Attachment 7 -589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2-7.pdf
PDF 19 MB Posted
- Solicitation number
- 36C77624B0026_1
About this file
This document appears to be Attachment 7 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 2-7.pdf, which is related to the federal contract opportunity for Y1DA--589A5-21-700 EHRM INFRASTRUCTURE UPGRADES (VA-24-00076324) in Topeka, KS. The solicitation number is 36C77624B0026_1 and the issuing agency is the Department of Veterans Affairs Technology Acquisition Center Austin. This document provides drawings related to the solicitation for EHRM (Electronic Health Record Modernization) infrastructure upgrades in Topeka, Kansas. The drawings are part of Volume 2-7 of the Invitation for Bid (IFB) for this project. No additional details about the required products, services, pricing, or other terms are provided in this specific attachment.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chart Rm C144
Tub Rm C170A Shower
C170
RR
C170B
Corr
CDR6
Report Rm C143
Staff BreakRm C142
Nurse Practitioner C141
Mech C140M
Social Rm C171
Supply Rm C172
Dock Area C173
Tray Delivery C174
Corr
CDR4
Dining/Activity A139
Corr A1-3
Elec Closet A139E
Closet A105A
Women's RR A104
Nurse Manager A105
Closet A101A
Engineering A139S
Hskpg A139A
Men's RR A103
Men's RR A180Hskpg
A179
Corr A1-1
Conference A174A
Soiled Linen A175
Recreational Therapy A178
Lobby A101
Entry A100
Dining/Activity A139 Projects Office
A107
Corr A1-2
Clean Stor A138
MDS Coordinator A137
Medical Dir A136
Stor A108A
Social Worker A135
Corr A1-2
Stor B133
Stor B130
Supply Rm A108
Office B108B
Physical Therapy B129
Stor B129A
Stor B127
Kitchen B128
Stor B120
Elec Closet B119
RR
B118
Stor B117
Elec Closet B108E
Patient Transfer Coord.
B108C
Clinical Pharmacist B116
Engineering Admin.
B121
Office B115
Office B114
Office B113
Palliative Care Coord.
B109
Women's Staff RR B110
Corr B1-4
Chase B111P
Program Support Assist.
B112
Gems Coordinator B112A
OSH Manager B112C
Safety & Emergency Mgmt.
B112B
RR
B126
Corr
DCDR7
Engineering Service B124
Chief Eng. Assistant B123C
Program Analyst B122
Engineering B123
Corr B1-5
Engineering Service Chief B123B
Engineering Service Manager B123A
Hskpg A176
Women's Locker Rm A176A
Stor A178A
Corr A1-12
RR
A175B
Men's Locker Rm A177
Bariatric BedRm D157
RR
D140A
Laundry D139
Medicine D138
Bathing Suite D137
RR
D156A Soiled Linen
D134
Activities Dir D128
Corr D121
Meal Cart Closet D132
Clean Linen D133
RR
D131
Employee Lounge D130
Janitor D180
Nurse Practitioner D126
Meditation D120B
Elec Closet D127
Mech D136M
Corr
DCDR4
Bistro D120A
Family Gathering D120
Medical Stor D124
Exam D123
Nursing Records D105A
Office D104
Administration D105
Closet D167
Closet D166
Women RR D122
Men RR D121
Office D116
Nurse Manager D117
GEC Office D115
Closet D106A
Closet D111
Corr
DCDR3
Hskpg Stor D112
Hskpg Office D157
Stretcher Stor D113
Media D119
Barber D118
Corr
DCDR2
Maintenance Stor D108
Maintenance Office D109
Closet D114
Conference D106
Receiving/Mail D103
Foyer D102
Vestibule D101
Entry Corr
DCDR1
Res Rm D140
Res Rm D141
Res Rm D142
Res Rm D143
Res Rm D144
RR
D141A
RR
D142A
RR
D143A
RR
D144A
Res Rm D145
Res Rm D146
RR
D145A
RR
D147A
Den D154A
Kitchen D155
Pantry D155A
Living/Dining D154
Staff RR D152
Stor D151
Garden Closet D157
RR
D148A
RR
D149A
RR
D150A
Res Rm D147
Res Rm D149
Res Rm D148
Res Rm D150
Corr
DCDR8
Stair A175A
RR
A177B
FARA
H
FA
R
A
Women's RR A102
TO
BLDGS
1 & 9
Res Rm D150
RM #17
C185
Hospice Sitting C185B
Family
Shower C185A
Toilet/ Shower C188C
Toilet/
Sitting C188B
Family
RM #15
C188
Hospice
Storage C188A
RM #13
C155B
Resident Shower
C155CA
Toilet/
Shower
C155BA
Toilet/
RM #11
C155C
Resident
RM #9
C156
Resident Shower C157A
Toilet/
Shower C156A
Toilet/
RM #16
C184
Hospice
Sitting C184B
Family
Shower C184A
Toilet/ N/S C182
Hospice
Meds C182A
Hospice
Shower C183A
Toilet/
Sitting C183B
Family
RM #14
C183
Hospice
RM #12
C155A
Resident
Shower
C155AA
Toilet/
Sitting C181
RM #10
C155
Resident Tub Room C154
Corridor C1-12
Shower
C166AA
Toilet/ Shower
C166BA
Toilet/
RM #6
C166A
Resident
RM #7
C166B
Resident
RM #4
C165
Resident
RM #5
C166C
Resident
Shower C165A
Toilet/ Shower
C166CA
Toilet/
Sitting C153Shower
C164A
Toilet/ Shower
C166DA
Toilet/
RM #2
C164
Resident
RM #3
C166D
Resident
RM #1
C167
Resident Laundry C163 Corridor
C1-11
Supply C161
Clean
Closet C159
Elec.
Linen C169
Clean Shower C167A
Toilet/
Holding C170A
Soiled
Closet C170E
Elec.
Corridor C1-10
RM #8
C157
Resident
N / S C151
Den C148
Dining Room C149A
Kitchen C151AToilet
C150
Public
Corridor DCDR6 Pantry
C151B
Nurse Leader C147
Clinical
Practitioner C146
Nurse
NURSE
WARD
D153
MEDICATION
C152
TR
B110
Nurse Ward D153
TR
A114
TR
A114
TR
D125
TR
C152
TR
D153A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 6-
1.
dw g
1/
/2
2:
:1
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ICT - BUILDING 06 - LEVEL 1 CABLE
TRAY PLAN
JG JG
TT-B06-101
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES
FLOOR PLAN KEYNOTESX
FLOOR PLAN LEGEND
BASKET CABLE TRAY.
1. PROVIDE BASKET TYPE CABLE TRAY TO SUPPORT OPTICAL FIBER BACKBONE AND NEW CAT 6A HORIZONTAL CABLING. CABLE TRAY TO BE SIZED AS PER CABLE TRAY CAPACITY PLANNING ON FLOOR PLAN LEGEND, ASSUMING 40% FILL AND 25% SPARE CAPACITY. ROUTING SHOWN INDICATES PRIMARY PATHWAYS. IN ADDITION TO PRIMARY PATHWAYS, CABLE TRAY SHALL BE PROVIDED WHEN CABLE BUNDLES EXCEED 24 CABLES. FIRE RATED MECHANICAL SLEEVE ASSEMBLIES SHALL BE PROVIDED WHEN PASSING THROUGH FIRE
RATED PARTITIONS. ASSUMING 40% FILL AND 50% SPARE CAPACITY.
CAT. NO
CF105/300
CF105/450
CF105/500
CF105/600
CF150/150
CF150/200
CF150/300
CF150/450
CF150/500
CF150/600
CF150/900
DEPTH
(IN)
WIDTH
(IN)
CAT 6A 4 PAIR
PLENUM (0.35")
- CABLE TRAY CAPACITY PLANNING.
- PROPOSED CABLE TRAY:
CABLOFIL 4" DEEP X 12" WIDE MINIMUM
(SIZE COMMENSURATE WITH DISTRIBUTION
REQUIREMENT) WHITE POWERCOAT TRAY INSERT.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 6 - LEVEL 1 CABLE TRAY PLAN
AutoCAD SHX Text
NORTH
mgonser Snapshot mgonser Snapshot mgonser Snapshot mgonser Snapshot
Chart Rm C144
Tub Rm C170A Shower
C170
RR
C170B
Corr
CDR6
Report Rm C143
Staff BreakRm C142
Nurse Practitioner C141
Mech C140M
Social Rm C171
Supply Rm C172
Dock Area C173
Tray Delivery C174
Corr
CDR4
Dining/Activity A139
Corr A1-3
Elec Closet A139E
Closet A105A
Women's RR A104
Nurse Manager A105
Closet A101A
Engineering A139S
Hskpg A139A
Men's RR A103
Men's RR A180Hskpg
A179
Corr A1-1
Conference A174A
Soiled Linen A175
Recreational Therapy A178
Lobby A101
Entry A100
Dining/Activity A139 Projects Office
A107
Corr A1-2
Clean Stor A138
MDS Coordinator A137
Medical Dir A136
Stor A108A
Social Worker A135
Corr A1-2
Stor B133
Stor B130
Supply Rm A108
Office B108B
Physical Therapy B129
Stor B129A
Stor B127
Kitchen B128
Stor B120
Elec Closet B119
RR
B118
Stor B117
Elec Closet B108E
Patient Transfer Coord.
B108C
Clinical Pharmacist B116
Engineering Admin.
B121
Office B115
Office B114
Office B113
Palliative Care Coord.
B109
Women's Staff RR B110
Corr B1-4
Chase B111P
Program Support Assist.
B112
Gems Coordinator B112A
OSH Manager B112C
Safety & Emergency Mgmt.
B112B
RR
B126
Corr
DCDR7
Engineering Service B124
Chief Eng. Assistant B123C
Program Analyst B122
Engineering B123
Corr B1-5
Engineering Service Chief B123B
Engineering Service Manager B123A
Hskpg A176
Women's Locker Rm A176A
Stor A178A
Corr A1-12
RR
A175B
Men's Locker Rm A177
Bariatric BedRm D157
RR
D140A
Laundry D139
Medicine D138
Bathing Suite D137
RR
D156A Soiled Linen
D134
Activities Dir D128
Corr D121
Meal Cart Closet D132
Clean Linen D133
RR
D131
Employee Lounge D130
Janitor D180
Nurse Practitioner D126
Meditation D120B
Elec Closet D127
Mech D136M
Corr
DCDR4
Bistro D120A
Family Gathering D120
Medical Stor D124
Exam D123
Nursing Records D105A
Office D104
Administration D105
Closet D167
Closet D166
Women RR D122
Men RR D121
Office D116
Nurse Manager D117
GEC Office D115
Closet D106A
Closet D111
Corr
DCDR3
Hskpg Stor D112
Hskpg Office D157
Stretcher Stor D113
Media D119
Barber D118
Corr
DCDR2
Maintenance Stor D108
Maintenance Office D109
Closet D114
Conference D106
Receiving/Mail D103
Foyer D102
Vestibule D101
Entry Corr
DCDR1
Res Rm D140
Res Rm D141
Res Rm D142
Res Rm D143
Res Rm D144
RR
D141A
RR
D142A
RR
D143A
RR
D144A
Res Rm D145
Res Rm D146
RR
D145A
RR
D147A
Den D154A
Kitchen D155
Pantry D155A
Living/Dining D154
Staff RR D152
Stor D151
Garden Closet D157
RR
D148A
RR
D149A
RR
D150A
Res Rm D147
Res Rm D149
Res Rm D148
Res Rm D150
Corr
DCDR8
Stair A175A
RR
A177B
FARA
H
FA
R
A
Women's RR A102
TO
BLDGS
1 & 9
Res Rm D150
RM #17
C185
Hospice Sitting C185B
Family
Shower C185A
Toilet/ Shower C188C
Toilet/
Sitting C188B
Family
RM #15
C188
Hospice
Storage C188A
RM #13
C155B
Resident Shower
C155CA
Toilet/
Shower
C155BA
Toilet/
RM #11
C155C
Resident
RM #9
C156
Resident Shower C157A
Toilet/
Shower C156A
Toilet/
RM #16
C184
Hospice
Sitting C184B
Family
Shower C184A
Toilet/ N/S C182
Hospice
Meds C182A
Hospice
Shower C183A
Toilet/
Sitting C183B
Family
RM #14
C183
Hospice
RM #12
C155A
Resident
Shower
C155AA
Toilet/
Sitting C181
RM #10
C155
Resident Tub Room C154
Corridor C1-12
Shower
C166AA
Toilet/ Shower
C166BA
Toilet/
RM #6
C166A
Resident
RM #7
C166B
Resident
RM #4
C165
Resident
RM #5
C166C
Resident
Shower C165A
Toilet/ Shower
C166CA
Toilet/
Sitting C153Shower
C164A
Toilet/ Shower
C166DA
Toilet/
RM #2
C164
Resident
RM #3
C166D
Resident
RM #1
C167
Resident Laundry C163 Corridor
C1-11
Supply C161
Clean
Closet C159
Elec.
Linen C169
Clean Shower C167A
Toilet/
Holding C170A
Soiled
Closet C170E
Elec.
Corridor C1-10
RM #8
C157
Resident
N / S C151
Den C148
Dining Room C149A
Kitchen C151AToilet
C150
Public
Corridor DCDR6 Pantry
C151B
Nurse Leader C147
Clinical
Practitioner C146
Nurse
NURSE
WARD
D153
MEDICATION
C152
TR
B110
Nurse Ward D153
TR
A114
TR
A114
TR
D125
TR
C152
TR
D153A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 6-
1R
P.
dw g 3/
/2
6:
:2
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ICT - BUILDING 06 - LEVEL 1 ROUTING
PLAN
JG JG
TT-B06-101RP
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES
FLOOR PLAN KEYNOTESX
1. PROVIDE SLEEVES, CONDUITS OR MECHANICAL FIRE-PROOF
ASSEMBLIES AS REQUIRED THROUGH WALL OR FLOORS AS REQUIRED
TO MAINTAIN EXISTING RATING. REFER TO ONE-LINE CABLE RISER
DIAGRAMS FOR CABLE QUANTITY AND TYPE. CONTRACTOR SHALL SIZE
PATHWAYS TO ACCOMMODATE DAY ONE CABLING PLUS 40 PERCENT
SPARE CAPACITY.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text ROUTE 'A' FROM STEAM TUNNEL. EXACT LOCATION OF ENTRANCE FROM STEAM TUNNEL TO BE FIELD COORDINATED.
AutoCAD SHX Text ROUTE 'A' FROM CEILING OF CONNECTING CORRIDOR. EXACT LOCATION OF ENTRANCE FROM CONNECTING CORRIDOR CEILING TO BE FIELD COORDINATED.
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 6 - LEVEL 1 ROUTING PLAN
AutoCAD SHX Text
NORTH
mgonser Snapshot mgonser Snapshot mgonser Snapshot
TYP
ESDC
TYP
MID
CR/K
RX
TYP
ES
DC
TYP
TYP
MID
RXCR/K
ICT - BUILDING 06 - LEVEL 1 -
ENLARGED PLANS
JG JG
TT-B06-411
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 6-
1.
dw g
3/
/2
:5 3:
A
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF
EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES.
F. TELECOMMUNICATION ROOM (TR) RACK MOUNTED PDU CORDSETS:
1. SHALL BE IEC 60320 C14-C15 DEVICE POWER CORDSETS, FUNCTIONALLY EQUIVALENT TO CISCO SYSTEMS
PART# CAB-C15-CBN.
2. SHALL BE RATED FOR: a. AT LEAST 250 VAC b.13 AMPS c.60HZ d.120 DEGREES C (248 DEGREES F)
3. UL LISTED
4. MAXIMUM OF 4 FEET IN LENGTH. SHORTER LENGTHS MAY BE USED TO REDUCE EXCESSIVE SLACK.
5. COUPLER TERMINATIONS ON CORDSET: a. IEC 60320 C14 PLUG CONNECTOR (RACK PDU END) b.IEC 60320 C15 PLUG (DEVICE END)
6. SELECTION OF DISTINCT CONTRASTING CORDSET COLORS TO INDICATE DIVERSE (A/B) POWER
DISTRIBUTION SOURCES.
a. BLACK AND GRAY RECOMMENDED.
7. QUANTITY:
a. PROVIDE ONE SET OF C14-C15 POWER CORDS PER DEVICE TO BE CONNECTED TO RACK
MOUNTED PDU’S.
i. ONE SET SHALL CONSIST OF TWO (2) POWER CORDS FOR CONNECTION TO
DIVERSE (A/B) POWER DISTRIBUTION SOURCES.
b. PROVIDE MINIMUM OF ONE SET OF C14-C15 POWER CORDS PER SET OF RACK MOUNTED PDU’S.
c. PROVIDE MINIMUM OF ONE SET OF C14-C15 POWER CORDS PER RACK INSTALLED IN EACH TR.
d. IN ADDITION OF QUANTITIES LISTED ABOVE, PROVIDE ONE SPARE SET OF C14-C15 POWER CORDS
PER TR.
FLOOR PLAN KEYNOTESX
FLOOR PLAN LEGEND
BACKBOARD PROVIDED AND INSTALLED BY OTHERS.
DEMO PLAN GENERAL NOTES
1. REMOVE EXISTING WALL MOUNTED SERVER RACK.
2. RELOCATE EXISTING UTILITY PIPING AS REQUIRED TO ACCOMMODATE NEW
SERVER RACK. COORDINATE FINAL LOCATIONS WITH VA/COR.
3. PROVIDE AND INSTALL VISQUEEN TYPE PLASTIC SHEET AND ZIPPER DOOR AS
REQUIRED TO MAINTAIN TYPE V INFECTION CONTROL PRECAUTIONS. EXTEND
AND SEAL TO ROOF DECK/STRUCTURE ABOVE.
4. SUPPLY AND INSTALL WALK OFF MATS.
5. PROTECT EXISTING FINISHES FROM DUST AND DAMAGE.
1. PROVIDE MIGHTY MO 20 RACK, OR-MM20730B (OR EQUIVALENT)
2. PROVIDE VERTICAL WIRE MANAGER, OR-MM20VMD706 (OR EQUIVALENT)
3. PROVIDE 4'X8' AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD BACKBOARD PAINTED HIGH GLOSS WHITE WITH
(2) COATS OF PAINT FOR SERVICE PROVIDER/SECURITY/VIDEO/ETC. AROUND PERIMETER WALLS OF TR"s AND ENTRANCE ROOMS AS SHOWN. ENSURE THAT FIRE RATING STAMP IS TO REMAIN UNCOVERED BY PAINT.
4. PROVIDE FIXED CAMERA WITH PASSIVE INFRARED(PIR) SUPPLEMENTAL LIGHTING ON TELECOM ROOM CORNER.
5. PROVIDE ACCESS CONTROL DEVICES ON SECURITY DOOR.
6. PROVIDE COPPER GROUNDING BUSBAR AT 5' AFF IN LOCATION SHOWN. SEE GROUNDING BAR DETAIL FOR
ADDITIONAL REQUIREMENTS.
7. BASKET STYLE CABLE TRAY MINIMUM 4"X18" SHALL BE USED. ALL TRAY MUST BE INSTALLED AT 7'8" AFF, SUPPORTED PER MANUFACTURER REQUIREMENTS, AND PROPERLY BONDED TO GROUND.
AutoCAD SHX Text
ROOM B-110
AutoCAD SHX Text
ROOM D-125
AutoCAD SHX Text
ROOM C-152
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text TERMINATE FIBER ON EXISTING RACK WITH NEW L.I.U. CONFIRM EXACT LOCATION WITH OWNER. TELEPHONE TERMINATION ON BACK BOARD. VERIFY EXACT LOCATION WITH OWNER.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NOT IN SCOPE
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 06 - ENLARGED PLAN RM B-110
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 06 - ENLARGED PLAN RM D-125
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 06 - ENLARGED PLAN RM C-152
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 06 - ENLARGED RCP RM C-152
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 06 - ENLARGED RCP RM B-110
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 06 - ENLARGED RCP RM D-125
AutoCAD SHX Text
KEY PLAN
mgonser Snapshot mgonser Snapshot mgonser Snapshot
D
C023
MEN
C024
WOMEN
C022M
MECH.
C025E
ELEC.
C030
VENDING
LUNCH/
C036
JANITOR
C035
NO. 3
STAIR
CG/1
CORRIDOR
AG/4
LOBBY
ELEV.
A001
LOBBY
A002
JANITOR
A004
COMMUNICATION
COMPUTER/
C021
ROOM
CONFERENCE
B013
OFFICE
OPEN
B013M
MECH.
B012
WOMEN
B011
MEN
BG/1
CORRIDOR
B007E
ELEC.
B008
NO. 2
STAIR
A003
A003
STAIR
CG/2
CORRIDOIR
C037B
I.T. OFFICE
C037C
I.T. OFFICE
A015E
ELEC.
C026
CLERK
FM SUPPLY
B013B
FIN. MGMT.
ASSOC. DIRECT.
B014
F/M
C028
STORAGE
FM
A018E
ELECT.
C031
HOUSEKEEPING
C029
STORAGE
IT
C027
BUCKS
HRC
B005
COPY
B006A
PHARMACY
B006B
PHARMACY
B006C
PHARMACY
A040B
DIR
DEPUTY
A040A
DIRECTOR
A040D
PAO
A040G
ASSISTANT
ADMIN.
C039
CONFERENCE
DIRECTOR'S
C037A
I.T. OFFICE
B006
OFFICE
OPEN
B010
OFFICE
OPEN
A040
AREA
EXECUTIVE
C024A
FEED. RM.
MOTHER
C037
OFFICE
IT OPEN
C032
AD/IT
C033
AD/IT
C034A
LAB
NETWORK
C034
OFFICE
IT OPEN
A040H
SUPRT. ASST.
PROGRAM
A040C
AREA
COPY
B013C
F/M
B013A
AD F/M
ASSOC.
A016
PROCESS ROOM
C020
TR
B009T
TR
AG/2
CORRIDOR
AG/3
CORRIDOR
BG/2
CORRIDOR
C038
STORAGE
POA
A000
VESTIBULE
B013D
F/M
AG/1
CORRIDOR
AG/5
LOBBY
ELEV.
A019
A017A
TR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 9-
0.
dw g
1/
/2
2:
:1
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ICT - BUILDING 09 - BASEMENT LEVEL
CABLE TRAY PLAN
JG JG
TT-B09-100
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES
FLOOR PLAN KEYNOTESX
FLOOR PLAN LEGEND
BASKET CABLE TRAY.
1. PROVIDE BASKET TYPE CABLE TRAY TO SUPPORT OPTICAL FIBER BACKBONE AND NEW CAT 6A HORIZONTAL CABLING. CABLE TRAY TO BE SIZED AS PER CABLE TRAY CAPACITY PLANNING ON FLOOR PLAN LEGEND, ASSUMING 40% FILL AND 25% SPARE CAPACITY. ROUTING SHOWN INDICATES PRIMARY PATHWAYS. IN ADDITION TO PRIMARY PATHWAYS, CABLE TRAY SHALL BE PROVIDED WHEN CABLE BUNDLES EXCEED 24 CABLES. FIRE RATED MECHANICAL SLEEVE ASSEMBLIES SHALL BE PROVIDED WHEN PASSING THROUGH FIRE
RATED PARTITIONS. ASSUMING 40% FILL AND 50% SPARE CAPACITY.
CAT. NO
CF105/300
CF105/450
CF105/500
CF105/600
CF150/150
CF150/200
CF150/300
CF150/450
CF150/500
CF150/600
CF150/900
DEPTH
(IN)
WIDTH
(IN)
CAT 6A 4 PAIR
PLENUM (0.35")
- CABLE TRAY CAPACITY PLANNING.
- PROPOSED CABLE TRAY:
CABLOFIL 4" DEEP X 12" WIDE MINIMUM
(SIZE COMMENSURATE WITH DISTRIBUTION
REQUIREMENT) WHITE POWERCOAT TRAY INSERT.
AutoCAD SHX Text
DF
AutoCAD SHX Text
DF
AutoCAD SHX Text
DF
AutoCAD SHX Text
CH101
AutoCAD SHX Text
DF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 9 - GROUND FLOOR CABLE TRAY PLAN
AutoCAD SHX Text
NORTH
mgonser Snapshot mgonser Snapshot mgonser Snapshot
D
C023
MEN
C024
WOMEN
C022M
MECH.
C025E
ELEC.
C030
VENDING
LUNCH/
C036
JANITOR
C035
NO. 3
STAIR
CG/1
CORRIDOR
AG/4
LOBBY
ELEV.
A001
LOBBY
A002
JANITOR
A004
COMMUNICATION
COMPUTER/
C021
ROOM
CONFERENCE
B013
OFFICE
OPEN
B013M
MECH.
B012
WOMEN
B011
MEN
BG/1
CORRIDOR
B007E
ELEC.
B008
NO. 2
STAIR
A003
A003
STAIR
CG/2
CORRIDOIR
C037B
I.T. OFFICE
C037C
I.T. OFFICE
A015E
ELEC.
C026
CLERK
FM SUPPLY
B013B
FIN. MGMT.
ASSOC. DIRECT.
B014
F/M
C028
STORAGE
FM
A018E
ELECT.
C031
HOUSEKEEPING
C029
STORAGE
IT
C027
BUCKS
HRC
B005
COPY
B006A
PHARMACY
B006B
PHARMACY
B006C
PHARMACY
A040B
DIR
DEPUTY
A040A
DIRECTOR
A040D
PAO
A040G
ASSISTANT
ADMIN.
C039
CONFERENCE
DIRECTOR'S
C037A
I.T. OFFICE
B006
OFFICE
OPEN
B010
OFFICE
OPEN
A040
AREA
EXECUTIVE
C024A
FEED. RM.
MOTHER
C037
OFFICE
IT OPEN
C032
AD/IT
C033
AD/IT
C034A
LAB
NETWORK
C034
OFFICE
IT OPEN
A040H
SUPRT. ASST.
PROGRAM
A040C
AREA
COPY
B013C
F/M
B013A
AD F/M
ASSOC.
A016
PROCESS ROOM
C020
TR
B009T
TR
AG/2
CORRIDOR
AG/3
CORRIDOR
BG/2
CORRIDOR
C038
STORAGE
POA
A000
VESTIBULE
B013D
F/M
AG/1
CORRIDOR
AG/5
LOBBY
ELEV.
A019
A017A
TR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 9-
0R
P.
dw g 3/
/2
7:
:5
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ICT - BUILDING 09 - BASEMENT LEVEL
ROUTING PLAN
JG JG
TT-B09-100RP
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES
FLOOR PLAN KEYNOTESX
1. PROVIDE SLEEVES, CONDUITS OR MECHANICAL FIRE-PROOF
ASSEMBLIES AS REQUIRED THROUGH WALL OR FLOORS AS REQUIRED
TO MAINTAIN EXISTING RATING. REFER TO ONE-LINE CABLE RISER
DIAGRAMS FOR CABLE QUANTITY AND TYPE. CONTRACTOR SHALL SIZE
PATHWAYS TO ACCOMMODATE DAY ONE CABLING PLUS 40 PERCENT
SPARE CAPACITY.
AutoCAD SHX Text
DF
AutoCAD SHX Text
DF
AutoCAD SHX Text
DF
AutoCAD SHX Text
CH101
AutoCAD SHX Text
DF
AutoCAD SHX Text
ROUTE 'A' TO TR 'B107' ON LEVEL 1 ABOVE
AutoCAD SHX Text
TR 'B107' ABOVE
AutoCAD SHX Text
ROUTE 'B' TO TR 'A119' ON LEVEL 1 ABOVE
AutoCAD SHX Text
TR 'A119' ABOVE
AutoCAD SHX Text ROUTE 'B' FROM STEAM TUNNEL EXACT LOCATION OF ENTRANCE FROM STEAM TUNNEL TO BE FIELD COORDINATED.
AutoCAD SHX Text ROUTE 'A' FROM CEILING OF CONNECTING CORRIDOR. EXACT LOCATION OF ENTRANCE FROM CONNECTING CORRIDOR CEILING TO BE FIELD COORDINATED.
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 9 - GROUND FLOOR ROUTING PLAN
AutoCAD SHX Text
NORTH
mgonser Snapshot mgonser Snapshot mgonser Snapshot
FD FD
C H
C H
TB
C H
CH101
TB
C H
C H
C H
C H
C H
CH101
http://www.archdaily.com/90006/presentation-tips-for-architects-part-i/
OPEN
OFFICE
B-108
STAIR 2
B-106
TELE
COMMUNICATIONS
B-107
EK STORAGE
A-118
TELECOMMUNICATIONS
A-119
TRAINING
OFFICE
C-120
RES. MANG.
SUPERVISOR
C-137
OPEN
OFFICE
C-135
CORRIDOR
C1/1
AD CUSTOMER
EXPERIENCE
C-124
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 9-
1.
dw g
1/
/2
2:
:1
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ICT - BUILDING 09 - LEVEL 1 CABLE
TRAY PLAN
JG JG
TT-B09-101
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES
FLOOR PLAN KEYNOTESX
FLOOR PLAN LEGEND
BASKET CABLE TRAY.
1. PROVIDE BASKET TYPE CABLE TRAY TO SUPPORT OPTICAL FIBER BACKBONE AND NEW CAT 6A HORIZONTAL CABLING. CABLE TRAY TO BE SIZED AS PER CABLE TRAY CAPACITY PLANNING ON FLOOR PLAN LEGEND, ASSUMING 40% FILL AND 25% SPARE CAPACITY. ROUTING SHOWN INDICATES PRIMARY PATHWAYS. IN ADDITION TO PRIMARY PATHWAYS, CABLE TRAY SHALL BE PROVIDED WHEN CABLE BUNDLES EXCEED 24 CABLES. FIRE RATED MECHANICAL SLEEVE ASSEMBLIES SHALL BE PROVIDED WHEN PASSING THROUGH FIRE
RATED PARTITIONS. ASSUMING 40% FILL AND 50% SPARE CAPACITY.
CAT. NO
CF105/300
CF105/450
CF105/500
CF105/600
CF150/150
CF150/200
CF150/300
CF150/450
CF150/500
CF150/600
CF150/900
DEPTH
(IN)
WIDTH
(IN)
CAT 6A 4 PAIR
PLENUM (0.35")
- CABLE TRAY CAPACITY PLANNING.
- PROPOSED CABLE TRAY:
CABLOFIL 4" DEEP X 12" WIDE MINIMUM
(SIZE COMMENSURATE WITH DISTRIBUTION
REQUIREMENT) WHITE POWERCOAT TRAY INSERT.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 9 - LEVEL 1 CABLE TRAY PLAN
AutoCAD SHX Text
NORTH
mgonser Snapshot mgonser Snapshot mgonser Snapshot
FD FD
C H
C H
TB
C H
CH101
TB
C H
C H
C H
C H
C H
CH101
http://www.archdaily.com/90006/presentation-tips-for-architects-part-i/
OPEN
OFFICE
B-108
STAIR 2
B-106
TELE
COMMUNICATIONS
B-107
EK STORAGE
A-118
TELECOMMUNICATIONS
A-119
TRAINING
OFFICE
C-120
RES. MANG.
SUPERVISOR
C-137
OPEN
OFFICE
C-135
CORRIDOR
C1/1
AD CUSTOMER
EXPERIENCE
C-124
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 9-
1R
P.
dw g 3/
/2
5:
:1
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ICT - BUILDING 09 - LEVEL 1 ROUTING
PLAN
JG JG
TT-B09-101RP
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES
FLOOR PLAN KEYNOTESX
1. PROVIDE SLEEVES, CONDUITS OR MECHANICAL FIRE-PROOF
ASSEMBLIES AS REQUIRED THROUGH WALL OR FLOORS AS REQUIRED
TO MAINTAIN EXISTING RATING. REFER TO ONE-LINE CABLE RISER
DIAGRAMS FOR CABLE QUANTITY AND TYPE. CONTRACTOR SHALL SIZE
PATHWAYS TO ACCOMMODATE DAY ONE CABLING PLUS 40 PERCENT
SPARE CAPACITY.
AutoCAD SHX Text
TR 'B210' ABOVE
AutoCAD SHX Text
ROUTE 'A' TO TR 'B210' ON LEVEL 2 ABOVE
AutoCAD SHX Text
TR 'B009T' BELOW
AutoCAD SHX Text
ROUTE 'A' FROM TR 'B009T' ON GROUND LEVEL BELOW
AutoCAD SHX Text ROUTE 'B' FROM TR 'C020' ON GROUND LEVEL BELOW AND TO TR 'A224' ON LEVEL 2 ABOVE.
AutoCAD SHX Text
TR 'C020' BELOW
AutoCAD SHX Text
TR 'A224' ABOVE (STACKED)
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 9 - LEVEL 1 ROUTING PLAN
AutoCAD SHX Text
NORTH
mgonser Snapshot mgonser Snapshot mgonser Snapshot
CM
OFFICE
B-208
CORRIDOR
B2/1
STAIR 2
B-207
ELEC.
B-206E
CM
OFFICE
B-209
OPEN
OFFICE
C-225
CORRIDOR
C2/1
WOMEN
C-228JANITOR
C-232
STAIR 1
C-231
TELECOMM-
UNICATIONS
B-210
TELECOMM-
UNICATIONS
A-224
CORRIDOR
A2/1
CM STAFF
A-223
ELEC.
C-230E
OPEN OFFICE
C-229
OPEN
OFFICE
C-225
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 9-
2.
dw g
1/
/2
2:
:1
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ICT - BUILDING 09 - LEVEL 2 CABLE
TRAY PLAN
JG JG
TT-B09-102
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES
FLOOR PLAN KEYNOTESX
FLOOR PLAN LEGEND
BASKET CABLE TRAY.
1. PROVIDE BASKET TYPE CABLE TRAY TO SUPPORT OPTICAL FIBER BACKBONE AND NEW CAT 6A HORIZONTAL CABLING. CABLE TRAY TO BE SIZED AS PER CABLE TRAY CAPACITY PLANNING ON FLOOR PLAN LEGEND, ASSUMING 40% FILL AND 25% SPARE CAPACITY. ROUTING SHOWN INDICATES PRIMARY PATHWAYS. IN ADDITION TO PRIMARY PATHWAYS, CABLE TRAY SHALL BE PROVIDED WHEN CABLE BUNDLES EXCEED 24 CABLES. FIRE RATED MECHANICAL SLEEVE ASSEMBLIES SHALL BE PROVIDED WHEN PASSING THROUGH FIRE
RATED PARTITIONS. ASSUMING 40% FILL AND 50% SPARE CAPACITY.
CAT. NO
CF105/300
CF105/450
CF105/500
CF105/600
CF150/150
CF150/200
CF150/300
CF150/450
CF150/500
CF150/600
CF150/900
DEPTH
(IN)
WIDTH
(IN)
CAT 6A 4 PAIR
PLENUM (0.35")
- CABLE TRAY CAPACITY PLANNING.
- PROPOSED CABLE TRAY:
CABLOFIL 4" DEEP X 12" WIDE MINIMUM
(SIZE COMMENSURATE WITH DISTRIBUTION
REQUIREMENT) WHITE POWERCOAT TRAY INSERT.
AutoCAD SHX Text
DF
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
TB101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
TB101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
DF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 9 - LEVEL 2 CABLE TRAY PLAN
AutoCAD SHX Text
NORTH
mgonser Snapshot mgonser Snapshot mgonser Snapshot
CM
OFFICE
B-208
CORRIDOR
B2/1
STAIR 2
B-207
ELEC.
B-206E
CM
OFFICE
B-209
OPEN
OFFICE
C-225
CORRIDOR
C2/1
WOMEN
C-228JANITOR
C-232
STAIR 1
C-231
TELECOMM-
UNICATIONS
B-210
TELECOMM-
UNICATIONS
A-224
CORRIDOR
A2/1
CM STAFF
A-223
ELEC.
C-230E
OPEN OFFICE
C-229
OPEN
OFFICE
C-225
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 9-
2R
P.
dw g 3/
/2
5:
:0
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ICT - BUILDING 09 - LEVEL 2 ROUTING
PLAN
JG JG
TT-B09-102RP
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES
FLOOR PLAN KEYNOTESX
1. PROVIDE SLEEVES, CONDUITS OR MECHANICAL FIRE-PROOF
ASSEMBLIES AS REQUIRED THROUGH WALL OR FLOORS AS REQUIRED
TO MAINTAIN EXISTING RATING. REFER TO ONE-LINE CABLE RISER
DIAGRAMS FOR CABLE QUANTITY AND TYPE. CONTRACTOR SHALL SIZE
PATHWAYS TO ACCOMMODATE DAY ONE CABLING PLUS 40 PERCENT
SPARE CAPACITY.
AutoCAD SHX Text
DF
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
TB101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
TB101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
CH101
AutoCAD SHX Text
DF
AutoCAD SHX Text
ROUTE 'A' FROM TR 'B107' ON LEVEL 1 BELOW
AutoCAD SHX Text
TR 'B107' BELOW
AutoCAD SHX Text
ROUTE 'B' FROM TR 'A119' ON LEVEL 1 BELOW
AutoCAD SHX Text
TR 'A119' BELOW (STACKED)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 9 - LEVEL 2 ROUTING PLAN
AutoCAD SHX Text
NORTH
mgonser Snapshot mgonser Snapshot mgonser Snapshot
ES DC
TYP
MID
RX
CR/K
ESDC
TYP
RX
CR/K
TYP
TYP
MID
ICT - BUILDING 09 - BASEMENT LEVEL -
ENLARGE PLANS
JG JG
TT-B09-401
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 9-
1.
dw g
3/
/2
:0 8:
A
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF
EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES.
F. TELECOMMUNICATION ROOM (TR) RACK MOUNTED PDU CORDSETS:
1. SHALL BE IEC 60320 C14-C15 DEVICE POWER CORDSETS, FUNCTIONALLY EQUIVALENT TO CISCO SYSTEMS
PART# CAB-C15-CBN.
2. SHALL BE RATED FOR: a. AT LEAST 250 VAC b.13 AMPS c.60HZ d.120 DEGREES C (248 DEGREES F)
3. UL LISTED
4. MAXIMUM OF 4 FEET IN LENGTH. SHORTER LENGTHS MAY BE USED TO REDUCE EXCESSIVE SLACK.
5. COUPLER TERMINATIONS ON CORDSET: a. IEC 60320 C14 PLUG CONNECTOR (RACK PDU END) b.IEC 60320 C15 PLUG (DEVICE END)
6. SELECTION OF DISTINCT CONTRASTING CORDSET COLORS TO INDICATE DIVERSE (A/B) POWER
DISTRIBUTION SOURCES.
a. BLACK AND GRAY RECOMMENDED.
7. QUANTITY:
a. PROVIDE ONE SET OF C14-C15 POWER CORDS PER DEVICE TO BE CONNECTED TO RACK
MOUNTED PDU’S.
i. ONE SET SHALL CONSIST OF TWO (2) POWER CORDS FOR CONNECTION TO
DIVERSE (A/B) POWER DISTRIBUTION SOURCES.
b. PROVIDE MINIMUM OF ONE SET OF C14-C15 POWER CORDS PER SET OF RACK MOUNTED PDU’S.
c. PROVIDE MINIMUM OF ONE SET OF C14-C15 POWER CORDS PER RACK INSTALLED IN EACH TR.
d. IN ADDITION OF QUANTITIES LISTED ABOVE, PROVIDE ONE SPARE SET OF C14-C15 POWER CORDS
PER TR.
FLOOR PLAN KEYNOTESX
FLOOR PLAN LEGEND
BACKBOARD PROVIDED AND INSTALLED BY OTHERS.
DEMO PLAN GENERAL NOTES
1. REMOVE EXISTING WALL MOUNTED SERVER RACK.
2. RELOCATE EXISTING UTILITY PIPING AS REQUIRED TO ACCOMMODATE NEW
SERVER RACK. COORDINATE FINAL LOCATIONS WITH VA/COR.
3. PROVIDE AND INSTALL VISQUEEN TYPE PLASTIC SHEET AND ZIPPER DOOR AS
REQUIRED TO MAINTAIN TYPE V INFECTION CONTROL PRECAUTIONS. EXTEND
AND SEAL TO ROOF DECK/STRUCTURE ABOVE.
4. SUPPLY AND INSTALL WALK OFF MATS.
5. PROTECT EXISTING FINISHES FROM DUST AND DAMAGE.
1. PROVIDE MIGHTY MO 20 RACK, OR-MM20730B (OR EQUIVALENT)
2. PROVIDE VERTICAL WIRE MANAGER, OR-MM20VMD706 (OR EQUIVALENT)
3. PROVIDE 4'X8' AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD BACKBOARD PAINTED HIGH GLOSS WHITE WITH
(2) COATS OF PAINT FOR SERVICE PROVIDER/SECURITY/VIDEO/ETC. AROUND PERIMETER WALLS OF TR"s AND ENTRANCE ROOMS AS SHOWN. ENSURE THAT FIRE RATING STAMP IS TO REMAIN UNCOVERED BY PAINT.
4. PROVIDE FIXED CAMERA WITH PASSIVE INFRARED(PIR) SUPPLEMENTAL LIGHTING ON TELECOM ROOM CORNER.
5. PROVIDE ACCESS CONTROL DEVICES ON SECURITY DOOR.
6. PROVIDE COPPER GROUNDING BUSBAR AT 5' AFF IN LOCATION SHOWN. SEE GROUNDING BAR DETAIL FOR
ADDITIONAL REQUIREMENTS.
7. BASKET STYLE CABLE TRAY MINIMUM 4"X18" SHALL BE USED. ALL TRAY MUST BE INSTALLED AT 7'8" AFF, SUPPORTED PER MANUFACTURER REQUIREMENTS, AND PROPERLY BONDED TO GROUND.
AutoCAD SHX Text
ROOM A-009
AutoCAD SHX Text
ROOM A-017A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 09 - ENLARGED PLAN RM C020
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 09 - ENLARGED PLAN RM B009T
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 09 - ENLARGED RCP C020
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 09 - ENLARGED RCP RM A-009
AutoCAD SHX Text N
AutoCAD SHX Text
KEY PLAN
mgonser Snapshot mgonser Snapshot mgonser Snapshot
ESDC
TYP
MID
RX
CR/K
TYP
TYP
TYP
ESDC
TYP
RX
CR/K
MID
ICT - BUILDING 09 - LEVEL 1 - ENLARGE
PLANS
JG JG
TT-B09-411
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 9-
1.
dw g
3/
/2
:0 1:
A
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF
EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES.
F. TELECOMMUNICATION ROOM (TR) RACK MOUNTED PDU CORDSETS:
1. SHALL BE IEC 60320 C14-C15 DEVICE POWER CORDSETS, FUNCTIONALLY EQUIVALENT TO CISCO SYSTEMS
PART# CAB-C15-CBN.
2. SHALL BE RATED FOR: a. AT LEAST 250 VAC b.13 AMPS c.60HZ d.120 DEGREES C (248 DEGREES F)
3. UL LISTED
4. MAXIMUM OF 4 FEET IN LENGTH. SHORTER LENGTHS MAY BE USED TO REDUCE EXCESSIVE SLACK.
5. COUPLER TERMINATIONS ON CORDSET: a. IEC 60320 C14 PLUG CONNECTOR (RACK PDU END) b.IEC 60320 C15 PLUG (DEVICE END)
6. SELECTION OF DISTINCT CONTRASTING CORDSET COLORS TO INDICATE DIVERSE (A/B) POWER
DISTRIBUTION SOURCES.
a. BLACK AND GRAY RECOMMENDED.
7. QUANTITY:
a. PROVIDE ONE SET OF C14-C15 POWER CORDS PER DEVICE TO BE CONNECTED TO RACK
MOUNTED PDU’S.
i. ONE SET SHALL CONSIST OF TWO (2) POWER CORDS FOR CONNECTION TO
DIVERSE (A/B) POWER DISTRIBUTION SOURCES.
b. PROVIDE MINIMUM OF ONE SET OF C14-C15 POWER CORDS PER SET OF RACK MOUNTED PDU’S.
c. PROVIDE MINIMUM OF ONE SET OF C14-C15 POWER CORDS PER RACK INSTALLED IN EACH TR.
d. IN ADDITION OF QUANTITIES LISTED ABOVE, PROVIDE ONE SPARE SET OF C14-C15 POWER CORDS
PER TR.
FLOOR PLAN KEYNOTESX
FLOOR PLAN LEGEND
BACKBOARD PROVIDED AND INSTALLED BY OTHERS.
DEMO PLAN GENERAL NOTES
1. REMOVE EXISTING WALL MOUNTED SERVER RACK.
2. RELOCATE EXISTING UTILITY PIPING AS REQUIRED TO ACCOMMODATE NEW
SERVER RACK. COORDINATE FINAL LOCATIONS WITH VA/COR.
3. PROVIDE AND INSTALL VISQUEEN TYPE PLASTIC SHEET AND ZIPPER DOOR AS
REQUIRED TO MAINTAIN TYPE V INFECTION CONTROL PRECAUTIONS. EXTEND
AND SEAL TO ROOF DECK/STRUCTURE ABOVE.
4. SUPPLY AND INSTALL WALK OFF MATS.
5. PROTECT EXISTING FINISHES FROM DUST AND DAMAGE.
1. PROVIDE MIGHTY MO 20 RACK, OR-MM20730B (OR EQUIVALENT)
2. PROVIDE VERTICAL WIRE MANAGER, OR-MM20VMD706 (OR EQUIVALENT)
3. PROVIDE 4'X8' AC GRADE 3/4" TRADE SIZE FIRE RATED PLYWOOD BACKBOARD PAINTED HIGH GLOSS WHITE WITH
(2) COATS OF PAINT FOR SERVICE PROVIDER/SECURITY/VIDEO/ETC. AROUND PERIMETER WALLS OF TR"s AND ENTRANCE ROOMS AS SHOWN. ENSURE THAT FIRE RATING STAMP IS TO REMAIN UNCOVERED BY PAINT.
4. PROVIDE FIXED CAMERA WITH PASSIVE INFRARED(PIR) SUPPLEMENTAL LIGHTING ON TELECOM ROOM CORNER.
5. PROVIDE ACCESS CONTROL DEVICES ON SECURITY DOOR.
6. PROVIDE COPPER GROUNDING BUSBAR AT 5' AFF IN LOCATION SHOWN. SEE GROUNDING BAR DETAIL FOR
ADDITIONAL REQUIREMENTS.
7. BASKET STYLE CABLE TRAY MINIMUM 4"X18" SHALL BE USED. ALL TRAY MUST BE INSTALLED AT 7'8" AFF, SUPPORTED PER MANUFACTURER REQUIREMENTS, AND PROPERLY BONDED TO GROUND.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ROOM B-107
AutoCAD SHX Text
ROOM A-119
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 09 - ENLARGED PLAN RM B-107
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 09 - ENLARGED PLAN RM A-119
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 09 - ENLARGED RCP RM B-107
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 09 - ENLARGED RCP RM A-119
AutoCAD SHX Text N
AutoCAD SHX Text
KEY PLAN
mgonser Snapshot mgonser Snapshot mgonser Snapshot
ES DC
TYP
MID
RX
CR/K
TYP
TYP
ES DC
TYP
MID
RX
CR/K
ICT - BUILDING 09 - LEVEL 2 -
ENLARGED PLANS
JG JG
TT-B09-421
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\T T-
B0 9-
1.
dw g
3/
/2
:5 9:
A
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
12/28/2023
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
GENERAL NOTES
A. FOR GENERAL NOTES AND LEGENDS REFER TO SHEET TT001.
B. EXISTING IT/TR/OI&T ROOMS TO REMAIN ACTIVE DURING CONSTRUCTION. G.C. TO PROTECT EQUIPMENT
DURING CONSTRUCTION WITH VISQUEEN. CONTRACTOR TO ENSURE CONTINUOUS OPERATION OF
EQUIPMENT.
C. NOT ALL KEY NOTES APPLY TO ALL PLAN SHEETS. G.C. TO APPLY ONLY AS INDICATED PER EACH SHEET.
D. APPLY FIRE RATED SEALANT TO ALL EXISTING AND NEW PENETRATIONS IN EXISTING WALLS TO MAKE
EXISTING WALLS A 1 HR ASSEMBLY. BASIS OF DESIGN FOR 1 HR WALL IS UL 419 ASSEMBLY.
E. CONTRACTOR SHALL PROVIDE AND INSTALL FIRE RATED SLEEVES AS NECESSARY AND ASSEMBLED PER UL
DETAIL APPROPRIATE FOR WALL/FLOOR AND RACEWAY/CABLE TYPES.
F. TELECOMMUNICATION ROOM (TR) RACK MOUNTED PDU CORDSETS:
1. SHALL BE IEC 60320 C14-C15…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .