Attachment 14 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_134-204.pdf
PDF 14 MB Posted
- Solicitation number
- 36C77624B0026_1
About this file
This document appears to be Attachment 14 - 589A5-21-700_Topeka EHRM_IFB R2 Drawings_Vol 1_134-204.pdf, which is related to the federal contract opportunity 36C77624B0026_1 for the EHRM Infrastructure Upgrades project in Topeka, Kansas.
The document contains technical drawings and specifications for the EHRM Infrastructure Upgrades project. It appears to be Volume 1, covering drawings 134 through 204. The drawings provide details on construction requirements, systems, and installations needed to upgrade the infrastructure at the Topeka VA facility as part of the EHRM (Electronic Health Record Modernization) program. The contract is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AP ACCESS PANEL
1. THE PLUMBING FIXTURE AND EQUIPMENT SCHEDULE, IN GENERAL, SPECIFIES THE PLUMBING FIXTURES, EQUIPMENT AND DEVICES: HOWEVER, UNLESS NOTED OTHERWISE, ALL FIXTURES SHALL BE PROVIDED WITH APPLICABLE ACCESSORIES (SUCH AS SUPPLY STOPS, WASTE TRAPS, FIXTURE
MOUNTING SUPPORTS, BOLT CAPS, WATER CLOSET SEATS, ETC., AS REQ'D TO COMPLETE THE
INSTALLATION.)
2. ALL ITEMS SPECIFIED HEREAFTER SHALL BE NEW, CLEANED AND ADJUSTED FOR THE SPECIFIED
DESIGN PURPOSE (UNLESS OTHERWISE SPECIFIED).
3. ALL EQUIPMENT AND DEVICES SHALL BEAR A.G.A., N.S.F., ASME, C.S.A. OR U.L. APPROVED LABELS AND
CERTIFICATIONS FOR THE SPECIFIED DESIGN PURPOSE.
4. PLUMBING CONTRACTOR SHALL VERIFY IN FIELD WITH VA/COR ALL FINAL FIXTURE AND EQUIPMENT
LOCATIONS AND MOUNTING HEIGHTS REQUIRED FOR THE DESIGN PURPOSE.
5. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES OF EACH CATALOG CUT, FOR EACH ITEM, TO BE APPROVED BY THE VA/COR (PRIOR TO THE BEGINNING OF CONSTRUCTION) FOR ALL NEW
ITEMS SPECIFIED HEREAFTER.
6. THE CONTRACTOR SHALL SUBMIT EQUIPMENT PRODUCT DATA FOR EACH PIECE OF EQUIPMENT PRIOR TO ORDERING. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES FOR APPROVAL BY THE VA/COR THIS CONTRACTOR SHALL ALSO ASSEMBLE PRINTED INSTRUCTIONS FOR THE OPERATION
AND MAINTENANCE OF EACH ITEM INSTALLED AND BIND TOGETHER WITH EQUIPMENT CUTS AND
CONTROL WIRING DIAGRAMS. DO NOT SUBMIT EQUIPMENT DATA FOR B.O.D. EQUIVALENCY
SUBSTITUTION ITEMS UNTIL SUCH TIME AS THE B.O.D. PROTOCOLS PROCESS HAS BEEN COMPLETED
AND THE SUBSTITUTION HAS BEEN APPROVED BY BOTH THE CO AND COR.
7. SOME FIXTURES FURNISHED BY VA SHALL BE INSTALLED BY PLUMBING CONTRACTOR, ALL OTHER
FIXTURES SHALL BE FURNISHED & INSTALLED BY PLUMBING CONTRACTOR.
1. ALL MATERIALS SHALL BE NEW OF FIRST QUALITY AND UL LISTED FOR THE SPECIFIC DESIGN PURPOSE.
2. SANITARY, VENT, AND STORM LINES SHALL BE SCHEDULE 40 CAST IRON OR COPPER PIPE.
3. DOMESTIC WATER SUPPLY PIPING LOCATED BELOW THE SLAB-ON-GRADE LESS THAN 2" SHALL BE TYPE "K" COPPER LINES
6" AND LARGER SHALL BE STAINLESS STEEL (ASTM 312)
4. THREADED FITTINGS ON GALVANIZED STEEL PIPING SHALL BE 150# CLASS GALVANIZED MALLEABLE IRON FITTING
CONFORMING TO ASTM A-197 SPECIFICATION.
5. FURNISH AND INSTALL UNIONS WHERE INDICATED OR AS DEEMED NECESSARY FOR REPAIR OR SERVICE. UNIONS 2" AND SMALLER SHALL BE STANDARD GROUND JOINT BRASS TO IRON SEAT, MALLEABLE IRON, SCREWED. UNIONS 2-1/2" AND
LARGER SHALL BE STANDARD CAST IRON FLANGED UNIONS 125# CLASS.
6. DOMESTIC HOT WATER SUPPLY AND RETURN PIPING SHALL BE INSULATED WITH ONE OF THE FOLLOWING:
A. 1" THICK PREFORMED FIBERGLASS WITH "K" FACTOR OF 0.23 MAXIMUM AT 75°F. MEAN TEMPERATURE. JACKET TO
BE FACTORY APPLIED KRAFT PAPER WITH VAPOR BARRIER.
B. 1" THICK MOLDED RIGID PHENOLIC FOAM WITH "K" FACTOR OF 0.23 MAXIMUM AT 78°F MEAN TEMPERATURE WITH
FACTORY APPLIED LAMINATED ALUMINUM FOILAND WHITE KRAFT PAPER VAPOR BARRIER JACKET.
9. DOMESTIC COLD WATER PIPING SHALL BE INSULATED WITH:
A. 1/2" THICK INSULATION FOR PIPING UP TO 1-1/4" DIAMETER.
B. 1" THICK INSULATION FOR PIPING LARGER THAN 1-1/2" DIAMETER.
10. HANGERS SHALL BE OF STANDARD WEIGHT STEEL OR IRON ROD AND RING OR CLEVIS TYPE. SEE DETAIL.
1. DISINFECTION OF POTABLE WATER SYSTEM SHALL BE AT THE VERY MINIMUM AS DESCRIBED BELOW IN ITEMS A THRU
D, OR THE MOST AGRESSIVE SYSTEM REQUIRED BY THE FOLLOWING FOR CITED AUTHORITIES:
NEW POTABLE WATER SYSTEMS SHALL BE PURGED OF DELETERIOUS MATTER AND DISINFECTED PRIOR TO UTILIZATION. THE METHOD TO BE FOLLOWED SHALL BE THAT PRESCRIBED BY THE HEALTH AUTHORITY HAVING JURISDICTION OR, IN THE ABSENCE OF A PRESCRIBED METHOD, THE PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652 LISTED IN CHAPTER 19, AND AS DESCRIBED IN THE VA SPECIFICATION SECTION. THIS REQUIREMENT SHALL APPLY TO "ONSITE" OR "IN-PLANT" FABRICATION OF A SYSTEM OR TO A MODULAR PORTION OF A SYSTEM.
A. THE PIPE SYSTEM SHALL BE FLUSHED WITH CLEAN, POTABLE WATER UNTIL DIRTY WATER DOES NOT APPEAR
AT THE POINTS OF OUTLET.
B. THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER/CHLORINE SOLUTION AT LEAST 50 PARTS PER MILLION (50 mg/l) OF CHLORINE, AND THE SYSTEM OR PART THEREOF SHALL BE VALVED OFF AND
ALLOWED TO STAND FOR 24 HOURS; OR THE
SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER CHLORINE SOLUTION AT LEAST 200 PARTS PER MILLION (200mg/l) OF CHLORINE AND ALLOWED TO STAND FOR 3 HOURS. FOLLOWING THE REQUIRED
STANDING TIME, THE SYSTEM SHALL BE FLUSHED.
C. THE SYSTEM SHALL BE FLUSHED WITH CLEAN POTABLE WATER UNTIL THE CHLORINE IS PURGED FROM THE
SYSTEM.
D. THE PROCEDURE SHALL BE REPEATED WHERE SHOWN BY A BACTERIOLOGICAL EXAMINATION THAT
CONTAMINATION REMAINS PRESENT IN THE SYSTEM.
2. PIPING SERVICE MARKING:
VINYL CLOTH PRESSURE SENSITIVE MARKERS BLACK LETTER ON WHITE BACKGROUND
A. PIPES 3" AND LARGER SPACING 30'-0" O.C. PIPES 2 1/2" AND SMALLER SPACING 20'-0" O.C.
B. INSTALL DIRECTIONAL ARROWS ON ALL PIPING AT SAME SPACING.
3. CONTRACTOR TO VERIFY IN FIELD AND PROVIDE EXTENSIONS REQUIRED TO ADJUST ALL FIXTURES TO GRADE LEVEL TO MAINTAIN INVERTS AS DETERMINED BY ALL FIXTURES RELATED (GREASE TRAPS, MAN HOLES, ETC.).
4. PROVIDE EXTERIOR ACCESS TO ISOLATION VALVES FOR HOT AND COLD WATER SUPPLY CUTOFF.
A.F.F. ABOVE FINISH FLOOR
1. ALL SUSPENDED HORIZONTAL PIPING SHALL BE SUPPORTED BY HANGERS SPACED NO FURTHER THAN 8'-0" APART. NO PIPING SHALL BE SELF-SUPPORTING NOR BE SUPPORTED FROM EQUIPMENT
CONNECTIONS.
2. ALL PARALLEL PIPES (TWO(2) OR MORE) SHALL BE SUPPORTED ON A CHANNEL TYPE TRAPEZE
HANGER.
3. SUPPORTS AND HANGERS SHALL BE INSTALLED TO PERMIT FREE EXPANSION AND CONTRACTION IN
PIPING SYSTEMS UNLESS PIPE REQUIRES FIRM ANCHOR CONTROL.
4. HORIZONTAL SOIL OR WASTE LINES SHALL BE AT A SLOPE OF NOT LESS THAN 1/8" PER FOOT AND
SHALL BE HELD CLOSE TO THE CONSTRUCTION TO MAINTAIN A MAXIMUM OF HEAD ROOM. ALL
CHANGES OF DIRECTION AND JUNCTIONS SHALL BE MADE WITH "Y" FITTINGS AND 1/8" BENDS. NO LINES OF ANY KIND SHALL BE LOCATED BELOW FREEZERS. ALL DRAIN LINES SHALL BE PROTECTED
FROM FREEZING.
5. HOT AND COLD WATER PIPING SHALL BE PROPERLY PITCHED TO LOW POINTS IN THE SYSTEM
WHERE DRAINS SHALL BE INSTALLED.
6. CLEANOUTS SHALL BE PLACED AT ALL DEAD ENDS, AT CHANGES OF DIRECTION, AT 50'-0" INTERVALS ON HORIZONTAL RUNS, OUT OF HIGH TRAFFIC AREAS, (NOT UNDER CASES) ETC. WHERE CLEANOUTS OCCUR IN CONCEALED SPACES, THEY SHALL BE PROVIDED WITH EXTENSIONS TO FLOOR ABOVE OR
TO WALLS. A HAND-HOLE TEST TEE SHALL BE PLACED AT THE BASE OF EACH STACK.
7. VENT STACKS EXTENDING UP THROUGH THE ROOF SHALL BE FLASHED WITH SIX POUND SHEET LEAD. FLASHING SHALL EXTEND 12" IN ALL DIRECTIONS FROM THE VENT, CARRIED OVER AND
TURNED DOWN THE INSIDE OF THE VENT. ALL SEAMS AND JOINTS OF FLASHING SHALL BE
SOLDERED AND PROVEN WEATHERTIGHT. EXTEND VENTS A MIN. OF 12" ABOVE ROOF, AND 30" AWAY
FROM PARAPET.
8. ALL SUPPLY PIPING TO BE RUN OVERHEAD, UNLESS NOTED OTHERWISE.
9. ALL SUPPLY PIPING TO BE A MINIMUM OF 3/4" DIA.
10. EACH FIXTURE WILL HAVE A 1/2" X 12" AIR CHAMBER.
11. PROVIDE SERVICE VALVE AT BRANCHES AND AT ALL APPLIANCES.
12. ALL FIXTURES WILL BE FURNISHED WITH INTEGRAL STOPS.
13. ALL FLOOR DRAINS AND FIXTURES TO BE VENTED IN ACCORDANCE WITH ALL LOCAL, STATE AND
FEDERAL CODES AND REGULATIONS.
14. ALL HORIZONTAL VENT PIPING SHALL BE RUN ABOVE FINISHED CEILINGS AND SLOPED UP TOWARD
MAIN STACK.
15. THE PLUMBING CONTRACTOR WILL NOT INSTALL COMBUSTIBLE PIPING MATERIAL IN OR THROUGH
FIRE RATED ASSEMBLIES.
16. HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THAN 1/4" PER FOOT FOR PIPING 3" DIA.
AND UNDER.
17. HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THEN 1/8" PER FOOT FOR PIPING 4" DIA.
AND OVER.
18. ALL EQUIPMENT DEVICES SHALL BE INSTALLED WITH UNIONS IN SUCH A MANNER TO FACILITATE
EASY REMOVAL AND MAINTENANCE OF EQUIPMENT WITHOUT DISRUPTING SERVICE AND CAUSING
MAJOR PIPING REVISIONS.
SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL REQUIREMENTS LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AND AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED BELOW.
EQUIVALENCY SUBSTITUTIONS: THE “BASIS OF DESIGN (BOD) PROTOCOLS” ARE TO BE FOLLOWED FOR ALL EQUIPMENT, MATERIALS AND ASSEMBLIES SPECIFIED AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE FULL BOD EQUIVALENCY SUBSTITUTION REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED.
1. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY LIMITED TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL DRAWINGS AND ENTIRE PROJECT SPECIFICATIONS. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS WORK. THIS CONTRACTOR SHALL FULLY COORDINATE HIS/HER WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE INSTALLATION. ALL OF THE ABOVE SHALL
BE INCLUDED IN THE SCOPE OF WORK.
2. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE VA/CO AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND NEW WORK, OR BETWEEN THEIR WORK AND THE WORK OF OTHER TRADES AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF SUCH NOTIFICATION SHALL BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR CONFLICTS EXIST.
3. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE INTENT, GENERAL CHARACTER, REQUIREMENTS AND LOCATION OF THE WORK SHOWN AND INCLUDED. THE WORK INDICATED, BUT HAVING MINOR DETAILS OBVIOUSLY OMITTED, SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE VA/GOVERNMENT.
4. THE CONTRACTOR IS REQUIRED TO BID, AS SPECIFIED, THE WORK SHOWN ON THE DRAWINGS AND PROVIDED IN THE SPECIFICATIONS WITHOUT DEVIATION, WITH THE EXCEPTION OF ANY BASIS OF DESIGN (BOD) EQUIVALENCY SUBSTITUTIONS. THESE REQUESTED SUBSTITUTIONS WILL NEED TO BE IDENTIFIED, SUBMITTED AND APPROVED BY THE VA/CO AND SHALL BE IN FULL COMPLIANCE WITH THE BASIS OF DESIGN COMPLIANCE PROTOCOLS. SEE GI001.
5. THIS CONTRACTOR IS RESPONSIBLE TO FURNISH AND INSTALL ALL LABOR AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM. WHERE THERE IS NO MENTION OF THE RESPONSIBLE PARTY FOR A SPECIFIC ITEM TO BE FURNISHED OR INSTALLED ON THE DRAWINGS, THE DRAWING'S TRADE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR ALL RELATED PURCHASES AND LABOR FOR PROVIDING A COMPLETE OPERATING SYSTEM FOR
THIS ITEM.
6. WHEN PERFORMING ANY CUTTING OR PATCHING (RESTORE TO ORIGINAL STATE) ALL BUILDING MATERIALS AND FINISHES AS REQUIRED TO PROVIDE A FINISHED PRODUCT THAT IS LIKE NEW AND DOESN'T STAND OUT AS BEING
DIFFERENT OR DISTINGUISHABLE AS A PATCH OR REPAIR.
7. THIS CONTRACTOR SHALL VERIFY AND COORDINATE ALL MOUNTING, ARRANGEMENTS, HEIGHTS AND LOCATIONS PRIOR TO ROUGH-IN AS REQUIRED BY THE VA DESIGN GUIDES/MANUALS ALONG WITH THE EXPRESSED DESIGN
INTENT PRESENTED WITHIN THESE DOCUMENTS.
8. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL SLEEVES THRU WALLS AND THROUGH FLOORS, INCLUDING
CORING IF REQUIRED.
9. PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL EXISTING SANITARY, STORM AND WATER SUPPLY
ON THE SITE PRIOR TO THE PERFORMANCE OF ANY WORK.
10. PROVIDE SERVICE VALVES AT ALL BRANCH SUPPLY PIPING. SUCH SERVICE VALVES SHALL BE AS PER THE
SPECIFICATIONS AND IN KEEPING WITH THE VA STANDARDS AND REQUIREMENTS.
11. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT GOVERNING LOCAL, COUNTY, STATE, AND FEDERAL BUILDING CODE REQUIREMENTS AND REGULATIONS PLUS COMPLIANCE WITH LOCAL UTILITY COMPANY
AND VA REQUIREMENTS.
12. THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF PERFORMING QUALITY
WORKMANSHIP.
13. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF ALL PERSONNEL THRU ALL PHASES OF WORK, COMPLYING WITH ALL APPLICABLE PROVISIONS OF CITY, STATE, AND FEDERAL SAFETY LAWS (OSHA) AND AS RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" AS ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, INC., 20TH AND E. STREETS, N.W.
WASHINGTON, D.C.
14. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE PURCHASE, DELIVERY, RECEIVING, UNLOADING, UNCRATING, STORING, SETTING IN PLACE, AND PROTECTING OF ALL NEW EQUIPMENT AND MATERIALS FURNISHED BY THIS CONTRACTOR ALONG WITH EQUIPMENT FURNISHED BY THE VA AND INSTALLED BY THIS CONTRACTOR.
PROVIDE PROTECTION FROM DAMAGE BY THE CONSTRUCTION, HANDLING, VANDALISM AND WEATHER DURING ALL
PHASES OF CONSTRUCTION UNTIL COMPLETION OF THE WORK.
15. THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS IN THE NUMBERS REQUIRED BY THE SPECIFICATIONS PRIOR TO THE START OF INSTALLATION FOR VA/COR APPROVAL AND A SUCCESSFUL REVIEW BY THE ARCHITECT/ENGINEER.
16. THIS CONTRACTOR SHALL FURNISH AS-BUILT CONTRACT DOCUMENTS TO THE VA/COR BEFORE FINAL PROJECT CLOSE-OUT CAN OCCUR. THE CONTRACT RECORD AS-BUILT DOCUMENTS SHALL BE PROVIDED IN ELECTRONIC
REPRODUCIBLE FORM.
17. BEFORE PLACING WATER SYSTEM IN OPERATION, CHLORINATE ENTIRE SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS OF THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL PLUMBING CODES ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND LOCAL. WHEN PROPERLY COMPLETED
AND APPROVED BY THE VA/COR PROVIDE THE SPECIFIED CERTIFICATION(S).
18. ALL NEW SANITARY PIPING SHALL BE GIVEN A FULL STATIC PRESSURE TEST. METHOD OF TEST AND REQUIREMENTS TO BE MET SHALL BE AS PER THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL CODE REQUIREMENTS ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND
LOCAL.
19. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE PUMPING AND DRAINING OF TRENCHES OR PITS
NECESSARY FOR THE INSTALLATION OF THEIR WORK.
20. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW AND CHECK THE ENTIRE PORTION OF THEIR WORK, CLEAN EQUIPMENT AND DEVICES, REMOVE SURPLUS MATERIALS AND RUBBISH FROM THE PROPERTY, LEAVE THE WORK IN NEAT AND CLEAN ORDER, AND PROVIDE A COMPLETED SYSTEM(S) THAT HAS BEEN FULLY TESTED AND IS IN GOOD WORKING CONDITION. EACH RESPECTIVE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY CARTONS, DEBRIS, EQUIPMENT, ETC., INSTALLED BY THIS
CONTRACTOR INCLUDING EQUIPMENT FURNISHED BY OTHERS
BFP BACKFLOW PREVENTER
CI CAST IRON (PIPE)
CO CLEANOUT
CW COLD WATER
105HW 140° HOT WATER
DN DOWN
EL ELEVATION
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
SAN SANITARY
LAV LAVATORY
W.C. WATER CLOSET
MB MOP BASIN
WHA WATER HAMMER ARRESTER
WCO WALL CLEANOUT
TYP. TYPICAL
V VENT
COLD WATER PIPING
HOT WATER PIPING
VENT
RISER DOWN
RISER UP
POINT OF CONNECTION (TO EXISTING)
DIELECTRIC UNION
SHUT-OFF VALVE
BUTTERFLY VALVE
BALL VALVE
CHECK VALVE (DIRECTION OF FLOW)
PLUMBING EQUIPMENT TAG
HOT WATER RETURN PIPING
POINT OF DEMOLITION (OF EXISTING)
TEMPERATURE/PRESSURE
BALANCING MIXING VALVE
EXISTING PIPING TO BE DEMOLISHED
SH SHOWER
TD TRENCH DRAIN
SK SINK
21. ALL EQUIPMENT/DEVICES SHALL BE AND OF FIRST RATE QUALITY (UNLESS OTHERWISE SPECIFIED) AND IS TO BEAR THE APPROPRIATE NSF, AGA, CSA OR UL APPROVED LABELS, LISTINGS, AND CERTIFICATIONS FOR THE SPECIFIC
DESIGN PURPOSE.
22. THE DRAWINGS, SCHEDULES AND SPECIFICATIONS HAVE BEEN PREPARED USING ONE MANUFACTURER FOR EACH PIECE OF EQUIPMENT AS THE BASIS OF DESIGN. BEFORE THE CONTRACTOR PURCHASES EQUIPMENT FROM A SPECIFIED ACCEPTABLE MANUFACTURER, BUT NOT THE SCHEDULED MANUFACTURER USED FOR THE BASE DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR FULL COMPLIANCE WITH THE PROTOCOLS REQUEST FOR EQUIVALENCY SUBMISSION AND APPROVAL PROCESS THAT NEEDS TO BE COMPLETED SUCCESSFULLY BEFORE SUCH A SUBSTITUTION WILL BE ALLOWED TO OCCUR AND BE SUBMITTED VIA THE SHOP DRAWING PROCESS. AS PART OF THAT PROCESS THE REQUESTING CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL THE DIMENSIONS OF THE EQUIPMENT TO VERIFY THAT IT WILL FIT IN THE SPACE SHOWN ON THE DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE PERMITTED, PROVIDED THE RATINGS MEET THOSE SHOWN ON THE DRAWINGS AND EQUIPMENT WILL PHYSICALLY FIT INTO THE SPACE ALLOCATED WITH SUITABLE ACCESS AROUND EQUIPMENT FOR OPERATION AND MAINTENANCE OF THE EQUIPMENT. WHEN EQUIPMENT SUBMITTED FOR REVIEW DOES NOT MEET THE PHYSICAL SIZE OR ARRANGEMENT OF THAT SCHEDULED AND SPECIFIED, CONTRACTOR SHALL BE RESPOSIBLE FOR ANY AND ALL ALTERATIONS REQUIRED TO ACCOMMODATE SUCH EQUIPMENT AT NO ADDITIONAL COST TO THE V.A.
CONTRACTOR WILL ALSO BE RESPONSIBLE FOR ALL ADDITIONAL WORK REQUIRED BY OTHER CONTRACTORS TO MAKE CHANGES WHICH WOULD ALLOW THE EQUIPMENT TO FIT IN THE SPACE AND FUNCTION AS INTENDED. SEE FULL
BASIS OF DESIGN COMPLIANCE PROTOCOLS ON GI001.
23. GENERAL CONTRACTOR MUST FIELD VERIFY SIZES, CAPACITIES, WEIGHTS, ETC. ON ALL EQUIPMENT. DISCREPANCIES FROM THE ORIGINAL BASIS OF DESIGN ON THE DRAWINGS WILL NOT CONSTITUTE A BASIS FOR CHANGE ORDERS.
VERIFY WITH VA/COR FOR ANY AND ALL DISCREPANCIES IF THEY EXIST.
24. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY AND QUALITY OF WORK, AS DETERMIONED BY
THE GOVERNMENT/CO/COR, SHALL BE PROVIDED.
A.O.R. ARCHITECT OF RECORD
E.O.R. ENGINEER OF RECORD
DRAWING SYMBOLS
PL105
DETAIL NUMBER
DRAWING NUMBER WHERE DRAWN
REDUCER OR INCREASER
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
CAPPED OUTLET
STRAINER
FCO FLOOR CLEAN OUT
KITCHEN EQUIPMENT TAG
THERMOSTATIC VALVE (HOT WATER RETURN)
HWR HOT WATER RETURN
S SOIL
HB HOSE BIBB
WALL CLEAN OUT
CRP CHEMICAL RESISTANT PIPE
(E) EXISTING
B.F.F. BELOW FINISHED FLOOR
A/E ARCHITECT / ENGINEER
GW GREASE WASTE PIPE
105TWC TEMPERED WATER CIRCULATION RETURN
105R 105° HOT WATER RETURN
140R 140° HOT WATER RETURN
140HW 105° HOT WATER
HW HOT WATER
G NATURAL GAS
GS GLYCOL SUPPLY
GR GLYCOL RETURN
GV NATURAL GAS VENT
PRESSURE REDUCING VALVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\P -0
.d w g
/8
/2
9:
:3
AM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
PLUMBING - GENERAL NOTES,
ABBREVIATIONS AND SCHEDUELS
JK ME
P-001
STORAGE
B-3
TR
B-3
SEE DETAIL 7
P502
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\P -B
-4
.d w g
2/
/2
6:
:5
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
PLUMBING - BUILDING 01 - BASEMENT
LEVEL - ENLARGED PLAN
JK ME
P-B01-402
NOT ALL KEYNOTES APPLICABLE TO EVERY DRAWING
1. REMOVE EXISTING SANITARY LINE BACK OUT OF ROOM 'B-3' AND CAP OR PLUG AT A POINT WHERE
THERE IS NO DEAD END.
2. EXISTING WATER PIPING - TO REMAIN.
3. EXISTING MEDICAL GAS RISERS - TO REMAIN.
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR
EXCEED FORMER CONDITIONS.
D. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND REINSTALLED IN SAME LOCATION. COORDINATE
WITH OTHER TRADES.
E. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
F. ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED AT 1.5X THE DIAMETER OF BRANCH PIPING. NO DEAD END OR STUBS ARE ALLOWED IN DOMESTIC WATER PIPING. ALL DEAD END
PIPING MUST BE CAPPED.
G. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
H. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
I. ALL ASSOCIATED PIPING SHALL INCLUDE BUT NOT BE LIMITED TO CW, HW, HWC, SANITARY, AND VENT
PIPING.
J. PATCH AND FILL CONCRETE SLAB WHERE DOMESTIC WATER, SANITARY AND VENT PIPING HAVE BEEN
REMOVED OR PLUGGED.
K. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH ARCHITECTURAL
AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS
EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME
REQUIRED TO RECEIVE THE NEW FLOOR FINISHES.
X
X
NOT ALL KEYNOTES APPLICABLE TO EVERY DRAWING
1. PLUG AND CAP EXISTING SANITARY TO REMAIN, LEAVE NO 'DEAD END'.
2. PAN CEILING TO ENCLOSE EXISTING DOMESTIC WATER PIPING.
3. EXISTING MEDICAL GAS RISERS - TO REMAIN. AREA TO BE ENCLOSED WITH CHASE PROVIDED
UNDER GENERAL WORK.
UP
OFFICE
A-19A
(E) V
(E) SA
(E) SA
UP
CLOSET
A-19C
TR
A-19A
A-19D
(E) V
(E) SA
(E) SA
SEE DETAIL7
P502
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\P -B
-4
.d w g
2/
/2
6:
:5
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
PLUMBING - BUILDING 01 - BASEMENT
LEVEL - ENLARGED PLAN
JK ME
P-B01-403
NOT ALL KEYNOTES APPLICABLE TO EVERY DRAWING
1. EXISTING SANITARY & VENT PIPES - TO REMAIN.
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR
EXCEED FORMER CONDITIONS.
D. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND REINSTALLED IN SAME LOCATION. COORDINATE
WITH OTHER TRADES.
E. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
F. ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED AT 1.5X THE DIAMETER OF BRANCH PIPING. NO DEAD END OR STUBS ARE ALLOWED IN DOMESTIC WATER PIPING. ALL DEAD END
PIPING MUST BE CAPPED.
G. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
H. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
I. ALL ASSOCIATED PIPING SHALL INCLUDE BUT NOT BE LIMITED TO CW, HW, HWC, SANITARY, AND VENT
PIPING.
J. PATCH AND FILL CONCRETE SLAB WHERE DOMESTIC WATER, SANITARY AND VENT PIPING HAVE BEEN
REMOVED OR PLUGGED.
K. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH ARCHITECTURAL
AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS
EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME
REQUIRED TO RECEIVE THE NEW FLOOR FINISHES.
X
X
NOT ALL KEYNOTES APPLICABLE TO EVERY DRAWING
1. PAN CEILING TO ENCLOSE EXISTING SANITARY & VENT PIPING.
SOUTH ELEVATOR LOBBY
A-546
PROSTHETICS SERVICE
A-544
V
SA
CW
HW
3 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\P -B
-4
.d w g
/1
3/
0:
:4
AM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
PLUMBING - BUILDING 01 - LEVEL 5 -
ENLARGED PLAN
JK ME
P-B01-451
NOT ALL KEYNOTES APPLICABLE TO EVERY DRAWING
1. REMOVE EXISTING LAVATORY & TRIM.
2. REMOVE PIPING AND FITTING BACK TO MAIN.
3. CAP EXISTING PIPING AT MAIN IN FLOOR, CEILING OR WALL.
4. EXISTING CW. HW, SAN, & VENT. VERIFY EXACT LOCATION IN CEILING.
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR
EXCEED FORMER CONDITIONS.
D. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND REINSTALLED IN SAME LOCATION. COORDINATE
WITH OTHER TRADES.
E. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
F. ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED AT 1.5X THE DIAMETER OF BRANCH PIPING. NO DEAD END OR STUBS ARE ALLOWED IN DOMESTIC WATER PIPING. ALL DEAD END
PIPING MUST BE CAPPED.
G. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
H. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
I. ALL ASSOCIATED PIPING SHALL INCLUDE BUT NOT BE LIMITED TO CW, HW, HWC, SANITARY, AND VENT
PIPING.
J. PATCH AND FILL CONCRETE SLAB WHERE DOMESTIC WATER, SANITARY AND VENT PIPING HAVE BEEN
REMOVED OR PLUGGED.
K. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH ARCHITECTURAL
AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS
EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME
REQUIRED TO RECEIVE THE NEW FLOOR FINISHES.
X
PATIENT TOILET
A-128
PATIENT TOILET
A-129
1 2
1 21 2
1 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\P -B
-4
.d w g
/1
3/
0:
:5
AM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
PLUMBING - BUILDING 02 - LEVEL 1 -
ENLARGED PLAN
JK ME
P-B02-411
NOT ALL KEYNOTES APPLICABLE TO EVERY DRAWING
1. REMOVE EXISTING LAVATORY & TRIM.
2. REMOVE PIPING AND FITTING BACK TO MAIN.
3. CAP EXISTING PIPING AT MAIN IN FLOOR, CEILING OR WALL.
4. EXISTING CW. HW, SAN, & VENT. VERIFY EXACT LOCATION IN CEILING.
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL PLUMBING SERVICE OUTAGES.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR COMPONENTS NOT
SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET OR
EXCEED FORMER CONDITIONS.
D. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED, STORED, AND REINSTALLED IN SAME LOCATION. COORDINATE
WITH OTHER TRADES.
E. ALL PENETRATIONS SHALL BE SEALED WITH FIRE PROOFING.
F. ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED AT 1.5X THE DIAMETER OF BRANCH PIPING. NO DEAD END OR STUBS ARE ALLOWED IN DOMESTIC WATER PIPING. ALL DEAD END
PIPING MUST BE CAPPED.
G. REMOVE ALL ASSOCIATED VALVING, CLAMPS, HANGERS, SUPPORTS, ETC., ASSOCIATED WITH PIPING
REMOVAL.
H. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING NECESSARY TO
PERMIT THE INSTALLATION OF NEW WORK.
I. ALL ASSOCIATED PIPING SHALL INCLUDE BUT NOT BE LIMITED TO CW, HW, HWC, SANITARY, AND VENT
PIPING.
J. PATCH AND FILL CONCRETE SLAB WHERE DOMESTIC WATER, SANITARY AND VENT PIPING HAVE BEEN
REMOVED OR PLUGGED.
K. COORDINATE CONCRETE FLOOR SLAB REMOVAL AND REPLACEMENT WORK WITH ARCHITECTURAL
AND STRUCTURAL REQUIREMENTS. NEW CONCRETE FLOOR SLAB WORK SHALL BE PERFORMED AS
EARLY AS POSSIBLE IN THE PROJECT SCHEDULE TO ALLOW FOR THE PROPER CURING TIME
REQUIRED TO RECEIVE THE NEW FLOOR FINISHES.
X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\M
1.
dw g 2/
/2
4:
:5
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
MECHANICAL - GENERAL NOTES,
SYMBOLS + ABBREVIATIONS
DG RR
M-001
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
DN
A
B
C
D
E
F
1 3 4 5 11 13 16 18 19 21 23 25 26 27 286 8 9
11.1
14 15 17
K
L
M
29 30
G
O
Q
S
T
U
V
P
S.2
S.1
Q.1
U.1
V.1
V.2
W.1
X
Y
8.26.36.2 10.19.3 12.111.23.8
Z.4
4.7 6.1 8.1 11.7
Z.3
Z.2
24 31 32
N
7 222010 12
18B 20B 22B 24B 24C
H
I
J
R
W
Z.1
22D
UPUP
UP
TR
C-20A
C-22
C-23
C-20
1 & 2 M-B01-402
1 & 2 M-B01-401
3 & 4 M-B01-401
TR
A19A A19B
A17F
A19
TR
B3
B3A B20
B13E
CO
-3A
B23B
A19D A19C
ACCU-B1-B3
3.5 TON
MECHANICAL - BUILDING 1 - BASEMENT
LEVEL PLAN
DG RR
M-B01-100
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\M -B
-1
0B .d w g
3/
/2
:1 4:
P
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
1 BUILDING 1 - BASEMENT LEVEL PLAN
NORTH
X MECHANICAL KEY NOTES
1. REMOTE AIR COOLED CONDENSING UNIT (ACCU). PROVIDE
CONCRETE PAD ACCORDING TO DETAILS.
2. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND
REPLACEMENT OF CEILINGS, CEILING TILES AND CEILING GRIDS
ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS.
3. REFRIGERANT PIPING CONTINUED TO DXC-B1-B3. REFER TO SHEET
M-B01-401 FOR CONTINUATION.
B3A B20 B13E
C0-3A
B23B STORAGE
B3
C0-2
WALL MOUNTED
DX SPLIT
CONDENSATE
PUMP
CONDENSATE
PUMP
DUCTED LIEBERT
DX UNIT
EXISTING SUPPLY AND
RETURN DUCTWORK AND
DAMPER TO REMAIN.
BALANCE TO 50CFM.
TR
B3
B3A B20 B13E
C0-3A
B23B
DXC-B1-B3
3.5 TON
12 6
C0-2
LIQ
SUC
3/4" COND
EXISTING SUPPLY AND
RETURN DUCTWORK AND
DAMPER TO REMAIN.
BALANCE TO 50CFM.
REFRIGERANT PIPING
CONTINUED ABOVE CEILING
TO ACCU-B1-B3 OUTDOORS
ON SHEET M-B01-100
3/4" COND TO
NEAREST INDIRECT
WASTE CONNECTION
DXC-B1-B3
A19D
A17F
A19
TR
A19A
A19C
CWC-B1-A19A
6.9 GPM
2 5
(E)2" CHWR
(E)2" CHWS
(E)1" COND
(E) FCU (E) FCU
(E) FAN /
DAMPER
1" CHWS
1" CHWR
3/4" COND
SA
12x12
50 CFM
RELOCATE OR PROVIDE NEW
THERMOSTAT TO CONTROL EXISTING
FAN COIL UNIT TO REMAIN.
CWC-B1-A19A
A17F
A19
A19C
(E)2" CHWR
(E)2" CHWS
(E)1" COND
(E) FCU (E) FCU
(E) FAN /
DAMPER
1 1
3 3
OFFICE
A19A
A. FIELD COORDINATE NEW DECK AND WALL MOUNTED EQUIPMENT TO INCLUDE CHILLED WATER OR DX FAN COIL UNITS, SUSPENDED GRILLES AND DIFFUSERS WITH SPRINKLER HEADS, LIGHTING FIXTURES, IT RACEWAYS, CABLE TRAYS, ELECTRICAL PANELS AND ALL EXISTING TO REMAIN DEVICES. REFER TO ELECTRICAL , FIRE
PROTECTION AND IT DATA DRAWINGS FOR ADDITIONAL INFORMATION AND LOCATIONS .
B. INSULATED COPPER CONDENSATE DRAIN LINES FROM NEW WALL MOUNTED CONDENSATE PUMPS BELOW AC UNITS ARE TO BE ROUTED TO NEAREST INDIRECT WASTE CONNECTION. ( IN MULTIPLE SYSTEM INSTALLATIONS DRAIN LINES FROM EACH UNIT SHALL BE SERVED BY ONE CONDENSATE PUMP AND DRAIN LINE TO NEAREST ABOVE CEILING CORRIDOR CONDENSATE DRAIN LINE, MOP SINK OR FLOOR DRAIN WITH A SINGLE INDEPENDENT CONNECTION FOR ALL INSTALLATION
CONDENSATE LINES TO EXISTING ROOMS).
C. WHERE APPLICABLE DX SPLIT UNITS REQUIRING REFRIGERANT SUCTION (RS) AND LIQUID (RL) LINES FROM EVAPORATOR COIL CONNECTIONS TO REMOTE OUTDOOR AIR COOLED CONDENSING UNITS (ACCU) SEE ROOF AND FULL FLOOR PLANS FOR LOCATIONS AND PIPING ROUTING . SIZE REFRIGERANT PIPING PER MANUFACTURE'S
RECOMMENDATION AND DISTANCE MAXIMUMS.
D. EXISTING COOLING THERMOSTATS AND CONTROL WIRING TO REMAIN ARE TO BE ADJUSTED 10 DEGREES ABOVE NEW AC EQUIPMENT SETPOINTS TO BE USED FOR
EMERGENCY BACK UP.
E. DURING CONSTRUCTION, PROVIDE TEMPORARY CLOSURES ON ALL SUPPLY AND RETURN AIR DUCT OPENINGS BY SEALING WITH A DISPOSABLE POLYETHYLENE SHEETING TO PREVENT CONSTRUCTION DUST FROM ENTERING DUCTWORK SYSTEM OR AIR TERMINAL UNITS.
F. REPAIR AND/OR REPLACE ALL INSULATION AT EXISTING SHEET METAL DUCTWORK WHICH BECOMES DAMAGED DURING CONSTRUCTION ACTIVITIES.
G. ANY DUCTWORK THAT IS EXISTING TO REMAIN, WHETHER OR NOT SHOWN ON THESE DRAWINGS, THAT IS CRUSHED OR DAMAGED IN ITS CURRENT CONDITION OR AS A
RESULT OF CONSTRUCTION, SHALL BE REPLACED WITH NEW.
H. PROVIDE STAINLESS STEEL DRAIN PAN UNDER ALL WATER AND STEAM PIPING RUNNING OVERHEAD IN THE TR ROOMS. DRAIN PAN DISCHARGE SHALL BE ROUTED TO
NEARBY CONDENSATE DRAIN LINE OR NEARBY INDIRECT WASTE CONNECTION.
I. WHERE REFRIGERANT PIPING LEAVES THE BUILDING, IT SHALL EXIT AT APPROXIMATELY 12-18 INCHES ABOVE GRADE.
J. PROVIDE SECURITY BARS IN ALL DUCTWORK AND OPENINGS (EXCLUDING DOORS AND WINDOWS) AT TR (TELECOM ROOM) WALLS WITH A CROSS SECTIONAL AREA
GREATER THAN 96 SQUARE INCHES. THIS INCLUDES ALL NEW AND EXISTING DUCTWORK PENETRATING TR WALLS. DUCTWORK SHOWN AT TR WALLS IN THIS DRAWING
SET MAY NOT REFLECT EXACT SIZE OR QUANTITY AND MUST BE VERIFIED PRIOR TO BID.
GENERAL NOTES
MECHANICAL
DEMOLITION KEY NOTES
1. ALL EXISTING HVAC SYSTEMS, EQUIPMENT, AIR DISTRIBUTION
DUCTWORK, HVAC PIPING PLUMBING PIPING, MEDICAL GAS PIPING
AND CONTROLS SERVING AREAS OUTSIDE OF THIS ROOM TO REMAIN
UNLESS SPECIFICALLY NOTED OTHERWISE.
2. EXISTING GRILLES, REGISTERS AND OPEN ENDED DUCTS TO REMAIN
AS IS.
3. EXISTING CHILLED WATER FAN COIL UNIT, CHILLED WATER PIPING,
RELATED CONTROLS AND CONDENSATE DRAIN PIPING SHALL
REMAIN AS BACK UP SYSTEMS FOR NEW DEDICATED HEAT REMOVAL
AND COOLING IN NEW WORK SCOPE.
4. EXISTING SPLIT SYSTEM DX CASSETTE OR VRF FAN COIL , UNIT
RELATED CONTROLS AND DRAIN PIPING SHALL REMAIN AS BACK UP
SYSTEMS FOR NEW DEDICATED HEAT REMOVAL AND COOLING IN
NEW WORK SCOPE.
5. EXISTING VAV BOX AND RELATED PIPING, DUCTWORK, AIR DEVICES
AND THERMOSTATS TO REMAIN AS BACK UP SYSTEMS FOR NEW
DEDICATED HEAT REMOVAL AND COOLING IN NEW WORK SCOPE.
6. REMOVE EXISTING DIFFUSER, REGISTER, OR GRILL AND DEMOLISH
DUCTWORK BACK TO NEAREST EXISTING MAIN. CAP AND SEAL
DUCTWORK AT MAIN.
7. EXISTING STEAM OR HOT WATER CONVECTIVE HEATING DEVICE TO
REMAIN. PROTECT DURING CONSTRUCTION.
8. EXISTING CHILLED WATER FAN COIL UNIT TO BE REMOVED.
DEMOLISH ALL DUCTWORK, CHILLED WATER SUPPLY AND RETURN
PIPING, CONDENSATE PIPING, ETC. BACK TO MAIN AND CAP.
9. EXISTING DX COOLING EQUIPMENT TO BE REMOVED. DEMOLISH ANY
ASSOCIATED REFRIGERANT LIQUID AND SUCTION LINES,
CONDENSATE PUMPS AND PIPING, AND REMOTE CONDENSING UNITS
WHETHER OR NOT INDICATED ON DRAWINGS.
10. DEMOLISH DUCTWORK SHOWN DASHED AND CAP AT MAIN.
11. DEMOLISH PIPING SHOWN DASHED AND CAP AT MAIN. CONTRACTOR
SHALL LEAVE NO DEAD-LEG PIPING ABANDONED IN PLACE.
12. REMOVE EXISTING VAV BOX AND ALL ASSOCIATED DUCTWORK,
PIPING, INSULATION, HANGERS, CONTROLS, ETC. CAP PIPING AND
DUCTWORK AT NEAREST MAIN.
13. RELOCATE EXISTING FAN COIL UNIT. REROUTE DUCTWORK, EXTEND
PIPING, AND RELOCATE DIFFUSERS AS NECESSARY TO
ACCOMMODATE NEW FAN COIL LOCATION.
14. RELOCATE EXISTING GRILLE. CONTRACTOR SHALL PERFORM
AIRFLOW MEASUREMENT READING ON EXISTING DIFFUSER BEFORE
REMOVING.
15. RELOCATE EXISTING THERMOSTAT INCLUDING ALL ASSOCIATED
CONDUIT, WIRING, PNEUMATIC TUBING, ETC. LOCATED ABOVE ANY
ACCESSIBLE CEILING BETWEEN THERMOSTAT AND THE NEW UNIT IT
CONTROLS. PROVIDE BLANK COVER PLATE OVER ALL ABANDONED
JUNCTION BOXES IN WALLS THAT ARE TO REMAIN.
16. REMOVE EXISTING THERMOSTAT INCLUDING ALL ASSOCIATED
CONDUIT, WIRING, PNEUMATIC TUBING, ETC. LOCATED BETWEEN
THERMOSTAT AND EQUIPMENT IT CONTROLS. PROVIDE BLANK
COVER PLATE OVER ALL ABANDONED JUNCTION BOXES IN WALLS
THAT ARE TO REMAIN.
X
NOT ALL KEYNOTES APPLICABLE TO EVERY DRAWING
X MECHANICAL KEY NOTES
1. WHERE EXISTING CEILINGS ARE REMOVED, EXISTING DIFFUSERS,
GRILLES, HARD AND FLEXIBLE DUCT WHETHER SHOWN OR NOT
SHALL BE SUSPENDED AND SECURED BY THE HVAC CONTRACTOR.
SECURE TO STRUCTURE ABOVE AS PER SMACNA STANDARDS AS
PART OF NEW WORK SCOPE.
2. COORDINATE LOCATION OF CEILING CASSETTE OR FAN COIL UNIT
WITH OTHER DISCIPLINES. AVOID LOCATING EQUIPMENT DIRECTLY
ABOVE TELECOMMUNICATION ROOM (TR) RACKS WHERE POSSIBLE.
3. DX EQUIPMENT REFRIGERANT SUCTION (RS) AND LIQUID (RL) LINES
FROM EVAPORATOR COIL CONNECTIONS TO REMOTE OUTDOOR AIR
COOLED CONDENSING UNITS (ACCU) SEE OVERALL FLOOR PLANS
FOR LOCATIONS AND PIPING ROUTING . SIZE REFRIGERANT PIPING
PER MANUFACTURE'S RECOMMENDATION AND DISTANCE MAXIMUMS.
4. CHILLED WATER WALL MOUNTED DUCT FREE FAN COIL. BOTTOM OF
UNIT MOUNTED TYPICALLY 9'-0" ABOVE FINISHED FLOOR.
5. CHILLED WATER CEILING CASSETTE. BOTTOM OF UNIT MOUNTED
TYPICALLY 9'-0" ABOVE FINISHED FLOOR.
6. DX CEILING CASSETTE. BOTTOM OF UNIT MOUNTED TYPICALLY 9'0"
ABOVE FINISHED FLOOR.
7. REMOTE AIR COOLED CONDENSING UNIT (ACCU). PROVIDE
CONCRETE PAD ACCORDING TO DETAILS.
8. PROVIDE BALANCING DAMPER IN DUCTWORK BALANCED TO 50 CFM
(ADJ.) TO PROVIDE PRESSURIZATION AIR TO TR SPACE.
9. PROVIDE WALL MOUNTED DIFFUSER. COORDINATE WITH OTHER
TRADES INCLUDING ELECTRICAL, ARCHITECTURAL, AND ICT FOR
EXACT POSITION AND ELEVATION.
10. ROUTE 6"Ø INSULATED SUPPLY DUCTWORK BACK TO NEAREST LOW
PRESSURE SUPPLY AIR MAIN DUCTWORK BRANCH.
11. PROVIDE SECURITY BARS IN ALL DUCTWORK AND OPENINGS
(EXCLUDING DOORS AND WINDOWS) AT TR (TELECOM ROOM) WALLS
WITH A CROSS SECTIONAL AREA GREATER THAN 96 SQUARE INCHES
TO BE FITTED WITH SECURITY BARS. THIS INCLUDES ALL NEW AND
EXISTING DUCTWORK PENETRATING TR WALLS. DUCTWORK SHOWN
AT TR WALLS IN THIS DRAWING SET MAY NOT REFLECT EXACT SIZE
OR QUANTITY AND MUST BE VERIFIED PRIOR TO BID.
12. NEW LOCATION OF RELOCATED FAN COIL UNIT. EXTENT ASSOCIATED
PIPING, POWER, AND DUCTWORK NEEDED TO ACCOMMODATE NEW
LOCATION.
13. NEW LOCATION OF RELOCATED THERMOSTAT. EXTENT ASSOCIATED
WIRING/TUBING TO NEW LOCATION.
14. NEW LOCATION OF RELOCATED GRILLE. CONTRACTOR SHALL
REINSTALL GRILLE AND DUCTWORK TO MATCH EXISTING SIZE.
BALANCE GRILLE TO MATCH PRE-CONSTRUCTION AIRFLOW READING.
NOT ALL KEYNOTES APPLICABLE TO EVERY DRAWING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
T op ek a
EH
R M
C
1R
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\A ut oC
AD
\M -B
-4
.d w g
3/
/2
1:
:2
PM
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
EHRM INFRASTRUCTURE
UPGRADES
COLMERY O'NEIL VA HEALTH CARE
21-116
Revisions: Date:
www. bancroft-ae.com
3300 Dundee RD.
Northbrook, IL 60062
T: 847.952.9362
35% SCHEMATIC DESIGN SUBMISSION 07-12-22
95% CONSTRUCTION DOCUMENTS SUBMISSION 10-31-23
100% CONSTRUCTION DOCUMENTS SUBMISSION
03/22/2024
12-19-23
Bancroft Project No: 21-116
35% SCHEMATIC DESIGN SUBMISSION R1 09-21-22
35% SUBMITTAL II 06-13-23
65% DESIGN DEVELOPMENT SUBMITTAL 09-12-23
ISSUED FOR BID 12-28-23
ISSUE FOR BID R1 02-28-24
ISSUE FOR BID R2 03-22-24
MECHANICAL - BUILDING 1 - BASEMENT
LEVEL - ENLARGED PLANS
DG RR
M-B01-401
MECHANICAL
ROOM/STORAGE
C-22
ADMINISTRATIVE
OFFICE
C-23
C-20
24x12 RA
24x12 SA
8"Ø SA
EXISTING AHU1
(E)2" STEAM COND
(E)4" MPS
RELOCATE EXISTING
WALL MOUNTED JCI
CONTROL PANEL
TR
C-20A
MECHANICAL
ROOM/STORAGE
C-22
ADMINISTRATIVE
OFFICE
C-23
C-20
CWC-B1-C20A
6.9 GPM
2 5
24x12 RA
24x12 SA
RELOCATE EXISTING
WALL MOUNTED JCI
CONTROL PANEL
EXISTING AHU
(E)2" STEAM COND
(E)4" MPS
1" CHWS
1" CHWR
3/4" COND ROUTED TO
OPEN SITE DRAIN IN
MECHANICAL ROOM
VAV-01
50 CFM
SA
12x12
50 CFM
VAV-01
CWC-B1-C20A
A. FIELD COORDINATE NEW DECK AND WALL MOUNTED EQUIPMENT TO INCLUDE CHILLED WATER OR DX FAN COIL UNITS, SUSPENDED GRILLES AND DIFFUSERS WITH SPRINKLER HEADS, LIGHTING FIXTURES, IT RACEWAYS, CABLE TRAYS, ELECTRICAL PANELS AND ALL EXISTING TO REMAIN DEVICES. REFER TO ELECTRICAL , FIRE
PROTECTION AND IT DATA DRAWINGS FOR ADDITIONAL INFORMATION AND LOCATIONS .
B. INSULATED COPPER CONDENSATE DRAIN LINES FROM NEW WALL MOUNTED CONDENSATE PUMPS BELOW AC UNITS ARE TO BE ROUTED TO NEAREST INDIRECT WASTE CONNECTION. ( IN MULTIPLE SYSTEM INSTALLATIONS DRAIN LINES FROM EACH UNIT SHALL BE SERVED BY ONE CONDENSATE PUMP AND DRAIN LINE TO NEAREST ABOVE CEILING CORRIDOR CONDENSATE DRAIN LINE, MOP SINK OR FLOOR DRAIN WITH A SINGLE INDEPENDENT CONNECTION FOR ALL INSTALLATION
CONDENSATE LINES TO EXISTING ROOMS).
C. WHERE APPLICABLE DX SPLIT UNITS REQUIRING REFRIGERANT SUCTION (RS) AND LIQUID (RL) LINES FROM EVAPORATOR COIL CONNECTIONS TO REMOTE OUTDOOR AIR COOLED CONDENSING UNITS (ACCU) SEE ROOF AND FULL FLOOR PLANS FOR LOCATIONS AND PIPING ROUTING . SIZE REFRIGERANT PIPING PER MANUFACTURE'S
RECOMMENDATION AND DISTANCE MAXIMUMS.
D. EXISTING COOLING THERMOSTATS AND CONTROL WIRING TO REMAIN ARE TO BE ADJUSTED 10 DEGREES ABOVE NEW AC EQUIPMENT SETPOINTS TO BE USED FOR
EMERGENCY BACK UP.
E. DURING CONSTRUCTION, PROVIDE TEMPORARY CLOSURES ON ALL SUPPLY AND RETURN AIR DUCT OPENINGS BY SEALING WITH A DISPOSABLE POLYETHYLENE SHEETING TO PREVENT CONSTRUCTION DUST FROM ENTERING DUCTWORK SYSTEM OR AIR TERMINAL UNITS.
F. REPAIR AND/OR REPLACE ALL INSULATION AT EXISTING SHEET METAL DUCTWORK WHICH BECOMES DAMAGED DURING CONSTRUCTION ACTIVITIES.
G. ANY DUCTWORK THAT IS EXISTING TO REMAIN, WHETHER OR NOT SHOWN ON THESE DRAWINGS, THAT IS CRUSHED OR DAMAGED IN ITS CURRENT CONDITION OR AS A
RESULT OF CONSTRUCTION, SHALL BE REPLACED WITH NEW.
H. PROVIDE STAINLESS STEEL DRAIN PAN UNDER ALL WATER AND STEAM PIPING RUNNING OVERHEAD IN THE TR ROOMS. DRAIN PAN DISCHARGE SHALL BE ROUTED TO
NEARBY CONDENSATE DRAIN LINE OR NEARBY INDIRECT WASTE CONNECTION.
I. WHERE REFRIGERANT PIPING LEAVES THE BUILDING, IT SHALL EXIT AT APPROXIMATELY 12-18 INCHES ABOVE GRADE.
J. PROVIDE SECURITY BARS IN ALL DUCTWORK AND OPENINGS (EXCLUDING DOORS AND WINDOWS) AT TR (TELECOM ROOM) WALLS WITH A CROSS SECTIONAL AREA
GREATER THAN 96 SQUARE INCHES. THIS INCLUDES ALL NEW AND EXISTING DUCTWORK PENETRATING TR WALLS. DUCTWORK SHOWN AT TR WALLS IN THIS DRAWING
SET MAY NOT REFLECT EXACT SIZE OR QUANTITY AND MUST BE VERIFIED PRIOR TO BID.
GENERAL NOTES
MECHANICAL
DEMOLITION KEY NOTES
1. ALL EXISTING HVAC SYSTEMS, EQUIPMENT, AIR DISTRIBUTION
DUCTWORK, HVAC PIPING PLUMBING PIPING, MEDICAL GAS PIPING
AND CONTROLS SERVING AREAS OUTSIDE OF THIS ROOM TO REMAIN
UNLESS SPECIFICALLY NOTED OTHERWISE.
2. EXISTING GRILLES, REGISTERS AND OPEN ENDED DUCTS TO REMAIN
AS IS.
3. EXISTING CHILLED WATER FAN COIL UNIT, CHILLED WATER PIPING,
RELATED CONTROLS AND CONDENSATE DRAIN PIPING SHALL
REMAIN AS BACK UP SYSTEMS FOR NEW DEDICATED HEAT REMOVAL
AND COOLING IN NEW WORK SCOPE.
4. EXISTING SPLIT SYSTEM DX CASSETTE OR VRF FAN COIL , UNIT
RELATED CONTROLS AND DRAIN PIPING SHALL REMAIN AS BACK UP
SYSTEMS FOR NEW DEDICATED HEAT REMOVAL AND COOLING IN
NEW WORK SCOPE.
5. EXISTING VAV BOX AND RELATED PIPING, DUCTWORK, AIR DEVICES
AND THERMOSTATS TO REMAIN AS BACK UP SYSTEMS FOR NEW
DEDICATED HEAT REMOVAL AND COOLING IN NEW WORK SCOPE.
6. REMOVE EXISTING DIFFUSER, REGISTER, OR GRILL AND DEMOLISH
DUCTWORK BACK TO NEAREST EXISTING MAIN. CAP AND SEAL
DUCTWORK AT MAIN.
7. EXISTING STEAM OR HOT WATER CONVECTIVE HEATING DEVICE TO
REMAIN. PROTECT DURING CONSTRUCTION.
8. EXISTING CHILLED WATER FAN COIL UNIT TO BE REMOVED.
DEMOLISH ALL DUCTWORK, CHILLED WATER SUPPLY AND RETURN
PIPING, CONDENSATE PIPING, ETC. BACK TO MAIN AND CAP.
9. EXISTING DX COOLING EQUIPMENT TO BE REMOVED. DEMOLISH ANY
ASSOCIATED REFRIGERANT LIQUID AND SUCTION LINES,
CONDENSATE PUMPS AND PIPING, AND REMOTE CONDENSING UNITS
WHETHER OR NOT INDICATED ON DRAWINGS.
10. DEMOLISH DUCTWORK SHOWN DASHED AND CAP AT MAIN.
11. DEMOLISH PIPING SHOWN DASHED AND CAP AT MAIN. CONTRACTOR
SHALL LEAVE NO DEAD-LEG PIPING ABANDONED IN PLACE.
12. REMOVE EXISTING VAV BOX AND ALL ASSOCIATED DUCTWORK,
PIPING, INSULATION, HANGERS, CONTROLS, ETC. CAP PIPING AND
DUCTWORK AT NEAREST MAIN.
13. RELOCATE EXISTING FAN COIL UNIT. REROUTE DUCTWORK, EXTEND
PIPING, AND RELOCATE DIFFUSERS AS NECESSARY TO
ACCOMMODATE NEW FAN COIL LOCATION.
14. RELOCATE EXISTING GRILLE. CONTRACTOR SHALL PERFORM
AIRFLOW MEASUREMENT READING ON EXISTING DIFFUSER BEFORE
REMOVING.
15. RELOCATE EXISTING THERMOSTAT INCLUDING ALL ASSOCIATED
CONDUIT, WIRING, PNEUMATIC TUBING, ETC. LOCATED ABOVE ANY
ACCESSIBLE CEILING BETWEEN THERMOSTAT AND THE NEW UNIT IT
CONTROLS. PROVIDE BLANK COVER PLATE OVER ALL ABANDONED
JUNCTION BOXES IN WALLS THAT ARE TO REMAIN.
16. REMOVE EXISTING THERMOSTAT INCLUDING ALL ASSOCIATED
CONDUIT, WIRING, PNEUMATIC TUBING, ETC. LOCATED BETWEEN
THERMOSTAT AND EQUIPMENT IT CONTROLS. PROVIDE BLANK
COVER PLATE OVER ALL ABANDONED JUNCTION BOXES IN WALLS
THAT ARE TO REMAIN.
X
NOT ALL KEYNOTES APPLICABLE TO EVERY DRAWING
X MECHANICAL KEY NOTES
1. WHERE EXISTING CEILINGS ARE REMOVED, EXISTING DIFFUSERS,
GRILLES, HARD AND FLEXIBLE DUCT WHETHER SHOWN OR NOT
SHALL BE SUSPENDED AND SECURED BY THE HVAC CONTRACTOR.
SECURE TO STRUCTURE ABOVE AS PER SMACNA STANDARDS AS
PART OF NEW WORK SCOPE.
2. COORDINATE LOCATION OF CEILING CASSETTE OR FAN COIL UNIT
WITH OTHER DISCIPLINES. AVOID LOCATING EQUIPMENT DIRECTLY
ABOVE TELECOMMUNICATION ROOM (TR) RACKS WHERE POSSIBLE.
3. DX EQUIPMENT REFRIGERANT SUCTION (RS) AND LIQUID (RL) LINES
FROM EVAPORATOR COIL CONNECTIONS TO REMOTE OUTDOOR AIR
COOLED CONDENSING UNITS (ACCU) SEE OVERALL FLOOR PLANS
FOR LOCATIONS AND PIPING ROUTING . SIZE REFRIGERANT PIPING
PER MANUFACTURE'S RECOMMENDATION AND DISTANCE MAXIMUMS.
4. CHILLED WATER WALL MOUNTED DUCT FREE FAN COIL. BOTTOM OF
UNIT MOUNTED TYPICALLY 9'-0" ABOVE FINISHED FLOOR.
5. CHILLED WATER CEILING CASSETTE. BOTTOM OF UNIT MOUNTED
TYPICALLY 9'-0" ABOVE FINISHED FLOOR.
6. DX CEILING CASSETTE. BOTTOM OF UNIT MOUNTED TYPICALLY 9'0"
ABOVE FINISHED FLOOR.
7. REMOTE AIR COOLED CONDENSING UNIT (ACCU). PROVIDE
CONCRETE PAD ACCORDING TO DETAILS.
8. PROVIDE BALANCING DAMPER IN DUCTWORK BALANCED TO 50 CFM
(ADJ.) TO PROVIDE PRESSURIZATION AIR TO TR SPACE.
9. PROVIDE WALL MOUNTED DIFFUSER. COORDINATE WITH OTHER
TRADES INCLUDING ELECTRICAL, ARCHITECTURAL, AND ICT FOR
EXACT POSITION AND ELEVATION.
10. ROUTE 6"Ø INSULATED SUPPLY DUCTWORK BACK TO NEAREST LOW
PRESSURE SUPPLY AIR MAIN DUCTWORK BRANCH.
11. PROVIDE SECURITY BARS IN ALL DUCTWORK AND OPENINGS
(EXCLUDING DOORS AND WINDOWS) AT TR (TELECOM ROOM) WALLS
WITH A CROSS SECTIONAL AREA GREATER THAN 96 SQUARE INCHES
TO BE FITTED WITH SECURITY BARS. THIS INCLUDES ALL NEW AND
EXISTING DUCTWORK PENETRATING TR WALLS. DUCTWORK SHOWN
AT TR WALLS IN THIS DRAWING SET MAY NOT REFLECT EXACT SIZE
OR QUANTITY AND MUST BE VERIFIED PRIOR TO BID.
12. NEW LOCATION OF RELOCATED FAN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .