTS
LONGEST PATH DISTANCE
EXIT LIGHTING
REQUIRED TOILET CLEARANCE
72" D X 66" W (BARRIER FREE)
REQUIRED TURNING RADIUS
66" DIAMETER (TYPICAL - BARRIER FREE)
72" DIAMETER (BARIATRIC - BARRIER FREE)
7" TOE / KNEE CLEARANCE OVERLAP
UNRATED PARTITION
SMOKE PARTITION
1 HOUR RATED PARTITION
2 HOUR RATED PARTITION
EXISTING WALL TO REMAIN
EXISTING AREA NOT IN CONTRACT (NIC)
66"W
"D
66"DIAM
"D
FLOOR SLOPE / FLOOR DRAIN
KEYNOTES-
2 HOUR RATED PARTITION - SHAFT WALL
EXIT
STAIR
MECHANICAL
4F-121E4F-121E
310 SF
STORAGE
4K-116B
246 SF
THERAPIST OFFICE
4K-116C
2084 SF
THERAPY GYM
4K-116
143 SF
PRIVATE OT
4K-116A
168 SF
PRIVATE PT
4K-116D
388 SF
PATIENT ROOM
4K-115
72 SF
TLT
4K-115A
316 SF
PATIENT ROOM
4K-114
73 SF
TLT
4K-113A
73 SF
TLT
4K-114A
73 SF
TLT
4K-112A
74 SF
TLT
4K-110A
75 SF
TLT
4K-108A
71 SF
TLT
4K-105A
88 SF
TLT
4K-103A
254 SF
BREAK RM
4H-113
128 SF
ANM + 1
4K-101
1127 SF
CORR.
C4-137
192 SF
TR
4H-114
642 SF
ELEV. LOBBY
4H-115
270 SF
ELEVATORS
E
66 SF
TLT
4H-102
65 SF
TLT
4H-101
110 SF
STAFF CORR.
4H-103
305 SF
W LOCKERS
4H-104
288 SF
M LOCKERS
4H-105
594 SF
DINING ACUTE
4H-108
113 SF
STOR.
4H-108A
699 SF
ENTRY CORR.
C4-114
241 SF
FAMILY ROOM
4H-109
594 SF
CORR.
C4-135
131 SF
NOURISH.
4H-110
215 SF
FAMILY CONF.
4H-111
703 SF
CORR.
C4-127
154 SF
TEAM RM
4K-102
121 SF
REC STOR
4K-127
76 SF
TLT
4K-123A
114 SF
SW +1
4K-104
68 SF
LSB
4K-106
88 SF
LINEN
4K-109
254 SF
STOR.
4K-121
98 SF
LAUNDRY
4K-126
59 SF
STAFF TLT
4K-107
71 SF
TLT
4K-120A
71 SF
TLT
4K-122A
306 SF
PATIENT ROOM
4K-119
71 SF
TLT
4K-119A
163 SF
NURSE STN
4K-111
104 SF
SOILED UTILITY
4K-118
89 SF
CLEAN
4K-117
77 SF
NURSING MOTHERS
RM
4H-104A
139 SF
MED RM
4H-107A
401 SF
CENTRAL NURSE
STATION
4H-107
150 SF
NURSE MNGR
4H-106
EXT'G WARD J
TO REMAIN
THIS PHASE
EXT'G WARD L
TO REMAIN
THIS PHASE
STAIRWELL
SW7SW7
EXIT
STAIR
STAIRWELL
SW8SW8
314 SF
PATIENT ROOM
4K-113
307 SF
PATIENT ROOM
4K-112
329 SF
PATIENT ROOM
4K-110
341 SF
PATIENT ROOM
4K-108
352 SF
PATIENT ROOM
4K-105
450 SF
BARIATRIC / SURGE
PATIENT ROOM
4K-103
307 SF
PATIENT ROOM
4K-120
328 SF
PATIENT ROOM
4K-122
318 SF
PATIENT ROOM
4K-123
483 SF
REC THERAPY
4K-128
849 SF
VACANT (FINISH
PHASE 2)
4H-100
132' - 4"
47' - 10"
147' - 10"
160' - 2"
143' - 1"
124' - 3"
116' - 1"
92' - 2"
82' - 8"
125' - 3"
125' - 5"
115' - 7"
92' - 3"
82' - 5"
60' - 10"
93' - 0"
112' - 2"
85 SF
CARTS
C4-126
160' - 11"
57' - 8"
40' - 7"
FEC
FEC
FEC
876 SF
ELEV. LOBBY
C4-115
WARD K - 4TH FLOOR
NFPA Health Care Use Sleeping
Departments
NFPA OCCUPANCY
NFPA Health Care Use Inpatient Treatment Departments
NFPA Health Care Use…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .