Attachment D.7-6_618-22-100_MPLS_PT_IFB_PLUMB_230404.pdf
PDF 6 MB Posted
- Solicitation number
- 36C26323R0058_1
About this file
This solicitation is for project 618-22-100 Renovate for Expanded Polytrauma Phase 1 at the Minneapolis VAHCS. The project scope includes general construction, electrical, plumbing and other trades as required to expand and consolidate Polytrauma care. The estimated value is between $10-20 million. The NAICS code is 236220 and it is set aside for Service-Disabled Veteran-Owned Small Businesses. The contractor shall provide all labor, materials, equipment, transportation and testing to complete the construction. Applicable taxes shall be included in pricing.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN DOWN
WC WATER CLOSET
FLUSH VALVEFV
YH YARD HYDRANT
TD TRENCH DRAIN
FOV
FOR
FOS
FUEL OIL VENT
FUEL OIL RETURN
FUEL OIL SUPPLY
ES
EEW
EMERGENCY SHOWER
EMERGENCY EYEWASH
CWV COMBINATION WASTE AND VENT
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ACID NEUTRALIZING TANK
ACID RESISTANT VENT THROUGH ROOF
BALANCING COCK
BOTTOM OF PIPE
BRITISH THERMAL UNIT
BTU PER HOUR
CLOTHES WASHER BOX
CORROSION RESISTANT STEEL
CLEANOUT
CLEANOUT TO GRADE
CIRCULATION PUMP
DOUBLE CLEANOUT
DRINKING FOUNTAIN
ELEVATION
ELECTRIC WATER HEATER
ELECTRIC WATER COOLER
DEGREES FAHRENHEIT
FLOOR CLEANOUT
FINISHED FLOOR ELEVATION
FEET
GUTTER DRAIN
GREASE INTERCEPTOR
GALLONS PER HOUR
GALLONS PER MINUTE
GAS WATER HEATER
HORSEPOWER
HEAD
INCHES
INVERT
KILOWATT
1,000 BTUH
MIXING VALVE
NOT APPLICABLE
NOT IN CONTRACT
NUMBER
NORMALLY CLOSED
NORMALLY OPEN
OUTSIDE SCREW AND YOKE
PHASE
POUNDS PER SQUARE INCH GAUGE
STATIC PRESSURE
TYPICAL
YARD BOX
WALL CLEANOUT
AFF
AFG
ANT
AVTR
B.C.
BOP
BTU
BTUH
CWB
CRS
CO
COTG
CP
DCO
DF
EL
EWH
EWC
°F
FCO
FFE
FT
GD
GI
GPH
GPM
GWH
HP
HD
IN
INV
kW MBh
MV
NA
NIC
No. # N.C.
N.O.
OS&Y
Ph
PSIG
SP
TYP
YB
WCO
DOUBLE CLEANOUT TO GRADEDCOTG
ESEW EMERGENCY SHOWER EYE WASH
POWERS OF HARDNESS
PH
HOSE BIBBHB
DS DOWNSPOUT
DSN DOWNSPOUT NOZZLE
PLUMBING SYMBOL LEGEND
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS APPLY TO THIS PROJECT
ABBREVIATIONS
A
PENETRATION
TEST PLUG (PRESS/TEMP)
(WH) (HB)
RD/OD/DD
DCOTG
FCO/COTG
FS/FD/AD
VTR
ROOF DRAIN/OVERFLOW DRAIN/DECK DRAIN
TWO WAY OR DOUBLE CLEANOUT TO GRADE
FLOOR CLEANOUT/CLEANOUT TO GRADE
FLOOR SINK , FLOOR DRAIN , AREA DRAIN
WATER HAMMER ARREST0R
FITTING (PETE'S PLUG)
POINT OF CONNECTION TO EXISTING
AQUASTAT
PRESSURE GAUGE AND GAUGE COCK
THERMOMETER
STRAINER WITH BLOWDOWN VALVE & HOSE BIBB
NEW PIPE CONNECTION TO EXISTING PIPING
EXISTING PIPE TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
FLEXIBLE CONNECTION
UNIVERSAL TEMPERATURE-PRESSURE
ORIFICE UNION
FLANGED UNION
UNION
RISE IN PIPE
DROP IN PIPE
CAPPED OUTLET
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
ECCENTRIC REDUCER
REDUCER OR INCREASER
PIPE GUIDE
DIRECTION OF FLOW
MAV MANUAL AIR VENT (MAV)
AAV AUTOMATIC AIR VENT (AAV)
TRAP PRIMER WITH ACCESS PANELTP
SLOPE OF PIPE
VENT THROUGH ROOF
AG AIR GAP FITTING
WALL HYDRANT, HOSE BIBB
KEYED NOTE
OR
SCHEMATIC SYMBOLS
ABBREVIATIONSYMBOL DESCRIPTION
XX
255' OF 6" @ 0.15%SLOPE
SLOPE AND LINEAL FOOTAGE
F.D.C.FIRE DEPARTMENT INLET CONNECTION F.D.C.
SAS SASSANITARY MANHOLE
M.H. M.H.(E)
GM
WM
REDUCED PRESSURE BACKFLOW PREVENTER
STORM DRAIN
IRRIGATION
F.H.(E)F.H.
LP
PP
C.O.(E)C.O.
LIGHT POLE
FENCING
POWER POLE
CLEANOUT
THRUST BLOCK
CONSTRUCTION
FIRE HYDRANT
VALVE WITH VALVE BOX
NATURAL GAS
FIRE PROTECTION
COLD WATER SUPPLY
SANITARY SEWER
SASSAS
WATER METER
NATURAL GAS METER
GATE VALVE
VALVE IN RISER
WM
GM
LP
PP
POST INDICATOR VALVE
PIV
PIV
W
F
SD
G
IRR
S EX. S
EX. W
EX. F
EX. G
EX. SD
EX. IRR
EXISTINGNEWDESCRIPTION
SITE UTILITY SYMBOLS
CARBON DIOXIDECO2
H
HE
AC
AR
CDA
LOX
LN
DV
DA
WAGD
IA
MV
O
NO
N
MA
DENTAL VACUUM
WASTE ANESTHESIA GAS DISPOSAL
INSTRUMENT AIR
DENTAL AIR
EXISTING PIPING
LIQUID NITROGEN
LIQUID OXYGEN
HYDROGEN
HELIUM
ACETYLENE
ARGON
COMPRESSED DRY AIR
ALARM PANEL (IN WALL)
MEDICAL VALVE BOX
MEDICAL GAS DROP
MEDICAL VACUUM
OXYGEN
NITROUS OXIDE
NITROGEN
MEDICAL AIR
O OXYGEN
CDA
CO2
AR
AC
HE
H
LN
LOX
MA
N
NO
O
MV
IA
WAGD
DA
DV
O
SYMBOL ABBREVIATION DESCRIPTION
DESCRIPTIONABBREVIATIONSYMBOL
PROCESS GASES
MEDICAL GAS SYMBOLS
S
VACUUM BREAKER
ATMOSPHERIC VACUUM BREAKER
PRESSURE STYLE
FLOW SWITCH
SOLENOID VALVE
FUEL GAS PRESSURE REGULATOR
DIAPHRAGM (PROCESS SYSTEMS)
OS&Y VALVE
GATE VALVE
GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
CHECK VALVE
PLUG VALVE
WATER PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
TEMPERATURE AND PRESSURE RELIEF VALVE
2-WAY CONTROL VALVE
3-WAY MODULATING CONTROL VALVE
VALVE IN VERTICAL
REDUCED PRESSURE BACKFLOW PREVENTER (RPBP)
DRAIN VALVE
BALANCING VALVE/CIRCUIT SETTER MEASURING DEVICE
OR OR
OR
OR
DESCRIPTIONSYMBOL
VALVE SYMBOLS
P##
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
SECTION LETTER
DRAWING NUMBER WHERE DETAILED
DETAIL NUMBER
DRAWING NUMBER WHERE DETAILED
ELEVATION LETTER
LETTER REFER TO EQUIPMENT TYPE
NUMBER REFERS TO SPECIFIC EQUIPMENT
SYMBOL INDICATES FIXTURE/EQUIPMENT
IDENTIFIED IN EQUIPMENT SCHEDULE
SECTION SYMBOL
DETAIL SYMBOL
SECTION, ELEVATION, AND DETAIL TITLES
FIXTURE & EQUIPMENT SYMBOL
P-100
A
P-500
P-200
A
P-500
P-300
A
SCALE
ELEVATION
SCALE
DETAIL
SCALE
SECTION
IRR
INDIRECT WASTEIW
TW
TWR
SAN
V
DHWR
DCW
DHW
LA
IA
INW
IHWR
IHW
ICW
PD
SCW
IRR
NGH
NGM
G
LPG
ORD
RD
DIR
DIS
NPW
MU
ROR
ROS
CD
CA
AW
AV
PUMPED DISCHARGE LINE
IRRIGATION
SOFT COLD WATER
TEMPERED WATER (TEMP °F)
TEMPERED WATER RETURN (TEMP °F)
NATURAL GAS-HIGH PRESSURE
NATURAL GAS-MEDIUM PRESSURE
LAB COMPRESSED AIR
INSTRUMENT COMPRESSED AIR
INDUSTRIAL WASTE
REVERSE OSMOSIS RETURN
INDUSTRIAL HOT WATER RETURN
INDUSTRIAL HOT WATER
INDUSTRIAL COLD WATER
NATURAL GAS-LOW PRESSURE
LIQUIFIED PETROLEUM GAS
OVERFLOW ROOF DRAIN
STORM/ROOF DRAIN
SANITARY SEWER
DEIONIZED WATER RETURN
DEIONIZED WATER SUPPLY
VENT
NON-POTABLE WATER
MAKE-UP WATER
REVERSE OSMOSIS SUPPLY
140° DOMESTIC HOT WATER
140° DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER
DOMESTIC COLD WATER
CONDENSATE DRAIN
COMPRESSED AIR
ACID WASTE
ACID VENT
SHW SOFT HOT WATER
SAN
AV
AW
CA
CD
ROS
ROR
NPW
V
DIS
DIR
RD
ORD
LPG
G
NGM
NGH
SCW
PD
INW
IA
IW
LA
SHW
GW GREASE WASTEGW
GV GREASE VENT
ABBREVIATIONSYMBOL DESCRIPTION
PIPING SYMBOLS
ICW
IHW
IHWR
TWR (_ _ _)
TW (_ _ _)
GV
DCW
DHW
DHWR
DHW 140ºF
DHWR 140ºF
MU
DHW 140ºF
DHWR 140ºF
CUBIC FEET PER HOURCFH
O OXYGENO
MA MEDICAL AIRMA
MV MEDICAL VACUUMMV
on e-ei gh th in ch o ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in es ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.G e n e ra l.
S h e e ts
.r v t
/3
/2
:4
:2
P
M 1/4" = 1'-0"
04/03/2023 K. Luke N. Harper
618-22-100
1390 - P-001
PLUMBING LEGEND
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM
ISSUED FOR BIDDING
04/03/2023
TTUUVVWWXXYY
TYP.
2" W 4"
4" W 1 1/2" W
1 1/2" W2" W
1 1/2" W
CO
TYP.
/F6 PD103i/F6 PD103i/F6 PD104
4" W
4" W
4" W
4" W
4" W2" W
4" W
TYP.
TTUUVVWWXX
TYP.
4" W
4" W
4" W
4" W
2" W
3" W
1 1/2" W
4" W
4" W4" W
4" W 3" W
4" W
4" W
3" W
4" W
4" W
2" W
4" W
4" W
4" W
4" W
1 1/2" W
4" W
4" W
4" W
4" W
4" W
4" W
1 1/2" W
1 1/2" W 4" W
4" W
2" W 4"
1 1/2" W
1 1/2" W
4" W 4" W
4" W
4" W
4" W 1 1/2" W
1 1/2" W2" W
TYP.
/F1 PD103i/F1 PD103i
TYP.
3/4" HW
6" W
3" V
3" V3" V
3" V
WALL SYMBOL LEGEND
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
PROPOSED EXTERIOR WALL.
SEE WALL SECTIONS
1 HR FIRE AND SMOKE
BARRIER
2 HR FIRE AND SMOKE
BARRIER (SHAFT)
SMOKE BARRIER PARTITION
DEMOLISHED WALL,
FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE
OR FURNISHING TO REMAIN
NOT IN CONTRACT - NO
WORK SCHEDULED
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.M E
P .B
.L
.r v t
/4
/2
:4
:1
A
M As indicated
04/03/2023 K. Luke N.Harper
618-22-100
1390 - PD103i
PLUMBING PLANS - THIRD LEVEL
INTERSTITIAL 3H&3K - DEMO
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM - PHASE 1
ISSUED FOR BIDDING
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED
OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE
FOUND TO DIFFER SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED
WITH THE COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO
OCCUR 2 DAYS PRIOR TO INTERRUPTION.
C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES
WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE
COR PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY
THE COR PRIOR TO THE START OF WORK.
D. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 22 05 11 COMMON
WORK RESULTS FOR PLUMBING. CONSTRUCTION WORK SHALL NOT START ON
ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
E. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA,
CEILING HEIGHTS, AND SQUARE FOOTAGE.
F. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
G. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
H. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
I. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL
VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED
UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF
WALL AND CEILING FIRE RATING.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
L. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS
SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.
APPROVED FIRE PROOF CAULKING MATERIAL.
M. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
N. CONTRACTOR SHALL REMOVE ALL DEAD LEGS BY REMOVING THE TEE AND
PROVIDING A COUPLING TO MAKE A CONTINUOUS RUN; OR PIPING SHALL BE
REMOVED BACK TO NEAREST FIXTURE OR TEE AND REPLACED WITH AN ELBOW
TO MAKE A CONTINUOUS RUN.
O. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES
ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS
DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE
DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR
SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS
POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT
CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS
FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES.
PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES,
ETC.) SHALL HAVE PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER,
VA SAFETY PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE
SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.
1. DEMOLISH ALL PLUMBING PIPING BACK TO MAIN INCLUDING ISOLATION VALVES
WHERE APPLICABLE, MAIN TO REMAIN IN PHASE 1, CUT AND CAP WITHIN 2.5D.
REMOVE EXISTING DOMESTIC HOT AND COLD WATER STUB OUTS, PIPING, SHUT
OFFS AND ALL ASSOCIATED EQUIPMENT. ISOLATION VALVES IN 4J MECHANICAL
ROOM. PHASE WORK TO MINIMIZE DOWNTIME FOR THE FACILITY.
2. REMOVE EXISTING SANITARY SEWER PIPING BACK TO RISER.
3. DISCONNECT EXISTING SANITARY SEWER, DOMESTIC WATER, AND VENT
BRANCH FROM RISER AND DEMOLISH.
4. DEMOLISH ALL PLUMBING FIXTURES IN THE AREA OF WORK, REMOVE ALL
EXISTING DOMESTIC WATER, SANITARY SEWER, AND VENT PIPING BACK TO
THE EXISTING RISER. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS,
LEVEL, AND FINISH TO MATCH EXISTING. DEMOLITION SHALL INCLUDE
REMOVING ALL EXISTING ISOLATION VALVES, INCLUDING MAIN ISOLATION
VALVES AT EACH RISER. PHASE WORK TO PROVIDE NEW ISOLATION VALVES
PRIOR TO REMOVING EXISTING TO MITIGATE SHUTDOWNS.
SCALE: 1/8" = 1'-0"
F1
PLUMBING PLANS - THIRD LEVEL
INTERSTITIAL 3H - DEMO
SCALE: 1/8" = 1'-0"
F6
PLUMBING PLANS - THIRD LEVEL
INTERSTITIAL 3K - DEMO
DEMO ALL SANITARY PIPING TO RISER HERE
NOTE: NOT ALL KEYNOTES
ARE USED ON ALL SHEETS
AREA NOT IN SCOPE OF WORK
ALL PLUMBING FIXTURES ARE EXISTING TO REMAIN
AREA NOT IN SCOPE OF WORK
ALL PLUMBING FIXTURES ARE EXISTING TO REMAIN
TYP.
TYP.
TYP.
TYP.
TYP.
/F6 PD104 /F6 PD104
TTUUVVWWXX
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
/F1 PD104/F1 PD104
6" W
3/4" HW
6" V
3/4" O
1 1/4" MA
2" MV
4G-109B
4G-111
4G-112
4G-114
4S-6
4H-121
4H-122
4H-123
C4-116
4G-116 4G-115 4G-111C 4G-111B 4G-111A
4H-114
4H-115 4H-116 4H-117
4H-118
4H-120
E
C-6
M-8
4L-101
4L-140
C4-126
C4-115
C4-137
4L-102
4L-102A
4H-102
4H-103
4H-104
4H-105
4H-106
4H-107
4H-109 4H-110
4H-111
4H-113
4G-117
4H-101A
4H-101B
C4-110
C4-114
4H-112
4K-101
4H-108C4-138
4H-108A
4K-142A
4K-142
4K-140
4K-140A
4K-138A
4K-138
4K-136
4K-136A
4K-134
4K-134A
4K-133A
4K-133
4K-132
4K-131A
4K-131
4K-129
4K-126
4K-127
4K-125 4K-123 4K-122 C4-132 4K-120 4K-121
4K-119
C4-133
4K-117
4K-109
4K-108
4K-106
4K-104
4K-103
4K-101
4H-108
4K-102
4K-107
4K-113
4K-112
4K-105
4K-102A
4K-124
4K-124A
4K-124B
4K-118
4K-128
4K-130
4K-130A
4K-121A
4K-115
4K-110
4K-111
C-7
C4-131
4K-114
4K-135
4K-137
4K-139
4K-141
4K-143
C4-135
C4-134
C4-138
C4-127
SW8
4K-116
WALL SYMBOL LEGEND
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
PROPOSED EXTERIOR WALL.
SEE WALL SECTIONS
1 HR FIRE AND SMOKE
BARRIER
2 HR FIRE AND SMOKE
BARRIER (SHAFT)
SMOKE BARRIER PARTITION
DEMOLISHED WALL,
FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE
OR FURNISHING TO REMAIN
NOT IN CONTRACT - NO
WORK SCHEDULED
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.M E
P .B
.L
.r v t
/4
/2
:4
:1
A
M As indicated
04/03/2023 K. Luke N.Harper
618-22-100
1390 - PD104
PLUMBING DEMO PLANS - FOURTH LEVEL -
AREA 4H&4K
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM - PHASE 1
ISSUED FOR BIDDING
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED
OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE
FOUND TO DIFFER SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED
WITH THE COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO
OCCUR 2 DAYS PRIOR TO INTERRUPTION.
C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES
WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE
COR PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY
THE COR PRIOR TO THE START OF WORK.
D. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 22 05 11 COMMON
WORK RESULTS FOR PLUMBING. CONSTRUCTION WORK SHALL NOT START ON
ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
E. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA,
CEILING HEIGHTS, AND SQUARE FOOTAGE.
F. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
G. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
H. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
I. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL
VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED
UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF
WALL AND CEILING FIRE RATING.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
L. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS
SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.
APPROVED FIRE PROOF CAULKING MATERIAL.
M. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
N. CONTRACTOR SHALL REMOVE ALL DEAD LEGS BY REMOVING THE TEE AND
PROVIDING A COUPLING TO MAKE A CONTINUOUS RUN; OR PIPING SHALL BE
REMOVED BACK TO NEAREST FIXTURE OR TEE AND REPLACED WITH AN ELBOW
TO MAKE A CONTINUOUS RUN.
O. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES
ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS
DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE
DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR
SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS
POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT
CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS
FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES.
PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES,
ETC.) SHALL HAVE PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER,
VA SAFETY PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE
SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.
1. DEMOLISH ALL PLUMBING FIXTURES IN THE AREA OF WORK, REMOVE ALL
EXISTING DOMESTIC WATER, SANITARY SEWER, AND VENT PIPING BACK TO
THE EXISTING RISER. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS,
LEVEL, AND FINISH TO MATCH EXISTING. DEMOLITION SHALL INCLUDE
REMOVING ALL EXISTING ISOLATION VALVES, INCLUDING MAIN ISOLATION
VALVES AT EACH RISER. PHASE WORK TO PROVIDE NEW ISOLATION VALVES
PRIOR TO REMOVING EXISTING TO MITIGATE SHUTDOWNS.
SCALE: 1/8" = 1'-0"
F1
PLUMBING DEMO PLAN - FOURTH
LEVEL - AREA 4H
SCALE: 1/8" = 1'-0"
F6
PLUMBING DEMO PLAN - FOURTH
LEVEL - AREA 4K
NOTE: NOT ALL KEYNOTES
2 1/2" V
V
2" CW
3/4" HWC
/2
H
W C
6" V
3" CW
1 1/4" HW
3/4" HWC
2" CW
2 1/2" V
1" HWC
2 1/2" HW
3" CW
6" V
S D
2" CW
3/4" HW HW
2" HW HW
4" V
4" V 4" V
2" CW
3/4" HW
2" CW
3/4" CW
3/4" CW
2" V
3/4" HW
1/2" HW
1/2" CW
2 1/2" V
2" V
3/4" CW
2" V
1 1/2" HW
3/4" CW
3/4" HWC
4" V
C W
1/2" HWC
1" HW
2" CW
/2
H
W
/2
C
W
/2
V
3" V
V
3" V2" V1 1/2" V
3/4" HW
2" V
2" CW
2 1/2" CW
1" HW
1/2" HWC
6" V
/F6 PD104i /F6 PD104i
TYP.
TYP.
TTUUVVWWXX
MECHANICAL
4K-124
2 1/2" V
3" CW
2 1/2" HW
4" V
C W
/2
H W
V
/4
H
W /4
C
W
V
3/4" HW
2" V
3/4" CW
C W
H W
V
3/4" V
3/4" HW
3/4" CW
3/4" CW
3/4" HW
3/4" V
3/4" CW
3/4" V
3/4" HW
3/4" V
3/4" CW
3/4" V
3/4" HW
3/4" CW
3/4" CW
3/4" V
3/4" HW
2 1/2" V
2" V
1/2" HW
1/2" CW
3/4" CW
2" V
3/4" HW
3/4" CW
2" V
3/4" HW
2" V
2 1/2" V
1/2" CW
1/2" HW
1 1/2" CW
2" V
3/4" HW
3/4" CW
3/4" V
3/4" HW
2" V
3/4" CW
3/4" CW
2" V
3/4" HW
3/4" HW
2" V
3/4" CW
1 1/2" CW
2" V
1 1/2" CW
2" V
3/4" CW
3/4" HW
3/4" V
3/4" HW
2" V
3/4" CW
3/4" CW
2" V
3/4" HW
2" V
1 1/2" CW
3/4" CW
2" V
3/4" HW
3/4" CW
2" V
3/4" HW
1/2" HW
1 1/2" V
1/2" CW
3/4" HW
2" V
3/4" CW
1/2" HW
1 1/2" V
1/2" CW
1 1/2" V
1/2" CW
2" CW
2 1/2" V
2 1/2" V
1/2" CW
1/2" HW
1/2" CW
2 1/2" V
2 1/2" V 2 1/2" V
1/2" HW
1/2" CW
3/4" CW
2" V
3/4" HW
3/4" HW
2" V
3/4" CW
1/2" CW
1 1/2" V
3/4" CW
2" V
3/4" HW
2" V
3/4" CW
3/4" V
1/2" CW
3/4" HW
2" CW
4" V
1/2" HW
1/2" CW
2 1/2" V
3/4" CW
3/4" V
3/4" HW
3/4" CW
3/4" HW
3/4" V
2 1/2" V
1/2" CW
1/2" HW
3/4" CW
2" V
3/4" HW
2" CW
4" V
V
2" CW
2" HW
3/4" CW
/F1 PD104i /F1 PD104i
TYP.
TYP.
TYP.
TYP.
TYP.
3/4" CW
2" V
3/4" HW
3/4" HW
2" V
3/4" CW
3/4" CW
3/4" V
3/4" HW
3/4" HW
1/2" HW
3/4" HW
3/4" HW
3/4" HW
1/2" HW
3/4" HW
WALL SYMBOL LEGEND
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
PROPOSED EXTERIOR WALL.
SEE WALL SECTIONS
1 HR FIRE AND SMOKE
BARRIER
2 HR FIRE AND SMOKE
BARRIER (SHAFT)
SMOKE BARRIER PARTITION
DEMOLISHED WALL,
FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE
OR FURNISHING TO REMAIN
NOT IN CONTRACT - NO
WORK SCHEDULED
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.M E
P .B
.L
.r v t
/3
/2
:3
:2
P
M As indicated
04/03/2023 K. Luke N.Harper
618-22-100
1390 - PD104i
PLUMBING PLANS - FOURTH LEVEL
INTERSTITIAL 4H&4K - DEMO
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM - PHASE 1
ISSUED FOR BIDDING
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED
OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE
FOUND TO DIFFER SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED
WITH THE COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO
OCCUR 2 DAYS PRIOR TO INTERRUPTION.
C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES
WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE
COR PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY
THE COR PRIOR TO THE START OF WORK.
D. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 22 05 11 COMMON
WORK RESULTS FOR PLUMBING. CONSTRUCTION WORK SHALL NOT START ON
ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
E. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA,
CEILING HEIGHTS, AND SQUARE FOOTAGE.
F. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
G. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
H. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
I. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL
VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED
UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF
WALL AND CEILING FIRE RATING.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
L. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS
SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.
APPROVED FIRE PROOF CAULKING MATERIAL.
M. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
N. CONTRACTOR SHALL REMOVE ALL DEAD LEGS BY REMOVING THE TEE AND
PROVIDING A COUPLING TO MAKE A CONTINUOUS RUN; OR PIPING SHALL BE
REMOVED BACK TO NEAREST FIXTURE OR TEE AND REPLACED WITH AN ELBOW
TO MAKE A CONTINUOUS RUN.
O. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES
ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS
DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE
DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR
SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS
POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT
CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS
FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES.
PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES,
ETC.) SHALL HAVE PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER,
VA SAFETY PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE
SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.
1. DEMOLISH ALL PLUMBING PIPING BACK TO MAIN INCLUDING ISOLATION VALVES
WHERE APPLICABLE, MAIN TO REMAIN IN PHASE 1, CUT AND CAP WITHIN 2.5D.
REMOVE EXISTING DOMESTIC HOT AND COLD WATER STUB OUTS, PIPING, SHUT
OFFS AND ALL ASSOCIATED EQUIPMENT. ISOLATION VALVES IN 4J MECHANICAL
ROOM. PHASE WORK TO MINIMIZE DOWNTIME FOR THE FACILITY.
2. REMOVE EXISTING SANITARY SEWER PIPING BACK TO RISER.
3. DISCONNECT EXISTING SANITARY SEWER, DOMESTIC WATER, AND VENT
BRANCH FROM RISER AND DEMOLISH.
4. DEMOLISH ALL PLUMBING FIXTURES IN THE AREA OF WORK, REMOVE ALL
EXISTING DOMESTIC WATER, SANITARY SEWER, AND VENT PIPING BACK TO
THE EXISTING RISER. PATCH AND REPAIR ALL EXISTING SLAB PENETRATIONS,
LEVEL, AND FINISH TO MATCH EXISTING. DEMOLITION SHALL INCLUDE
REMOVING ALL EXISTING ISOLATION VALVES, INCLUDING MAIN ISOLATION
VALVES AT EACH RISER. PHASE WORK TO PROVIDE NEW ISOLATION VALVES
PRIOR TO REMOVING EXISTING TO MITIGATE SHUTDOWNS.
1/8" = 1'-0" F1
PLUMBING DEMO PLAN - FOURTH LEVEL INTERSTITIAL - AREA H
1/8" = 1'-0"
F6
PLUMBING DEMO PLAN - FOURTH LEVEL INTERSTITIAL - AREA K
NOTE: NOT ALL KEYNOTES
4G-109B
4G-111
4G-112
4G-114
4S-6
4G-116 4G-115 4G-111C 4G-111B 4G-111A
E 4L-101
4L-140
4L-102
4L-102A
4J-101
4J-1024J-103
4J-102B 4J-103B
4J-102A4J-103A
C4-142
C4-141
C4-139
4H-110
4H-113
4H-114
4H-115
C4-115
4H-106
4H-111
4H-107
4H-105
4H-102
4H-101
4H-104
4H-104A
4H-107A
4H-109
4H-103
C4-137
C4-114
C4-126
4K-101
4K-127
4H-108A
4H-108
4K-103A
4K-149
SW8
4H-100
4K-152
4H-121
4H-122
4H-123
4H-112
3H-110
C4-114
4H-108
C4-137
/F6 PG104i /F6 PG104i
TTUUVVWWXX
2 2
4J-101
4K-116B
4K-118
4K-117
4K-116C
4K-116D
4K-116A 4K-116
4K-128
4K-109
4K-126
4K-121
4H-110
4H-113
4K-123
4K-122
4K-120
4K-119A
4K-120A
4K-122A
4K-123A
4K-106
4K-104
4K-102
4H-111
4K-111
C4-135
C4-127
4K-101
4K-127
4K-119
4K-107
4K-103
4K-105
4K-108
4K-110
4K-112
4K-105A
4K-108A
4K-110A
4K-112A
4K-113
4K-114
4K-113A
4K-114A
4K-115
C4-131
4K-115A
4K-103A
4K-151
4K-155
4K-156
4K-154
4K-153
4K-150
4K-149
SW7
SW8
C4-132
4K-152
4K-124 4K-124A
4K-124B
4K-125
/F2 PG104i /F2 PG104i
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
2" MV
3/4" O
1 1/4" MA
WALL SYMBOL LEGEND
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
PROPOSED EXTERIOR WALL.
SEE WALL SECTIONS
1 HR FIRE AND SMOKE
BARRIER
2 HR FIRE AND SMOKE
BARRIER (SHAFT)
SMOKE BARRIER PARTITION
DEMOLISHED WALL,
FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE
OR FURNISHING TO REMAIN
NOT IN CONTRACT - NO
WORK SCHEDULED
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.M E
P .B
.L
.r v t
/3
/2
:3
:4
P
M As indicated
04/03/2023 K. Luke N.Harper
618-22-100
1390 - PGD104i
PLUMBING MED GAS PLANS - FOURTH
LEVEL INTERSTITIAL - DEMO
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM - PHASE 1
ISSUED FOR BIDDING
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED
OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE
FOUND TO DIFFER SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED
WITH THE COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO
OCCUR 2 DAYS PRIOR TO INTERRUPTION.
C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES
WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE
COR PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY
THE COR PRIOR TO THE START OF WORK.
D. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 22 05 11 COMMON
WORK RESULTS FOR PLUMBING. CONSTRUCTION WORK SHALL NOT START ON
ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
E. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA,
CEILING HEIGHTS, AND SQUARE FOOTAGE.
F. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
G. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
H. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
I. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL
VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED
UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF
WALL AND CEILING FIRE RATING.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
L. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS
SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.
APPROVED FIRE PROOF CAULKING MATERIAL.
M. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
N. CONTRACTOR SHALL REMOVE ALL DEAD LEGS BY REMOVING THE TEE AND
PROVIDING A COUPLING TO MAKE A CONTINUOUS RUN; OR PIPING SHALL BE
REMOVED BACK TO NEAREST FIXTURE OR TEE AND REPLACED WITH AN ELBOW
TO MAKE A CONTINUOUS RUN.
1. REMOVE AND REPLACE ALL MEDICAL GAS AND VACUUM PIPING BACK TO
EXISTING ZONE VALVE BOX.
2. REMOVE EXISTING MEDICAL GAS FIXTURES AND ASSOCIATED COMPONENTS
SERVING PROJECT AREA AS REQUIRED. REMOVE MED GAS PIPING BACK TO
EXISTING PIPE RISER MAINS.
3. DEMOLISH EXISTING ZONE VALVE BOX.
4. DISCONNECT EXISTING MEDICAL GAS PIPING FROM RISER AND DEMOLISH.
NOTE: NOT ALL KEYNOTES
ARE USED ON EACH SHEET
1/8" = 1'-0" F2
MED GAS DEMO PLAN - FOURTH LEVEL INTERSTITIAL - AREA H
1/8" = 1'-0"
F6
MED GAS DEMO PLAN - FOURTH LEVEL INTERSTITIAL - AREA K
4" W
4" W
4" W
4" W
4" W
4" W P-110
P-110
P-110
P-201
P-110 P-110
P-408 P-408
P-404
P-408
P-408
P-408 P-408
P-701
P-701
P-524
P-408
P-408
P-408
P-404
P-408
CO
CO
CO
TYP.
P-502
CO
4" W
4" W
2" W
2" W4" W
4" W
2" W
2" W
/F6 P-103i /F6 P-103i
P-608
2" W
2" W
2" W 2" W
4" W
2" W
2" W
2" W 4" W
4" W
4" W
4" W
4" W 4" W
4" W
4" W
4" W
2" W
4" W
4" W
2" W
2" W
FD-Z
FD-Z
FD-C
FD-C
FD-C
FD-C
TTUUVVWWXX
P-110
P-110
P-110
P-110
P-110
P-110
P-110
P-110
P-110
P-110
P-110
P-404
P-404
P-404
P-404
P-404
P-404
P-404
P-404
P-404
P-404
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-110
P-110
P-505
P-408
P-404
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-C
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-C
FD-Z
FD-Z
FD-C
FD-C
FD-Z
P-114
P-404
4" W
4" W
4" W
4" W
4" W
4" W
4" W
4" W
4" W
4" W
4" W
4" W
4" W
4" W
4" W
4" W
3" V
3" V
3" V
4" W 4" W
2" W
2" W
4" W
4" W4" W
4" W
2" W
2" W
2" W
4" W
4" W
4" W
4" W
4" W
4" W 2" W
2" W
2" W
2" W
2" W
2" W 4" W
4" W2" W
4" W
4" W
2" W
2" W
2" W
2" W
2" W
2" W
4" W 4" W
2" W
4" W
TYP.
TYP.
10" SD
3K-122
WCO
P-808
WCO
P-604
P-408
P-528
FD-C
FD-C
P-408
WCO
CO
2" W
P-528
/F1 P-103i /F1 P-103i
4" W
2" W
2" W4" W
2" W
2" W 2" W
1 1/2" W
4" W
2" W
2" W
4" W
2" W
4" W
4" W
4" W
WCO
4" W
6" V
6" W
FD-C
FD-C
P-302
P-408
P-408
P-528 P-408
WALL SYMBOL LEGEND
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
PROPOSED EXTERIOR WALL.
SEE WALL SECTIONS
1 HR FIRE AND SMOKE
BARRIER
2 HR FIRE AND SMOKE
BARRIER (SHAFT)
SMOKE BARRIER PARTITION
DEMOLISHED WALL,
FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE
OR FURNISHING TO REMAIN
NOT IN CONTRACT - NO
WORK SCHEDULED
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENINGS SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
Approved: Division Chief
Issue Date Checked Drawn
DrawingNumber
Building Number
Project NumberDrawing Title Project Title
Location Drawing Scale
Approved: Service DirectorPlot Scale U.S. Department of Veterans Affairs
Office of Construction and Facilities Management
FULLY SPRINKLERED
Phase
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
TRUE NORTH
PLAN NORTH
KEYPLAN
A/E:
TRIPLE C - The A/E Group
Mat Perkins
(520) 481-8548
A
B D
EF
G
H
J
K
L
M
C
GENERAL NOTES
KEYNOTES
LINE INDICATES
PHASE 1 SCOPE AREA
B
IM
/6
-2
-1
E x p a n d e d P o ly tr a u m a P ro g ra m P h a s e
/6 -2
-7
.M
P L S
.P O
L Y
T R
A U
M A
.M E
P .B
.L
.r v t
/3
/2
:3
:1
P
M As indicated
04/03/2023 K. Luke N.Harper
618-22-100
1390 - P-103i
SANITARY PLANS - THIRD LEVEL
INTERSTITIAL - AREA 3H&3K
1 Veterans Drive, Minneapolis, MN 55417
B70
RENOVATE FOR EXPANDED
POLYTRAUMA PROGRAM - PHASE 1
ISSUED FOR BIDDING
A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD
VERIFICATION WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM
THOSE INDICATED. CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE
LOCATION AND CONDITION OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED
OR REMOVED. CONTRACTOR TO NOTIFY ARCHITECT SHOULD CONDITIONS BE
FOUND TO DIFFER SIGNIFICANTLY FROM THE CONSTRUCTION DOCUMENTS.
B. CONTRACTOR TO ENSURE ALL SERVICE INTERRUPTIONS ARE COORDINATED
WITH THE COR 30 DAYS IN ADVANCE AND A PRE-CUTOVER MEETING IS TO
OCCUR 2 DAYS PRIOR TO INTERRUPTION.
C. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES
WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE
COR PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY
THE COR PRIOR TO THE START OF WORK.
D. COMPLETE LAYOUT DRAWINGS SHALL BE REQUIRED BY 22 05 11 COMMON
WORK RESULTS FOR PLUMBING. CONSTRUCTION WORK SHALL NOT START ON
ANY SYSTEM UNTIL THE LAYOUT DRAWINGS HAVE BEEN APPROVED BY THE VA.
E. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA,
CEILING HEIGHTS, AND SQUARE FOOTAGE.
F. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND
OTHER TRADES PRIOR TO CONSTRUCTION.
G. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED
CHASES UNLESS NOTED OTHERWISE.
H. CONTRACTOR SHALL COORDINATE ALL PIPING, PLUMBING, AND CONDUIT
PIPING WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND
SHALL PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN
REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.
I. PROVIDE ACCESS PANELS IN INACCESSIBLE CEILINGS AND/OR CHASES FOR ALL
VALVES, TRAPS, CLEANOUTS, ETC. ACCESS PANELS SHALL BE FURNISHED
UNDER DIVISION 22 AND INSTALLED UNDER THE ARCHITECTURAL
SPECIFICATIONS. ACCESS PANEL RATING SHALL MATCH CLASSIFICATION OF
WALL AND CEILING FIRE RATING.
J. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO
COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND
RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.
K. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT
CONNECTIONS BETWEEN ALL DISSIMILAR METALS.
L. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE
RATED WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA.
PROVIDE ALL PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS
SHALL BE CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L.
APPROVED FIRE PROOF CAULKING MATERIAL.
M. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.
N. CONTRACTOR SHALL REMOVE ALL DEAD LEGS BY REMOVING THE TEE AND
PROVIDING A COUPLING TO MAKE A CONTINUOUS RUN; OR PIPING SHALL BE
REMOVED BACK TO NEAREST FIXTURE OR TEE AND REPLACED WITH AN ELBOW
TO MAKE A CONTINUOUS RUN.
O. IT IS CRITICAL THAT THE CONTRACTOR PERFORM A COMPLETE REVIEW OF ALL
SUBMITTALS PRIOR TO SUBMISSION TO THE AE/COR. INCOMPLETE, INCORRECT
AND UNCLEAR SUBMITTALS WILL BE REJECTED AND MARKED AS "REVISE AND
RESUBMIT". ALL SUBMITTALS MUST CLEARLY INDICATE THE EQUIPMENT
SELECTIONS FOR THE PROJECT. TECHNICAL DRAWINGS OF COMPLETE
ASSEMBLIES, REFLECTING ACCURATE PROJECT CONDITIONS, SHALL BE
SUBMITTED WITH EQUIPMENT SELECTIONS TO ENSURE SPACE ALLOWANCES
ARE REFLECTED IN THE ACTUAL SPACE AVAILABLE. WHERE SIZE DEVIATIONS
DIFFER FROM THE BASIS OF DESIGN, CONTRACTOR SHALL HIGHLIGHT THE
DIFFERENCES FOR AE/COR REVIEW WITHIN THE SUBMITTAL. CONTRACTOR
SHALL PROVIDE INSTALLATION ROUTE AND VERIFICATION THAT ACCESS
POINTS, PLACEMENT ROUTE, SUPPORTS, AND REQUIRED EQUIPMENT
CLEARANCES ARE IDENTIFIED ON THE ROUTE DRAWING. SAFETY PROTOCOLS
FOR SUBJECT STATION SHALL BE REFLECTED ON EQUIPMENT CLEARANCES.
PLATFORMS AND INTERFACE AREAS (FILTER, GAUGES, MONITORS, VALVES,
ETC.) SHALL HAVE PROPER CLEARANCE AS DEFINED BY THE MANUFACTURER,
VA SAFETY PERSONNEL AND SERVICE PERSONNEL. ACCESS POINTS OF USE
SHALL BE CLEARLY IDENTIFIED ON THE DRAWINGS.
1. PROVIDE NEW SANITARY SEWER PIPING TO SERVE NEW PLUMBING FIXTURES.
2. CONNECT NEW 6" WASTE PIPE TO EXISTING RISER.
3. CONNECT NEW 6" VENT PIPE TO EXISTING RISER.
1/8" = 1'-0" F1
SANITARY PLAN - THIRD LEVEL - AREA 3H
1/8" = 1'-0"
F6
SANITARY PLAN - THIRD LEVEL - AREA 3K
4J-101
AREA NOT IN SCOPE OF WORK
AREA NOT IN SCOPE OF WORK
4G-109B
4G-111
4G-112
4G-114
SHAFT
4S-6
4G-116 4G-115 4G-111C 4G-111B 4G-111A
ELEVATORS
E 4L-101
4L-140
4L-102
4L-102A
4J-1024J-103
4J-102B 4J-103B
4J-102A4J-103A
C4-142
C4-141
C4-139
NOURISH.
4H-110
BREAK RM
4H-113
TR
4H-114
ELEV. LOBBY
4H-115
ELEV. LOBBY
C4-115
NURSE MNGR
4H-106
FAMILY CONF.
4H-111
CENTRAL NURSE STATION
4H-107
M LOCKERS
4H-105
TLT
4H-102
TLT
4H-101
W LOCKERS
4H-104
NURSING MOTHERS RM
4H-104A
MED RM
4H-107A
FAMILY ROOM
4H-109
STAFF CORR.
4H-103
CORR.
C4-137
CORR.
C4-135
ENTRY CORR.
C4-114
CARTS
C4-126
ANM + 1
4K-101
REC STOR
4K-127
STOR.
4H-108A
DINING ACUTE
4H-108
TLT
4K-103A
CARTS
4K-149
STAIRWELL 8
SW8
VACANT (FINISH PHASE 2)
4H-100
HAND WASH
4K-152
ELECTRICAL ROOM
4H-121
TELECOM ROOM
4H-122
P-110
P-110
P-110
P-201
P-110 P-110
P-408 P-408
P-404
P-408
P-408
P-408 P-408
P-701
P-701
P-524
P-528
P-528
P-528
P-404
P-408
OFFICE
4H-123
P-608
4" V 4" W
P-502
/F6 P-104 /F6 P-104
FD-Z
FD-Z
FD-CFD-C
FD-C
FD-C
2" OFL
1/2" HWC
1" HW
2 1/2" CW
AAP-1
TTUUVVWWXX
STORAGE
4K-116B
SOILED UTILITY
4K-118
CLEAN
4K-117
THERAPIST OFFICE
4K-116C
PRIVATE PT
4K-116D
PRIVATE OT
4K-116A
THERAPY GYM
4K-116
REC THERAPY
4K-128
LINEN
4K-109
LAUNDRY
4K-126
STOR.
4K-121
NOURISH.
4H-110
BREAK RM
4H-113
PATIENT ROOM
4K-123
PATIENT ROOM
4K-122
PATIENT ROOM
4K-120
TLT
4K-119A
TLT
4K-120A
TLT
4K-122A
TLT
4K-123A
LSB
4K-106
SW +1
4K-104
TEAM RM
4K-102
FAMILY CONF.
4H-111
NURSE STN
4K-111
CORR.
C4-135
CORR.
C4-127
ANM + 1
4K-101
REC STOR
4K-127
PATIENT ROOM
4K-119
STAFF TLT
4K-107
BARIATRIC / SURGE PATIENT ROOM
4K-103
PATIENT ROOM
4K-105
PATIENT ROOM
4K-108
PATIENT ROOM
4K-110
PATIENT ROOM
4K-112
TLT
4K-105A
TLT
4K-108A
TLT
4K-110A
TLT
4K-112A
PATIENT ROOM
4K-113
PATIENT ROOM
4K-114
TLT
4K-113A
TLT
4K-114A
PATIENT ROOM
4K-115
CORR.
C4-131
TLT
4K-115A
TLT
4K-103A
NURSE
4K-151
NURSE
4K-155
NURSE
4K-154
NURSE
4K-153
NURSE
4K-150
CARTS
4K-149
STAIRWELL 8
SW8
CORR.
C4-132
HAND WASH
4K-152
TYP.
TYP.
TYP.
TYP.
P-110
P-110
P-110
P-110
P-110
P-110
P-110
P-110
P-110
P-110
P-110
P-404
P-404
P-404
P-404
P-404
P-404
P-404
P-404
P-404
P-404
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-418
P-110
P-110
P-505
P-408
P-404
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-C
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-C
FD-Z
FD-Z
FD-C
FD-C
FD-Z
P-114
P-404
TYP.
TYP.
8 9
TYP.
TYP.
TYP.
1 1/4" MA
10" SD
3/4" O
2" MV
6" V
WCO
FD-C
FD-C
FD-C
MECHANICAL
4K-124
TELECOM ROOM
4K-124A
ELECTRICAL ROOM
4K-124B
P-701
P-701
P-701
P-701
P-608 P-408
P-701
P-701
P-701
P-701
P-701
P-701
P-701
P-408
P-528
P-808
P-302
WCO
P-528
P-528
P-701
FD-Z
P-708
/F1 P-104 /F1 P-104
WCO
WCO
AAP-2
P-408
2 1/2" HW
3/4" HWR
6" W
WALL SYMBOL LEGEND
CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES
PROPOSED EXTERIOR WALL.
SEE WALL SECTIONS
1 HR FIRE AND SMOKE
BARRIER
2 HR FIRE AND SMOKE
BARRIER (SHAFT)
SMOKE BARRIER PARTITION
DEMOLISHED WALL,
FIXTURE OR FURNISHING
EXISTING WALL, FIXTURE
OR FURNISHING TO REMAIN
NOT IN CONTRACT - NO
WORK SCHEDULED
on e-ei gh th ne fo ot on e-qu ar te r ne fo ot th re e-ei gh th s ne fo ot on e-ha lf ne fo ot th re e-qu ar te r ne fo ot in ch on e ne fo ot on e an d on e-ha lf ne fo ot th re e in ne fo ot
REVISIONS DATE
General Notes:
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE…