This appears to be a set of architectural, mechanical and electrical drawings for Building 19 (Data Center) at the Colmery-O'Neil VA Medical Center in Topeka, KS as part of EHRM Infrastructure Upgrades project.
The drawings include building sections showing construction details like brick facade, cast stone copings, TPO membrane roof, insulation, and fire-rated assemblies. The mechanical drawings detail HVAC systems including supply/return air ductwork, VAV boxes, and cooling units with specifications for air flow rates. Electrical drawings show underground 13.6kV and 480V power distribution, transformer locations, switchgear, and manhole/vault details. Specific equipment schedules list items like air handling units, exhaust fans, and electrical distribution equipment with detailed specifications. The drawings indicate this is an "Issue for Bid" set dated February/March 2024, with previous submission milestones from schematic design through construction documents noted in the revision history.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINISH FLOOR
0"
T.O. ROOF DECK
16' - 6 1/2"
A-B19-301
T.O COPING (DCA)
19' - 0 5/8"
DCBA B.9 C.3
A-B19-311
AS4
AS6
AS7AS10
AS11
AS1
AS2AS2
AS2AS2
AS2AS2
AS12
AS13 AS13
UPPER SIDEWALK
3' - 0"
FINISH FLOOR
0"
T.O. ROOF DECK
16' - 6 1/2"
A-B19-301
T.O COPING (DCA)
19' - 0 5/8"
1 5432 6 7
A-B19-301
T/O STEEL (LINK)
13' - 0"
A-B19-311
3A-B19-311
AS5
AS8
AS14
AS3AS3AS2AS2AS15
AS11
AS1
AS4
AS6
AS4
AS7
AS6
AS7
FINISH FLOOR
0"
A-B19-301CB.9 C.3
T/O STEEL (LINK)
13' - 0"
A-B19-311
AS3
AS5
AS9
AS4
AS14
AS6
AS7
UPPER SIDEWALK
3' - 0"
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
Bancroft Project No. VA CONTRACT NO.
02-28-24
ARCHITECTURAL - BUILDING 19 - BUILDING
SECTIONS
EHRM INFRASTRUCTURE
UPGRADES
COLMERY-O'NEIL VA MEDICAL CENTER
Checker Author
589A5-21-700
A-B19-301
ISSUE FOR BID
21-116367C77622C0043
1. REFER TO SHEET A-B19-002 FOR GENERAL SHEET NOTES AND LEGENDS.
GENERAL SHEET NOTES
BUILDING SECTION KEYNOTES
1/4" = 1'-0"1
SECTION BUILDING 19 (DATA CENTER) - NORTH/SOUTH
1/4" = 1'-0"2
SECTION BUILDING 19 (DATA CENTER) - WEST/EAST
AS1 FULL BRICK FACADE OVER CONTINUOUS INSULATION (TO MATCH
CAMPUS BRICK).
AS2 STRUCTURAL STEEL MEMBER. REFER TO STRUCTURAL DRAWINGS.
AS3 ACOUSTIC TILE CEILING.
AS4 CAST STONE COPING.
AS5 ALUMINUM STOREFRONT SYSTEM.
AS6 TPO MEMBRANE ROOF OVER TAPERED INSULATION.
AS7 ROOF INSULATION.
AS8 EXISTING BUILDING.
AS9 CAST STONE PANEL.
AS10 PROTRUDING STRUCTURAL COLUMN FOR FUTURE STORY (FUTURE
STORY NOT INCLUDED IN THIS PROJECT'S SCOPE OF WORK). PROVIDE
WEATHER PROTECTIVE ENCLOSURE AT EVERY COLUMN. REFER
STRUCTURAL DRAWINGS FOR LOCATIONS.
AS11 CAST STONE BUILDING BAND, REFER SHEET A-B19-512.
AS12 1HR FIRE RESISTANT ASSEMBLY.
AS13 2HR FIRE RESISTANT ASSEMBLY.
AS14 NEW DOOR OPENING IN EXISTING WALL, REFER FLOOR PLAN.
AS15 FIRE RATED WINDOW, REFER FLOOR PLAN.
1/4" = 1'-0"3
PARTIAL SECTION AT LINK
0 2' 4' 8'
0 2' 4' 8' 0 2' 4' 8'
Revisions: Date:
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMISSION 09-12-23
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION 12-19-23
ISSUED FOR BID 12-28-23
ISSUED FOR BID R1 02-28-24
Addendum #1 11-15-24
BUILDING 19 - DOOR AND FRAME TYPE ELEVATIONS
SE
E
DO
OR
S
CH
ED
UL
E
SEE DOOR SCHEDULE
FRAME TYPE 1
SE
E
DO
OR
S
CH
ED
UL
E
DOOR TYPE A
SEE DOOR SCHEDULE
DOOR TYPE B
SEE DOOR SCHEDULE
SE
E
DO
O
R
SC
HE
DU
LE
DOOR TYPE C
SEE DOOR SCHEDULE
SE
E
DO
OR
S
CH
ED
UL
E
3' - 6" 1' - 6"EQ EQ
2" 2"2"
SE
E
DO
OR
S
CH
ED
UL
E
SEE DOOR SCHEDULE
FRAME TYPE 2
2" 2"4"
DOOR TYPE D
SEE DOOR SCHEDULE
SE
E
DO
OR
S
CH
ED
UL
E
1 15/16" 1 9/16"
/8
1/2" 1/2"
SEE PARTITION TYPE
VARIES
SEALANT AT BOTH SIDES
HOLLOW METAL
FRAME
(2) 3 5/8" X 20 GA STUDS
VARIES
/1
/1
5/8"2" /2
/2
S E
E P
A R
T
IT
IO
N
T Y
P E
V A
R
IE
S
FACE OF PERPENDICULAR
PARTITION
SEALANT AT BOTH SIDES
JAMB ANCHORS. (3) ANCHORS
PER JAMB
HOLLOW METAL
FRAME
RETURN FRAME. TYP.
DOUBLE STUDS BACK TO
BACK
V A
R
IE
S
18" MIN.
CONTINUOUS BACKER ROD AND
SEALANT AT EACH SIDE
5/ 8"
4" 1 15/16"1 15/16"
8" 3"
HM FRAME AND DOOR
STEEL MEMBER; REF. STRUCT.
THRU-WALL STAINLESS STEEL FLASHING
WEATHER BARRIER
RETURN BRICK AT OPENINGS TYP.
3/4" SHEATHING
3 1/2" THICK MINERAL WOOL INSULATION
(R-13 MIN.)
1 1/2" CONTINUOUS RIGID INSULATION
(R-7.5 MIN.)
5/8" GYP. BD
CONTINUOUS BACKER ROD AND
SEALANT AT EACH SIDE
5/8"2"
/1 6"
/1 6"
8"
HM FRAME AND DOOR
RETURN BRICK AT OPENINGS TYP.
5/8" GYP. BD
WEATHER BARRIER
3/4" SHEATHING
3 1/2" THICK MINERAL WOOL INSULATION
(R-13 MIN.)
1 1/2" CONTINUOUS RIGID INSULATION
(R-7.5 MIN.)
FULL-DEPTH FACE BRICK MATCHING
EXISTING VA BUILDING BRICK
SPECIFICATIONS
BL
DG
. J T.
2"
2" WALL EXPANSION JOINT - BASIS
OF DESIGN: INPRO 811-A07-050.
INTERIOR DOOR AND HOLLOW
METAL FRAME.
ANCHOR BOLT EMBEDED
IN EPOXY; PER SPECS.
2" FLOOR EXPANSION JOINT (BEYOND) -
BASIS OF DESIGN: INPRO 733-A01-050.
TOP OF JOINT TO ALIGN WITH TOP
OF FINISHED FLOOR MATERIAL.
CONTINUOUS SEALANT AT
EACH SIDE
MODIFY EDGE OF EXISTING WALL AS
REQUIRED TO INSTALL NEW
HOLLOW METAL FRAME.
5/8" GYP. BD
/1 6"
9/
3/
4"
2" 5/8"
BLDG. JT.
2"
2" WALL / CEILING EXPANSION
JOINT - BASIS OF DESIGN:
INPRO 811-A07-050.
INTERIOR DOOR AND HOLLOW
METAL FRAME.
ANCHOR BOLT EMBEDED
IN EPOXY; PER SPECS.
CONTINUOUS SEALANT AT
EACH SIDE
MODIFY EDGE OF EXISTING WALL
AS REQUIRED TO INSTALL NEW
HOLLOW METAL FRAME.
1 15/16" 1 9/16"
5 3/4"
5/8" GYP. BD
2" 5/
8"
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
Bancroft Project No. VA CONTRACT NO.
02-28-24
ARCHITECTURAL - BUILDING 19 - DOOR
SCHEDULE AND DETAILS
EHRM INFRASTRUCTURE
UPGRADES
COLMERY-O'NEIL VA MEDICAL CENTER
589A5-21-700
A-B19-601
ISSUE FOR BID
21-116367C77622C0043
3" = 1'-0"
TYPICAL HEADER AT STUD WALL
3" = 1'-0"
TYPICAL JAMB AT STUD WALL
BUILDING 19 - EXTERIOR DOOR SCHEDULE
FROM ROOM TO ROOM
DOOR FRAME
FIRE RATING
LABEL HARDWARE SET NOTESTAG
SIZE
MATERIAL FINISH DOOR TYPE GLAZING MATERIAL FRAME TYPE
DETAILS
WIDTH HEIGHT THICKNESS HEAD JAMB SILL
CORRIDOR XA1-01 3' - 0" 8' - 0" 1 3/4" HM PAINT A HM 2 3 / A-B19-601 4 / A-B19-601 HW-E1 # 2
MECHANICAL XA101 6' - 0" 8' - 0" 1 3/4" HM PAINT B HM 2 3 / A-B19-601 4 / A-B19-601 HW-E8 # 2
CORRIDOR XA1-02 6' - 0" 8' - 0" 1 3/4" HM PAINT B HM 2 3 / A-B19-601 4 / A-B19-601 HE-E6 # 2
CORRIDOR (LINK) XB1-01 3' - 4" 7' - 2" 1 3/4" D
ELECTRICAL ROOM XA108 6' - 0" 8' - 0" 1 3/4" HM PAINT B HM 2 3 / A-B19-601 4 / A-B19-601 HW-E8 # 2
3" = 1'-0"
HEAD AT EXT. BRICK WALL
3" = 1'-0"
JAMB AT EXT. BRICK WALL
3" = 1'-0"
HM JAMB AT EXISTING WALL
3" = 1'-0"
HM HEAD AT EXISTING WALL
ALUM ANOD IG-1 ALUM PER SYSTEM PER SYSTEM PER SYSTEM BASIS OF DESIGN:PER SYSTEM PER SYSTEM
BUILDING 19 - INTERIOR DOOR SCHEDULE
FROM ROOM TO ROOM
DOOR FRAME
FIRE RATING
LABEL
HARDWARE
SET NOTESTAG
SIZE
MATERIAL FINISH DOOR TYPE GLAZING MATERIAL FRAME TYPE
DETAILS
WIDTH HEIGHT THICKNESS HEAD JAMB SILL
CORRIDOR CORRIDOR (LINK) A1-01A 6' - 0" 7' - 0" 1 3/4" HM PAINT B HM 1 6 / A-B19-601 5 / A-B19-601 HW-12 # 2
CORRIDOR ENTRANCE ROOM B A105 3' - 0" 8' - 0" 1 3/4" HM PAINT A HM 1 1 / A-B19-601 2 / A-B19-601 HW-SH-3
BREAKDOWN
ROOM
CORRIDOR A104 6' - 0" 8' - 0" 1 3/4" HM PAINT B HM 1 1 / A-B19-601 2 / A-B19-601 HW-SH-9
WORK ROOM IT EQUIPMENT
STORAGE
A106A 6' - 0" 8' - 0" 1 3/4" HM PAINT B HM 1 1 / A-B19-601 2 / A-B19-601 HW-11
CORRIDOR MECHANICAL A101A 3' - 0" 8' - 0" 1 3/4" HM PAINT A HM 1 1 / A-B19-601 2 / A-B19-601 HW-5G
CORRIDOR ELECTRICAL ROOM A108 3' - 0" 8' - 0" 1 3/4" HM PAINT A HM 1 1 / A-B19-601 2 / A-B19-601 90 MIN. HW-5D
CORRIDOR ENTRANCE ROOM A A109 3' - 0" 8' - 0" 1 3/4" HM PAINT A HM 1 1 / A-B19-601 2 / A-B19-601 HW-SH-3
MCR CORRIDOR A107A 6' - 0" 8' - 0" 1 3/4" HM PAINT B HM 1 1 / A-B19-601 2 / A-B19-601 45 MIN. HW-SH-9
MCR CORRIDOR A107B 6' - 0" 8' - 0" 1 3/4" HM PAINT B HM 1 1 / A-B19-601 2 / A-B19-601 45 MIN. HW-SH-9
CORRIDOR A101B 3' - 0" 8' - 0" 1 3/4" HM PAINT A HM 1 1 / A-B19-601 2 / A-B19-601 HW-5G
TOILET CORRIDOR A102 3' - 0" 8' - 0" 1 3/4" HM PAINT A HM 1 1 / A-B19-601 2 / A-B19-601 HW-2
CORRIDOR HAC A103 3' - 0" 8' - 0" 1 3/4" HM PAINT A HM 1 1 / A-B19-601 2 / A-B19-601 HW-5D
CORRIDOR (LINK) A1-01B 6' - 0" 7' - 0" 1 3/4" HM PAINT B HM 1 3 / A-B19-601 3 / A-B19-601 HW-12
WORK ROOM CORRIDOR A106 5' - 0" 8' - 0" 1 3/4" PAINT C 1 / A-B19-601 2 / A-B19-601 HW-10C
BUILDING 19 - DOOR SCHEDULE LEGEND AND NOTES
A. CONTRACTOR SHALL REVIEW HARDWARE SETS WITH VA COR PRIOR TO ORDERING.
B. SEE SPECIFICATIONS (DIVISION 09 OPENINGS) FOR DOOR AND FRAMES.
C. SEE SPECIFICATION SECTION 08 71 00 FOR HARDWARE SETS.
D. SEE SPECIFICATION SECTION 08 80 00 FOR GLAZING TYPES.
E. ALL WOOD DOORS ARE SOLID CORE.
F. FOR DOOR SCHEDULE, TYPES AND DETAILS ON BUILDING 19, SEE SHEET A-B19-601. FOR THE
REST OF THE DOOR SCHEDULE, TYPES AND DETAILS, SEE SHEET A-601.
GENERAL NOTES NOTES LEGEND
1. KNOCK-DOWN DOOR FRAME WITH HOSPITAL STOPS.
2. REFER TO SPECIFICATION 08 56 53 FOR BLAST REQUIREMENTS.
3. FULLY WELDED FRAME.
4. WOOD DOOR - EACH LOCATION - SPECIES, CUT AND STAIN COLOR TO MATCH EXISTING ADJACENT DOORS.
5. KNOCK-DOWN DOOR FRAME WITH STANDARD STOPS.
HM HOLLOW METAL
WD WOOD
ALUM ALUMINUM
IG INSULATED GLASS
ANOD CLEAR ANODIZED
T TEMPERED
HM HM 1
0 6" 9"3" 0 6" 9"3"
0 6" 9"3" 0 6" 9"3"
0 6" 9"3" 0 6" 9"3"
Revisions: Date:
65% DESIGN DEVELOPMENT SUBMISSION 09-12-23
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION 12-19-23
ISSUED FOR BID 12-28-23
ISSUED FOR BID R1 02-28-24
Addendum #1 11-20-24
T
T
TT
T
T
T
T
EF-B19-101EF-B19-101
410 CFM
LV-B19-101
5,200 CFM
LV-B19-102
5,200 CFM
AHU-B19-101
LV-B19-103
410 CFMVAV-B19-101VAV-B19-101
1,650 CFM
VAV-B19-102VAV-B19-102
465 CFM
VAV-B19-103VAV-B19-103
1,235 CFM
VAV-B19-104VAV-B19-104
875 CFM
ACCU-B19-105
14"x14"
RB
370 CFM
22x22
20"x18"
"ø
50"x22"
12"x14"
RB
200 CFM
22x22
RB
550 CFM
22x22
RB
440 CFM
22x22
RB
440 CFM
22x22
RB
370 CFM
22x22
B
265 CFM
22x22
RB
565 CFM
22x22
ROOM
TEMPERATURE
SENSOR
ROOM
TEMPERATURE
SENSOR
ACCU-B19-102 ACCU-B19-103
ACCU-B19-104
ACCU-B19-101
72"x30"
36"x30"
36"x30"36"x30"
72"x30"
12"ø
DCBA
B.9 C.3
VAV-B19-105VAV-B19-105
500 CFM
RB
500 CFM
22x22
ACCU-B19-106AC-B19-101
CRAC-B19-101
CRAC-B19-102
CRAC-B19-103
CRAC-B19-104
ACCU-B19-107
AC-B19-102
ENTRANCE ROOM
A
A109
ENTRANCE ROOM
B
A105
MCR
A107
HAC
A103
TOILET
A102
IT EQUIPMENT
STORAGE
A106A
BREAKDOWN
ROOM
A104
WORK ROOM
A106
ELECTRICAL
ROOM
A108
MECHANICAL
A101
MCR SUPPR.
TANKS
A111
FIRE WATER
RISER ROOM
A110
CORRIDOR
A1-02
CORRIDOR
A1-01
CORRIDOR (LINK)
B1-01
VAV-B19-106VAV-B19-106
435 CFM
14"x12"
"ø
3 3 3
72"x30"
30"x16" RA
30"x16" SA 30"x16" SA
10"ø
SA
275 CFM
14"ø
"x
" R
A
10"ø
SA
230 CFM
10"x10"
8"ø
SA
135 CFM
EB
110 CFM
10x10
EB
125 CFM
22x22
8"ø
12"x12"
6"ø
SA
50 CFM
10"ø
SA
260 CFM
16"x15"
12"ø
SA
565 CFM
RB
200 CFM
22x22
"x
" R
A
"x
" R A
10"ø 20"x18"
"x
10"x10"
10"x10"
14"ø
10"ø
"x
" R
A
14"ø
12"ø
12"x12"
SC
550 CFM
12"x12"
SC
550 CFM
12"x12"
SC
435 CFM 12"x12"
SC
500 CFM
12"x12"
SC
435 CFM
12"ø
12"ø
12"ø
10"ø
10"ø
12"ø
10"ø
6"ø
8"ø
12"x12"
SC
435 CFM
12"x12"
SC
310 CFM
10"x10"
10"ø
MM
MM 66
12"x12"
RB
550 CFM
VAV-B19-106
VAV-B19-104
VAV-B19-101
VAV-B19-105
VAV-B19-102
VAV-B19-106
10"ø
12"x12"
RB
550 CFM
12"x12"
SC
550 CFM
1. FLOOR MOUNTED FRONT DISCHARGE CRAC UNIT.
2. VERTICAL STACK FROM SERVER CABINET SUPPLIED WITH CABINET. EXTEND TO RETURN DUCTWORK ABOVE AND
HARD CONNECT.
3. RETURN DUCT AND RETURN PLENUM TO BE AS HIGH AS POSSIBLE AND WILL ALLOWING SPACE BETWEEN DUCT
AND STRUCTURE FOR FIRE / ELECTRICAL / IT AS REQUIRED.
4. PLACE AIR DEVICES AND COOLING SYSTEMS TO AVOID BEING DIRECTLY OVER EQUIPMENT.
5. COORDINATE CONCRETE PAD SIZE AND LOCATION WITH ARCH/CIVIL
6. MOTORIZED DAMPER IN RETURN ABOVE CRAC UNIT TO CLOSE WHEN UNIT IS NOT IN OPERATION AND OPEN WHEN UNIT IS IN OPERATION. SEE CONTROLS SEQUENCE OF OPERATION FOR MORE INFORMATION.
7. MOTORIZED DAMPER AT EXTERIOR LOUVER
MECHANICAL KEY NOTES
A. PROVIDE BALANCING DAMPER AT ALL SUPPLY DIFFUSER AND RETURN/EXHAUST GRILLES WHETHER OR NOT
SHOWN ON DRAWINGS.
B. COORDINATE CEILING MOUNTED GRILLES AND DIFFUSERS WITH SPRINKLER HEADS, LIGHTING FIXTURES AND ALL CEILING MOUNTED DEVICES. REFER TO ARCHITECTURAL CEILING GRID DRAWINGS FOR LOCATIONS.
C. CEILING ACCESS SHALL BE PROVIDED FOR ALL HVAC EQUIPMENT AND COMPONENTS LOCATED ABOVE THE CEILING THAT REQUIRE OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION.
D. DURING CONSTRUCTION, PROVIDE TEMPORARY CLOSURES ON ALL SUPPLY AND RETURN AIR DUCT OPENINGS BY SEALING WITH A DISPOSABLE POLYETHYLENE SHEETING TO PREVENT CONSTRUCTION DUST FROM
ENTERING DUCTWORK SYSTEM OR AIR TERMINAL UNITS.
E. ROUTE REFRIGERANT PIPING FROM REMOTE MOUNTED CONDENSING UNIT TO ITS ASSOCIATED COOLING UNIT.
SIZE REFRIGERANT PIPING PER MANUFACTURER RECOMMENDATION.
F. ALLOW FOR 36" CLEARANCE ON ELECTRICAL SIDE OF VAV TERMINAL UNITS WITH ELECTRIC REHEAT
GENERAL MECHANICAL NOTES
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
Bancroft Project No. VA CONTRACT NO.
DCA MECHANICAL PLAN EHRM Infrastructure Upgrades
Colmery O’Neil VAMC
03/22/2024 BT BT
589A5-21-700
M-B19-101
19 - Data Center
ISSUE FOR BID
21-116367C77622C0043
N 1/4" = 1'-0"
M-B19-101 - DCA MECHANICAL PLAN
Revisions: Date:
65% DESIGN DEVELOPMENT SUBMITTAL 09/12/2023
95% CONSTRUCTION DOCUMENTS SUBMISSION 10/31/2023
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/19/2023
ISSUE FOR BID 12/28/2023
ISSUE FOR BID R1 02/28/2024
ISSUE FOR BID R2 03/22/2024
ADDENDUM #1 11/20/2024
J
A
3-3/0 XL PE,
UNDERGROUND DUCT
480V DUCT TO BLDG 19
19 SWBD MSB ATS
480 DUCT FROM 19-TI
TO 19H-SWBD1
CONTINUATION SEE
DWG. EP-B19-102
MLO
NEW TRANSFORMER SWGR PAD
EXISTING EM GEN PAD
T -1
-1
E M
G
E N
1600A
1200A ROLL UP
GENERATOR
1200A
FROM GEN
0V
D U
C T
T O
B
LD
G
T R
X F
1, K
V A
.6
K V
/4
V
0V
C O
M P
A R
T M
E N
T M
V C
O M
P A
R T
M E
N T
SWBD EM GEN
D
IS
T R
IB
U
T
IO
N
0/
7V /2
V
S
W B
D M
S B
H
S W
B D
GATE
GATE
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
Bancroft Project No. VA CONTRACT NO.
ELECTRICAL - UNDERGROUND 13.6KV AND
480V
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
02/28/2024 WG MK
589A5-21-700
EP-B19-100.4
ISSUE FOR BID
21-116367C77622C0043
N 1/4" = 1'-0"
UNDERGROUND 13.6KV AND 480V
GENERAL NOTES
KEY NOTES
A. IF ADVICE IS NEEDED, WHEN PLANNING TO PERFORM WORK
INSIDE GENERATOR ENCLOSURE CONTACT “CENTRAL
POWER SYSTEMS AND SERVICES”, PHJONE 816-415-6702.
B. FOLLOW VA LOCKOUT – TAGOUT PROCEDURES TO SAFELY
PERFORM WORK IN MANHOLES.
C. DUCT BANK SHALL BE CONCRETE ENCASED.
D. NEW FEEDER SHALL BE 90 DEG. C WIRING.
E. CONCRETE FOR DUCT SHOULD BE RED IN COLOR.
F. DRAWINGS USED ARE THE BEST AVAILABLE. CONTRACTOR
TO PERFORM GROUND PENETRATING RADAR SURVEY
(GPRS) OF CHOSEN PATH TO FINALIZE FIELD DESIGN OF
NEW DUCT RUN.
G. SEE DRAWING(S) E-B19-500 SERIES FOR DUCT BANK, PULL
BOX AND MANHOLE DETAILS.
H. SEE DRAWING SERIES E-B19-600 FOR WIRING SCHEDULES.
I. SEE DRAWING SERIES E-B19-700 FOR SINGLE LINE DIAGRAM.
J. WHEN PULLING THE 13.6KV CABLING FOLLOW CABLE
MANUFACTURER’S INSTALLATION REQUIREMENTS.
K. TWO 13.6KV MANHOLES ARE SHOWN ON DRAWING.
CONTRACTOR MAY ADD ADDITIONAL MANHOLE OF CABLE
PULLING CALCULATIONS THAT IT IS NEEDED.
1. INSTALL NEW SWBD EM GEN. DISCONNECT FEEDER FROM
GENERATOR MAIN BREAKER AND RUN NEW FEEDER FROM
GENERATOR MAIN TO OUTDOOR SWITCHBOARD SWBD EM
GEN.
a. RUN NEW FEEDER FROM SWBD EM GEN AND
INTERCEPT DUCT GOING INTO BLDG 24 MRI. RUN NEW
CABLES.
b. RUN NEW FEEDER FROM SWBD EM GEN INTO BLDG 19
INTO SWBD MSB SECTION “EM GEN”.
2. INSTALL NEW PAD MOUNTED TRANSFORMER 13.6KV TO
480/277V. ROUTE UNDERGROUND 13.6KV INTO MV SECTION
OF TRANSFORMER.
a. RUN NEW 480V FEEDER FROM TRANSFORMER INTO
BLDG 19 SWBD MSB, 19H SWBD1.
3. RUN CONDUIT AND WIRING TO DISCONNECT. MOUNT
DISCONNECT ON UNISTRUT STAND.
0 2' 4' 8'
Revisions: Date:
65% DESIGN DEVELOPMENT SUBMITTAL 09/12/2023
95% CONSTRUCTION DOCUMENTS SUBMISSION 10/31/2023
100% CONSTRUCTION DOCUMENTS SUBMISSION 12/19/2023
ISSUE FOR BID 12/28/2023
ISSUE FOR BID R1 02/28/2024
ISSUE FOR BID R2 03/22/2024
ADDENDUM #1 11/20/2024
3" 3"
3" 3" 3" 3"
3,000 PSI CONCRETE
BACKFILL
MARKER TAPE FINISH TO GRADE OR
FINISHED SIDEWALK
" M
INI
MU
M 6"
1.
2.
3.
GENERAL NOTES:
USE THIS DETAIL FOR DUCTBANKS NOT LOCATED UNDER PAVED
AREAS OF PARKING LOTS.
MINIMUM COVER TO TOP OF ENVELOPE SHALL BE 24" OR AS
OTHERWISE SPECIFIED IN SECTION 26 05 41.
PROVIDE PULLSTRINGS IN ALL UNDERGROUND CONDUIT FOR FUTURE
CABLE PULLS.
4" SCHEDULE 80 PVC
CONDUIT
(TYPICAL) UON
(3) 4/0 - 15KV CABLE
(TYPICAL) UON
L1 L2
2-TON LIFT ANCHOR
(4 PLACES IN TOP)
SPRING ASSISTED
GALVANIZED DIAMOND PLATE DOORS
WITH LOCKING LATCH
OPTIONAL-NONSLIP DOORS
OPTIONAL OFFSET DOOR
LOCATION (TYPICAL)
1" DIAMETER GROUND
ROD KNOCKOUT
GALVANIZED PULL/LIFT IRON
(1 EACH WALL)
18"x24" KNOCKOUT
(2 EACH WALL)
BASE
NO. 774-B
5'-0" LONG GALVANIZED "C" CHANNEL
(1 EACH WALL)
TOP
NO. 774-B
4,000 LBS
FULL 180 DEGREES OPEN
(TYPICAL)
WEST
SOUTH
7'-0" 7'-0"
6'-0"
42" DIAMETER ACCESS
ROUND ACCESS
NO. 77-8-T42C
4,310 LBS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\E le ct ric al \E
-B
-5
.d w g
/2 1/
0:
:2
AM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
03/22/2024Bancroft Project No: 21-116ISSUE FOR BID R2 03-22-24
MANHOLE - DETAILS
WG ME
E-B19-504
NOT TO SCALE
1 CONCRETE ENCASED 4-WAY DUCTBANK
NOT TO SCALE
2 ELECTRICAL VAULT
ELECTRICAL POWER GENERAL NOTES
A.
B.
C.
D.
E.
a.
F.
a.
b.
CONTRACTOR TO UTILIZE CERTIFIED HIGH VOLTAGE ELECTRICIANS FOR ALL 13.8KV WORK.
CONTRACTOR TO FOLLOW VA LOCK-OUT-TAG-OUT PROCEDURES.
CONTRACTOR TO SCHEDULE ELECTRICAL OUTAGES WITH COR AT LEAST THREE WEEKS
PRIOR TO PLANNED WORK.
CONTRACTOR SHALL PROVIDE A PERMANENT CONCRETE PATCH TO OPENINGS IN MANHOLE
THAT SHALL NO LONGER BE USED.
THE SIZING FOR THE VAULTS IS “TYPICAL”. CONTRACTOR CAN ADJUST THE SIZES TO SIZES
AVAILABLE FROM LOCAL MANUFACTURERS.
VAULT HEIGHT AND WIDTH DIMENSIONS NEEDS TO ALLOW FOR TWO TO THREE
ELECTRICIANS TO SAFELY WORK IN THE VAULT.
CONTRACTOR TO ASSURE THAT “GROUNDING INSERTS” ARE PROVIDED IN THE
VAULT.
THE OUTSIDE GROUND SHALL BE CAD WELDED TO A GROUND ROD.
THE INSIDE GROUNDS WILL BE USED FOR GROUNDING THE 13.8KV CABLE SHIELDS.
ADDENDUM #1 11-20-24
AutoCAD SHX Text
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\E le ct ric al \E
-B
-6
.d w g
/2 0/
1:
:4
AM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
03/22/2024Bancroft Project No: 21-116ISSUE FOR BID R2 03-22-24
ELECTRICAL - BLDG 19 ELECTRICAL
SCHEDULES
WG BX
E-B19-600
ADDENDUM #1 11-20-24
AutoCAD SHX Text